CN103558481B - 同塔并架多回直流线路耦合作用引发换相失败的判别方法 - Google Patents

同塔并架多回直流线路耦合作用引发换相失败的判别方法 Download PDF

Info

Publication number
CN103558481B
CN103558481B CN201310577378.3A CN201310577378A CN103558481B CN 103558481 B CN103558481 B CN 103558481B CN 201310577378 A CN201310577378 A CN 201310577378A CN 103558481 B CN103558481 B CN 103558481B
Authority
CN
China
Prior art keywords
fault
centerdot
current
commutation
formula
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310577378.3A
Other languages
English (en)
Other versions
CN103558481A (zh
Inventor
周全
钱海
周尚礼
王钢
李海锋
刘俊磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Maintenance and Test Center of Extra High Voltage Power Transmission Co
Original Assignee
South China University of Technology SCUT
Maintenance and Test Center of Extra High Voltage Power Transmission Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT, Maintenance and Test Center of Extra High Voltage Power Transmission Co filed Critical South China University of Technology SCUT
Priority to CN201310577378.3A priority Critical patent/CN103558481B/zh
Publication of CN103558481A publication Critical patent/CN103558481A/zh
Application granted granted Critical
Publication of CN103558481B publication Critical patent/CN103558481B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了同塔并架多回直流线路耦合作用引发换相失败的判别方法:计算线路间的电流耦合系数K;计算交流电网所能提供的最大换相时间面积Bmax;计算极线故障时故障极逆变侧的最大突变量电流ΔIf.max;计算非故障极换相成功所需要的换相面积A;对A与Bmax的大小进行比较,若A>Bmax,则认为同塔并架多回直流输电线路间耦合作用引起非故障极换相失败。本发明的判别方法,基于换相电压时间面积理论分析了换相暂态过程中直流电流变化与换相失败的关系,并结合所推导的同塔并架多回直流输电系统线路间的电流耦合系数,建立适用判别同塔并架多回直流线路耦合作用是否引发换相失败的最大换相时间面积判据,该方法简单,且能迅速、有效地进行判定。

