CN101701996A - 一种高压直流系统换相失败的判别方法及装置 - Google Patents

一种高压直流系统换相失败的判别方法及装置 Download PDF

Info

Publication number
CN101701996A
CN101701996A CN200910194153A CN200910194153A CN101701996A CN 101701996 A CN101701996 A CN 101701996A CN 200910194153 A CN200910194153 A CN 200910194153A CN 200910194153 A CN200910194153 A CN 200910194153A CN 101701996 A CN101701996 A CN 101701996A
Authority
CN
China
Prior art keywords
commutation
area
fault
voltage time
commutation voltage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN200910194153A
Other languages
English (en)
Other versions
CN101701996B (zh
Inventor
王钢
李志铿
黄敏
李海锋
朱革兰
梁远升
王智东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
South China University of Technology SCUT
Original Assignee
South China University of Technology SCUT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by South China University of Technology SCUT filed Critical South China University of Technology SCUT
Priority to CN2009101941533A priority Critical patent/CN101701996B/zh
Publication of CN101701996A publication Critical patent/CN101701996A/zh
Application granted granted Critical
Publication of CN101701996B publication Critical patent/CN101701996B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种高压直流系统换相失败的判别方法,包括以下步骤:S1、计算其中某一点在给定故障合闸角下发生故障时,高压直流系统换流母线上换相电压的负荷分量和故障附加分量;S2、确定积分区间,计算实际换相电压时间面积;S3、比较实际换相电压时间面积与临界换相电压时间面积,并判别该点的故障是否会引起换相失败;S4、重复步骤S1至步骤S3,确定引起高压直流系统换相失败的交流故障区域。本发明还公开了一种高压直流系统换相失败的判别装置,包括准备单元、计算单元、判别单元;本发明大幅减少了计算规模,其精度满足工程应用所需,揭示了故障合闸角对换相失败影响的机理,适用于故障稳态和故障暂态的分析。

Description

一种高压直流系统换相失败的判别方法及装置
技术领域
本发明涉及电力系统领域中的故障检测技术,尤其涉及一种在交直流混合系统中对交流系统故障引发高压直流系统换相失败的判别方法及应用该方法的装置。
背景技术
随着我国电力“西电东送、南北互供、全国联网”战略的实施,已有越来越多的高压直流工程投入运行。目前,南方电网已形成了“六交四直”的交直流混合输电系统,成为世界上最大的多馈入交直流混合系统。在交直流混合系统中,换流器的换相失败是直流系统最常见的故障之一。连续的换相失败不仅严重威胁直流系统本身的安全稳定运行,而且有可能造成交流系统继电保护的不正确动作,甚至引起一系列控制保护装置的动作,造成严重后果。实际上,2003年以来南方电网先后发生两起因天广直流、三广直流换相失败导致交流线路保护误动作的事故。相关研究表明,交流系统故障造成交流电压幅值下降及其相位偏移是引起换流器换相失败的主要原因。因此,对交流系统故障与直流系统换相失败之间的关系进行定量研究,分析影响直流系统换相失败的各个因素,提出换相失败的判别方法,对系统的安全稳定运行具有重要意义。
对于交流系统故障所引起的直流系统换相失败,现有的研究表明:换流阀的关断角过小是引起其换相失败的根本原因,而故障合闸角、直流电流、触发角、换流母线线电压、换流变压器变比和换相阻抗,以及交流系统频谱特性都对逆变器的关断角有不同程度的影响。以此为基础,目前已有各种基于实测电气量的换相失败判别方法和各种仅适用于故障稳态的换相失败的判据。然而,限于计算规模和效率,基于实测电气量的换相失败判别方法并不适用于对大规模交直流系统中换相失败的分析,如换相失败风险评估和交、直流系统控制保护优化配置等。而且,这种判别方法也无法研究交流故障对换相失败影响的内在机理。而各种换相失败的稳态判据,如基于换相电压降幅的方法,则是从故障稳态的角度提出的,无法反映故障合闸角的不同所对应的故障暂态过程的差异,以及这种差异对换相失败的影响,因而不能适用于故障暂态的研究。
发明内容
本发明的目的在于克服现有技术的缺点和不足,提供了一种在交直流混合系统中对交流系统故障所引发的高压直流系统换相失败的判别方法。该方法大幅减少了计算规模,其精度满足工程应用所需,而且计及了故障暂态过程对换相失败的影响,因而同时适用于故障稳态和故障暂态的分析,并可用于高压直流系统换相失败的在线控制、换相失败风险评估和交直流系统控制保护的优化配置等,突破了现有方法的应用局限性。
本发明的目的还在于提供一种应用上述方法的高压直流系统换相失败的判别装置。
本发明的目的之一是通过下述技术方案实现:一种高压直流系统换相失败的判别方法,包括以下步骤:
S1、计算交流系统中某一点在给定故障合闸角下发生故障(故障类型给定)时,高压直流系统换流母线上换相电压的负荷分量和故障附加分量,获得换相电压的时域波形;
S2、利用步骤S1所得的换相电压时域波形确定积分区间,计算实际换相电压时间面积;
S3、比较实际换相电压时间面积与临界换相电压时间面积,若实际换相电压时间面积>临界换相电压时间面积,则该点在所给定的故障合闸角下不会发生换相失败;若实际换相电压时间面积<临界换相电压时间面积,则该点在给定的故障合闸角下会发生换相失败;
S4、对于交流系统中的各点,重复步骤S1至步骤S3,确定在给定的故障合闸角和故障类型下引起高压直流系统换相失败的交流故障区域。
为更好的实现本发明,所述步骤S2具体包括以下步骤:
S2.1、确定积分区间:根据步骤S1计算所得的换相电压时域波形,并以换相开始时刻为零时刻点,确定换相电压时域波形的第一个过零点,以此作为积分上限,并以t2表示;
根据故障前直流控制系统中逆变器控制的越前触发角βo,以及换流阀允许的最小关断角γmin,计算积分下限t1
t1=t2-0.01×(βomin)/π
S2.2、计算实际换相电压时间面积:由步骤S1中得到的换相电压时域波形和由步骤S2.1得到的积分区间,计算在此积分区间内换相电压波形与时间轴围成的面积,即实际换相电压时间面积Af
A f = ∫ t 1 t 2 u ( t ) dt
式中,t为时间变量,u(t)为由换相电压的负荷分量和故障附加分量组成的换相电压时域波形。
所述步骤S2.2中计算实际换相电压时间面积Af,具体包括:
S2.21、计算由负荷分量构成的换相电压时间面积Af0
A f 0 = &Integral; t 1 t 2 u f 0 ( t ) dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 u f 0 ( t ) dt t 1 < 0
其中,uf0(t)为高压直流系统换流母线上换相电压的负荷分量;
S2.22、计算由故障附加分量构成的换相电压时间面积,具体包括由稳态分量所造成的附加换相面积ΔA′f和由衰减非周期分量及衰减周期分量所共同造成的附加换相面积ΔA″f
&Delta;A f &prime; = &Integral; t 1 t 2 &Delta;u f &prime; ( t ) dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 &Delta;u f &prime; ( t ) dt t 1 < 0
&Delta;A f &prime; &prime; = &Integral; t 1 t 2 [ &Delta;u f 1 &prime; &prime; ( t ) + &Delta;u f 2 &prime; &prime; ( t ) ] dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 [ &Delta;u f 1 &prime; &prime; ( t ) + &Delta;u f 2 &prime; &prime; ( t ) ] dt t 1 < 0
