CN103593720A - 基于灰色层次分析法建立的城市电网规划综合评价体系 - Google Patents

基于灰色层次分析法建立的城市电网规划综合评价体系 Download PDF

Info

Publication number
CN103593720A
CN103593720A CN201210286796.2A CN201210286796A CN103593720A CN 103593720 A CN103593720 A CN 103593720A CN 201210286796 A CN201210286796 A CN 201210286796A CN 103593720 A CN103593720 A CN 103593720A
Authority
CN
China
Prior art keywords
power network
network planning
hierarchy process
expert
analytic hierarchy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201210286796.2A
Other languages
English (en)
Inventor
但春林
封长林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XI'AN YUANSHUO SCIENCE & TECHNOLOGY Co Ltd
Original Assignee
XI'AN YUANSHUO SCIENCE & TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XI'AN YUANSHUO SCIENCE & TECHNOLOGY Co Ltd filed Critical XI'AN YUANSHUO SCIENCE & TECHNOLOGY Co Ltd
Priority to CN201210286796.2A priority Critical patent/CN103593720A/zh
Publication of CN103593720A publication Critical patent/CN103593720A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明开发了基于灰色层次分析法建立的城市电网规划综合评价体系。这一体系首先应用德尔菲专家咨询法确定影响电网规划的主要因素,并结合层次分析法的基本思想构成一个包括儿个层次的完整的电网规划评价指标体系;再应用层次分析法分别计算体系末端的属性的权重;其次,选取多名专家对电网规划方案关于体系末端属性进行打分,再应用灰色关联分析理论计算专家关于电网规划方案的评分值,并在此基础上,应用熵权法确定所选专家的权重系数;最后应用加权法获得电网规划方案的综合的、整体的评分值。综合评分值越高说明电网规划方案越好,即规划后的电网在适应性、安全性、经济性和环境性这4个方面都达到了较高的水平。

