CN103541463A - 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法 - Google Patents

墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法 Download PDF

Info

Publication number
CN103541463A
CN103541463A CN201310531275.3A CN201310531275A CN103541463A CN 103541463 A CN103541463 A CN 103541463A CN 201310531275 A CN201310531275 A CN 201310531275A CN 103541463 A CN103541463 A CN 103541463A
Authority
CN
China
Prior art keywords
shear wall
wallboard
upper strata
connector
lower floor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310531275.3A
Other languages
English (en)
Other versions
CN103541463B (zh
Inventor
王睿敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Lijiu Construction Robot Co., Ltd.
Original Assignee
王睿敏
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王睿敏 filed Critical 王睿敏
Priority to CN201310531275.3A priority Critical patent/CN103541463B/zh
Publication of CN103541463A publication Critical patent/CN103541463A/zh
Application granted granted Critical
Publication of CN103541463B publication Critical patent/CN103541463B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提供了一种墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法。一种墙板,其四周外围边侧面上等距设置有适当数量的突出筋,所述突出筋突出于所述墙板的边面上;墙板底部四角设置有移动轮。一种楼层位置设后浇带的剪力墙,剪力墙包括上层剪力墙和下层剪力墙;上层剪力墙和下层剪力墙的水平方向均具有多个所述的墙板,且通过相邻两个墙板之间的突出筋插入凹座内连接为一体;上层剪力墙和下层剪力墙之间通过竖直方向相邻两个墙板之间的突出筋搭接为一体,且上层剪力墙和下层剪力墙之间设有后浇带。