式中,Δu′f(t)为故障附加分量的稳态分量,Δu″f1(t)为故障附加分量的衰减非周期分量,Δu″f2(t)为故障附加分量的衰减周期分量;
S2.23、计算实际换相电压时间面积Af
A f = &Integral; t 1 t 2 u ( t ) dt = A f 0 + &Delta;A f &prime; + &Delta;A f &prime; &prime;
式中,Af0为由负荷分量构成的换相电压时间面积,ΔA′f为由稳态分量所造成的附加换相面积,ΔA″f为由衰减非周期分量及衰减周期分量所共同造成的附加换相面积。
所述临界换相电压时间面积通过下式求出:
Acr=2LrId
式中,Acr为临界换相电压时间面积,Id为高压直流系统的直流电流运行额定值,Lr为每相等值换相电感。
本发明的目的之二是通过下述技术方案实现的,一种高压直流系统换相失败的判别装置,包括:
准备单元,用于计算交流系统中某一点在给定的故障合闸角下发生故障时,高压直流系统换流母线上换相电压的负荷分量和故障附加分量,获得换相电压的时域波形;
计算单元,用于根据准备单元的时域波形确定积分区间,计算实际换相电压时间面积;
判别单元,用于比较实际换相电压时间面积与临界换相电压时间面积,若实际换相电压时间面积>临界换相电压时间面积,则判别该点在所给定的故障合闸角下不会发生换相失败;若实际换相电压时间面积<临界换相电压时间面积,则判别该点在给定的故障合闸角下会发生换相失败。
为更好的实现本发明,所述计算单元具体包括:
确定积分区间单元:根据准备单元计算所得换相电压的负荷分量和故障附加分量,并以换相开始时刻为零时刻点,确定换相电压时域波形的第一个过零点,以此作为积分上限,并以t2表示;
根据故障前直流控制系统中逆变器控制的越前触发角βo,以及换流阀允许的最小关断角γmin,确定积分下限t1
t1=t2-0.01×(βomin)/π
计算实际换相电压时间面积单元:根据准备单元得到的换相电压时域波形和确定积分区间单元得到的积分区间,计算在此积分区间内换相电压波形与时间轴围成的面积,即实际换相电压时间面积Af
A f = &Integral; t 1 t 2 u ( t ) dt
式中,t为时间变量,u(t)为由换相电压的稳态分量和故障暂态分量组成的换相电压时域波形。
所述计算单元还包括计算临界换相电压时间面积单元,用于通过下式求出临界换相电压时间面积:
Acr=2LrId
式中,Acr为临界换相电压时间面积,Id为高压直流系统的直流电流运行额定值,Lr为每相等值换相电感。
本发明的原理:基于换相电压时间面积可作为评价高压直流系统抵御换相失败能力强弱的定量指标的理论论证,该方法通过分析交流系统中某点在不同故障合闸角下发生故障时,换流母线交流电压故障暂态分量的特性,及其对换相电压时间面积大小的影响,对该点故障是否将引起换相失败的发生进行判别。
本发明与现有技术相比,具有如下优点和有益效果:
(1)适用于故障稳态和故障暂态的分析:现有的基于换相电压降幅的换相失败判别方法无法反映故障合闸角的不同所对应的故障暂态过程的差异,以及这种差异对换相失败的影响,因而不能适用于故障暂态的研究;本发明以换相电压面积的大小作为判断换相失败的定量指标,其计及了故障合闸角的影响,因此同时适用于故障稳态和暂态下的分析,突破了现有方法的应用局限性。
(2)减少了计算量,适用于大规模交直流混联系统:与基于电磁暂态仿真软件的时域仿真方法相比,本发明利用已有的交流系统暂态分析方法和数值积分算法,仅需已知交流系统的网架参数,以及高压直流系统的运行参数,无需建立高压直流系统的数学模型,也无需对全系统进行数字仿真,有效的降低了计算量。
(3)揭示了故障合闸角对换相失败影响的机理:换相电压时间面积可作为评价高压直流系统抵御换相失败能力强弱的定量指标,而故障合闸角对其有直接影响,因此,和各种基于实测电气量的换相失败判别方法相比,通过分析与不同故障合闸角下的交流故障相对应的换相电压时间面积的变化特性,本发明揭示了故障合闸角对换相失败影响的机理,从而为交直流系统相互作用的定量分析、提高高压直流系统抵御换相失败能力的研究、直流控制系统参数的整定以及受端交流电网继电保护运行特性的研究提供了理论研究的参考。
(4)实现高压直流系统换相失败的在线控制:在已知故障地点的情况下,利用已有的计算故障合闸角的算法,本发明可用于高压直流系统换相失败的在线控制。
附图说明
图1是本发明高压直流输电系统中的交流系统的结构示意图;
图2是本发明中的换相电压时域波形示意图。
具体实施方式
下面结合实施例及附图,对本发明作进一步地详细说明,但本发明的实施方式不限于此。
实施例
本发明高压直流输电系统中的交流系统的结构如图1所示。设图1中F点发生B相单相接地故障,过渡电阻Rg=70欧姆,故障合闸角为130°。下面应用本发明装置来判别该交流系统故障是否会引发高压直流输电系统换相失败。
本高压直流系统换相失败的判别装置,包括:
准备单元,用于计算交流系统中某一点在所给定的故障合闸角下发生指定的故障时,高压直流系统换流母线上换相电压的负荷分量和故障附加分量,获得换相电压的时域波形;
计算单元,用于根据准备单元的时域波形确定积分区间,计算实际换相电压时间面积;
判别单元,用于比较实际换相电压时间面积与临界换相电压时间面积,若实际换相电压时间面积>临界换相电压时间面积,则判别该点在所给定的故障合闸角下不会发生换相失败;若实际换相电压时间面积<临界换相电压时间面积,则判别该点在所给定的故障合闸角下会发生换相失败。
所述计算单元具体包括:
确定积分区间单元:根据准备单元计算所得换相电压的负荷分量和故障附加分量,并将换相开始时刻作为零时刻点,确定换相电压时域波形的第一个过零点,以此作为积分上限,并以t2表示;
根据故障前直流控制系统中逆变器控制的越前触发角βo,以及换流阀允许的最小关断角γmin,确定积分下限t1
t1=t2-0.01×(βomin)/π
计算实际换相电压时间面积单元:根据准备单元得到的换相电压时域波形和确定积分区间单元得到的积分区间,计算在此积分区间内换相电压波形与时间轴围成的面积,即实际换相电压时间面积Af
A f = &Integral; t 1 t 2 u ( t ) dt
式中,t为时间变量,u(t)为由换相电压的稳态分量和故障暂态分量组成的换相电压时域波形。
所述计算单元还包括计算临界换相电压时间面积单元,用于通过下式求出临界换相电压时间面积:
Acr=2LrId
式中,Acr为临界换相电压时间面积,Id为高压直流系统的直流电流运行额定值,Lr为换相电感。
本装置对该交流系统故障是否会引发高压直流输电系统换相失败的判别过程如下:
1.准备单元利用现有的交流系统暂态分析方法,计算故障发生后换相电压的负荷分量和故障附加分量。如图1所示的交流系统,负荷分量uf0(t)表示,而故障附加分量包括稳态分量、衰减非周期分量和衰减周期分量,分别用Δu′f(t)、Δu″f1(t)和Δu″f2(t)表示。由负荷分量和故障附加分量所构成的换相电压时域波形如图2中u(t)所示。
2.计算单元中的确定积分区间单元根据换相电压的稳态分量和故障暂态分量,并以换相开始时刻为零时刻点,确定换相电压时域波形u(t)的第一个过零点,以此作为积分上限t2,如t2=0.0099s;
根据已知的故障前的逆变器控制系统的越前触发角βo和换流阀允许的最小关断角γmin,如βo=0.6440和γmin=0,确定积分上限t1
t1=t2-0.01×0.644/π=0.0079s
3.计算实际换相电压时间面积单元利用已有的数值积分方法,如梯形积分法,计算实际换相电压时间面积Af
A f = &Integral; t 1 t 2 u ( t ) dt = A f 0 + &Delta;A f &prime; + &Delta;A f &prime; &prime;
式中,Af0为由负荷分量构成的换相电压时间面积,ΔA′f为由稳态分量所造成的附加换相面积;ΔA″f为由衰减非周期分量及衰减周期分量所共同造成的附加换相面积,分别由下式计算:
A f 0 = &Integral; t 1 t 2 u f 0 ( t ) dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 u f 0 ( t ) dt t 1 < 0 ;
&Delta;A f &prime; = &Integral; t 1 t 2 &Delta;u f &prime; ( t ) dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 &Delta;u f &prime; ( t ) dt t 1 < 0 ;
&Delta;A f &prime; &prime; = &Integral; t 1 t 2 [ &Delta;u f 1 &prime; &prime; ( t ) + &Delta;u f 2 &prime; &prime; ( t ) ] dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 [ &Delta;u f 1 &prime; &prime; ( t ) + &Delta;u f 2 &prime; &prime; ( t ) ] dt t 1 < 0
由此,根据如图1所示的交流系统的结构和参数,可得Af=0.1514;
4.计算单元中的计算临界换相电压时间面积单元,根据已知的高压直流系统的直流电流运行额定值Id和换相电感Lr,如Id=2kA,Lr=0.042H,计算临界换相电压时间面积Acr:Acr=2LrIdn=0.1693。
5.判别单元比较实际换相电压时间面积与临界换相电压时间面积,由于Af<Acr,因此判别在图1所示的交流系统中,F点发生故障合闸角为130°的B相接地故障时,将引起高压直流系统发生换相失败。
将本发明应用于国际大电网会议(CIGRE)高压直流输电系统标准模型的换相失败评估,并与基于PSCAD/EMTDC所得的数字仿真结果相比较。在该模型中,最小关断角γmin=0;直流电流额定值Idn=2kA;逆变侧换流变压器漏电感Lr=0.042H。表1为不同故障合闸角换流母线发生a相接地故障时,应用本发明计算求得的实际换相电压时间面积Af和通过仿真计算获得的实际换相电压时间面积Afsim,以及应用本发明得到的换相失败判别结果和通过仿真获得的是否换相失败的结果。其中Acr=2LrIdn=1.693×10-1,换相面积Af均为交流故障发生后0.01s内ab两相换相时的换相面积。
表1
Figure G2009101941533D0000091
如表1所示,在不同故障合闸角下单相故障时的换相面积和换相失败判断结果:所示的74种不同故障情况,Af的解析计算结果与仿真计算结果基本一致,且应用本发明能正确判别其中68种故障情况是否发生换相失败。即使对于判别错误的各种故障情况,其Af的解析值也均是处于临界值,即非常接近Acr。因此,应用本发明所得到的计算结果与仿真结果相吻合,满足工程精度要求。
上述实施例为本发明较佳的实施方式,但本发明的实施方式并不受所述实施例的限制,其他的任何未背离本发明的精神实质与原理下所作的改变、修饰、替代、组合、简化,均应为等效的置换方式,都包含在本发明的保护范围之内。

Claims (7)

1.一种高压直流系统换相失败的判别方法,其特征在于,包括以下步骤:
S1、计算交流系统中某一点在给定故障合闸角下发生故障时,高压直流系统换流母线上换相电压的负荷分量和故障附加分量,获得换相电压的时域波形;
S2、利用步骤S1所得的换相电压时域波形确定积分区间,计算实际换相电压时间面积;
S3、比较实际换相电压时间面积与临界换相电压时间面积,若实际换相电压时间面积>临界换相电压时间面积,则该点在所给定的故障合闸角下不会发生换相失败;若实际换相电压时间面积<临界换相电压时间面积,则该点在所给定的故障合闸角下会发生换相失败;
S4、对于交流系统中的各点,重复步骤S1至步骤S3,确定在给定的故障合闸角和故障类型下引起高压直流系统换相失败的交流故障区域。
2.根据权利要求1所述的高压直流系统换相失败的判别方法,其特征在于,所述步骤S2具体包括以下步骤:
S2.1、确定积分区间:根据步骤S1计算所得的换相电压时域波形,并以换相开始时刻为零时刻点,确定换相电压时域波形的第一个过零点,以此作为积分上限,并以t2表示;
根据故障前直流控制系统中逆变器控制的越前触发角βo,以及换流阀允许的最小关断角γmin,计算积分下限t1
t1=t2-0.01×(βomin)/π
S2.2、计算实际换相电压时间面积:由步骤S1中得到的换相电压时域波形和由步骤S2.1得到的积分区间,计算在此积分区间内换相电压波形与时间轴围成的面积,即实际换相电压时间面积Af
A f = &Integral; t 1 t 2 u ( t ) dt
式中,t为时间变量,u(t)为由换相电压的负荷分量和故障附加分量组成的换相电压时域波形。
3.根据权利要求1所述的高压直流系统换相失败的判别方法,其特征在于,所述步骤S2.2中计算实际换相电压时间面积,具体包括:
S2.21、计算由负荷分量构成的换相电压时间面积Af0
A f 0 = &Integral; t 1 t 2 u f 0 ( t ) dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 u f 0 ( t ) dt t 1 < 0
其中,uf0(t)为高压直流系统换流母线上换相电压的负荷分量;
S2.22、计算由故障附加分量构成的换相电压时间面积,具体包括由稳态分量所造成的附加换相面积ΔA′f和由衰减非周期分量及衰减周期分量所共同造成的附加换相面积ΔA″f
&Delta; A f &prime; = &Integral; t 1 t 2 &Delta; u f &prime; ( t ) dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 &Delta; u f &prime; ( t ) dt t 1 < 0
&Delta; A f &prime; &prime; = &Integral; t 1 t 2 [ &Delta; u f 1 &prime; &prime; ( t ) + &Delta; u f 2 &prime; &prime; ( t ) ] dt t 1 &GreaterEqual; 0 &Integral; 0 t 2 [ &Delta; u f 1 &prime; &prime; ( t ) + &Delta; u f 2 &prime; &prime; ( t ) ] dt t 1 < 0
式中,Δu′f(t)为故障附加分量的稳态分量,Δu″f1(t)为故障附加分量的衰减非周期分量,Δu″f2(t)为故障附加分量的衰减周期分量;
S2.23、计算实际换相电压时间面积Af
A f = &Integral; t 1 t 2 u ( t ) dt = A f 0 + &Delta; A f &prime; + &Delta; A f &prime; &prime;
式中,Af0为由负荷分量构成的换相电压时间面积,ΔA′f为由稳态分量所造成的附加换相面积,ΔA″f为由衰减非周期分量及衰减周期分量所共同造成的附加换相面积。
4.根据权利要求1所述的高压直流系统换相失败的判别方法,其特征在于,所述临界换相电压时间面积通过下式求出:
Acr=2LrId
式中,Acr为临界换相电压时间面积,Id为高压直流系统的直流电流运行额定值,Lr为每相等值换相电感。
5.一种高压直流系统换相失败的判别装置,其特征在于,包括:
准备单元,用于计算交流系统中某一点在给定的故障合闸角下发生指定的故障时,高压直流系统换流母线上换相电压的负荷分量和故障附加分量,获得换相电压的时域波形;
计算单元,用于根据准备单元的时域波形确定积分区间,计算实际换相电压时间面积;
判别单元,用于比较实际换相电压时间面积与临界换相电压时间面积,若实际换相电压时间面积>临界换相电压时间面积,则判别该点在所给定的故障合闸角下不会发生换相失败;若实际换相电压时间面积<临界换相电压时间面积,则判别该点在所给定的故障合闸角下会发生换相失败。
6.根据权利要求5所述高压直流系统换相失败的判别装置,其特征在于,所述计算单元具体包括:
确定积分区间单元:根据准备单元计算所得换相电压的负荷分量和故障附加分量,并以换相开始时刻为零时刻点,确定换相电压时域波形的第一个过零点,以此作为积分上限,并以t2表示;
根据故障前直流控制系统中逆变器控制的越前触发角βo,以及换流阀允许的最小关断角γmin,确定积分下限t1
t1=t2-0.01×(βomin)/π
计算实际换相电压时间面积单元:根据准备单元得到的换相电压时域波形和确定积分区间单元得到的积分区间,计算在此积分区间内换相电压波形与时间轴围成的面积,即实际换相电压时间面积Af
A f = &Integral; t 1 t 2 u ( t ) dt
式中,t为时间变量,u(t)为由换相电压的稳态分量和故障暂态分量组成的换相电压时域波形。
7.根据权利要求5所述高压直流系统换相失败的判别装置,其特征在于,所述计算单元还包括计算临界换相电压时间面积单元,用于通过下式求出临界换相电压时间面积:
Acr=2LrId
式中,Acr为临界换相电压时间面积,Id为高压直流系统的直流电流运行额定值,Lr为每相等值换相电感。
CN2009101941533A 2009-11-26 2009-11-26 一种高压直流系统换相失败的判别方法及装置 Expired - Fee Related CN101701996B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2009101941533A CN101701996B (zh) 2009-11-26 2009-11-26 一种高压直流系统换相失败的判别方法及装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2009101941533A CN101701996B (zh) 2009-11-26 2009-11-26 一种高压直流系统换相失败的判别方法及装置

Publications (2)

Publication Number Publication Date
CN101701996A true CN101701996A (zh) 2010-05-05
CN101701996B CN101701996B (zh) 2012-03-28

Family

ID=42156916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2009101941533A Expired - Fee Related CN101701996B (zh) 2009-11-26 2009-11-26 一种高压直流系统换相失败的判别方法及装置

Country Status (1)

Country Link
CN (1) CN101701996B (zh)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102353874A (zh) * 2011-07-11 2012-02-15 四川大学 基于换相电流时间面积指标的换相失败检测方法
CN102520317A (zh) * 2011-12-15 2012-06-27 四川大学 基于小波香侬熵标准化特征矢量的换相失败故障检测方法
CN103065016A (zh) * 2013-01-07 2013-04-24 华南理工大学 确定引起直流换相失败的交流系统故障范围的方法及系统
CN103078311A (zh) * 2013-01-10 2013-05-01 河海大学 一种抑制换相失败的直流电流预测整定方法
CN103257581A (zh) * 2013-03-29 2013-08-21 国家电网公司 一种换相失败保护仿真装置
CN103323790A (zh) * 2013-06-07 2013-09-25 华北电力大学 基于直流输电逆变侧两相短路故障的换相失败分析方法
CN103487680A (zh) * 2013-09-11 2014-01-01 国家电网公司 一种换流阀换相失败判别方法
CN103488883A (zh) * 2013-09-11 2014-01-01 国家电网公司 一种高压直流输电换流阀换相失败监测方法
CN103545835A (zh) * 2013-09-22 2014-01-29 国家电网公司 直流电力系统换相失败判断方法
CN103543357A (zh) * 2013-10-23 2014-01-29 华北电力大学 一种换流阀换相失败的预判方法
CN103558481A (zh) * 2013-11-18 2014-02-05 中国南方电网有限责任公司超高压输电公司检修试验中心 同塔并架多回直流线路耦合作用引发换相失败的判别方法
CN103762581A (zh) * 2014-01-23 2014-04-30 国家电网公司 一种同塔双回直流输电系统周期性换相失败的防御方法
CN104237745A (zh) * 2014-10-16 2014-12-24 国家电网公司 多馈入高压直流输电系统异常换相失败判定方法
CN104614640A (zh) * 2014-12-26 2015-05-13 四川大学 一种高压直流输电系统换相失败检测方法
WO2015074304A1 (zh) * 2013-11-19 2015-05-28 国家电网公司 一种基于可控换相电感的换相装置及其实现方法
CN104820167A (zh) * 2015-04-30 2015-08-05 国家电网公司 直流输电系统换相失败检测方法
CN104950205A (zh) * 2015-06-30 2015-09-30 南方电网科学研究院有限责任公司 一种交流系统故障对直流线路影响的量化分析方法
CN105024393A (zh) * 2015-06-24 2015-11-04 国家电网公司 一种直流输电系统换相面积计算方法及换相失败检测方法
CN105162154A (zh) * 2014-12-22 2015-12-16 中国南方电网有限责任公司 直流换相失败根据面积数值设置增加熄弧角数值的方法
CN105866627A (zh) * 2016-04-08 2016-08-17 国网福建省电力有限公司 一种适用于电力电子系统的故障信号检测方法
CN107942181A (zh) * 2018-01-04 2018-04-20 华南理工大学 换相失败识别方法、装置、存储介质和计算机设备
CN109635732A (zh) * 2018-12-12 2019-04-16 国网山东省电力公司电力科学研究院 一种lcc-hvdc连续换相失败故障预警网络训练方法
CN111781453A (zh) * 2020-07-04 2020-10-16 国家电网公司华中分部 一种基于故障时刻的直流系统换相失败风险评估方法
CN112421666A (zh) * 2020-11-10 2021-02-26 国网新疆电力有限公司经济技术研究院 一种高压直流输电系统后续换相失败风险评估及抑制方法
CN113162039A (zh) * 2021-04-28 2021-07-23 昆明理工大学 一种交流系统故障对直流各换相阀换相失败几率影响分析的方法
CN113285477A (zh) * 2021-05-25 2021-08-20 南方电网科学研究院有限责任公司 一种抑制直流输电系统换相失败方法及装置
CN113869668A (zh) * 2021-09-09 2021-12-31 上海电力大学 一种多电力电子设备馈入系统动态稳定判断方法