Description

基于灰色层次分析法建立的城市电网规划综合评价体系
技术领域
本发明属于电网规划技术领域,具体涉及到基于灰色层次分析法建立的城市电网规划综合评价体系。
背景技术
城市电网规划一方面是城市总体发展规划的重要组成部分,另一方面是城市电网更新改造的依据。随着城市电网建设的大规模开展,出现了一系列急需解决的问题。目前的电网规划评价方法主要侧重于对电网的适应性、安全性及经济性等指标进行了评价,而忽略了电网规划的环境影响因素。在国家大力提倡经济与社会和谐发展、可持续发展的今天,环境影响因素在电网规划中将越来越受到关注。
层次分析法是建立在系统理论基础上的一种解决实际问题的方法,是定性与定量相结合的权重确定方法,可以使各因素的赋值更加科学、合理,较好地反映了各因素对电网规划项目效果的重要程度。熵权是一种客观赋权法,熵是系统无序程度的独立,其思想为:权重系数应该是各个指标在指标总体中关于不确定性的度量,赋权的原始信息来源于指标所提供的信息量的大小。
灰色关联分析理论是邓聚龙教授针对少数据不确定性系统创立的属于系统工程,而污水处理工艺的选择也属于系统工程范畴,因此,本发明以灰色关联分析理论作为城市电网规划方案的评价工具,可以从系统工程的角度,实现对城市电网规划方案的良好评价。
结合这三种方法的优点,研究开发了基于灰色层次分析法的城市电网规划综合评价体系,科学合理地确定城市电网规划方案。
发明内容
本发明的目的是以多属性评价为手段,从电网的适应性、安全性、经济性和环境适应性这4个方面对电网规划方案进行量化分析,为电网规划提供理论依据。
为了上述目的,本发明采用的技术方案如下:
(1)建立评价指标体系
收集相关文献,确定影响电网规划所有因素,组织多名专家采用德尔菲专家咨询法确就预测的问题向专家征求意见,之后,进行整理、归纳、统计,将统计结果再匿名发给各专家,再次征求意见,再集中,再反馈,直至得到稳定的意见。应用层次分析法的基本思想,对这些影响电网规划的主要因素进行归类分析,并建立具有多层次的电网规划综合评价指标体系。
(2)应用层次分析法确定评价指标的权重系数。
层次分析法的思想是首先通过建立清晰的层次结构来分解复杂问题,其次引入测度理论,通过两两比较,用相对标度将人的判断标量化,并逐层建立判断矩阵,然后求解判断矩阵的权重。针对电网规划综合评价指标体系的层次结构,首先采用层次分析法确定中间层中各个指标的权重,不妨设第t个指标的权重为λt,t=1,2,3,4;再应用层次分析法确定准则层中第t个指标下属的子指标的权重,不妨记为
Figure BSA00000762991100021
t=1,2,3,4,p=1,2,…,nt;最后体系中第三层的指标权重为:
Figure BSA00000762991100022
为了方便起见,不妨记为wj,其中
Figure BSA00000762991100023
(3)建立评分矩阵
组织l名专家,采用百分制对m个规划方案关于n个单项指标进行评分,根据每个专家的评分结果,建立属性矩阵
Figure BSA00000762991100024
其中i表示电网规划方案,j表示评价指标,k表示专家。应用灰色关联分析理论确定第k个专家关于第i个规划方案的值yik,构造评分矩阵Y=(yik)m×l,具体算法如下:
1)确定参考序列和比较序列
出属性矩阵
Figure BSA00000762991100025
可知,比较序列为第i个电网规划方案中所有指标评分值构成的向量,即:
x i k = ( x i k ( 1 ) , x i k ( 2 ) , . . . , x i k ( n ) )
其中
Figure BSA00000762991100028
由于采用百分制进行评分,则参考序列x0为:
Figure BSA00000762991100029
2)计算参考序列和比较序列的关联系数γ(x0(j),x1(j)),其中ξ∈(0,1]。
γ ( x 0 ( j ) , x i k ( j ) ) = min i min j | x 0 ( j ) - x i k ( j ) | + ξ max i max j | x 0 ( j ) - x i k ( j ) | | x 0 ( j ) - x i k ( j ) | + ξ max i max j | x 0 ( j ) - x i k ( j ) |
3)计算参考序列和比较序列的关联度yik,即:
y ik = Σ j = 1 n w j · γ ( x 0 ( j ) , x i k ( j ) )
(4)计算专家权重
根据不同专家关于各个电网规划方案的关联度,构造评分矩阵Y=(yik)m×l,并应用熵权法确定专家的权重系数,其中熵权法的具体计算过程如下:
1)确定第k个专家的熵为:
H k = - 1 ln m Σ i = 1 m f ik ln f ik ,
f ik = 1 + y ik Σ i = 1 m ( 1 + y ik )
2)根据第k个专家的熵值,得到第k个专家的熵权rk,即:
r k = 1 - H k l - Σ k = 1 l H k .
(5)综合评分值
对各个电网规划方案进行综合评分,其中第i个电网规划方案的评分公式为:
result i = Σ k = 1 l r k · y ik .
综合评分值越高表明电网规划方案的整体情况越好,即规划后的电网在适应性、安全性、经济性和环境性这4个方面都达到了较高的水平。
本发明与现有技术相比主要的特点如下:
(1)本发明考虑了环境对电网规划的影响,较其他电网规划评价指标体系更加全面。
(2)本发明考虑到专家由于专业水平、经验等方面的程度不同,看待电网规划方案的深度不同,采用熵权法确定专家权重,比其他技术的评价结果更加准确。
(3)本发明建立的决策方法概念清晰、直观、计算过程简单,易于计算机编程。
附图说明
图1是本发明的建立流程;
图2是本发明中关于电网规划的综合评价指标体系结构。
具体实施方式
参照图1,本发明的具体过程包括:
(1)指标确定和评价指标体系的建立
采用德尔菲咨询法确定影响电网规划的主要因素,并将这些主要因素进行归类,结合层次分析法的基本思想,建立综合评价指标体系如附图2。附图2所述的层次结构是将电网规划综合评价的目标进行逐层分解归并而建立的,分为3个层次,其中最上层为目标层,中间为准则层(包括:社会效益、技术性能、经济效益和环境协调性),第三层为指标层,它们是中间层的子指标,具体关系见附图2.
(2)应用层次分析法确定单个指标的总权重
表1为单个指标的总权重系数。
表1单个指标的总权重系数
Figure BSA00000762991100041
Figure BSA00000762991100051
(3)建立评分矩阵
假设现在有三个电网规划方案,组织3名专家对三个方案进行评分,构造属性矩阵Xk,k=1,2,3,见表2。
表2属性矩阵
  X1  方1   方2  方3   X2  方1   方2  方3   X3  方1   方2  方3
  项目技术进步  100   100  98  98   100  97  99   100  96
  对地区经济影响  98   97  95  89   98  80  89   98  89
  供电可靠率  96   94  87  91   96  89  96   99  87
  系统暂态稳定性  95   92  88  96   98  77  91   98  69
  N-1校验  94   90  80  95   95  86  78   97  79
  容载比  98   96  83  97   96  93  84   89  76
  线损率  91   90  84  94   97  91  92   87  68
  财务水平  94   93  85  95   98  89  89   90  88
  投资效益  83   84  90  90   87  76  89   95  78
  年费用  85   83  82  87   90  79  89   90  70
  抗电磁干扰  60   75  80  75   89  80  90   98  87
  抗无线电干扰  65   80  85  68   87  67  70   81  50
  抗噪声干扰  70   72  85  81   88  80  68   87  65
  市政设施配合  75   75  83  69   81  80  87   89  50
  其他  68   78  86  70   78  68  50   80  50
取参考序列
Figure BSA00000762991100061
结合表2中的数据,应用灰色关联分析分别计算3位专家关于3个方案的关联度
Figure BSA00000762991100062
即为3为专家关于3个方案的评分结果,具体结果见表3:
表3 3位专家对3种方案的评分结果
  方案1   方案2   方案3
 专家1   0.7395   0.7306   0.6756
 专家2   0.6852   0.7991   0.5912
 专家3   0.7446   0.8486   0.6073
从表3可以看出,专家1与专家2、3关于方案的评价结果不一致,其原因在于三位专家对电网规划各个指标的理解不同导致的,这就需要进一步确定三位专家的权重系数。
(4)确定专家权重系数
采用熵权法确定专家的权重系数rk,k=1,2,3,其中r1=0.3265,r2=0.2994,r3=0.3741。
(5)确定3个方案的最终评分值,见表4.
表4 3个方案的最终评分值
  方案1   方案2   方案3
  最终值   0.7251   0.7953   0.6248
结果分析:根据最终评分值可知,电网规划方案的优劣排序为:方案2>方案1>方案3.这与实际情况相符。

