CN103541307B - 辅助支撑式水上工程作业船 - Google Patents

辅助支撑式水上工程作业船 Download PDF

Info

Publication number
CN103541307B
CN103541307B CN201310491267.0A CN201310491267A CN103541307B CN 103541307 B CN103541307 B CN 103541307B CN 201310491267 A CN201310491267 A CN 201310491267A CN 103541307 B CN103541307 B CN 103541307B
Authority
CN
China
Prior art keywords
connecting elements
supporting leg
sides
hydraulic locking
workboat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310491267.0A
Other languages
English (en)
Other versions
CN103541307A (zh
Inventor
张怀金
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201310491267.0A priority Critical patent/CN103541307B/zh
Publication of CN103541307A publication Critical patent/CN103541307A/zh
Application granted granted Critical
Publication of CN103541307B publication Critical patent/CN103541307B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明涉及一种辅助支撑式水上工程作业船,它属于一种水上桥梁施工用工程作业设备。本发明主要是解决现有栈桥法施工存在的施工周期长、费用高和效率低的技术问题。为解决上述技术问题,本发明采用的技术方案是:辅助支撑式水上工程作业船,它包括工作船,其中:它还包括至少四个浮箱、液压锁紧装置、支腿和支腿导向筒,四个浮箱分别通过上连接构件和下链接构件装在工作船两侧的前后两边,支腿导向筒设在浮箱前边的中部,支腿设在支腿导向筒中,液压锁紧装置设置在浮箱的上端面上且使支腿位于液压锁紧装置中。本发明具有工周期短、节省费用和能重复使用且效率高的优点。

Description

辅助支撑式水上工程作业船
技术领域
本发明涉及一种辅助支撑式水上工程作业船,它属于一种水上桥梁施工用工程作业设备。
背景技术
目前,我国在大型河流上建造桥梁时一般都采用栈桥法施工,即在要建桥梁的河流上预先建造能运送施工材料和设备的栈桥,然后再建设桥梁。由于修建栈桥和工作台花费时间长和费用高,因此,这种方法存在的施工周期长、费用高、效率低的缺点。
发明内容
本发明的目的是解决现有栈桥法施工存在的施工周期长、费用高和效率低的技术问题,提供一种能缩短施工周期、节省大量费用和能重复使用且效率高的辅助支撑式水上工程作业船。
为解决上述技术问题,本发明采用的技术方案是:
辅助支撑式水上工程作业船,它包括工作船,其中:它还包括至少四个浮箱、液压锁紧装置、支腿和支腿导向筒,四个浮箱分别通过上连接构件和下连接构件装在工作船两侧的前后两边,支腿导向筒设在浮箱前边的中部,支腿设在支腿导向筒中,液压锁紧装置设置在浮箱的上端面上且使支腿位于液压锁紧装置中。
所述液压锁紧装置由液压缸、支腿锁定动蹄片、支腿锁定静蹄片、加强筋和液压锁紧支架组成,支腿锁定静蹄片通过加强筋设在液压锁紧支架的前端,液压缸的底座与设置在液压锁紧支架后端的支座连接,液压缸活塞杆的头部与支腿锁定动蹄片的支耳连接。
所述上连接构件由上连接构件母头和上连接构件公头构成,上连接构件母头设在工作船两侧的前后两边,上连接构件公头设在浮箱一侧的前后两边,上连接构件母头和上连接构件公头通过上连接固定销连接在一起。
所述下连接构件由下连接构件母头和下连接构件公头构成,下连接构件母 头设在工作船两侧的前后两边,下连接构件公头设在浮箱一侧的前后两边,下连接构件母头和下连接构件公头通过下连接固定销连接在一起。
由于本发明采用了上述技术方案,利用船的机动性和桩柱式支腿的支撑和稳定作用,解决了现有栈桥法施工存在的施工周期长、费用高和效率低的技术问题。因此,与背景技术相比,本发明具有下列优点。
1、缩短施工周期。由于栈桥施工方法修建栈桥和拆除栈桥都需要数月的时间,而本发明只需将工作船在水上航行至指定地点,再将浮箱安装在工作船的两侧并用支腿固定,当天即可完成准备工作,能大大的缩短施工周期。对500米以上特大桥,可缩短施工工期6~8个月以上。
2、节省费用。使用本发明施工,可以节省大量的临时工程费用。
3、本发明能重复使用且效率高。
附图说明
图1是本发明的结构示意图;
图2是图1的俯视图;
图3是图1的左视图;
图4是图2中的A——A剖视图;
图5是图4中的B——B剖视图;
图6是图3中的C——C剖视图;
图7是图3中的D——D剖视图;
图8是本发明上连接构件的连接示意图;
图9是本发明下连接构件的连接示意图。
具体实施方式
下面结合附图和实施例对本发明做进一步的详细说明。
如图1、图2和图3所示,本实施例中的辅助支撑式水上工程作业船,它包括工作船3,其中:它还包括至少四个浮箱1、液压锁紧装置2、支腿5和支腿导向筒7,四个浮箱1分别通过上连接构件4和下链接构件6装在工作船3两侧的前后两边,支腿导向筒7设在浮箱1前边的中部,支腿5设在支腿导向筒7 中并通过导向筒固定销穿过支腿5和支腿导向筒7上设置的销孔8、9将支腿5固定在支腿导向筒7中,液压锁紧装置2设置在浮箱1的上端面上且使支腿5位于液压锁紧装置2中以便于将支腿5锁紧在浮箱1上。支腿5的下端为圆锥形以利于支腿5插入河床。
如图4和图5所示,所述液压锁紧装置2由液压缸10、支腿锁定动蹄片11、支腿锁定静蹄片12、加强筋13和液压锁紧支架20组成,支腿锁定静蹄片12通过加强筋13设在液压锁紧支架20的前端,液压缸10的底座与设置在液压锁紧支架20后端的支座连接,液压缸10活塞杆的头部与支腿锁定动蹄片11的支耳连接。
如图6、图7、图8和图9所示,所述上连接构件4由上连接构件母头15和上连接构件公头16构成,上连接构件母头15设在工作船3两侧的前后两边,上连接构件公头16设在浮箱1一侧的前后两边,上连接构件母头15和上连接构件公头16通过上连接固定销14连接在一起。所述下连接构件6由下连接构件母头18和下连接构件公头19构成,下连接构件母头18设在工作船两侧的前后两边,下连接构件公头19设在浮箱一侧的前后两边,下连接构件母头18和下连接构件公头19通过下连接固定销17连接在一起。
本发明的工作过程是:
1、工作船由拖轮牵引至工作位置。
2、工作船下锚,工作船共设6~8组锚机,分散布置在工作船的四面,由锚索的牵拉精确定位工作船。
3、工作船上4个支腿,用振动锤打入河床合适深度,锁定支腿。至此工作船定位固定完成。
4、施工机具如:钻机、吊车、混凝土泵车、混凝土罐车等都可以先后登上工作船形成的工作平台作业。
5、作业完成后,支腿解除锁定,振动锤拔出支腿,收锚。由拖轮牵引至下个工作位置。

Claims (4)

1.一种辅助支撑式水上工程作业船,它包括工作船,其特征是:它还包括至少四个浮箱、液压锁紧装置、支腿和支腿导向筒,四个浮箱分别通过上连接构件和下连接构件装在工作船两侧的前后两边,支腿导向筒设在浮箱前边的中部,支腿设在支腿导向筒中,液压锁紧装置设置在浮箱的上端面上且使支腿位于液压锁紧装置中。
2.根据权利要求1所述的一种辅助支撑式水上工程作业船,其特征是:所述液压锁紧装置由液压缸、支腿锁定动蹄片、支腿锁定静蹄片、加强筋和液压锁紧支架组成,支腿锁定静蹄片通过加强筋设在液压锁紧支架的前端,液压缸的底座与设置在液压锁紧支架后端的支座连接,液压缸活塞杆的头部与支腿锁定动蹄片的支耳连接。
3.根据权利要求1所述的一种辅助支撑式水上工程作业船,其特征是:所述上连接构件由上连接构件母头和上连接构件公头构成,上连接构件母头设在工作船两侧的前后两边,上连接构件公头设在浮箱一侧的前后两边,上连接构件母头和上连接构件公头通过上连接固定销连接在一起。
4.根据权利要求1所述的一种辅助支撑式水上工程作业船,其特征是:所述下连接构件由下连接构件母头和下连接构件公头构成,下连接构件母头设在工作船两侧的前后两边,下连接构件公头设在浮箱一侧的前后两边,下连接构件母头和下连接构件公头通过下连接固定销连接在一起。
CN201310491267.0A 2013-10-18 2013-10-18 辅助支撑式水上工程作业船 Expired - Fee Related CN103541307B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310491267.0A CN103541307B (zh) 2013-10-18 2013-10-18 辅助支撑式水上工程作业船

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310491267.0A CN103541307B (zh) 2013-10-18 2013-10-18 辅助支撑式水上工程作业船

Publications (2)

Publication Number Publication Date
CN103541307A CN103541307A (zh) 2014-01-29
CN103541307B true CN103541307B (zh) 2015-09-30

Family

ID=49965133

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310491267.0A Expired - Fee Related CN103541307B (zh) 2013-10-18 2013-10-18 辅助支撑式水上工程作业船

Country Status (1)

Country Link
CN (1) CN103541307B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111645819B (zh) * 2020-06-15 2021-06-29 黄芳 稳定悬浮的海上浮动平台

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3523944A1 (de) * 1985-07-04 1987-01-15 Dyckerhoff & Widmann Ag Einrichtung zum bewegen schwerer lasten, z. b. baukoerper, gerueste oder dergleichen
CN202481253U (zh) * 2012-02-29 2012-10-10 霞浦县创新农业发展有限公司 新型钢结构近海作业船体
CN202557745U (zh) * 2012-01-09 2012-11-28 广东华尔辰海上风电工程有限责任公司 海上高空重载起升安装作业多功能双体风电工程船
CN202593794U (zh) * 2012-02-15 2012-12-12 上海佳豪船舶工程设计股份有限公司 一种提高双体风电工程作业船强度的装置
CN203546608U (zh) * 2013-10-18 2014-04-16 张怀金 辅助支撑式水上工程作业船

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3523944A1 (de) * 1985-07-04 1987-01-15 Dyckerhoff & Widmann Ag Einrichtung zum bewegen schwerer lasten, z. b. baukoerper, gerueste oder dergleichen
CN202557745U (zh) * 2012-01-09 2012-11-28 广东华尔辰海上风电工程有限责任公司 海上高空重载起升安装作业多功能双体风电工程船
CN202593794U (zh) * 2012-02-15 2012-12-12 上海佳豪船舶工程设计股份有限公司 一种提高双体风电工程作业船强度的装置
CN202481253U (zh) * 2012-02-29 2012-10-10 霞浦县创新农业发展有限公司 新型钢结构近海作业船体
CN203546608U (zh) * 2013-10-18 2014-04-16 张怀金 辅助支撑式水上工程作业船

Also Published As

Publication number Publication date
CN103541307A (zh) 2014-01-29

Similar Documents

Publication Publication Date Title
WO2018000409A1 (zh) 桩顶支撑步履式移动打桩平台
CN104404882B (zh) 一种支座辅助安装模具及其施工方法
CN203716129U (zh) 一种用于桁架型桩腿的插销式升降装置
CN203514808U (zh) 墙体模板支撑组合结构
CN101792015A (zh) 一种多功能的拼装式水上移动设备
CN103541307B (zh) 辅助支撑式水上工程作业船
CN103556820A (zh) 混凝土梁在加大加固时用的一种吊模以及该吊模施工方法
CN205420997U (zh) 一种液压升降桥
CN205382488U (zh) 一种水工混凝土坝体专用模板
CN203546608U (zh) 辅助支撑式水上工程作业船
CN102877469B (zh) 一种海上作业万向双梁压桩夹持器
CN203755173U (zh) 用于桥梁高墩液压爬升的模板装置
CN215760498U (zh) 一种房建工程混凝土模板拆除机
CN202659248U (zh) 自行式坑道钻孔台车
CN203583506U (zh) 高渗透层水位下电梯基坑沉井刃脚支设结构
CN202347884U (zh) 水轮机检修平台
CN204899034U (zh) 一种预制墙柱
CN211389334U (zh) 预应力实心方桩模具长线台
CN203729578U (zh) 墙体用折叠升降模板装置
CN204278222U (zh) 一种钢结构张拉台座
CN204059396U (zh) 塔吊底部固定基础结构
CN204199283U (zh) 建筑工程微型液压锤桩机
CN211819423U (zh) 一种隧道电缆沟槽自脱模式台车
CN204185859U (zh) 一种海上风电基础打桩用浮箱式定位工装
CN103953043A (zh) 一种海上风电基础打桩用浮箱式定位工装

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150930

Termination date: 20211018

CF01 Termination of patent right due to non-payment of annual fee