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100529781C (zh) * 2006-06-28 2009-08-19 南京南瑞继保电气有限公司 用计次识别换相失败的方法

Cited By (43)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102353874A (zh) * 2011-07-11 2012-02-15 四川大学 基于换相电流时间面积指标的换相失败检测方法
CN102353874B (zh) * 2011-07-11 2013-09-11 四川大学 基于换相电流时间面积指标的换相失败检测方法
CN102520317A (zh) * 2011-12-15 2012-06-27 四川大学 基于小波香侬熵标准化特征矢量的换相失败故障检测方法
CN103065016A (zh) * 2013-01-07 2013-04-24 华南理工大学 确定引起直流换相失败的交流系统故障范围的方法及系统
CN103065016B (zh) * 2013-01-07 2015-03-11 华南理工大学 确定引起直流换相失败的交流系统故障范围的方法
CN103078311A (zh) * 2013-01-10 2013-05-01 河海大学 一种抑制换相失败的直流电流预测整定方法
CN103257581A (zh) * 2013-03-29 2013-08-21 国家电网公司 一种换相失败保护仿真装置
CN103257581B (zh) * 2013-03-29 2015-12-16 国家电网公司 一种换相失败保护仿真装置
CN103323790A (zh) * 2013-06-07 2013-09-25 华北电力大学 基于直流输电逆变侧两相短路故障的换相失败分析方法
CN103323790B (zh) * 2013-06-07 2015-09-23 华北电力大学 基于直流输电逆变侧两相短路故障的换相失败分析方法
CN103488883A (zh) * 2013-09-11 2014-01-01 国家电网公司 一种高压直流输电换流阀换相失败监测方法
CN103487680B (zh) * 2013-09-11 2016-01-20 国家电网公司 一种换流阀换相失败判别方法
CN103487680A (zh) * 2013-09-11 2014-01-01 国家电网公司 一种换流阀换相失败判别方法
CN103545835A (zh) * 2013-09-22 2014-01-29 国家电网公司 直流电力系统换相失败判断方法
CN103545835B (zh) * 2013-09-22 2015-06-03 国家电网公司 直流电力系统换相失败判断方法
CN103543357A (zh) * 2013-10-23 2014-01-29 华北电力大学 一种换流阀换相失败的预判方法
CN103543357B (zh) * 2013-10-23 2015-12-02 华北电力大学 一种换流阀换相失败的预判方法
CN103558481B (zh) * 2013-11-18 2016-05-04 中国南方电网有限责任公司超高压输电公司检修试验中心 同塔并架多回直流线路耦合作用引发换相失败的判别方法
CN103558481A (zh) * 2013-11-18 2014-02-05 中国南方电网有限责任公司超高压输电公司检修试验中心 同塔并架多回直流线路耦合作用引发换相失败的判别方法
WO2015074304A1 (zh) * 2013-11-19 2015-05-28 国家电网公司 一种基于可控换相电感的换相装置及其实现方法
CN103762581A (zh) * 2014-01-23 2014-04-30 国家电网公司 一种同塔双回直流输电系统周期性换相失败的防御方法
CN103762581B (zh) * 2014-01-23 2016-01-20 国家电网公司 一种同塔双回直流输电系统周期性换相失败的防御方法
CN104237745B (zh) * 2014-10-16 2015-04-15 国家电网公司 多馈入高压直流输电系统异常换相失败判定方法
CN104237745A (zh) * 2014-10-16 2014-12-24 国家电网公司 多馈入高压直流输电系统异常换相失败判定方法
CN105162154B (zh) * 2014-12-22 2017-10-31 中国南方电网有限责任公司 直流换相失败根据面积数值设置增加熄弧角数值的方法
CN105162154A (zh) * 2014-12-22 2015-12-16 中国南方电网有限责任公司 直流换相失败根据面积数值设置增加熄弧角数值的方法
CN104614640A (zh) * 2014-12-26 2015-05-13 四川大学 一种高压直流输电系统换相失败检测方法
CN104820167A (zh) * 2015-04-30 2015-08-05 国家电网公司 直流输电系统换相失败检测方法
CN105024393A (zh) * 2015-06-24 2015-11-04 国家电网公司 一种直流输电系统换相面积计算方法及换相失败检测方法
CN104950205A (zh) * 2015-06-30 2015-09-30 南方电网科学研究院有限责任公司 一种交流系统故障对直流线路影响的量化分析方法
CN104950205B (zh) * 2015-06-30 2019-01-04 南方电网科学研究院有限责任公司 一种交流系统故障对直流线路影响的量化分析方法
CN105866627A (zh) * 2016-04-08 2016-08-17 国网福建省电力有限公司 一种适用于电力电子系统的故障信号检测方法
CN105866627B (zh) * 2016-04-08 2018-07-20 国网福建省电力有限公司 一种适用于电力电子系统的故障信号检测方法
CN107942181A (zh) * 2018-01-04 2018-04-20 华南理工大学 换相失败识别方法、装置、存储介质和计算机设备
CN109635732B (zh) * 2018-12-12 2020-10-09 国网山东省电力公司电力科学研究院 一种lcc-hvdc连续换相失败故障预警网络训练方法
CN109635732A (zh) * 2018-12-12 2019-04-16 国网山东省电力公司电力科学研究院 一种lcc-hvdc连续换相失败故障预警网络训练方法
CN111781453A (zh) * 2020-07-04 2020-10-16 国家电网公司华中分部 一种基于故障时刻的直流系统换相失败风险评估方法
CN111781453B (zh) * 2020-07-04 2022-07-29 国家电网公司华中分部 一种基于故障时刻的直流系统换相失败风险评估方法
CN112421666A (zh) * 2020-11-10 2021-02-26 国网新疆电力有限公司经济技术研究院 一种高压直流输电系统后续换相失败风险评估及抑制方法
CN113162039A (zh) * 2021-04-28 2021-07-23 昆明理工大学 一种交流系统故障对直流各换相阀换相失败几率影响分析的方法
CN113285477A (zh) * 2021-05-25 2021-08-20 南方电网科学研究院有限责任公司 一种抑制直流输电系统换相失败方法及装置
CN113285477B (zh) * 2021-05-25 2023-05-16 南方电网科学研究院有限责任公司 一种抑制直流输电系统换相失败方法及装置
CN113869668A (zh) * 2021-09-09 2021-12-31 上海电力大学 一种多电力电子设备馈入系统动态稳定判断方法

