The blower foundation of build-in in rock foundation
Technical field
The present invention relates to the blower foundation of a kind of build-in in rock foundation.
Background technology
Blower fan is that China is called for short the custom of gas compression and gas conveying machinery, and usually said blower fan comprises ventilation fan, blast fan, wind-driven generator.The blower foundation the present invention relates to refers in particular to wind driven generator base.
Wind-driven generator need to adopt blower foundation to be fixed on large ground, and the blower foundation that is arranged at present rock foundation mostly adopts expanded type reinforced concrete foundation.Stable in order to ensure blower foundation, avoid basis to come to nothing, sole plate size is larger.The blower fan of general single-machine capacity 2MW, hub height 80m, sole plate diameter reaches about 20m, the about 500m of concrete needing
3.Along with wind-powered electricity generation single-machine capacity constantly increases, the size on expanded type basis will continue to increase.Will bring following problem thus:
(1) the permanent floor space of blower foundation is large, increases and builds expropriation of land difficulty;
(2) difficulty of construction is large, and the disposable continuous pouring engineering time is long, generally over 14 hours;
(3) construction quality is difficult to control, and during winter construction of mass concrete, the heat of hydration, cushion cap be outside, and to produce the phenomenons such as temperature difference crack be all in work progress, to be difficult to the difficult problem avoiding and be difficult to deal carefully with;
(4) the concrete work consumption of blower foundation is large, increase of investment.
Summary of the invention
The shortcoming of prior art in view of the above, the object of the present invention is to provide the blower foundation of a kind of build-in in rock foundation, for solving the problem that prior art blower foundation floor space is large, concrete work consumption is large, difficulty of construction is large and construction quality is restive.
For achieving the above object and other relevant objects, the invention provides the blower foundation of a kind of build-in in rock foundation, comprise a foundation ditch on rock foundation, the cross-sectional area of foundation ditch progressively reduces from top to bottom; In foundation ditch, build steel concrete and form reinforced concrete body; It also comprises blower foundation ring, and the axis of blower foundation ring is positioned at vertical direction, and the bottom of blower foundation ring is embedded in reinforced concrete body.
Excavate the foundation ditch that cross-sectional area progressively reduces from top to bottom, then build steel concrete, make reinforced concrete body and rock foundation build-in form integral body, jointly stressed, structural safety is reliable; Due to foundation ditch from top to bottom cross-sectional area progressively reduce, reduced concrete amount and floor space.
Preferably, blower foundation ring by they sup-port the bottom at foundation ditch.
Preferably, the bottom of foundation ditch is provided with one deck plain concrete cushion layer.
Preferably, reinforced concrete body comprise with rock foundation build under all-in-one-piece, water building body and with under water building body and build fixed body on all-in-one-piece, under water the upper surface elevation of building body lower than the surperficial elevation of rock foundation, the soffit area of upper fixed body is less than down the upper surface area of watering building body, and the upper surface elevation of upper fixed body is higher than the surperficial elevation of rock foundation.Further preferred, under water the backfill formation backfill soil body in the space that the inner surface of the upper surface of building body, the side of upper fixed body and foundation ditch forms, the upper surface of the backfill soil body and the surface of rock foundation are positioned in same level.The backfill soil body covers on reinforced concrete body, played as the effect of whole blower foundation ballast, and to the protection of blower foundation be convenient to green manure.
Preferably, the inner surface of foundation ditch is that upper periphery diameter is greater than the round table-like of lower periphery diameter.Further preferred, the excavation slope of foundation ditch is slope.The foundation ditch of this shape is convenient to operation in excavation of foundation pit and foundation ditch.
As mentioned above, the blower foundation of build-in of the present invention in rock foundation, has following beneficial effect:
The blower foundation of this build-in in rock foundation, structural safety is reliable, saves land area, and concrete amount is little, has had significantly and reduce in construction costs; And construction technology is simple, only need to change the planform of the reinforced concrete body in blower foundation, do not need to increase other operation.
Accompanying drawing explanation
Fig. 1 is shown as the structural representation of the blower foundation of build-in of the present invention in rock foundation.
Fig. 2 is shown as the top view of the blower foundation of the build-in shown in Fig. 1 in rock foundation.
Element numbers explanation
1 rock foundation
2 foundation ditches
3 reinforced concrete bodies
Water building body 31 times
Fixed body on 32
4 blower foundation rings
5 support bars
6 plain concrete cushion layer
The 7 backfill soil bodys
The specific embodiment
By particular specific embodiment explanation embodiments of the present invention, person skilled in the art scholar can understand other advantages of the present invention and effect easily by the disclosed content of this manual below.
Refer to Fig. 1 to Fig. 2.Notice, appended graphic the illustrated structure of this manual, ratio, size etc., equal contents in order to coordinate manual to disclose only, for person skilled in the art scholar, understand and read, not in order to limit the enforceable qualifications of the present invention, therefore the technical essential meaning of tool not, the adjustment of the modification of any structure, the change of proportionate relationship or size, not affecting under the effect that the present invention can produce and the object that can reach, all should still drop on disclosed technology contents and obtain in the scope that can contain.Simultaneously, in this manual, quote as " on ", the term of D score, " left side ", " right side ", " centre " and " " etc., also only for ease of understanding of narrating, but not in order to limit the enforceable scope of the present invention, the change of its relativeness or adjustment, under without essence change technology contents, when being also considered as the enforceable category of the present invention.
As depicted in figs. 1 and 2, the invention provides the blower foundation of a kind of build-in in rock foundation, comprise a foundation ditch 2 on rock foundation 1, the cross-sectional area of foundation ditch 2 progressively reduces from top to bottom; In foundation ditch 2, build steel concrete and form reinforced concrete body 3; It also comprises blower foundation ring 4, and the axis of blower foundation ring 4 is positioned at vertical direction, and the bottom of blower foundation ring 4 is embedded in reinforced concrete body 3.
Excavate the foundation ditch 2 that cross-sectional area progressively reduces from top to bottom, then build steel concrete, make reinforced concrete body 3 and rock foundation 1 build-in shape in aggregates, jointly stressed, structural safety is reliable; Due to foundation ditch 2 from top to bottom cross-sectional area progressively reduce, reduced concrete amount and floor space.
Blower foundation ring 4 is supported on the bottom of foundation ditch 2 by support bar 5.The bottom of foundation ditch 2 is provided with one deck plain concrete cushion layer 6.Reinforced concrete body 3 comprise with rock foundation 1 build under all-in-one-piece, water building body 31 and with under water building body 31 and build fixed body 32 on all-in-one-piece, under water the upper surface elevation of building body 31 lower than the surperficial elevation of rock foundation 1, the soffit area of upper fixed body 32 is less than down the upper surface area of watering building body 31, and the upper surface elevation of upper fixed body 32 is higher than the surperficial elevation of rock foundation 1; Under water the backfill formation backfill soil body 7 in the space that the inner surface of the upper surface of building body 31, the side of upper fixed body 32 and foundation ditch 2 forms, the surface of the upper surface of the backfill soil body 7 and rock foundation 1 is positioned in same level.The backfill soil body 7 covers on reinforced concrete body 3, has played as the effect of whole blower foundation ballast.
The inner surface of foundation ditch 2 is that upper periphery diameter is greater than the round table-like of lower periphery diameter; The excavation slope of foundation ditch 2 is slope.
The blower foundation of build-in of the present invention in rock foundation, preferred embodiment detailed data is as follows:
The upper fixed body 32 of reinforced concrete body 3 is cylinder, and diameter is 6.0m, high 1.5m; Under water building body 31 for Rotary-table, under round platform, periphery diameter is 6.0m, upper periphery diameter is 10.0m, high 7.0m; The thick 1.0m of thickness of the backfill soil body 7.
A kind of concrete construction method of the blower foundation of build-in of the present invention in rock foundation is as follows:
1) carry out the excavation to rock foundation 1, form foundation ditch 2, excavation slope ratio is preferably 1:0.3;
2) in the bottom of foundation ditch 2, build one deck plain concrete cushion layer 6;
3) blower foundation ring 4 is fixed in plain concrete cushion layer 6 by support bar 5;
4) in foundation ditch 2, build steel concrete, form reinforced concrete body 3, reinforced concrete body 3 comprise columned upper fixed body 32 and round table-like under water building body 31; Upper fixed body 32 is fixing with blower foundation ring 4;
5) under water building body 31 upper surface, in the space that forms of the side of fixed body 32 and the inner surface of foundation ditch 2 backfill form the backfill soil body 7, the surface of the upper surface of the backfill soil body 7 and rock foundation 1 is positioned in same level.
In sum, the blower foundation of build-in of the present invention in rock foundation, structural safety is reliable, saves land area, and concrete amount is little, has had significantly and reduce in construction costs; And construction technology is simple, only need to change the planform of the reinforced concrete body in blower foundation, do not need to increase other operation.So the present invention has effectively overcome various shortcoming of the prior art and tool high industrial utilization.
Above-described embodiment is illustrative principle of the present invention and effect thereof only, but not for limiting the present invention.Any person skilled in the art scholar all can, under spirit of the present invention and category, modify or change above-described embodiment.Therefore, such as in affiliated technical field, have and conventionally know that the knowledgeable, not departing from all equivalence modifications that complete under disclosed spirit and technological thought or changing, must be contained by claim of the present invention.