Description

墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法
技术领域
本发明涉及建筑技术领域,特别涉及一种墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法。
背景技术
剪力墙又称抗风墙或抗震墙、结构墙。房屋或构筑物中主要承受风荷载或地震作用引起的水平荷载的墙体。防止结构剪切破坏。
现有的装配式剪力墙结构多采用套筒灌浆连接、钢筋焊接连接或搭接浆锚连接,均具有成本高、施工精度要求高,施工难度大等问题,导致装配式剪力墙推广难度大。
发明内容
    本发明不仅提供了一种结构简单、可以进行工厂化生产的墙板,本发明而且提供了一种由上述墙板构成的楼层位置设后浇带的剪力墙,本发明还提供了一种施工方便的剪力墙的施工方法。
为了上述目的,本发明是通过以下措施来实现的:
一种墙板,其四周外围边侧面上等距设置有适当数量的突出筋,所述突出筋突出于所述墙板的边面上;墙板底部四角设置有移动轮。
上述墙板中,其包括两面板,两面板之间通过连接钢筋连接,且两面板之间设有中间层;每块面板设有钢筋网片;每个移动轮均经高度调整装置与钢筋网连接。
上述墙板中,高度调整装置包括上连接体、连接套和下连接体,连接套两端分别通过螺纹连接上连接体及下连接体,移动轮安装架设置在下连接体,上连接体通过斜加强筋与钢筋网焊接。
上述墙板中,每块面板的内表面及上下两端面等距凹设有多个凹座;突出筋凹设于凹座内适当位置。
一种楼层位置设后浇带的剪力墙,剪力墙包括上层剪力墙和下层剪力墙;上层剪力墙和下层剪力墙的水平方向均具有多个权利要求4所述的墙板,且通过相邻两个墙板之间的突出筋插入凹座内连接为一体;上层剪力墙和下层剪力墙之间通过竖直方向相邻两个墙板之间的突出筋搭接为一体,且上层剪力墙和下层剪力墙之间设有后浇带。
一种所述剪力墙的施工方法,包括以下步骤:
1)现场放线,安装临时固定架,固定架用于固定所述的墙板和支撑上层预制楼板;
2)预制所述的墙板,运到施工现场;
3)吊装所述的墙板到位,与临时固定架连接固定;
4)安装下层剪力墙:利用所述的墙板水平方向突出筋相互连接将各个墙板构成一个整体;墙板下部与墙板下方的结构筋焊接,在墙板底部固定模板;
5)安装上层预制楼板;
6)剪力墙墙板内灌注混凝土,上层预制楼板之间灌注混凝土;
7)安装上层剪力墙:利用所述的墙板水平方向突出筋相互连接将各个墙板构成一个整体;
8)吊装上一层预制楼板,并放置到位;
9)上、下两层剪力墙对接: 将上层剪力墙及下层剪力中水平方向的各个墙板推接到位,通过上层剪力墙中所述的墙板上的移动轮调整剪力墙墙板竖直方向的高度,将上层剪力墙和下层剪力墙之间突出钢筋焊接为一体,并在上层剪力墙和下层剪力墙之间预留后浇带;
10)在后浇带两侧安装模板;待所有模板固定好后,在上层剪力墙内浇筑混凝土,上层预制楼板缝之间浇筑混凝土;混凝土达到一定强度后,拆除模板,本层施工完毕,进行下一层吊装安装。
本发明的有益效果:
1.整体结构简单,墙板底部设移动轮方便调整墙板的位置;
2.剪力墙设后浇带,施工方便; 
3.制造、加工、运输方便;
4.施工方法简单,且施工周期短。
附图说明
图1为实施例1的立面示意图。
图2为实施例1的主视示意图。
图3为实施例1的纵向剖视示意图。
图4为实施例1两个墙板结合横向剖视示意图。
图5为实施例1墙板构成的剪力墙示意图。
图6为移动轮与墙板连接结构示意图。
图7为墙板与模板连接示意图。
图8为剪力墙与楼板连接示意图。
图中1、面板,2、突出筋,3、中间层,4、移动轮,5、凹座,6、上连接体,7、连接套,8、下连接体,9、移动轮安装架,10、模板,11、螺栓,12、螺母,13、钢筋网片, 14、斜加强筋, 15、后浇带,16、上层预制楼板, 17、下层剪力墙,18、上层剪力墙,a、连接钢筋。
具体实施方式
现参照说明书附图来阐明本发明的选定实施例,本领域技术人员根据本公开的本发明的实施例的下属说明仅是示例性的,并不是为了限制本发明的方案。
参考附图1.2.3.4,一种墙板,其包括两面板1,两面板1之间通过连接钢筋a连接,且两面板1之间设有中间层3;每块面板1设有多个横向贯穿筋和多个纵向贯穿筋,且每块面板1的内表面及上下两端面等距凹设有多个凹座5;横向贯穿筋和纵向贯穿筋穿过凹座5构成突出筋2,突出筋2凹于凹座,且突出筋2突出于所述墙板的边面上;墙板底部四角设置有移动轮4。
参考附图6,考虑到结构强度及加工方便,每块面板1设有钢筋网片13,每个移动轮4均经高度调整装置与钢筋网连接。本实施例中高度调整装置包括上连接体6、连接套7和下连接体8,连接套7两端分别通过螺纹连接上连接体6及下连接体8,移动轮安装架9设置在下连接体8,上连接体6通过斜加强筋14与钢筋网13焊接。
参考附图5、8,一种楼层位置设后浇带的剪力墙,剪力墙包括上层剪力墙18和下层剪力墙17;上层剪力墙18和下层剪力墙17的水平方向均具有多个所述的墙板,且通过相邻两个墙板之间的突出筋2插入凹座5内连接为一体;上层剪力墙17和下层剪力墙18之间通过竖直方向相邻两个墙板之间的突出筋2搭接为一体,且上层剪力墙17和下层剪力墙18之间设有后浇带15。
参考附图8,一种所述剪力墙的施工方法,包括以下步骤:
1)现场放线,安装临时固定架,固定架用于固定所述的墙板和支撑上层预制楼板;
2)预制所述的墙板,运到施工现场;
3)吊装所述的墙板到位,与临时固定架连接固定;
4)安装下层剪力墙:利用所述的墙板水平方向突出筋相互连接将各个墙板构成一个整体;墙板下部与墙板下方的结构筋焊接,在墙板底部固定模板;
5)安装上层预制楼板;
6)剪力墙墙板内灌注混凝土,上层预制楼板之间灌注混凝土;
7)安装上层剪力墙:利用所述的墙板水平方向突出筋2相互连接将各个墙板构成一个整体;
8)吊装上一层预制楼板,并放置到位;
9)上、下两层剪力墙对接: 将上层剪力墙及下层剪力中水平方向的各个墙板推接到位,通过上层剪力墙中所述的墙板上的移动轮调整上、下两层剪力墙竖直方向的高度,将上层剪力墙和下层剪力墙之间突出钢筋焊接为一体,并在上层剪力墙和下层剪力墙之间预留后浇带15;
10)参考附图7,在后浇带15两侧通过螺栓11及螺母12安装模板10;待所有模板10固定好后,在上层剪力墙和下层剪力墙墙板之间、上层预制楼板缝之间浇筑混凝土;混凝土达到一定强度后,拆除模板10,施工完毕,,本层施工完毕,进行下一层吊装安装。
本发明没有公开的技术特征,是本技术领域的已知技术。
以上描述了本发明的基本原理及优点。本发明不受上述实施例的限制,在不脱离本发明范围的前提,本领域人员可以根据需要做许多变化和改进。本发明保护范围应由所附的权利要求书及其等效物界定。