Claims (5)

1.基于灰色层次分析法建立的城市电网规划综合评价体系,其步骤如下:
(1)应用德尔菲专家咨询法建立电网规划综合评价指标体系;
(2)应用层次分析法确定单项指标权重;
(3)应用灰色关联分析理论计算单个专家关于各个电网规划方案的评分值。
(4)应用熵权法确定专家的权重,并结合单个专家关于各个电网规划方案的评分值,计算各个电网规划方案的综合评分值。
2.根据权利要求1所述的基于灰色层次分析法建立的城市电网规划综合评价体系,其特征在于应用德尔菲专家咨询法确定电网规划的影响因素。
3.根据权利要求1所述的基于灰色层次分析法建立的城市电网规划综合评价体系,其特征在于采用层次分析法的基本思想建立电网规划综合评价体系;并应用层次分析法确定各个层次指标的权重,并应用乘积法将确定指标体系末端的属性权重。
4.根据权利要求1所述的基于灰色层次分析法建立的城市电网规划综合评价体系,其特征在于采用灰色关联分析理论确定各个电网规划方案的综合评分值。
5.根据权利要求1所述的基于灰色层次分析法建立的城市电网规划综合评价体系,其特征在于采用了熵权法。由于各个专家的知识水平、专业深度等方面的不同,需要计算各个专家的权重系数。本发明通过专家对各个电网规划方案中关于单项指标的评分情况,应用熵权法计算专家权重,最后采用加权法确定各个电网规划方案关于单项指标的评分向量。
CN201210286796.2A 2012-08-13 2012-08-13 基于灰色层次分析法建立的城市电网规划综合评价体系 Pending CN103593720A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210286796.2A CN103593720A (zh) 2012-08-13 2012-08-13 基于灰色层次分析法建立的城市电网规划综合评价体系