Description

同塔并架多回直流线路耦合作用引发换相失败的判别方法
技术领域
本发明涉及电力系统故障分析领域,特别涉及同塔并架多回直流线路耦合作用引发换相失败的判别方法。
背景技术
同塔并架多回输电技术可以在提高线路单位走廊输电容量和土地利用率的同时降低电力建设成本。目前,同塔并架多回交流输电技术已得到了广泛应用,而同塔双回直流输电工程近年来也开始出现。国家电网公司的林枫直流和葛南直流以及南方电网公司的溪洛渡直流工程均为双回直流同塔架设。随着直流输电技术发展和西电东送战略的实施,同塔双回直流输电工程将越来越多。同塔架设的直流线路间存在电磁耦合,当直流线路发生接地故障等情况下,故障产生的暂态分量会因电磁耦合的关系及线路参数不平衡等原因影响到其他正常运行的极导线。例如,一极线路接地故障在非故障极上耦合出的故障电流有可能导致非故障极换流器发生换相失败,进而可能引起非故障极保护误动甚至闭锁。换相失败作为直流系统最常见的故障,现有的研究表明:换流阀的关断角过小是引起其换相失败的根本原因,而交流电网故障、直流电流、触发角、换相阻抗等均对关断角有不同程度的影响。目前,关于换相失败判据的研究多是针对交流系统故障情况。但是对于同塔并架多回直流输电系统,由于线路间的耦合,一极线路故障产生的电流突变量会引起非故障极电流发生变化,有可能引起其发生换相失败,而此时利用判断交流故障引起直流系统发生换相失败的判据已不适合对该种故障情况进行研究。现有的研究多是利用数字仿真工具重现了实际工程故障暂态过程中耦合直流电流可能导致非故障极发生换相失败的现象,并没有提出合适的针对该种故障情况的换相失败判据。
发明内容
本发明的目的在于克服现有技术的缺点与不足,提供同塔并架多回直流线路耦合作用引发换相失败的判别方法。
本发明的目的通过以下的技术方案实现:
同塔并架多回直流线路耦合作用引发换相失败的判别方法,包括以下顺序的步骤:
1)根据同塔并架多回直流输电线路的结构和参数,计算线路间的电流耦合系数K;
2)根据换流器变压器的参数和交直流系统的运行参数,计算交流电网所能提供的最大换相时间面积Bmax
3)根据系统参数计算极线故障时故障极逆变侧的最大突变量电流ΔIf.max
4)根据最大突变量电流ΔIfmax、电流耦合系数K和非故障极额定直流电流IdN,计算非故障极换相成功所需要的换相面积A;
5)对A与Bmax的大小进行比较,若A>Bmax,则判定同塔并架多回直流输电线路耦合作用引起换相失败;反之,不会引起换相失败。
步骤1)中,所述的K的表达式如下:
K = m a x | I · j p h a s e , x ′ I · i p h a s e , x ′ |
其中,为故障极i上距故障点x处的故障电流;为非故障极j上距故障点x处耦合出的故障电流,(i,j=1,2,3,....);
K的计算步骤为:
a)根据线路参数和结构建立线路阻抗矩阵[Zphase]和导纳矩阵[Yphase],并计算[Zphase][Yphase]特征值矩阵为[Λ],特征向量矩阵[Tv],则有:
[Zphase][Yphase]=[Tv][Λ][Tv]-1(1)
b)根据同塔并架线路结构,以及线路故障的边界条件和过渡电阻Rf计算故障点电流和电压值,其计算过程如下,首先电压电流满足式(2):
[ U · p h a s e ] = - [ Z C p ] [ I · p h a s e ] - - - ( 2 )
式(2)中, [ U · p h a s e ] = U · 1 p h a s e U · 2 p h a s e U · 3 p h a s e ... T 为极线电压列向量; [ I · p h a s e ] = I · 1 p h a s e I · 2 p h a s e I · 3 p h a s e ... T 为极线电流列向量; [ Z C p ] = [ T v ] [ Λ ] - 1 [ T v ] - 1 [ Z p h a s e ] ;
则对于含有n条极线的同塔并架直流输电线路的第i条上的发生过渡电阻为Rf的接地故障时,如图2所示,根据故障边界条件有:
{ U · i p h a s e ′ = - U · f - 2 I · i p h a s e ′ R f I · j p h a s e ′ = 0 - - - ( 3 )
式(3)中,j=1,2...n且j≠i;为故障附加电源,其幅值为故障极线路直流电压的额定值;为故障极线故障点的电压;为第l(l=1,2…n)条极线故障点处传相两端的故障行波电流;
c)联立式(2)和(3)求解可得故障点处的电流值:
[ I · p h a s e ′ ] = I · 1 p h a s e ′ . . . I · i p h a s e ′ . . . I · n p h a s e ′ = 0 . . . - U · f Z C p ( i , i ) + 2 R f . . . 0 - - - ( 4 )
d)则距离故障点x处的电流值为:
[ I · p h a s e , x ′ ] = [ T i ] d i a g ( e - γ 1 x , e - γ 2 x ... e - γ n x ) [ T i ] - 1 [ I · p h a s e ′ ] - - - ( 5 )
式(5)中,[Ti]=([Tv]-1)T;γl为第l(l=1,2…n)个模量的衰减系数,可由线路参数求得;x为传播距离;
e)即可得第j根极线相对于第i根极线的电流耦合系数为:
k · i - j = I · j p h a s e , x ′ I · i p h a s e , x ′ - - - ( 6 )
式(6)中,为故障极i上距故障点x处的故障电流;为非故障极j上距故障点x处耦合出的故障电流;
f)实际计算电流耦合系数K时,考虑极端情况,认为故障极导线电流所含频率区间内的各次电流耦合系数均为该频率区间内的最大值并且忽略相角的影响,即:
K = m a x ( | k · i - j | ) - - - ( 7 )
由此计算出K的值。
步骤2)中,所述的最大换相时间面积Bmax的表达式为:
B m a x = 1 L r ∫ t 1 t 2 u a b ( t ) d t - - - ( 8 )
式(8)中,Lr为等值换相电感;t1,t2为换相时间区间的起始时刻和关断时刻,如图3所示;uab=ua-ub为ab相换相线电压;
Bmax的计算步骤为:
a)计算等值换相电感Lr
L r = U T _ N 2 2 ω 0 S T u k % - - - ( 9 )
式(9)中,UT_N2为换流变压器阀侧额定相电压;ST为换流变压器的额定容量;uk%为换流变压器的短路阻抗百分数;ω0为工频角频率(ω0=2πf,其中f=50Hz);
b)计算换相时间区间[t1,t2];
t 1 = π - β ω 0 t 2 = π - γ ω 0 - - - ( 10 )
式(10)中,ω0为工频角频率;β和γ分别为触发越前角和关断角;
c)根据额定运行时换流母线电压计算uab(t);
式(11)中,Uab_N为换流母线额定线电压的幅值;ω0为额定线电压的工频角频率和初相位;
d)根据式(9)、(10)和(11),带入式(8)可求得交流电网所能提供的最大换相时间面积Bmax
步骤3)中,所述的最大突变量电流ΔIf.max的表达式为:
ΔIf.max=Idc.inv.f-IdN(12)
式(12)中,IdN为故障极的额定直流电流;Idc.inv.f为故障极线路故障电流的最大值;Idc.inv.f的计算步骤如下:
a)根据图4所示的运算电路,则故障点的直流电压值为:
U M ( s ) = ( R + s L ) I d c . r e c ( s ) + U d c . i n v ( s ) 1 + s C ( R + s L ) - L 2 i d c . i n v ( 0 _ ) + C ( R + s L ) u c ( 0 _ ) 1 + s C ( R + s L ) - - - ( 13 )
式(13)中,uc(0_)为线路电容电压的初始值,即为额定直流电压;Idc.rec(s)=idc.rec(0_)/s为整流侧直流电流象函数,idc.inv(0_)为直流电流的初始值,也即为额定直流电流值;Udc.inv(s)是逆变侧理想空载直流电压Udc.inv的象函数,Udc.inv(s)=Udc.inv/s,Udc.inv为额定直流电压,R、L、C分别为线路电阻、电感、电容参数;其中L2为电感,s为象函数的运算系数;
b)根据图4和式(13)可计算Idc.inv.f
I d c . i n v · f = | L - 1 ( U M ( s ) + L 2 i d c . i n v ( 0 _ ) - U d c . i n v ( s ) R + s L ) | - - - ( 14 )
式(14)中,L-1——表示拉普拉斯反变换的符号。
步骤4)中,所述的换相面积A的表达式为:
A=2(IdN+KΔIf.max)(15)
式(15)中,IdN为非故障极额定直流电流;K均为电流耦合系数;ΔIf.max为同塔并架多回直流故障极逆变侧最大突变量电流。
本发明与现有技术相比,具有如下优点和有益效果:
基于换相电压时间面积理论分析了换相暂态过程中直流电流变化与换相失败的关系,并结合所推导的同塔并架多回直流输电系统线路间的电流耦合系数,建立适用判别同塔并架多回直流线路耦合作用是否引发换相失败的最大换相时间面积判据,提供一种同塔并架多回直流线路耦合作用引发换相失败的判别方法,且该方法简单,有效。
附图说明
图1为本发明所述的同塔并架多回直流线路耦合作用引发换相失败的判别方法的流程示意图;
图2为图1所述方法的实施例中直流线路故障分量等效电路图;
图3为图1所述方法的实施例中交流系统换相电压时间面积示意图;
图4为图1所述方法的实施例中直流极线接地故障时计算直流电流的运算电路图;
图5为图1所述方法的实施例中所用到的溪洛渡同塔双回直流系统结构图;
图6为图1所述方法的实施例中溪洛渡直流工程的同塔线路的杆塔布置图;
图7为图1所述方法的实施例中Ⅰ回直流正极线路末端金属性故障时逆变侧直流电流图;
图8为图1所述方法的实施例中Ⅰ回直流正极线路末端金属性故障时Ⅰ回直流逆变侧正极Y桥和D桥直流电压图;
图9为图1所述方法的实施例中Ⅰ回直流负极线路末端金属性故障时Ⅰ回直流逆变侧正极Y桥和D桥直流电压图;
图10为图1所述方法的实施例中Ⅰ回直流正极线路末端金属性故障时Ⅱ回直流逆变侧正极Y桥和D桥直流电压图;
图11为图1所述方法的实施例中Ⅰ回直流正极线路末端金属性故障时Ⅱ回直流逆变侧正极Y桥和D桥直流电压图;
图12为图1所述方法的实施例中Ⅰ回直流单极金属回线运行时线路故障时逆变侧直流电流图;
图13为图1所述方法的实施例中Ⅰ回直流单极金属回线运行时线路故障时Ⅰ回直流逆变侧正极Y桥和D桥直流电压图;
图14为图1所述方法的实施例中Ⅰ回直流单极金属回线运行时线路故障时Ⅱ回直流逆变侧正极Y桥和D桥直流电压图;
图15为图1所述方法的实施例中Ⅰ回直流单极金属回线运行时线路故障时Ⅱ回直流逆变侧正极Y桥和D桥直流电压图。
具体实施方式
下面结合实施例及附图对本发明作进一步详细的描述,但本发明的实施方式不限于此。
以溪洛渡同塔双回直流输电系统为例。
算例参数设置:系统的主要参数见表1,线路的主要参数见表2。
表1溪洛渡同塔双回直流系统主要参数
触发超前角β=0.6632;关断角γ=0.2967。
表2直流线路杆塔的导线和地线参数
表3换流变压器参数
参数 数值
换流变压器额定容量 952.8MVA
原方电压有效值 525kV(相对相有效值)
副方电压 210.5kV(相对相有效值)
漏抗 0.165p.u.
实施例1:
如图1所示,本实施例利用所提方法判断溪洛渡双回直流均额定运行时,Ⅰ回直流正极线路末端金属性故障时,非故障极是否发生换相失败,包括以下步骤:
1)根据同塔双回直流输电线路的结构和参数,计算线路间的电流耦合系数K;
2)根据换流器变压器的参数和交直流系统的运行参数,计算交流电网所能提供的最大换相时间面积Bmax
3)根据系统参数计算极线故障时故障极逆变侧的最大突变量电流ΔIf.max
4)根据最大突变量电流ΔIfmax、电流耦合系数K和非故障极额定直流电流IdN,计算非故障极换相成功所需要的换相面积A;
5)对A与Bmax的大小进行比较,若A>Bmax,则认为同塔并架多回直流输电线路耦合作用引起换相失败;反之,不会引起换相失败。
步骤1中,所述K的表达式如下:
K = m a x | I · j p h a s e , x ′ I · i p h a s e , x ′ |
式中,为故障极i上距故障点x处的故障电流;为非故障极j上距故障点x处耦合出的故障电流,(i,j=1,2,3,4);
K的计算步骤为:
a)根据线路参数和结构建立线路阻抗矩阵[Zphase]和导纳矩阵[Yphase],并计算[Zphase][Yphase]特征值矩阵为[Λ],特征向量矩阵[Tv],则有:
[Zphase][Yphase]=[Tv][Λ][Tv]-1(1)
b)根据同塔并架线路结构,以及线路故障的边界条件和过渡电阻Rf计算故障点电流值和故障点电压,其计算过程如下,首先电压电流满足式(2):
[ U · p h a s e ] = - [ Z C p ] [ I · p h a s e ] - - - ( 2 )
式(2)中, [ U · p h a s e ] = U · 1 p h a s e U · 2 p h a s e U · 3 p h a s e ... T 为极线电压列向量; [ I · p h a s e ] = I · 1 p h a s e I · 2 p h a s e I · 3 p h a s e ... T 为极线电流列向量; [ Z C p ] = [ T v ] [ Λ ] - 1 [ T v ] - 1 [ Z p h a s e ] ;
则对于含有n条极线的同塔并架直流输电线路的第i条上的发生过渡电阻为Rf的接地故障时,如图2所示,根据故障边界条件有:
{ U · i p h a s e ′ = - U · f - 2 I · i p h a s e ′ R f I · j p h a s e ′ = 0 - - - ( 3 )
式(3)中,j=1,2...4且j≠i;为故障附加电源,其幅值为故障极线路直流电压的额定值;为故障极线故障点的电压;为第l(l=1,2,3,4)条极线故障点处传相两端的故障行波电流;
c)联立式(2)和(3)求解可得故障点处的电流值:
[ I · p h a s e ′ ] = I · 1 p h a s e ′ . . . I · i p h a s e ′ . . . I · n p h a s e ′ = 0 . . . - U · f Z C p ( i , i ) + 2 R f . . . 0 - - - ( 4 )
d)则距离故障点x处的电流值为:
[ I · p h a s e , x ′ ] = [ T i ] d i a g ( e - γ 1 x , e - γ 2 x ... e - γ n x ) [ T i ] - 1 [ I · p h a s e ′ ] - - - ( 5 )
式(5)中,[Ti]=([Tv]-1)T;γl为第l(l=1,2,3,4)个模量的衰减系数,可由线路参数求得;x为传播距离;
e)即可得第j根极线相对于第i根极线的电流耦合系数为:
k · i - j = I · j p h a s e , x ′ I · i p h a s e , x ′ - - - ( 6 )
式(6)中,为故障极i上距故障点x处的故障电流;为非故障极j上距故障点x处耦合出的故障电流;
f)实际计算电流耦合系数K时,考虑极端情况,认为故障极导线电流所含频率区间内的各次电流耦合系数均为该频率区间内的最大值并且忽略相角的影响,即:
K = m a x ( | k · i - j | ) - - - ( 7 )
根据表2中的线路参数,以及式(1)-式(7)可得溪洛渡双回直流极线间的耦合系数如表4所示:
表4双回直流极线间的耦合系数
耦合系数 数值
KI.42=KI.31 0.22
KI.41=KI.32 0.20
KI.34 0.25
KI.12 0.18
步骤2
根据换流器变压器的参数和交流系统的运行电压,计算交流电网所能提供的最大换相时间面积Bmax,其表达式为:
B m a x = 1 L r ∫ t 1 t 2 u a b ( t ) d t - - - ( 8 )
式(8)中,Lr为等值换相电感;t1,t2为换相时间区间的起始时刻和关断时刻,如图3所示;uab=ua-ub为ab相换相线电压;
Bmax的计算步骤为:
a)计算等值换相电感Lr
L r = U T _ N 2 2 ω 0 S T u k % - - - ( 9 )
式(9)中,为换流变压器阀侧额定相电压;ST为换流变压器的额定容量;uk%为换流变压器的短路阻抗百分数;ω0为工频角频率(ω0=2πf,其中f=50Hz);
b)计算换相时间区间[t1,t2];
t 1 = π - β ω 0 t 2 = π - γ ω 0 - - - ( 10 )
式(10)中,ω0为工频角频率ω0=2πf,(f=50Hz);β和γ分别为触发越前角和关断角;
根据表3得变压器参数UT_N2=210.52kA;ST=952.8;uk%=0.165;ω0=314.15926;且有系统参数知,触发超前角β=0.6632;关断角γ=0.2967,则换相角μ=β-γ0=0.3665; U a b _ N = 2 * 210.5 = 297.65 k V ; ω0=314.15926;带入式(8)-式(10)求解得到Bmax=8.31;
步骤3
根据系统参数计算极线故障时故障极逆变侧的最大突变量电流ΔIf.max;其表达式为:
ΔIf.max=Idc.inv.f-IdN(12)
式(12)中,IdN为故障极的额定直流电流,Idc.inv.f为故障极线路电流的最大值;Idc.inv.f的计算步骤如下:
a)根据图4所示的运算电路,则故障点的直流电压值为:
U M ( s ) = ( R 2 + s L ) I d c . r e c ( s ) + U d c . i n v ( s ) 1 + s C ( R + s L ) - L 2 i d c . i n v ( 0 _ ) + C ( R + s L ) u c ( 0 _ ) 1 + s C ( R + s L ) - - - ( 13 )
式(13)中,uc(0_)为线路电容电压的初始值,即为额定直流电压;Idc.rec(s)=idc.rec(0_)/s为整流侧直流电流象函数,idc.inv(0_)为直流电流的初始值,也即为额定直流电流值;Udc.inv(s)是逆变侧理想空载直流电压Udc.inv的象函数,Udc.inv(s)=Udc.inv/s,Udc.inv为额定直流电压;R,L,C为线路电阻,电感和电容参数;其中L2为电感,s为象函数的运算系数;
b)根据图3和式(13)可计算Idc.inv.f
I d c . i n v . f = | L - 1 ( U M ( s ) + L 2 i d c . i n v ( 0 _ ) - U d c . i n v ( s ) R + s L ) | - - - ( 14 )
式(14)中,L-1——表示拉普拉斯反变换的符号;
带入表1和表2中的系统参数和线路参数,可得ΔIf.max=3.12kA.
步骤4
计算一极线路故障时非故障极换相成功所需要的换相面积A,其表达式为:
A=2(IdN+KΔIf.max)(15)
式(15)中,IdN为非故障极额定直流电流;K均为电流耦合系数;ΔIf.max为同塔双回直流故障极逆变侧最大突变量电流;
由表1知,IdN=3.2kA;由步骤3知ΔId1_P=3.12kA;根据图6线路排布,考虑各非故障极的耦合出的电流的极性,最有可能引起换相失败的是Ⅱ回直流的正极,由表4知KI.32=0.20;
带入式(15)可得,A=2(IdN+KΔIf.max)=2(IdN+KI.32ΔId1_P)=7.6;
步骤5
比较A与Bmax的大小
由步骤2和4知,A=7.6<Bmax=8.31,则认为溪洛渡同塔并架双回直流输电工程双回额定运行时Ⅰ回直流正极线路故障不会引起非故障极换相失败;相应的电压电流的仿真波形可见图7-图11,可知非故障极没有发生换相失败。
实施例2:
如图1所示,本实施例的判断溪洛渡双回直流Ⅰ回直流正极金属回线运行时,Ⅰ回直流正极线路末端金属性故障时,非故障极是否发生换相失败,包括以下步骤:
1)根据同塔双回直流输电线路的结构和参数,计算线路间的电流耦合系数K;
2)根据换流器变压器的参数和交直流系统的运行参数,计算交流电网所能提供的最大换相时间面积Bmax
3)根据系统参数计算极线故障时故障极逆变侧的最大突变量电流ΔIf.max
4)根据最大突变量电流ΔIfmax、电流耦合系数K和非故障极额定直流电流IdN,计算非故障极换相成功所需要的换相面积A;
5)对A与Bmax的大小进行比较,若A>Bmax,则认为同塔并架多回直流输电线路耦合作用引起换相失败;反之,不会引起换相失败。
步骤1中,所述K的表达式如下:
K = m a x | I · j p h a s e , x ′ I · i p h a s e , x ′ |
式中,为故障极i上距故障点x处的故障电流;为非故障极j上距故障点x处耦合出的故障电流,(i,j=1,2,3,4);
K的计算步骤为:
a)根据线路参数和结构建立线路阻抗矩阵[Zphase]和导纳矩阵[Yphase],并计算[Zphase][Yphase]特征值矩阵为[Λ],特征向量矩阵[Tv],则有:
[Zphase][Yphase]=[Tv][Λ][Tv]-1(1)
b)根据同塔并架线路结构,以及线路故障的边界条件和过渡电阻Rf计算故障点电流值和故障点电压,其计算过程如下,首先电压电流满足式(2):
[ U · p h a s e ] = - [ Z C p ] [ I · p h a s e ] - - - ( 2 )
式(2)中, [ U · p h a s e ] = U · 1 p h a s e U · 2 p h a s e U · 3 p h a s e ... T 为极线电压列向量; [ I · p h a s e ] = I · 1 p h a s e I · 2 p h a s e I · 3 p h a s e ... T 为极线电流列向量; [ Z C p ] = [ T v ] [ Λ ] - 1 [ T v ] - 1 [ Z p h a s e ] ;
则对于含有n条极线的同塔并架直流输电线路的第i条上的发生过渡电阻为Rf的接地故障时,如图2所示,根据故障边界条件有:
{ U · i p h a s e ′ = - U · f - 2 I · i p h a s e ′ R f I · j p h a s e ′ = 0 - - - ( 3 )
式(3)中,j=1,2...4且j≠i;为故障附加电源,其幅值为故障极线路直流电压的额定值;为故障极线故障点的电压; I · l p h a s e ′ 为第l(l=1,2,3,4)条极线故障点处传相两端的故障行波电流;
c)联立式(2)和(3)求解可得故障点处的电流值:
[ I · p h a s e ′ ] = I · 1 p h a s e ′ . . . I i p h a s e ′ . . . I · n p h a s e ′ = 0 . . . - U · f Z C p ( i , i ) + 2 R f . . . 0 - - - ( 4 )
d)则距离故障点x处的电流值为:
[ I · p h a s e , x ′ ] = [ T i ] d i a g ( e - γ 1 x , e - γ 2 x ... e - γ n x ) [ T i ] - 1 [ I · p h a s e ′ ] - - - ( 5 )
式(5)中,[Ti]=([Tv]-1)T;γl为第l(l=1,2,3,4)个模量的衰减系数,可由线路参数求得;x为传播距离;
e)即可得第j根极线相对于第i根极线的电流耦合系数为:
k · i - j = I · j p h a s e , x ′ I · i p h a s e , x ′ - - - ( 6 )
式(6)中,为故障极i上距故障点x处的故障电流;为非故障极j上距故障点x处耦合出的故障电流;
f)实际计算电流耦合系数K时,考虑极端情况,认为故障极导线电流所含频率区间内的各次电流耦合系数均为该频率区间内的最大值并且忽略相角的影响,即:
K = m a x ( | k · i - j | ) - - - ( 7 )
根据表2中的线路参数,以及式(1)-式(7)可得溪洛渡双回直流极线间的耦合系数如表4所示:
表4双回直流极线间的耦合系数
耦合系数 数值
KI.42=KI.31 0.22
KI.41=KI.32 0.20
KI.34 0.25
KI.12 0.18
步骤2
根据换流器变压器的参数和交流系统的运行电压,计算交流电网所能提供的最大换相时间面积Bmax,其表达式为:
B m a x = 1 L r ∫ t 1 t 2 u a b ( t ) d t - - - ( 8 )
式(8)中,Lr为等值换相电感;t1,t2为换相时间区间的起始时刻和关断时刻,如图3所示;uab=ua-ub为ab相换相线电压;
Bmax的计算步骤为:
a)计算等值换相电感Lr
L r = U T _ N 2 2 ω 0 S T u k % - - - ( 9 )
式(9)中,为换流变压器阀侧额定相电压;ST为换流变压器的额定容量;uk%为换流变压器的短路阻抗百分数;ω0为工频角频率(ω0=2πf,其中f=50Hz);
b)计算换相时间区间[t1,t2];
t 1 = π - β ω 0 t 2 = π - γ ω 0 - - - ( 10 )
式(10)中,ω0为工频角频率ω0=2πf,(f=50Hz);β和γ分别为触发越前角和关断角;
根据表3得变压器参数UT_N2=210.52kA;ST=952.8;uk%=0.165;ω0=314.15926;且有系统参数知,触发超前角β=0.6632;关断角γ=0.2967,则换相角μ=β-γ0=0.3665; U a b _ N = 2 * 210.5 = 297.65 k V ; ω0=314.15926;带入式(8)-式(10)求解得到Bmax=8.31;
步骤3
根据系统参数计算极线故障时故障极逆变侧的最大突变量电流ΔIf.max;其表达式为:
ΔIf.max=Idc.inv.f-IdN(12)
式(12)中,IdN为故障极的额定直流电流,Idc.inv.f为故障极线路电流的最大值;Idc.inv.f的计算步骤如下:
a)根据图4所示的运算电路,则故障点的直流电压值为:
U M ( s ) = ( R 2 + s L ) I d c . r e c ( s ) + U d c . i n v ( s ) 1 + s C ( R + s L ) - L 2 i d c . i n v ( 0 _ ) + C ( R + s L ) u c ( 0 _ ) 1 + s C ( R + s L ) - - - ( 13 )
式(13)中,uc(0_)为线路电容电压的初始值,即为额定直流电压;Idc.rec(s)=idc.rec(0_)/s为整流侧直流电流象函数,idc.inv(0_)为直流电流的初始值,也即为额定直流电流值;Udc.inv(s)是逆变侧理想空载直流电压Udc.inv的象函数,Udc.inv(s)=Udc.inv/s,Udc.inv为额定直流电压;R,L,C为线路电阻,电感和电容参数;其中L2为电感,s为象函数的运算系数;
b)根据图3和式(13)可计算Idc.inv.f
I d c . i n v · f = | L - 1 ( U M ( s ) + L 2 i d c . i n v ( 0 _ ) - U d c . i n v ( s ) R + s L ) | - - - ( 14 )
式(14)中,L-1——表示拉普拉斯反变换的符号;
带入表1和表2中的系统参数和线路参数,可得ΔIf.max=3.12kA.
步骤4
计算一极线路故障时非故障极换相成功所需要的换相面积A,其表达式为:
A=2(IdN+KΔIf.max)(15)
式(15)中,IdN为非故障极额定直流电流;K均为电流耦合系数;ΔIf.max为同塔双回直流故障极逆变侧最大突变量电流;
由表1知,IdN=3.2kA;Ⅰ回直流正极线路末端金属性故障时,故障极的电流最大突变量ΔId1_P=3.12kA;由于单极金属回线运行,金属回线的电流突变量与正极相等为ΔId1_N=3.12kA;考虑各非故障极的耦合出的电流的极性,最有可能引起换相失败的是Ⅱ回直流的负极,由表4知KI.34=0.25;KI.32=0.20;
带入式(15)可得,A=2(IdN+KΔIf.max)=2(IdN+KI.34ΔId1_P+KI.32ΔId1_N)=9.1;
步骤5
比较A与Bmax的大小
由步骤2和4知,A=9.1>Bmax=8.31,则认为溪洛渡同塔并架双回直流输电线路Ⅰ回直流正极金属回线运行时Ⅰ回直流正极线路故障可能导致非故障极发生换相失败;仿真图如图12-图15所示,由图可见,Ⅱ回直流的负极发生换相失败。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受上述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。

