CN203768940U - Angle steel tower foundation of overhead power transmission line - Google Patents
Angle steel tower foundation of overhead power transmission line Download PDFInfo
- Publication number
- CN203768940U CN203768940U CN201420055812.1U CN201420055812U CN203768940U CN 203768940 U CN203768940 U CN 203768940U CN 201420055812 U CN201420055812 U CN 201420055812U CN 203768940 U CN203768940 U CN 203768940U
- Authority
- CN
- China
- Prior art keywords
- steel truss
- transmission line
- foundation
- steel tower
- tower foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 63
- 239000010959 steel Substances 0.000 title claims abstract description 63
- 230000005540 biological transmission Effects 0.000 title claims abstract description 13
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 12
- 239000004575 stone Substances 0.000 claims description 8
- 229910052742 iron Inorganic materials 0.000 claims description 6
- 239000011435 rock Substances 0.000 abstract description 12
- 239000002689 soil Substances 0.000 abstract description 6
- 238000009412 basement excavation Methods 0.000 abstract description 5
- 230000007613 environmental effect Effects 0.000 abstract description 5
- 238000010276 construction Methods 0.000 abstract description 4
- 230000006378 damage Effects 0.000 abstract description 4
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 3
- 238000003672 processing method Methods 0.000 abstract 1
- 239000000725 suspension Substances 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses an angle steel tower foundation of an overhead power transmission line. The angle steel tower foundation comprises a planar steel truss, a supporting member and anchor rods. The planar steel truss comprises main beams and subsidiary beams, wherein the main beams and the subsidiary beams are arranged in a net mode, and foundation bolts are arranged at joints between the main beams and the subsidiary beams. One end of the planar steel truss is directly hinged to one anchor rod. The other end of the planar steel truss is directly hinged to the other anchor rod through the supporting member. The overall planar steel truss is on the same horizontal plane. The angle steel tower foundation of the overhead power transmission line has the advantages that the disadvantage that a conventional mountain land foundation is large in floor space is overcome, mountain land earth-rock excavation is greatly reduced through the processing method of zero foundation plane descent, large-area damage to mountain rocks and damage to the integrality and stability of side slopes are avoided, the earth-rock excavation volume is small, construction is convenient, and water and soil conservation and environmental protection are promoted.
Description
technical field
The utility model relates to for electrical domain, particularly a kind of overhead transmission line angle-steel tower foundation.
Background technology
In life, the normal angle steel tower overhead transmission line that adopts carrys out conveying high-pressure electricity, in the time being positioned at mountain area high gradient slope, because physical features height in mountain region rises and falls, the ground height of four tower legs of carrying angle steel tower differs, for making angle steel tower upright, generally can adopt two kinds of patterns of comprehensive height leg angle steel tower or half overhanging type steel truss basis.
Local basement rock soil is that overall rock and the hillside gradient are when steeper, especially the location that is greater than 45 ° in the gradient, adopt half overhanging type steel truss basis can cause large-area earthwork evacuation, constructional difficulties, dangerous high, base values is poor, larger to environmental disruption, what construction produced abandons stone, the difficult processing of spoir, and the high slope of formation easily impacts massif resistance to overturning; In the time adopting the pattern of comprehensive height leg angle steel tower, if the differential maximum considerably beyond steel tower unequal leg of unequal leg is used differential, adopt the method that reduces basal plane or hillside downside pilum is up extended to be difficult to solve, and the measure that basal plane falls in excavation is also unfavorable for stability of slope and environmental protection, and pilum concrete square amount is very large while extending, cost is high, constructional difficulties.
Utility model content
The purpose of this utility model is to solve special high slope, the vertical tower problem in serious limited mountain area, Li Ta position.For addressing the above problem, the technical scheme that the utility model is taked is as follows:
A kind of overhead transmission line angle-steel tower foundation, comprises plane steel truss, supporting member and anchor pole;
Described plane steel truss comprises girder and secondary beam, girder and secondary beam intersect and are netted setting, and the node place of girder and secondary beam is provided with stone bolt, and stone bolt is for established angle head tower, one end of plane steel truss directly and anchor pole hinged, the other end is hinged by supporting member and anchor pole.