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210286796.2A CN103593720A (zh) 2012-08-13 2012-08-13 基于灰色层次分析法建立的城市电网规划综合评价体系

Publications (1)

Publication Number Publication Date
CN103593720A true CN103593720A (zh) 2014-02-19

Family

ID=50083850

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210286796.2A Pending CN103593720A (zh) 2012-08-13 2012-08-13 基于灰色层次分析法建立的城市电网规划综合评价体系

Country Status (1)

Country Link
CN (1) CN103593720A (zh)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104331628A (zh) * 2014-11-17 2015-02-04 国网河南省电力公司 电网安全性综合指标评价方法
CN104915897A (zh) * 2015-06-24 2015-09-16 国家电网公司 一种电网规划评价业务的计算机实现方法
CN105023067A (zh) * 2015-08-04 2015-11-04 环境保护部南京环境科学研究所 基于层次分析法-模糊综合评价的化工项目环境风险评价体系
CN105205341A (zh) * 2015-10-27 2015-12-30 国网福建省电力有限公司 一种基于客户诉求的电力配网改造需求模型构建方法
CN105243255A (zh) * 2015-08-11 2016-01-13 北华航天工业学院 一种软基处理方案的评价方法
CN105761161A (zh) * 2015-12-21 2016-07-13 国家电网公司 一种交直流配电网供电模式评价方法
CN106056307A (zh) * 2016-06-14 2016-10-26 中国电力科学研究院 一种基于综合赋权法的电能替代技术综合效益评估方法
CN106845763A (zh) * 2016-12-13 2017-06-13 全球能源互联网研究院 一种电网可靠性分析方法和装置
CN107239900A (zh) * 2017-06-01 2017-10-10 陕西学前师范学院 基于可拓云模型的本科毕业论文质量评价方法
CN108335053A (zh) * 2018-03-08 2018-07-27 中国人民解放军61489部队 一种应用研究型军事科研课题立项评价方法
CN108446563A (zh) * 2018-02-09 2018-08-24 桂林电子科技大学 一种基于模糊层次分析法的ics信息安全评估方法
CN110210740A (zh) * 2019-05-22 2019-09-06 广西电网有限责任公司电力科学研究院 一种考虑供电质量的配电网可靠性评估方法
CN116050945A (zh) * 2023-03-29 2023-05-02 国网山东省电力公司菏泽供电公司 一种用于配电网末端低压台区降损分析评价系统及方法

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104331628A (zh) * 2014-11-17 2015-02-04 国网河南省电力公司 电网安全性综合指标评价方法
CN104915897A (zh) * 2015-06-24 2015-09-16 国家电网公司 一种电网规划评价业务的计算机实现方法
CN104915897B (zh) * 2015-06-24 2018-10-19 国家电网公司 一种电网规划评价业务的计算机实现方法
CN105023067A (zh) * 2015-08-04 2015-11-04 环境保护部南京环境科学研究所 基于层次分析法-模糊综合评价的化工项目环境风险评价体系
CN105243255A (zh) * 2015-08-11 2016-01-13 北华航天工业学院 一种软基处理方案的评价方法
CN105205341A (zh) * 2015-10-27 2015-12-30 国网福建省电力有限公司 一种基于客户诉求的电力配网改造需求模型构建方法
CN105205341B (zh) * 2015-10-27 2018-02-09 国网福建省电力有限公司 一种基于客户诉求的电力配网改造需求模型构建方法
CN105761161A (zh) * 2015-12-21 2016-07-13 国家电网公司 一种交直流配电网供电模式评价方法
CN106056307A (zh) * 2016-06-14 2016-10-26 中国电力科学研究院 一种基于综合赋权法的电能替代技术综合效益评估方法
CN106845763A (zh) * 2016-12-13 2017-06-13 全球能源互联网研究院 一种电网可靠性分析方法和装置
CN106845763B (zh) * 2016-12-13 2020-09-08 全球能源互联网研究院有限公司 一种电网可靠性分析方法和装置
CN107239900A (zh) * 2017-06-01 2017-10-10 陕西学前师范学院 基于可拓云模型的本科毕业论文质量评价方法
CN108446563A (zh) * 2018-02-09 2018-08-24 桂林电子科技大学 一种基于模糊层次分析法的ics信息安全评估方法
CN108335053A (zh) * 2018-03-08 2018-07-27 中国人民解放军61489部队 一种应用研究型军事科研课题立项评价方法
CN110210740A (zh) * 2019-05-22 2019-09-06 广西电网有限责任公司电力科学研究院 一种考虑供电质量的配电网可靠性评估方法
CN110210740B (zh) * 2019-05-22 2023-09-15 广西电网有限责任公司电力科学研究院 一种考虑供电质量的配电网可靠性评估方法
CN116050945A (zh) * 2023-03-29 2023-05-02 国网山东省电力公司菏泽供电公司 一种用于配电网末端低压台区降损分析评价系统及方法
CN116050945B (zh) * 2023-03-29 2023-07-25 国网山东省电力公司菏泽供电公司 一种用于配电网末端低压台区降损分析评价系统及方法