Claims (6)

1.一种墙板,其特征是:其四周外围边侧面上等距设置有适当数量的突出筋,所述突出筋突出于所述墙板的边面上;墙板底部四角设置有移动轮。
2.根据权利要求1所述墙板,其特征是:其包括两面板,两面板之间通过连接钢筋连接,且两面板之间设有中间层;每块面板设有钢筋网片;每个移动轮均经高度调整装置与钢筋网连接。
3.根据权利要求2所述墙板,其特征是:高度调整装置包括上连接体、连接套和下连接体,连接套两端分别通过螺纹连接上连接体及下连接体,移动轮安装架设置在下连接体,上连接体通过斜加强筋与钢筋网焊接。
4.根据权利要求2或3所述墙板,其特征是:每块面板的内表面及上下两端面等距凹设有多个凹座;突出筋凹设于凹座内适当位置。
5.一种楼层位置设后浇带的剪力墙,其特征在于:剪力墙包括上层剪力墙和下层剪力墙;上层剪力墙和下层剪力墙的水平方向均具有多个权利要求4所述的墙板,且通过相邻两个墙板之间的突出筋插入凹座内连接为一体;上层剪力墙和下层剪力墙之间通过竖直方向相邻两个墙板之间的突出筋搭接为一体,且上层剪力墙和下层剪力墙之间设有后浇带。
6.一种权利要求5所述剪力墙的施工方法,其特征在于包括以下步骤:
1)现场放线,安装临时固定架,固定架用于固定所述的墙板和支撑上层预制楼板;
2)预制所述的墙板,运到施工现场;
3)吊装所述的墙板到位,与临时固定架连接固定;
4)安装下层剪力墙:利用所述的墙板水平方向突出筋相互连接将各个墙板构成一个整体;墙板下部与墙板下方的结构筋焊接,在墙板底部固定模板;
5)安装上层预制楼板;
6)剪力墙墙板内灌注混凝土,上层预制楼板之间灌注混凝土;
7)安装上层剪力墙:利用所述的墙板水平方向突出筋相互连接将各个墙板构成一个整体;
8)吊装上一层预制楼板,并放置到位;
9)上、下两层剪力墙对接: 将上层剪力墙及下层剪力中水平方向的各个墙板推接到位,通过上层剪力墙中所述的墙板上的移动轮调整剪力墙墙板竖直方向的高度,将上层剪力墙和下层剪力墙之间突出钢筋焊接为一体,并在上层剪力墙和下层剪力墙之间预留后浇带;
10)在后浇带两侧安装模板;待所有模板固定好后,在上层剪力墙内浇筑混凝土,上层预制楼板缝之间浇筑混凝土;混凝土达到一定强度后,拆除模板,本层施工完毕,进行下一层吊装安装。
CN201310531275.3A 2013-11-01 2013-11-01 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法 Active CN103541463B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310531275.3A CN103541463B (zh) 2013-11-01 2013-11-01 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310531275.3A CN103541463B (zh) 2013-11-01 2013-11-01 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法

Publications (2)

Publication Number Publication Date
CN103541463A true CN103541463A (zh) 2014-01-29
CN103541463B CN103541463B (zh) 2015-06-10

Family

ID=49965284

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310531275.3A Active CN103541463B (zh) 2013-11-01 2013-11-01 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法

Country Status (1)

Country Link
CN (1) CN103541463B (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234267A (zh) * 2014-09-04 2014-12-24 中国建筑股份有限公司 可调节高度的预制装配钢筋混凝土剪力墙板及其安装方法
CN104563299A (zh) * 2015-01-15 2015-04-29 建研科技股份有限公司 钢筋混凝土预制组件及安装方法
CN105155856A (zh) * 2015-08-06 2015-12-16 上海同凝节能科技有限公司 一种利用预制装配式外围护墙体的建筑方法
CN105275145A (zh) * 2015-11-19 2016-01-27 王硕干 一种装配式多功能复合墙板
CN105369901A (zh) * 2015-12-10 2016-03-02 中建三局集团有限公司重庆分公司 楼板预埋钢筋结构
CN106638940A (zh) * 2016-12-30 2017-05-10 青建集团股份公司 一种装配式高层住宅混凝土预制构件施工工法
CN106894503A (zh) * 2017-04-18 2017-06-27 成都福仕特科技有限责任公司 一种装配式房屋
CN107288350A (zh) * 2017-07-07 2017-10-24 中国十七冶集团有限公司 一种装配式楼板预留钢筋的快速承插装置
CN109680829A (zh) * 2018-12-12 2019-04-26 唐山学院 钢梁、钢柱和填充墙一体化构件的制作安装方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1161398A (zh) * 1996-04-03 1997-10-08 廖崇德 墙面叠砌施工的方法
CN2307854Y (zh) * 1997-03-06 1999-02-17 北京市建筑工程研究院 节能外墙板
KR20100000053A (ko) * 2008-06-24 2010-01-06 대한주택공사 선상이동이 가능한 도어벽체 구조
CN202767230U (zh) * 2012-09-01 2013-03-06 初明进 装配整体式剪力墙建筑结构
CN203546945U (zh) * 2013-11-01 2014-04-16 王睿敏 墙板及其构成的楼层位置设后浇带的剪力墙

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1161398A (zh) * 1996-04-03 1997-10-08 廖崇德 墙面叠砌施工的方法
CN2307854Y (zh) * 1997-03-06 1999-02-17 北京市建筑工程研究院 节能外墙板
KR20100000053A (ko) * 2008-06-24 2010-01-06 대한주택공사 선상이동이 가능한 도어벽체 구조
CN202767230U (zh) * 2012-09-01 2013-03-06 初明进 装配整体式剪力墙建筑结构
CN203546945U (zh) * 2013-11-01 2014-04-16 王睿敏 墙板及其构成的楼层位置设后浇带的剪力墙

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104234267A (zh) * 2014-09-04 2014-12-24 中国建筑股份有限公司 可调节高度的预制装配钢筋混凝土剪力墙板及其安装方法
CN104563299A (zh) * 2015-01-15 2015-04-29 建研科技股份有限公司 钢筋混凝土预制组件及安装方法
CN105155856A (zh) * 2015-08-06 2015-12-16 上海同凝节能科技有限公司 一种利用预制装配式外围护墙体的建筑方法
CN105275145A (zh) * 2015-11-19 2016-01-27 王硕干 一种装配式多功能复合墙板
CN105369901A (zh) * 2015-12-10 2016-03-02 中建三局集团有限公司重庆分公司 楼板预埋钢筋结构
CN106638940A (zh) * 2016-12-30 2017-05-10 青建集团股份公司 一种装配式高层住宅混凝土预制构件施工工法
CN106638940B (zh) * 2016-12-30 2019-02-05 青建集团股份公司 一种装配式高层住宅混凝土预制构件施工工法
CN106894503A (zh) * 2017-04-18 2017-06-27 成都福仕特科技有限责任公司 一种装配式房屋
CN107288350A (zh) * 2017-07-07 2017-10-24 中国十七冶集团有限公司 一种装配式楼板预留钢筋的快速承插装置
CN109680829A (zh) * 2018-12-12 2019-04-26 唐山学院 钢梁、钢柱和填充墙一体化构件的制作安装方法

