CN103590417A - Fan base built in rock foundation - Google Patents

Fan base built in rock foundation Download PDF

Info

Publication number
CN103590417A
CN103590417A CN201210287276.3A CN201210287276A CN103590417A CN 103590417 A CN103590417 A CN 103590417A CN 201210287276 A CN201210287276 A CN 201210287276A CN 103590417 A CN103590417 A CN 103590417A
Authority
CN
China
Prior art keywords
foundation
build
rock
blower
reinforced concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210287276.3A
Other languages
Chinese (zh)
Other versions
CN103590417B (en
Inventor
蒋光遒
王冬珍
姜娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Three Gorges Technology Co ltd
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Original Assignee
Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Investigation Design and Research Institute Co Ltd SIDRI filed Critical Shanghai Investigation Design and Research Institute Co Ltd SIDRI
Priority to CN201210287276.3A priority Critical patent/CN103590417B/en
Publication of CN103590417A publication Critical patent/CN103590417A/en
Application granted granted Critical
Publication of CN103590417B publication Critical patent/CN103590417B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The invention provides a fan base built in a rock foundation. The fan base comprises a base pit on the rock foundation, wherein the sectional area of the base pit decreases from top to bottom; reinforced concrete is poured into the base pit to form a reinforced concrete body. The fan base further comprises a fan base ring, wherein the axis of the fan base ring is positioned in the vertical direction, and the lower portion of the fan base ring is built in the reinforced concrete body. The fan base built in the rock foundation is safe and reliable in structure, capable of reducing floor area, small in reinforced concrete consumption, and capable of greatly reducing construction cost. Furthermore, due to the fact that the structural shape of the reinforced concrete body in the fan base only needs to be changed, and other procedures are not needed, the construction process is simple.