Similar Documents

Publication Publication Date Title
CN103593720A (zh) 基于灰色层次分析法建立的城市电网规划综合评价体系
Gul et al. A state of the art literature review of VIKOR and its fuzzy extensions on applications
Subedi et al. Application of a hybrid cellular automaton–Markov (CA-Markov) model in land-use change prediction: a case study of Saddle Creek Drainage Basin, Florida
Jablonsky Efficiency analysis in multi-period systems: an application to performance evaluation in Czech higher education
He et al. Comprehensive evaluation of regional clean energy development levels based on principal component analysis and rough set theory
Colbert et al. Determining the relative efficiency of MBA programs using DEA
Puška et al. Model for investment decision making by applying the multi-criteria analysis method
CN103065042B (zh) 基于情景的多目标综合决策评价方法
CN107169633A (zh) 一种输气管网、储气库调峰方案综合评价方法
CN103632203A (zh) 一种基于综合评价的配电网供电区域划分方法
CN105678403A (zh) 一种基于模型族分解与集成技术的区域饱和负荷预测方法
Chou et al. Establishing expert system for prediction based on the project-oriented data warehouse
Batkovskiy et al. Models of Economic Evaluation of High-Tech Products
CN104504280A (zh) 考虑规划需求的电动汽车充电桩集群管理系统通信方式综合评价方法
CN103700030A (zh) 基于灰色粗糙集的电网建设项目后评价指标赋权方法
CN103853939A (zh) 一种基于社会经济因素影响的电力系统月度负荷的组合预测方法
Foliente et al. Modelling building stock energy use and carbon emission scenarios
Bucur et al. Insights into energy indicators analytics towards European green energy transition using statistics and self-organizing maps
Shakouri G et al. Selection of the best ARMAX model for forecasting energy demand: case study of the residential and commercial sectors in Iran
Slavinskaite et al. Financial innovation management: Impact of fiscal decentralization on economic growth of the Baltic countries
CN103164619A (zh) 基于最佳鉴别准则的变电站接地网腐蚀率模式识别方法
Zhao et al. LandSys II: Agent-based land use–forecast model with artificial neural networks and multiagent model
CN102880753B (zh) 基于分形维数的土地利用空间特征尺度转换方法
CN117114176A (zh) 基于数据分析和机器学习的土地利用变化预测方法及系统
Mrówczyńska et al. Research on energy consumption in the city. A system of modelling potential for energy effectiveness using artificial intelligence

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
DD01 Delivery of document by public notice

Addressee: XI'AN YUANSHUO SCIENCE & TECHNOLOGY CO., LTD.

Document name: Notification of Publication of the Application for Invention

DD01 Delivery of document by public notice

Addressee: XI'AN YUANSHUO SCIENCE & TECHNOLOGY CO., LTD.

Document name: Notification of before Expiration of Request of Examination as to Substance

DD01 Delivery of document by public notice

Addressee: XI'AN YUANSHUO SCIENCE & TECHNOLOGY CO., LTD.

Document name: Notification that Application Deemed to be Withdrawn

C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20140219