Claims (1)

1.同塔并架多回直流线路耦合作用引发换相失败的判别方法,包括以下顺序的步骤:
1)根据同塔并架多回直流输电线路的结构和参数,计算线路间的电流耦合系数K;
2)根据换流器变压器的参数和交直流系统的运行参数,计算交流电网所能提供的最大换相时间面积Bmax
3)根据系统参数计算极线故障时故障极逆变侧的最大突变量电流ΔIf.max
4)根据最大突变量电流ΔIfmax、电流耦合系数K和非故障极额定直流电流IdN,计算非故障极换相成功所需要的换相面积A;
5)对A与Bmax的大小进行比较,若A>Bmax,则判定同塔并架多回直流输电线路耦合作用引起换相失败;反之,不会引起换相失败;
步骤1)中,所述的K的表达式如下:
K = m a x | I · j p h a s e , x ′ I · i p h a s e , x ′ |
其中,为故障极i上距故障点x处的故障电流;为非故障极j上距故障点x处耦合出的故障电流,其中i,j=1,2,3,....;
K的计算步骤为:
a)根据线路参数和结构建立线路阻抗矩阵[Zphase]和导纳矩阵[Yphase],并计算[Zphase][Yphase]特征值矩阵为[Λ],特征向量矩阵[Tv],则有:
[Zphase][Yphase]=[Tv][Λ][Tv]-1(1)
b)根据同塔并架线路结构,以及线路故障的边界条件和过渡电阻Rf计算故障点电流和电压值,其计算过程如下,首先电压电流满足式(2):
[ U · p h a s e ] = - [ Z C p ] [ I · p h a s e ] - - - ( 2 )
式(2)中, [ U · p h a s e ] = U · 1 p h a s e U · 2 p h a s e U · 3 p h a s e ... T 为极线电压列向量; [ I · p h a s e ] = I · 1 p h a s e I · 2 p h a s e I · 3 p h a s e ... T 为极线电流列向量; [ Z C p ] = [ T v ] [ Λ ] - 1 [ T v ] - 1 [ Z p h a s e ] ;
则对于含有n条极线的同塔并架直流输电线路的第i条上的发生过渡电阻为Rf的接地故障时,根据故障边界条件有:
U · i p h a s e ′ = - U · f - 2 I · i p h a s e ′ R f I · j p h a s e ′ = 0 - - - ( 3 )
式(3)中,j=1,2...n且j≠i;为故障附加电源,其幅值为故障极线路直流电压的额定值;为故障极线故障点的电压;为第l条极线故障点处传相两端的故障行波电流,其中l=1,2…n;
c)联立式(2)和(3)求解可得故障点处的电流值:
[ I · p h a s e ′ ] = I · 1 p h a s e ′ . . . I · i p h a s e ′ . . . I · n p h a s e ′ = 0 . . . - U · f Z C p ( i , i ) + 2 R f . . . 0 - - - ( 4 )
d)则距离故障点x处的电流值为:
[ I · p h a s e , x ′ ] = [ T i ] d i a g ( e - γ 1 x , e - γ 2 x ... e - γ n x ) [ T i ] - 1 [ I · p h a s e ′ ] - - - ( 5 )
式(5)中,[Ti]=([Tv]-1)T;γl为第l个模量的衰减系数,可由线路参数求得;x为传播距离,其中l=1,2…n;
e)即可得第j根极线相对于第i根极线的电流耦合系数为:
k · i - j = I · j p h a s e , x ′ I · i p h a s e , x ′ - - - ( 6 )
式(6)中,为故障极i上距故障点x处的故障电流;为非故障极j上距故障点x处耦合出的故障电流;
f)实际计算电流耦合系数K时,考虑极端情况,认为故障极导线电流所含频率区间内的各次电流耦合系数均为该频率区间内的最大值并且忽略相角的影响,即:
K = m a x ( | k · i - j | ) - - - ( 7 )
由此计算出K的值;
步骤2)中,所述的最大换相时间面积Bmax的表达式为:
B m a x = 1 L r ∫ t 1 t 2 u a b ( t ) d t - - - ( 8 )
式(8)中,Lr为等值换相电感;t1,t2为换相时间区间的起始时刻和关断时刻,uab=ua-ub为ab相换相线电压;
Bmax的计算步骤为:
a)计算等值换相电感Lr
L r = U T _ N 2 2 ω 0 S T u k % - - - ( 9 )
式(9)中,UT_N2为换流变压器阀侧额定相电压;ST为换流变压器的额定容量;uk%为换流变压器的短路阻抗百分数;ω0为工频角频率,ω0=2πf,其中f=50Hz;
b)计算换相时间区间[t1,t2];
t 1 = π - β ω 0 t 2 = π - γ ω 0 - - - ( 10 )
式(10)中,ω0为工频角频率;β和γ分别为触发越前角和关断角;
c)根据额定运行时换流母线电压计算uab(t);
式(11)中,Uab_N为换流母线额定线电压的幅值;ω0为额定线电压的工频角频率和初相位;
d)根据式(9)、(10)和(11),带入式(8)可求得交流电网所能提供的最大换相时间面积Bmax
步骤3)中,所述的最大突变量电流ΔIf.max的表达式为:
ΔIf.max=Idc.inv.f-IdN(12)
式(12)中,IdN为故障极的额定直流电流;Idc.inv.f为故障极线路故障电流的最大值;Idc.inv.f的计算步骤如下:
a)故障点的直流电压值为:
U M ( s ) = ( R + s L ) I d c . r e c ( s ) + U d c . i n v ( s ) 1 + s C ( R + s L ) - L 2 i d c . i n v ( 0 - ) + C ( R + s L ) u c ( 0 - ) 1 + s C ( R + s L ) - - - ( 13 )
式(13)中,uc(0_)为线路电容电压的初始值,即为额定直流电压;Idc.rec(s)=idc.rec(0_)/s为整流侧直流电流象函数,idc.inv(0_)为直流电流的初始值,也即为额定直流电流值;Udc.inv(s)是逆变侧理想空载直流电压Udc.inv的象函数,Udc.inv(s)=Udc.inv/s,Udc.inv为额定直流电压,R、L、C分别为线路电阻、电感、电容参数;其中L2为电感,s为象函数的运算系数;
b)根据式(13)可计算Idc.inv.f
I d c . i n v . f = | L - 1 ( U M ( s ) + L 2 i d c . i n v ( 0 - ) - U d c . i n v ( s ) R + s L ) | - - - ( 14 )
式(14)中,L-1——表示拉普拉斯反变换的符号;
步骤4)中,所述的换相面积A的表达式为:
A=2(IdN+KΔIf.max)(15)
式(15)中,IdN为非故障极额定直流电流;K均为电流耦合系数;ΔIf.max为同塔并架多回直流故障极逆变侧最大突变量电流。
CN201310577378.3A 2013-11-18 2013-11-18 同塔并架多回直流线路耦合作用引发换相失败的判别方法 Active CN103558481B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310577378.3A CN103558481B (zh) 2013-11-18 2013-11-18 同塔并架多回直流线路耦合作用引发换相失败的判别方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310577378.3A CN103558481B (zh) 2013-11-18 2013-11-18 同塔并架多回直流线路耦合作用引发换相失败的判别方法

