CN202593794U - 一种提高双体风电工程作业船强度的装置 - Google Patents

一种提高双体风电工程作业船强度的装置 Download PDF

Info

Publication number
CN202593794U
CN202593794U CN 201220049088 CN201220049088U CN202593794U CN 202593794 U CN202593794 U CN 202593794U CN 201220049088 CN201220049088 CN 201220049088 CN 201220049088 U CN201220049088 U CN 201220049088U CN 202593794 U CN202593794 U CN 202593794U
Authority
CN
China
Prior art keywords
utility
model
operation ship
twin
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220049088
Other languages
English (en)
Inventor
刘楠
章新水
吴元良
任继新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianhai fusion defense equipment and technology Limited by Share Ltd
China Railway Wuhan Bridge Industries Ltd
Original Assignee
SHANGHAI BESTWAY MARINE ENGINEERING DESIGN Co Ltd
China Railway Wuhan Bridge Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI BESTWAY MARINE ENGINEERING DESIGN Co Ltd, China Railway Wuhan Bridge Industries Ltd filed Critical SHANGHAI BESTWAY MARINE ENGINEERING DESIGN Co Ltd
Priority to CN 201220049088 priority Critical patent/CN202593794U/zh
Application granted granted Critical
Publication of CN202593794U publication Critical patent/CN202593794U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Other Liquid Machine Or Engine Such As Wave Power Use (AREA)

Abstract

本实用新型公开了一种提高双体风电工程作业船强度的装置,所述装置包括两个抗扭箱,所述抗扭箱横向安置在两个片体的中部,所述装置还包括八个肘板,所述肘板的一端与抗扭箱相连接,另一端与片体甲板相连接。本实用新型能提高作业船的抗扭转能力和抗弯曲能力。

Description

一种提高双体风电工程作业船强度的装置
技术领域
本实用新型涉及双体风电工程作业船领域,特别涉及一种提高双体风电工程作业船强度的装置。
背景技术
目前,国内用于风电工程作业的船舶都是单体型驳船,工程用途比较单一,难以满足风电作业的复杂要求,双体型风电工程作业船可以满足风机安装过程中的整体吊装、运输、拼装以及打桩等多种功能。
对于双体风电工程船的结构强度问题主要就出现在连接两个片体的结构强度上。由于两个片体在受外部载荷(主要是波浪载荷和片体的不同步纵摇)时的不同步性,因此对连接构件除了要承受因片体浮力和重力分布不均衡而产生的横向弯矩;同时,连接构件还要承受因片体受不同步的纵摇和横摇,以及受到斜波影响而产生的扭矩。
针对双体风电工程作业船的作业特点,通过对片体连接结构的创新设计,达到船体连接结构强度方面能够满足工程作业的需求。
实用新型内容
本实用新型要解决的技术问题是提供一种能提高双体风电工程作业船抗扭强度的抗扭箱。
为达到上述目的,本实用新型的技术方案如下:
一种提高双体风电工程作业船强度的装置,所述装置包括两个抗扭箱,所述抗扭箱横向安置在两个片体的中部,所述装置还包括八个肘板,所述肘板的一端与抗扭箱相连接,另一端与片体甲板相连接。
优选的,所述抗扭箱为钢质焊接而成。
通过上述技术方案,本实用新型的有益效果是:
本实用新型抗扭箱通过甲板和纵舱壁有效连接起来,使之成为一个能够有效提供抗扭转能力和抗弯曲能力的整体;本实用新型肘板分担了抗扭箱和甲板连接位置的巨大的切力;两个抗扭箱和其连接甲板结构除了能够提供抗扭转能力,同时也能保证因两个片体浮力和重力分布不均衡而产生的横向弯矩。
附图说明
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。
图1为本实用新型安装结构示意图;
图2为本实用新型安装结构俯视图。
图中数字和字母所表示的相应部件名称:
10、抗扭箱  20、片体  30、肘板  40、甲板  50、舱壁结构  60、片体甲板
具体实施方式
为了使本实用新型实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合具体图示,进一步阐述本实用新型。
参见图1和图2所示,本实用新型一种提高双体风电工程作业船强度的装置,所述装置包括两个抗扭箱10,所述抗扭箱10为钢质焊接结构,所述抗扭箱10横向安置在片体20的中部,所述装置还包括八个肘板30,所述肘板30的一端与抗扭箱10相连接,另一端与片体甲板60相连接。
本实用新型甲板40和舱壁结构50分别连接着两个抗扭箱10,将两个抗扭箱10连接成为一个整体结构。
肘板30可以有效解决船体结构和抗扭箱10连接区域的应力集中问题。
以上显示和描述了本实用新型的基本原理和主要特征和本实用新型的优点。本行业的技术人员应该了解,本实用新型不受上述实施例的限制,上述实施例和说明书中描述的只是说明本实用新型的原理,在不脱离本实用新型精神和范围的前提下,本实用新型还会有各种变化和改进,这些变化和改进都落入要求保护的本实用新型范围内。本实用新型要求保护范围由所附的权利要求书及其等效物界定。