Description

The blower foundation of build-in in rock foundation
Technical field
The present invention relates to the blower foundation of a kind of build-in in rock foundation.
Background technology
Blower fan is that China is called for short the custom of gas compression and gas conveying machinery, and usually said blower fan comprises ventilation fan, blast fan, wind-driven generator.The blower foundation the present invention relates to refers in particular to wind driven generator base.
Wind-driven generator need to adopt blower foundation to be fixed on large ground, and the blower foundation that is arranged at present rock foundation mostly adopts expanded type reinforced concrete foundation.Stable in order to ensure blower foundation, avoid basis to come to nothing, sole plate size is larger.The blower fan of general single-machine capacity 2MW, hub height 80m, sole plate diameter reaches about 20m, the about 500m of concrete needing 3.Along with wind-powered electricity generation single-machine capacity constantly increases, the size on expanded type basis will continue to increase.Will bring following problem thus:
(1) the permanent floor space of blower foundation is large, increases and builds expropriation of land difficulty;
(2) difficulty of construction is large, and the disposable continuous pouring engineering time is long, generally over 14 hours;
(3) construction quality is difficult to control, and during winter construction of mass concrete, the heat of hydration, cushion cap be outside, and to produce the phenomenons such as temperature difference crack be all in work progress, to be difficult to the difficult problem avoiding and be difficult to deal carefully with;
(4) the concrete work consumption of blower foundation is large, increase of investment.
Summary of the invention
The shortcoming of prior art in view of the above, the object of the present invention is to provide the blower foundation of a kind of build-in in rock foundation, for solving the problem that prior art blower foundation floor space is large, concrete work consumption is large, difficulty of construction is large and construction quality is restive.
For achieving the above object and other relevant objects, the invention provides the blower foundation of a kind of build-in in rock foundation, comprise a foundation ditch on rock foundation, the cross-sectional area of foundation ditch progressively reduces from top to bottom; In foundation ditch, build steel concrete and form reinforced concrete body; It also comprises blower foundation ring, and the axis of blower foundation ring is positioned at vertical direction, and the bottom of blower foundation ring is embedded in reinforced concrete body.
Excavate the foundation ditch that cross-sectional area progressively reduces from top to bottom, then build steel concrete, make reinforced concrete body and rock foundation build-in form integral body, jointly stressed, structural safety is reliable; Due to foundation ditch from top to bottom cross-sectional area progressively reduce, reduced concrete amount and floor space.
Preferably, blower foundation ring by they sup-port the bottom at foundation ditch.
Preferably, the bottom of foundation ditch is provided with one deck plain concrete cushion layer.
Preferably, reinforced concrete body comprise with rock foundation build under all-in-one-piece, water building body and with under water building body and build fixed body on all-in-one-piece, under water the upper surface elevation of building body lower than the surperficial elevation of rock foundation, the soffit area of upper fixed body is less than down the upper surface area of watering building body, and the upper surface elevation of upper fixed body is higher than the surperficial elevation of rock foundation.Further preferred, under water the backfill formation backfill soil body in the space that the inner surface of the upper surface of building body, the side of upper fixed body and foundation ditch forms, the upper surface of the backfill soil body and the surface of rock foundation are positioned in same level.The backfill soil body covers on reinforced concrete body, played as the effect of whole blower foundation ballast, and to the protection of blower foundation be convenient to green manure.
Preferably, the inner surface of foundation ditch is that upper periphery diameter is greater than the round table-like of lower periphery diameter.Further preferred, the excavation slope of foundation ditch is slope.The foundation ditch of this shape is convenient to operation in excavation of foundation pit and foundation ditch.
As mentioned above, the blower foundation of build-in of the present invention in rock foundation, has following beneficial effect:
The blower foundation of this build-in in rock foundation, structural safety is reliable, saves land area, and concrete amount is little, has had significantly and reduce in construction costs; And construction technology is simple, only need to change the planform of the reinforced concrete body in blower foundation, do not need to increase other operation.
Accompanying drawing explanation
Fig. 1 is shown as the structural representation of the blower foundation of build-in of the present invention in rock foundation.
Fig. 2 is shown as the top view of the blower foundation of the build-in shown in Fig. 1 in rock foundation.
Element numbers explanation
1 rock foundation
2 foundation ditches
3 reinforced concrete bodies
Water building body 31 times
Fixed body on 32
4 blower foundation rings
5 support bars
6 plain concrete cushion layer
The 7 backfill soil bodys
The specific embodiment
By particular specific embodiment explanation embodiments of the present invention, person skilled in the art scholar can understand other advantages of the present invention and effect easily by the disclosed content of this manual below.
Refer to Fig. 1 to Fig. 2.Notice, appended graphic the illustrated structure of this manual, ratio, size etc., equal contents in order to coordinate manual to disclose only, for person skilled in the art scholar, understand and read, not in order to limit the enforceable qualifications of the present invention, therefore the technical essential meaning of tool not, the adjustment of the modification of any structure, the change of proportionate relationship or size, not affecting under the effect that the present invention can produce and the object that can reach, all should still drop on disclosed technology contents and obtain in the scope that can contain.Simultaneously, in this manual, quote as " on ", the term of D score, " left side ", " right side ", " centre " and " " etc., also only for ease of understanding of narrating, but not in order to limit the enforceable scope of the present invention, the change of its relativeness or adjustment, under without essence change technology contents, when being also considered as the enforceable category of the present invention.
As depicted in figs. 1 and 2, the invention provides the blower foundation of a kind of build-in in rock foundation, comprise a foundation ditch 2 on rock foundation 1, the cross-sectional area of foundation ditch 2 progressively reduces from top to bottom; In foundation ditch 2, build steel concrete and form reinforced concrete body 3; It also comprises blower foundation ring 4, and the axis of blower foundation ring 4 is positioned at vertical direction, and the bottom of blower foundation ring 4 is embedded in reinforced concrete body 3.
Excavate the foundation ditch 2 that cross-sectional area progressively reduces from top to bottom, then build steel concrete, make reinforced concrete body 3 and rock foundation 1 build-in shape in aggregates, jointly stressed, structural safety is reliable; Due to foundation ditch 2 from top to bottom cross-sectional area progressively reduce, reduced concrete amount and floor space.
Blower foundation ring 4 is supported on the bottom of foundation ditch 2 by support bar 5.The bottom of foundation ditch 2 is provided with one deck plain concrete cushion layer 6.Reinforced concrete body 3 comprise with rock foundation 1 build under all-in-one-piece, water building body 31 and with under water building body 31 and build fixed body 32 on all-in-one-piece, under water the upper surface elevation of building body 31 lower than the surperficial elevation of rock foundation 1, the soffit area of upper fixed body 32 is less than down the upper surface area of watering building body 31, and the upper surface elevation of upper fixed body 32 is higher than the surperficial elevation of rock foundation 1; Under water the backfill formation backfill soil body 7 in the space that the inner surface of the upper surface of building body 31, the side of upper fixed body 32 and foundation ditch 2 forms, the surface of the upper surface of the backfill soil body 7 and rock foundation 1 is positioned in same level.The backfill soil body 7 covers on reinforced concrete body 3, has played as the effect of whole blower foundation ballast.
The inner surface of foundation ditch 2 is that upper periphery diameter is greater than the round table-like of lower periphery diameter; The excavation slope of foundation ditch 2 is slope.
The blower foundation of build-in of the present invention in rock foundation, preferred embodiment detailed data is as follows:
The upper fixed body 32 of reinforced concrete body 3 is cylinder, and diameter is 6.0m, high 1.5m; Under water building body 31 for Rotary-table, under round platform, periphery diameter is 6.0m, upper periphery diameter is 10.0m, high 7.0m; The thick 1.0m of thickness of the backfill soil body 7.
A kind of concrete construction method of the blower foundation of build-in of the present invention in rock foundation is as follows:
1) carry out the excavation to rock foundation 1, form foundation ditch 2, excavation slope ratio is preferably 1:0.3;
2) in the bottom of foundation ditch 2, build one deck plain concrete cushion layer 6;
3) blower foundation ring 4 is fixed in plain concrete cushion layer 6 by support bar 5;
4) in foundation ditch 2, build steel concrete, form reinforced concrete body 3, reinforced concrete body 3 comprise columned upper fixed body 32 and round table-like under water building body 31; Upper fixed body 32 is fixing with blower foundation ring 4;
5) under water building body 31 upper surface, in the space that forms of the side of fixed body 32 and the inner surface of foundation ditch 2 backfill form the backfill soil body 7, the surface of the upper surface of the backfill soil body 7 and rock foundation 1 is positioned in same level.
In sum, the blower foundation of build-in of the present invention in rock foundation, structural safety is reliable, saves land area, and concrete amount is little, has had significantly and reduce in construction costs; And construction technology is simple, only need to change the planform of the reinforced concrete body in blower foundation, do not need to increase other operation.So the present invention has effectively overcome various shortcoming of the prior art and tool high industrial utilization.
Above-described embodiment is illustrative principle of the present invention and effect thereof only, but not for limiting the present invention.Any person skilled in the art scholar all can, under spirit of the present invention and category, modify or change above-described embodiment.Therefore, such as in affiliated technical field, have and conventionally know that the knowledgeable, not departing from all equivalence modifications that complete under disclosed spirit and technological thought or changing, must be contained by claim of the present invention.

Claims (7)

1. the blower foundation of build-in in rock foundation, is characterized in that: it comprises a foundation ditch (2) on rock foundation (1), and the cross-sectional area of described foundation ditch (2) progressively reduces from top to bottom; In described foundation ditch (2), build steel concrete and form reinforced concrete body (3); It also comprises blower foundation ring (4), and the axis of described blower foundation ring (4) is positioned at vertical direction, and the bottom of described blower foundation ring (4) is embedded in described reinforced concrete body (3).
2. the blower foundation of build-in according to claim 1 in rock foundation, is characterized in that: described blower foundation ring (4) is supported on the bottom of described foundation ditch (2) by support bar (5).
3. the blower foundation of build-in according to claim 1 and 2 in rock foundation, is characterized in that: the bottom of described foundation ditch (2) is provided with one deck plain concrete cushion layer (6).
4. the blower foundation of build-in according to claim 1 in rock foundation, it is characterized in that: described reinforced concrete body (3) comprise with described rock foundation (1) build under all-in-one-piece, water building body (31) and with described under water building body (31) and build fixed body on all-in-one-piece (32), under described, water the upper surface elevation of building body (31) lower than the surperficial elevation of described rock foundation (1), the soffit area of fixed body (32) is less than the upper surface area of watering building body (31) under described, the upper surface elevation of fixed body (32) is higher than the surperficial elevation of described rock foundation (1).
5. the blower foundation of build-in according to claim 4 in rock foundation, it is characterized in that: under described, water the backfill formation backfill soil body (7) in the space that the inner surface of the upper surface of building body (31), the side of fixed body (32) and described foundation ditch (2) forms, the surface of the upper surface of the described backfill soil body (7) and described rock foundation (1) is positioned in same level.
6. the blower foundation of build-in according to claim 1 in rock foundation, is characterized in that: the inner surface of described foundation ditch (2) is that upper periphery diameter is greater than the round table-like of lower periphery diameter.
7. the blower foundation of build-in according to claim 6 in rock foundation, is characterized in that: the excavation slope of described foundation ditch (2) is slope.
CN201210287276.3A 2012-08-13 2012-08-13 The blower foundation of build-in in rock foundation Active CN103590417B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210287276.3A CN103590417B (en) 2012-08-13 2012-08-13 The blower foundation of build-in in rock foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210287276.3A CN103590417B (en) 2012-08-13 2012-08-13 The blower foundation of build-in in rock foundation

Publications (2)

Publication Number Publication Date
CN103590417A true CN103590417A (en) 2014-02-19
CN103590417B CN103590417B (en) 2016-03-30

Family

ID=50080719

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210287276.3A Active CN103590417B (en) 2012-08-13 2012-08-13 The blower foundation of build-in in rock foundation

Country Status (1)

Country Link
CN (1) CN103590417B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912096A (en) * 2015-04-30 2015-09-16 湖南科技大学 Land wind turbine foundation drainage system
CN105350563A (en) * 2015-11-26 2016-02-24 中国电建集团成都勘测设计研究院有限公司 Shallow foundation structure for wind driven generator set
CN110984691A (en) * 2019-12-30 2020-04-10 重庆长赛新材料科技有限公司 Construction method of enclosure upright post
CN110984692A (en) * 2019-12-30 2020-04-10 重庆长赛新材料科技有限公司 Do benefit to enclosure stand of construction
CN116180801A (en) * 2023-04-14 2023-05-30 歌山建设集团有限公司 Environment-friendly civil construction pre-buried construction method and auxiliary piece

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201411705Y (en) * 2009-05-06 2010-02-24 中国水电顾问集团西北勘测设计研究院 Inverse-cone reinforced concrete spread foundation
CN202098811U (en) * 2011-05-31 2012-01-04 成都大宏立机器制造有限公司 Driving device of belt conveying machine
CN102286987B (en) * 2011-07-05 2013-04-03 天津大学 Gravity-type foundation structure for maritime equipment engineering and construction method thereof
CN202809637U (en) * 2012-08-13 2013-03-20 上海勘测设计研究院 Fan basis embedded in rock foundation

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104912096A (en) * 2015-04-30 2015-09-16 湖南科技大学 Land wind turbine foundation drainage system
CN105350563A (en) * 2015-11-26 2016-02-24 中国电建集团成都勘测设计研究院有限公司 Shallow foundation structure for wind driven generator set
CN110984691A (en) * 2019-12-30 2020-04-10 重庆长赛新材料科技有限公司 Construction method of enclosure upright post
CN110984692A (en) * 2019-12-30 2020-04-10 重庆长赛新材料科技有限公司 Do benefit to enclosure stand of construction
CN110984692B (en) * 2019-12-30 2021-07-13 重庆长赛新材料科技有限公司 Do benefit to enclosure stand of construction
CN110984691B (en) * 2019-12-30 2021-09-28 重庆长赛新材料科技有限公司 Construction method of enclosure upright post
CN116180801A (en) * 2023-04-14 2023-05-30 歌山建设集团有限公司 Environment-friendly civil construction pre-buried construction method and auxiliary piece
CN116180801B (en) * 2023-04-14 2023-08-04 歌山建设集团有限公司 Environment-friendly civil construction pre-buried construction method and auxiliary piece

Also Published As

Publication number Publication date
CN103590417B (en) 2016-03-30

Similar Documents

Publication Publication Date Title
CN103590417B (en) The blower foundation of build-in in rock foundation
CN202809637U (en) Fan basis embedded in rock foundation
CN202117068U (en) Micropile plate-type composite foundation
CN102425171A (en) Forward-backward constructing method for central island of deep and large foundation pit
CN102995655A (en) Cylindrical structure and pile group combined type offshore wind turbine foundation
CN202577313U (en) Supporting combined system for deep foundation pit
CN203238642U (en) Supporting retaining wall of foundation pit
CN104131571A (en) Deep foundation pit support construction method
CN103147457A (en) Manufacturing method for independent column foundation of wind turbine generator
CN104818729A (en) Common foundation for transformation of large and small tower cranes
CN206308703U (en) 20kV and following nonprestressed reinforcement concurrent prefabricated foundation structure
CN102808419B (en) Combined pile foundation structure
CN202595758U (en) Batter post foundation structure for overhead transmission line
CN110607801A (en) Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity
CN202298630U (en) System adopting root piles and pile-side compacting grouting
CN105604082A (en) Beam-type wind turbine pile foundation in soft soil foundation
CN206562613U (en) A kind of mini pile suspension roof support structure
CN202865863U (en) Basic structure of heavy piece lifting frame
CN110172988A (en) A kind of piling formula composite concrete placement ground and its construction method
CN105155573A (en) Offshore wind turbine barrel-in-barrel foundation
CN204662486U (en) Can for the mutual foundation of size tower crane conversion
CN211257051U (en) Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity
CN201943060U (en) Reinforcing structure for gate dam foundation of deep riverbed covering layer
CN201554033U (en) Tower crane foundation for deep foundation ditch
CN211172057U (en) Offshore single-pile foundation with cement mixing pile reinforced foundation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 200434 Shanghai city Hongkou District Yixian Road No. 388

Patentee after: SHANGHAI INVESTIGATION, DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Address before: 200434 Shanghai city Hongkou District Yixian Road No. 388

Patentee before: SHANGHAI INVESTIGATION, DESIGN & Research Institute

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20221209

Address after: 200434 Shanghai city Hongkou District Yixian Road No. 388

Patentee after: SHANGHAI INVESTIGATION, DESIGN & RESEARCH INSTITUTE Co.,Ltd.

Patentee after: Three Gorges Technology Co.,Ltd.

Address before: 200434 Shanghai city Hongkou District Yixian Road No. 388

Patentee before: SHANGHAI INVESTIGATION, DESIGN & RESEARCH INSTITUTE Co.,Ltd.

TR01 Transfer of patent right