Publications (2)

Publication Number Publication Date
CN103558481A CN103558481A (zh) 2014-02-05
CN103558481B true CN103558481B (zh) 2016-05-04

Family

ID=50012783

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310577378.3A Active CN103558481B (zh) 2013-11-18 2013-11-18 同塔并架多回直流线路耦合作用引发换相失败的判别方法

Country Status (1)

Country Link
CN (1) CN103558481B (zh)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104572584B (zh) * 2014-12-17 2021-04-02 南昌大学 基于稀疏技术的lr分解求取电力系统节点阻抗矩阵方法
CN104617576B (zh) * 2015-01-29 2017-01-25 国网宁夏电力公司 考虑直流控制特性的多直流馈出交流电网故障计算方法
CN104655988B (zh) * 2015-02-28 2018-02-23 华南理工大学 一种基于单回信息的同塔双回直流线路行波故障定位方法
CN104820167A (zh) * 2015-04-30 2015-08-05 国家电网公司 直流输电系统换相失败检测方法
CN104950229B (zh) * 2015-06-17 2018-07-24 国家电网公司 基于单回线路单端电气量双回线路跨线故障点短路电阻测量方法
CN106786815B (zh) * 2017-01-23 2023-11-14 中国电力科学研究院有限公司 一种交直流系统电压耦合作用的衡量方法及系统
CN109887625B (zh) * 2019-03-07 2022-04-22 中国核动力研究设计院 用于堆芯在线监测的探测器失效应对方法及电流恢复方法
CN110336266B (zh) * 2019-05-07 2020-09-04 山东大学 交直流混联受端电网的直流分群规划方法
CN110189011B (zh) * 2019-05-23 2021-06-01 国电南瑞科技股份有限公司 自然灾害下密集输电通道故障评估方法及系统
CN111628486A (zh) * 2020-05-28 2020-09-04 中国南方电网有限责任公司超高压输电公司检修试验中心 一种直流线路电压突变量保护防误动策略及系统

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4028607A (en) * 1974-04-22 1977-06-07 Hitachi, Ltd. Inverter control system
JPH04168983A (ja) * 1990-10-31 1992-06-17 Toshiba Corp 転流失敗検出回路
CN101701996A (zh) * 2009-11-26 2010-05-05 华南理工大学 一种高压直流系统换相失败的判别方法及装置
CN102353874A (zh) * 2011-07-11 2012-02-15 四川大学 基于换相电流时间面积指标的换相失败检测方法
CN103065016A (zh) * 2013-01-07 2013-04-24 华南理工大学 确定引起直流换相失败的交流系统故障范围的方法及系统

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4028607A (en) * 1974-04-22 1977-06-07 Hitachi, Ltd. Inverter control system
JPH04168983A (ja) * 1990-10-31 1992-06-17 Toshiba Corp 転流失敗検出回路
CN101701996A (zh) * 2009-11-26 2010-05-05 华南理工大学 一种高压直流系统换相失败的判别方法及装置
CN102353874A (zh) * 2011-07-11 2012-02-15 四川大学 基于换相电流时间面积指标的换相失败检测方法
CN103065016A (zh) * 2013-01-07 2013-04-24 华南理工大学 确定引起直流换相失败的交流系统故障范围的方法及系统

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
HVDC 输电系统换相失败的故障合闸角影响机理;王钢等;《电力系统自动化》;20100225;第34卷(第4期);正文第49-54、102页 *
多馈入直流输电系统中换相失败研究综;林凌雪等;《电网技术》;20060930;第30卷(第17期);正文第40-46页 *

Also Published As

Publication number Publication date
CN103558481A (zh) 2014-02-05

Similar Documents

Publication Publication Date Title
CN103558481B (zh) 同塔并架多回直流线路耦合作用引发换相失败的判别方法
CN103887810B (zh) 基于短路比动态跟踪的直流系统持续换相失败判断方法
CN103323790B (zh) 基于直流输电逆变侧两相短路故障的换相失败分析方法
CN104466984B (zh) 一种提高直流换相安全水平的动态无功备用优化方法
CN103345162B (zh) 一种功率级数模混合仿真系统
CN110474307B (zh) 基于电流暂降检测的自适应故障分量电流差动保护方法
CN103078311B (zh) 一种抑制换相失败的直流电流预测整定方法
CN103972900B (zh) 利用电压控制敏感因子确定多馈入直流输电系统无功补偿装置布点的方法
CN103954885B (zh) 基于分布参数的双回线故障单端定位系统及定位方法
CN103915808A (zh) 基于电压源型换流器的直流融冰装置及其控制方法
CN104617576B (zh) 考虑直流控制特性的多直流馈出交流电网故障计算方法
CN106451432A (zh) 多直流馈入系统故障后的协调恢复控制方法
CN102916450A (zh) 一种三相不对称交直流电力系统的混合实时仿真方法
CN106549377B (zh) 一种交直流混联系统机电-电磁暂态混合仿真的交接方法
CN104104251B (zh) 一种基于ssr-kdf的并网逆变器的鲁棒控制方法
CN104809308A (zh) 一种适用于非对称运行状态的换流器开关函数建模方法
CN103795030B (zh) 一种基于纵联支接电导的变压器继电保护方法
Wang et al. A novel hybrid directional comparison pilot protection scheme for the LCC-VSC hybrid HVDC transmission lines
CN203561703U (zh) 用于光伏并网逆变器低电压穿越测试的电压跌落发生器
CN103560494B (zh) 配电网保护整定的短路电流获取方法
CN103117562A (zh) 一种高压级联能量回馈变频器功率模块的控制方法
CN111371128A (zh) 一种对称单极型柔性直流换流站
CN110460082B (zh) 一种多馈入高压直流系统换相失败风险判别方法及系统
CN203301140U (zh) 变压器直流偏磁抑制装置
CN110048427A (zh) 一种多端柔性直流配电网潮流保护定值计算方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant