CN103334497A - 一种世构体系框架柱钢筋的连接方法 - Google Patents

一种世构体系框架柱钢筋的连接方法 Download PDF

Info

Publication number
CN103334497A
CN103334497A CN2013102384162A CN201310238416A CN103334497A CN 103334497 A CN103334497 A CN 103334497A CN 2013102384162 A CN2013102384162 A CN 2013102384162A CN 201310238416 A CN201310238416 A CN 201310238416A CN 103334497 A CN103334497 A CN 103334497A
Authority
CN
China
Prior art keywords
post
reinforcing bar
steel bar
prefabricated
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013102384162A
Other languages
English (en)
Inventor
汪杰
李宁
吴敦军
陆欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Yangtze River Urban Architectural Design Co Ltd
Original Assignee
Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Yangtze River Urban Architectural Design Co Ltd filed Critical Nanjing Yangtze River Urban Architectural Design Co Ltd
Priority to CN2013102384162A priority Critical patent/CN103334497A/zh
Publication of CN103334497A publication Critical patent/CN103334497A/zh
Pending legal-status Critical Current

Links

Images

Abstract

本发明涉及建筑工程技术领域,具体是一种世构体系框架柱钢筋的连接方法。本发明将世构体系预制柱钢筋连接从浆锚搭接连接,改为直螺纹—浆锚套筒的机械连接,将柱钢筋的连接方式从搭接改为相当于机械连接的直螺纹—浆锚套筒连接,使钢筋的连接长度从54.4d缩短为8d,原柱预留钢筋长度以直径25为例,从1360mm缩短至200mm,极大地方便了柱子的制作、运输、吊装,节约钢材,缩短工期。

Description

一种世构体系框架柱钢筋的连接方法
技术领域
本发明涉及建筑工程技术领域,具体是一种世构体系框架柱钢筋的连接方法。
背景技术   
世构体系是目前江苏省采用的预制装配框架体系的主要形式,有国家行业规范。在多层预制装配框架结构中已应用于多个工程实例。但其柱钢筋的连接是采用搭接的方法施工,在预制柱的一端留浆锚孔,另一端预留插筋,插筋长度按国家现行规范要求为:(以二级抗震C40混凝土、HRB400钢材为例)34d×1.6=54.4d,若钢筋直径为25mm,则预留钢筋长度达 1360mm,对于预制柱的制作、运输、吊装带来很大困难。
发明内容
本发明将世构体系预制柱钢筋连接从浆锚搭接连接,改为直螺纹—浆锚套筒的机械连接,具体发明内容为:
一种世构体系框架柱钢筋的连接方法,包括以下几个步骤:
第一步、在制作预制柱构件时在柱钢筋的一端用直螺纹连接钢筋套筒;
第二步、预制柱钢筋的另一端伸出柱预制段达到连接所需长度;
第三步、预制柱构件制作完成并运输至工地后吊装,将所述第一步中预制柱连接套筒端套入下层预制柱预留的钢筋上,然后固定;
第四步、在完成本层梁板的安装、浇筑后,通过预制柱下端预留的注浆口注入灌浆料,待出浆口溢出浆后封堵灌浆口,完成柱钢筋连接。
本发明有益效果:将柱钢筋的连接方式从搭接改为相当于机械连接的直螺纹—浆锚套筒连接,使钢筋的连接长度从54.4d缩短为8d,原柱预留钢筋长度以直径25为例,从1360mm缩短至200mm,极大地方便了柱子的制作、运输、吊装,节约钢材,缩短工期。
附图说明
图1为世构体系预制柱钢筋浆锚套筒连接剖面结构示意图;
图中:1-预制梁;2-预制柱;3-柱主筋;4-预埋钢套筒;5-出浆口;6-灌浆口;7-柱箍筋;d-柱宽;h-梁高。
具体实施方式
本发明采用直螺纹—浆锚套筒对柱钢筋采用机械连接,替代了原世构体系中柱钢筋浆锚搭接连接方法。
一种世构体系框架柱钢筋的连接方法,包括以下几个步骤:
第一步、在制作预制柱构件时在柱钢筋的一端用直螺纹连接钢筋套筒;
第二步、预制柱钢筋的另一端伸出柱预制段达到连接所需长度;
第三步、预制柱构件制作完成并运输至工地后吊装,将所述第一步中预制柱连接套筒端套入下层预制柱预留的钢筋上,然后固定;
第四步、在完成本层梁板的安装、浇筑后,通过预制柱下端预留的注浆口注入灌浆料,待出浆口溢出浆后封堵灌浆口,完成柱钢筋连接。
在世构体系预制装配框架结构中,预制柱钢筋连接是采用搭接的方法施工,在预制柱的一端留浆锚孔,另一端预留插筋。插筋长度要满足国家现行规范要求。
本发明有益效果:将柱钢筋的连接方式从搭接改为相当于机械连接的直螺纹—浆锚套筒连接,使钢筋的连接长度从54.4d缩短为8d,原柱预留钢筋长度以直径25为例,从1360mm缩短至200mm,极大地方便了柱子的制作、运输、吊装,节约钢材,缩短工期。
本发明已用于南京万科上坊保障房6-05栋廉租房项目,该项目为全预制装配式高层住宅,地上15层,地下设置一层自行车库,一层为架空休闲空间,建筑高度45米,建筑面积约1万平米。为江苏省首个全预制装配高层住宅。结构体系采用全预制装配式框架—钢支撑结构体系 ,主体框架除地下室及底层架空层柱采用现浇外,其余结构部分均采用预制装配整体式技术,预制技术在本工程的应用范围如下:
1) 结构主体竖向构件采用预制混凝土框架柱,水平楼面构件采用预制混凝土叠合梁及预制预应力混凝土叠合板,抗侧向构件采用框架—钢支撑;
2)标准层楼梯采用预制混凝土梯板,阳台采用预制混凝土叠合楼板;
3)内外填充墙采用蒸压轻质加气混凝土板材。

Claims (1)

1. 一种世构体系框架柱钢筋的连接方法,其特征在于,包括以下几个步骤:
第一步、在制作预制柱构件时在柱钢筋的一端用直螺纹连接钢筋套筒;
第二步、预制柱钢筋的另一端伸出柱预制段达到连接所需长度;
第三步、预制柱构件制作完成并运输至工地后吊装,将所述第一步中预制柱连接套筒端套入下层预制柱预留的钢筋上,然后固定;
第四步、在完成本层梁板的安装、浇筑后,通过预制柱下端预留的注浆口注入灌浆料,待出浆口溢出浆后封堵灌浆口,完成柱钢筋连接。
CN2013102384162A 2013-06-17 2013-06-17 一种世构体系框架柱钢筋的连接方法 Pending CN103334497A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013102384162A CN103334497A (zh) 2013-06-17 2013-06-17 一种世构体系框架柱钢筋的连接方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013102384162A CN103334497A (zh) 2013-06-17 2013-06-17 一种世构体系框架柱钢筋的连接方法

Publications (1)

Publication Number Publication Date
CN103334497A true CN103334497A (zh) 2013-10-02

Family

ID=49242698

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013102384162A Pending CN103334497A (zh) 2013-06-17 2013-06-17 一种世构体系框架柱钢筋的连接方法

Country Status (1)

Country Link
CN (1) CN103334497A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643737A (zh) * 2013-12-27 2014-03-19 中国京冶工程技术有限公司 预制钢筋混凝土构件组装成的多层立体框架
CN103669597A (zh) * 2013-12-27 2014-03-26 中国京冶工程技术有限公司 预制钢筋混凝土纵梁与横梁连接结构
CN104164920A (zh) * 2014-07-23 2014-11-26 南京长江都市建筑设计股份有限公司 一种键槽节点预制框架梁的底部钢筋连接结构
CN104882686A (zh) * 2015-05-27 2015-09-02 南京长江都市建筑设计股份有限公司 一种防雷引下线及其施工方法
CN104975652A (zh) * 2015-06-30 2015-10-14 中国矿业大学 一种预制混凝土构件对接连接结构
CN105735466A (zh) * 2016-03-30 2016-07-06 上海建工二建集团有限公司 预制墙柱一段式钢筋连接结构及方法
CN107100290A (zh) * 2017-04-28 2017-08-29 广东省建科建筑设计院有限公司 一种装配式预制剪力墙与叠合板节点
CN107975151A (zh) * 2017-12-29 2018-05-01 广东省建筑科学研究院集团股份有限公司 首层竖向构件与地下室顶板的强连接构造和施工方法
CN113235919A (zh) * 2021-05-31 2021-08-10 江苏永创建设有限公司 可调式穿楼板套管固定架和穿楼板套管的安装方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265555A (ja) * 1999-03-15 2000-09-26 Toda Constr Co Ltd 鉄筋コンクリート柱と鉄骨梁の接合方法およびその接合構造
CN101333825A (zh) * 2008-08-06 2008-12-31 北京首钢建设集团有限公司 高层建筑框支型钢砼梁式结构转换层施工方法
JP2011252304A (ja) * 2010-06-01 2011-12-15 Shimizu Corp PCa柱と複合梁との接合構造および接合方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000265555A (ja) * 1999-03-15 2000-09-26 Toda Constr Co Ltd 鉄筋コンクリート柱と鉄骨梁の接合方法およびその接合構造
CN101333825A (zh) * 2008-08-06 2008-12-31 北京首钢建设集团有限公司 高层建筑框支型钢砼梁式结构转换层施工方法
JP2011252304A (ja) * 2010-06-01 2011-12-15 Shimizu Corp PCa柱と複合梁との接合構造および接合方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴敦军等: "预制装配式技术在高层建筑中的应用研究", 《工程建设与设计》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103643737B (zh) * 2013-12-27 2015-10-28 中国京冶工程技术有限公司 预制钢筋混凝土构件组装成的多层立体框架
CN103669597A (zh) * 2013-12-27 2014-03-26 中国京冶工程技术有限公司 预制钢筋混凝土纵梁与横梁连接结构
CN103643737A (zh) * 2013-12-27 2014-03-19 中国京冶工程技术有限公司 预制钢筋混凝土构件组装成的多层立体框架
CN103669597B (zh) * 2013-12-27 2016-02-10 中国京冶工程技术有限公司 预制钢筋混凝土纵梁与横梁连接结构
CN104164920A (zh) * 2014-07-23 2014-11-26 南京长江都市建筑设计股份有限公司 一种键槽节点预制框架梁的底部钢筋连接结构
CN104882686A (zh) * 2015-05-27 2015-09-02 南京长江都市建筑设计股份有限公司 一种防雷引下线及其施工方法
CN104975652A (zh) * 2015-06-30 2015-10-14 中国矿业大学 一种预制混凝土构件对接连接结构
CN105735466A (zh) * 2016-03-30 2016-07-06 上海建工二建集团有限公司 预制墙柱一段式钢筋连接结构及方法
CN105735466B (zh) * 2016-03-30 2018-12-18 上海建工二建集团有限公司 预制墙柱一段式钢筋连接结构及方法
CN107100290A (zh) * 2017-04-28 2017-08-29 广东省建科建筑设计院有限公司 一种装配式预制剪力墙与叠合板节点
CN107975151A (zh) * 2017-12-29 2018-05-01 广东省建筑科学研究院集团股份有限公司 首层竖向构件与地下室顶板的强连接构造和施工方法
CN113235919A (zh) * 2021-05-31 2021-08-10 江苏永创建设有限公司 可调式穿楼板套管固定架和穿楼板套管的安装方法
CN113235919B (zh) * 2021-05-31 2022-05-17 江苏永创建设有限公司 可调式穿楼板套管固定架和穿楼板套管的安装方法

Similar Documents

Publication Publication Date Title
CN103334497A (zh) 一种世构体系框架柱钢筋的连接方法
CN107165272B (zh) 预应力装配式混凝土框架节点连接结构及其施工方法
CN108331158B (zh) 一种预制钢筋混凝土梁柱的现场连接方法
CN107060140B (zh) 一种预制装配式双钢管混凝土剪力墙及其装配方法
CN101565969B (zh) 间接装配式钢管混凝土组合异形柱及其制作方法
CN106836479B (zh) 一种装配式预应力混凝土框架结构
WO2019056716A1 (zh) 全装配式预应力砼框架抗震耗能构件体系及施工方法
CN201217898Y (zh) 混凝土预制楼梯
CN103982041A (zh) 框架结构体系的钢筋混凝土预制构件装配式房屋建造方法
CN106703197B (zh) 一种大跨度多层抗震框架结构体系及其施工方法
CN105178433A (zh) 预制混凝土剪力墙结构及其施工方法
CN103541463B (zh) 墙板及其构成的楼层位置设后浇带的剪力墙及剪力墙施工方法
CN104775553A (zh) 一种新型l型叠合板式剪力墙边缘构件及其连接方法
CN102704704A (zh) 一种砌体建筑竖向无粘结预应力抗震加固结构
CN105064529A (zh) 一种预制装配式带暗支撑的大板剪力墙结构
CN108775084B (zh) 钢-混凝土组合预制梁和预制柱连接结构和施工方法
CN110805144B (zh) 全装配式高层/超高层混凝土框支结构体系及其施工方法
KR101478611B1 (ko) 기둥 주체 조립식 풀 피씨 계단실의 시공방법
CN204530982U (zh) 一种预制装配式异形小墙肢产业化住宅结构体系
CN203334698U (zh) 一种预制装配柱钢筋套筒连接头的定位装置
CN103352584A (zh) 一种外套式加固方法
CN109610684B (zh) 一种高效配筋及连接预制剪力墙
CN204266370U (zh) 预制src-s-rc柱梁剪力墙支撑楼板装配式体系
CN215802289U (zh) 一种用于轻质混凝土模块化集成结构的模块连接系统
CN115434425A (zh) 一种格构式钢骨混凝土预制梁柱节点和方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20131002