Claims (2)

1.一种提高双体风电工程作业船强度的装置,其特征在于,所述装置包括两个抗扭箱,所述抗扭箱横向安置在两个片体的中部,所述装置还包括八个肘板,所述肘板的一端与抗扭箱相连接,另一端与片体甲板相连接。
2.根据权利要求1所述的一种提高双体风电工程作业船强度的装置,其特征在于:所述抗扭箱为钢质焊接而成。 
CN 201220049088 2012-02-15 2012-02-15 一种提高双体风电工程作业船强度的装置 Expired - Fee Related CN202593794U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220049088 CN202593794U (zh) 2012-02-15 2012-02-15 一种提高双体风电工程作业船强度的装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220049088 CN202593794U (zh) 2012-02-15 2012-02-15 一种提高双体风电工程作业船强度的装置

Publications (1)

Publication Number Publication Date
CN202593794U true CN202593794U (zh) 2012-12-12

Family

ID=47311360

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220049088 Expired - Fee Related CN202593794U (zh) 2012-02-15 2012-02-15 一种提高双体风电工程作业船强度的装置

Country Status (1)

Country Link
CN (1) CN202593794U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541307A (zh) * 2013-10-18 2014-01-29 张怀金 辅助支撑式水上工程作业船

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103541307A (zh) * 2013-10-18 2014-01-29 张怀金 辅助支撑式水上工程作业船
CN103541307B (zh) * 2013-10-18 2015-09-30 张怀金 辅助支撑式水上工程作业船

Similar Documents

Publication Publication Date Title
CN202593794U (zh) 一种提高双体风电工程作业船强度的装置
CN202812471U (zh) 可调式电缆支架
CN203006805U (zh) 浮式起重机的人字架装置
CN201442646U (zh) 成品油船货油舱的特涂脚手架脚码
CN102797647A (zh) 一种风力发电机塔筒与导管架基础双层甲板支撑连接结构
CN112278144A (zh) 一种多体船
CN204979124U (zh) 船舶抗疲劳弹性接头
CN205059933U (zh) 一种楔形木紧固装置
CN201597732U (zh) 组合式抗扭箱
CN203237383U (zh) 一种舰船旗杆轻便收放装置
CN206545163U (zh) 箱桁组合式浮游栈桥
CN206457179U (zh) 一种平台吊装辅助装置
CN201615031U (zh) 海上风力发电机组安装用平衡梁结构
CN205660562U (zh) 船舵叶及舵臂维修专用装置
CN204937404U (zh) 一种新型浮筒帆船
CN205220987U (zh) 一种反向造船模架结构
CN204913841U (zh) 一种a字形支撑架
CN204588428U (zh) 一种艉轴拂配用吊装工装
CN205327366U (zh) 一种船舶下水起吊结构
DE102014015001A1 (de) Adaptive Auftriebshilfe für Schiffe
CN202449200U (zh) 一种新型抗沉性通风设备
CN202756772U (zh) 船舶管路保护及支撑结构
CN206141777U (zh) 一种可防止与船体碰撞的托管架结构
CN201914412U (zh) 一种舱口围板
CN102464103A (zh) 一种可使船只迅速停航的装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP03 Change of name, title or address

Address after: 201612, Shanghai, Songjiang District Xin Brick Road No. 10, 518, 8

Patentee after: Tianhai fusion defense equipment and technology Limited by Share Ltd

Patentee after: China Railway Wuhan Bridge Industries Limited

Address before: 201707 Shanghai city Qingpu District No. 599 new road, building 1, room 639

Patentee before: Shanghai Bestway Marine Engineering Design Co., Ltd.

Patentee before: China Railway Wuhan Bridge Industries Limited

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20121212

Termination date: 20180215