Also Published As

Publication number Publication date
CN103541463B (zh) 2015-06-10

Similar Documents

Publication Publication Date Title
CN103541463B (zh) 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法
CN104746435B (zh) 一种大角度y型墩柱的施工方法
CN203834739U (zh) 端部钢板连接定位装配式剪力墙结构
CN103726607A (zh) 装配整体式剪力墙用墙板及剪力墙和剪力墙的施工方法
CN204126048U (zh) 牛腿型钢筋混凝土剪力墙连接销接点装配式建筑
CN103334497A (zh) 一种世构体系框架柱钢筋的连接方法
CN103850352A (zh) 一种预制板的连接方法
CN102661010B (zh) 一种组合剪力墙
CN103452235A (zh) 预制叠合剪力墙用墙板及剪力墙和剪力墙的施工方法
CN104775553A (zh) 一种新型l型叠合板式剪力墙边缘构件及其连接方法
CN104153462A (zh) 错层悬挂式预制飘窗
CN112878535B (zh) 一种预制混凝土墙板连接结构及其施工方法
CN103741842A (zh) 一种轻型装配式剪力墙结构
CN104763085A (zh) 装配整体式预应力双t楼板框架结构及其施工方法
CN103726589A (zh) 工形钢与钢管架构界面鼓凸设斜钢筋装配剪力墙及作法
CN104631674A (zh) 一种叠合楼板及其施工方法
CN103981998B (zh) 预制剪力墙板及剪力墙和剪力墙的施工方法
CN204112525U (zh) 高强度混凝土预制框架内嵌带竖缝预制剪力墙结构
CN203716397U (zh) 装配整体式剪力墙用墙板及剪力墙
CN204645343U (zh) 预制装配式混凝土外挂墙板固定装置
CN203546945U (zh) 墙板及其构成的楼层位置设后浇带的剪力墙
CN203066260U (zh) 一种钢板-混凝土组合剪力墙与组合楼板的连接节点
CN104895221B (zh) 装配式型钢约束混凝土剪力墙结构
CN104533097A (zh) 装配式多层建筑的递推阶梯式施工方法
CN205024843U (zh) 预应力空心楼板与h型钢梁的连接构造

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: SHANDONG LIJIU BUILDING TECHNOLOGY CO., LTD.

Free format text: FORMER OWNER: WANG RUIMIN

Effective date: 20150121

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 250001 JINAN, SHANDONG PROVINCE TO: 250101 JINAN, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150121

Address after: High tech Zone of Ji'nan City Industrial Road, No. 59 in Shandong province 250101 Expo International Building 1 unit 1301 room 6

Applicant after: Shandong Lijiu Building Technology Co., Ltd.

Address before: 250001 Jianshe Road Century Park, Ji'nan City, Shandong province 15-2-1103

Applicant before: Wang Ruimin

C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: WANG RUIMIN

Free format text: FORMER OWNER: SHANDONG LIJIU BUILDING TECHNOLOGY CO., LTD.

Effective date: 20150618

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150618

Address after: 250001 Jianshe Road Century Park, Ji'nan City, Shandong province 15-2-1103

Patentee after: Wang Ruimin

Address before: High tech Zone of Ji'nan City Industrial Road, No. 59 in Shandong province 250101 Expo International Building 1 unit 1301 room 6

Patentee before: Shandong Lijiu Building Technology Co., Ltd.

CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Wang Quanliang

Inventor after: Wang Ruimin

Inventor before: Wang Ruimin

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20170424

Address after: 100089 Beijing city Haidian District Qinghe Street No. 72 No. 23 floor 2 room 2345

Patentee after: Beijing Lian Fang Network Information Co., Ltd.

Address before: 250001 Jianshe Road Century Park, Ji'nan City, Shandong province 15-2-1103

Patentee before: Wang Ruimin

TR01 Transfer of patent right

Effective date of registration: 20191212

Address after: Room 601, block B, Olympic Tiantai Plaza, 5777 jingshidong Road, high tech Zone, Jinan City, Shandong Province, 250000

Patentee after: Shandong Lijiu Construction Robot Co., Ltd.

Address before: 100089 Beijing city Haidian District Qinghe Street No. 72 No. 23 floor 2 room 2345

Patentee before: Beijing Lian Fang Network Information Co., Ltd.

TR01 Transfer of patent right