Also Published As

Publication number Publication date
CN101701996B (zh) 2012-03-28

Similar Documents

Publication Publication Date Title
CN101701996B (zh) 一种高压直流系统换相失败的判别方法及装置
AU2018295937B2 (en) Safe operation method for voltage reduction and arc suppression of ground fault phase of non-effective grounding system
EP3605768B1 (en) Safe processing method for active voltage reduction of ground fault phase of non-effective grounding system
CN103106299B (zh) 基于机电暂态的直流输电系统换相失败判断与模拟方法
CN101304170B (zh) 高压直流输电工程的系统调试方法
CN103762581B (zh) 一种同塔双回直流输电系统周期性换相失败的防御方法
Moravej et al. Impact of UPFC on power swing characteristic and distance relay behavior
Kunlun et al. Study on protective performance of HVDC transmission line protection with different types of line fault
Zhao et al. DC faults ride-through capability analysis of Full-Bridge MMC-MTDC System
CN103812129A (zh) 一种多馈入直流输电系统换相失败的判断方法
CN104237745B (zh) 多馈入高压直流输电系统异常换相失败判定方法
CN108054764A (zh) 一种多功能配电网柔性接地装置及控制方法
CN103887810A (zh) 基于短路比动态跟踪的直流系统持续换相失败判断方法
CN108808718A (zh) 交流故障时高压直流输电系统直流电流运行范围确定方法
CN107979080B (zh) 半波长输电线路沿线避雷器额定电压的确定方法和装置
CN102508098A (zh) 用于交直流混联电网的快速零序方向元件判别方法
CN105958429B (zh) 一种降低交直流系统中工频故障分量距离保护误动率的单相重合时序整定方法
Qi et al. Design issues and practical application challenges of DC shipboard distribuiton system protection
Zhang et al. Experimental measurement of PMU error distribution and its impact on load model identification
CN109672153B (zh) 基于abc-αβ变化的交直流互联系统交流差动保护方法
Azizi et al. A modified formula for distance relaying of tapped transmission lines with grounded neutrals
CN107045116B (zh) 一种发电机保护的电流互感器极性检测方法及装置
CN110071499B (zh) 一种快速判断配电网安全合环的方法和系统
CN103268429B (zh) 一种高压直流输电系统100Hz保护的性能评价方法与系统
CN107664718A (zh) 一种hvdc晶闸管级直流均压电阻动态参数在线监测方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20120328

Termination date: 20171126