Further, described plane steel truss also comprises bridging, and the two ends of bridging are hinged with two diagonal angles of plane steel truss respectively.
Further, girder and secondary beam are i iron or H shaped steel, and support bar is steel pipe or i iron or H shaped steel.
One end of plane steel truss is directly fixed by anchor pole and rock, the other end is fixed with rock by supporting member and anchor pole successively again, make plane steel truss entirety in same level by the length and the direction that change supporting member, thereby angle steel tower is installed on plane steel truss stably, do not need massif to fall base processing, this zero processing mode of falling basal plane greatly reduces mountain soil rock excavation, avoid destroying the destruction of massif rock and the globality to side slope and stability on a large scale, there is earthwork evacuation amount little, easy construction, be conducive to water and soil conservation, the advantages such as environmental protection.
Brief description of the drawings
Fig. 1 is the utility model schematic diagram.
Fig. 2 is the utility model plane steel truss composition schematic diagram.
Detailed description of the invention
Below in conjunction with accompanying drawing, detailed description of the invention of the present utility model is described further.
As depicted in figs. 1 and 2, a kind of overhead transmission line angle-steel tower foundation of the utility model, comprises plane steel truss 1, supporting member 2 and anchor pole 3;
Described plane steel truss 1 comprises girder 4 and secondary beam 5, girder 4 and secondary beam 5 intersect and are netted setting, the node place of girder 4 and secondary beam 5 is provided with stone bolt, one end of plane steel truss 1 directly and anchor pole 3 hinged, the other end is hinged by supporting member 2 and anchor pole 3, is horizontally disposed with by regulating the length of supporting member 2 and angle that plane steel truss 1 is.Four suspension columns of angle steel tower 8 are connected with the stone bolt on plane steel truss 1, and the planar dimension of plane steel truss is opened size design according to 8 of angle steel towers.
Steel truss girder 4 and secondary beam 5 adopt H shaped steel or i iron, and supporting member 2 adopts steel pipe, i iron or H shaped steel, and bridging 6 adopts steel pipe.
Specific implementation process of the present utility model is: 8 four suspension columns of angle steel tower of overhead transmission line drop on plane steel truss 1, be connected to form hinged column base by stone bolt and girder 4, suspension column horizontal reacting force and vertical counter-force pass to anchor pole 3 by plane steel truss 1 and supporting member 2, then pass to ground by anchor pole 3 and bear.
It is better that a kind of overhead transmission line angle-steel tower foundation of the utility model has mainly solved rock overall performance, the vertical tower problem in high gradient slope district that grade of side slope is larger, solve the comprehensive height leg of angle steel tower and coordinated the still vertical tower difficult problem of the high drop physical features in very scabrous mountain region of height basis, overcome the large inferior position of conventional mountain region basis floor space, greatly reduce mountain soil rock excavation by zero processing mode of falling basal plane, avoid destroying the destruction of massif rock and the globality to side slope and stability on a large scale, there is earthwork evacuation amount little, easy construction, be conducive to water and soil conservation, the advantages such as environmental protection.
Claims (3)
1. an overhead transmission line angle-steel tower foundation, is characterized in that, comprises plane steel truss (1), supporting member (2) and anchor pole (3);
Described plane steel truss (1) comprises girder (4) and secondary beam (5), girder (4) and secondary beam (5) intersect and are netted setting, the node place of girder (4) and secondary beam (5) is provided with stone bolt, stone bolt is for established angle head tower (8), one end of plane steel truss (1) is directly hinged with anchor pole (3), and the other end is hinged by supporting member (2) and anchor pole (3).
2. overhead transmission line angle-steel tower foundation as claimed in claim 1, is characterized in that, described plane steel truss (1) also comprises bridging (6), and the two ends of bridging (6) are hinged with two diagonal angles of plane steel truss (1) respectively.
3. overhead transmission line angle-steel tower foundation as claimed in claim 1, is characterized in that, girder (4) and secondary beam (5) are i iron or H shaped steel, and supporting member (2) is steel pipe or i iron or H shaped steel.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420055812.1U CN203768940U (en) | 2014-01-28 | 2014-01-28 | Angle steel tower foundation of overhead power transmission line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420055812.1U CN203768940U (en) | 2014-01-28 | 2014-01-28 | Angle steel tower foundation of overhead power transmission line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN203768940U true CN203768940U (en) | 2014-08-13 |
Family
ID=51286147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420055812.1U Expired - Lifetime CN203768940U (en) | 2014-01-28 | 2014-01-28 | Angle steel tower foundation of overhead power transmission line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN203768940U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306006A (en) * | 2020-03-27 | 2020-06-19 | 中国华能集团清洁能源技术研究院有限公司 | Steel pipe concrete tower and mounting method thereof |
CN112900955A (en) * | 2021-03-24 | 2021-06-04 | 中国电力工程顾问集团华北电力设计院有限公司 | Framework type metal connecting device for fixing anchor rod and tower foot |
CN114457835A (en) * | 2022-01-25 | 2022-05-10 | 国家电网有限公司 | Metal section bearing platform anchoring foundation for power transmission line truss |
-
2014
- 2014-01-28 CN CN201420055812.1U patent/CN203768940U/en not_active Expired - Lifetime
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111306006A (en) * | 2020-03-27 | 2020-06-19 | 中国华能集团清洁能源技术研究院有限公司 | Steel pipe concrete tower and mounting method thereof |
CN111306006B (en) * | 2020-03-27 | 2024-05-28 | 中国华能集团清洁能源技术研究院有限公司 | Steel pipe concrete tower and installation method thereof |
CN112900955A (en) * | 2021-03-24 | 2021-06-04 | 中国电力工程顾问集团华北电力设计院有限公司 | Framework type metal connecting device for fixing anchor rod and tower foot |
CN114457835A (en) * | 2022-01-25 | 2022-05-10 | 国家电网有限公司 | Metal section bearing platform anchoring foundation for power transmission line truss |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203654295U (en) | Single-leg inclined strut reinforced foundation pit supporting structure | |
CN206204986U (en) | A kind of civil construction retaining wall structure | |
CN203768940U (en) | Angle steel tower foundation of overhead power transmission line | |
CN204676584U (en) | A kind of high stake truss-like offshore wind turbine foundation structure | |
CN205205833U (en) | Soil nail and stock combined type double row pile underground structure | |
CN104775649A (en) | Shock-resistant steel-bar concrete structure side coal bunker | |
CN104818729B (en) | Can be for the mutual foundation of big or small tower crane conversion | |
CN202273242U (en) | Base of union type mini type pile rod tower | |
CN203361183U (en) | Power transmission tower foundation | |
CN205577187U (en) | Prefabricated steel pipe concrete constructional column rammed earth wall | |
CN202017214U (en) | Power pole tower base for frozen soil foundation | |
CN110656723B (en) | Rail support for sliding construction of cylindrical arch shell roof | |
CN103741708A (en) | Prefabricated concrete pole sleeve base | |
CN204125935U (en) | A kind of micropore castinplace pile being applicable to solar photovoltaic bracket basis | |
CN203462797U (en) | Overhead-type cable terminal field with overhang structure | |
CN103981799B (en) | A kind of concrete filled steel tube opens string stiff beam and construction method thereof | |
CN203411988U (en) | Independent medium-sized pile foundation | |
CN203247917U (en) | Reinforced iron tower for power transmission lines in gob area | |
CN204662486U (en) | Can for the mutual foundation of size tower crane conversion | |
CN204690774U (en) | Transmission pole pile foundation | |
CN201169781Y (en) | Cap digging pit structure | |
CN204529148U (en) | Cement electric pole press-rod apparatus | |
CN204080848U (en) | The two bar gate shaft tower self-regulated basis of transmission line of electricity | |
CN202672177U (en) | Tower foundation of wind driven generator | |
CN203684258U (en) | Prefabricated concrete rod sleeve foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CX01 | Expiry of patent term | ||
CX01 | Expiry of patent term |
Granted publication date: 20140813 |