CN103523679B - With the container handling system of bilayer trestle over strait - Google Patents

With the container handling system of bilayer trestle over strait Download PDF

Info

Publication number
CN103523679B
CN103523679B CN201310479370.3A CN201310479370A CN103523679B CN 103523679 B CN103523679 B CN 103523679B CN 201310479370 A CN201310479370 A CN 201310479370A CN 103523679 B CN103523679 B CN 103523679B
Authority
CN
China
Prior art keywords
bridge
over strait
track
trestle
carrier bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310479370.3A
Other languages
Chinese (zh)
Other versions
CN103523679A (en
Inventor
刘天军
赵迎九
肖强
郑雪峰
杜蔚琼
倪华
皮岩峰
秦春雷
黄福安
李庆建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Huadian Lanke Technology Co Ltd
Original Assignee
Huadian Heavy Industries Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huadian Heavy Industries Co Ltd filed Critical Huadian Heavy Industries Co Ltd
Priority to CN201310479370.3A priority Critical patent/CN103523679B/en
Publication of CN103523679A publication Critical patent/CN103523679A/en
Application granted granted Critical
Publication of CN103523679B publication Critical patent/CN103523679B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a kind of container handling system with bilayer trestle over strait, comprise An Qiao and Chang Qiao, double-deck trestle over strait is provided with between An Qiao and field bridge, bank bridge and bilayer trestle over strait are connected by bank bridge bridge of ferrying, field bridge is connected by field bridge ferry-boat bridge with bilayer trestle over strait, double-deck trestle over strait comprises longitudinal bearer and support post, longitudinal bearer is located at the top of support post, longitudinal bearer comprises carrier bar and lower carrier bar, upper carrier bar is connected by being connected support with lower carrier bar, track b on track a on upper carrier bar and lower carrier bar is equipped with trestle transport carriage over strait.Compared with conventional art, double-deck trestle over strait is provided with between the present invention's bridge on the scene ferry-boat bridge and bank bridge ferry-boat bridge, solve traditional obstruct problem due to the seawater between Chang Qiao and bank bridge in this way, double-deck the two-layer up and down of trestle over strait is equipped with trestle transport carriage over strait, improve the handling efficiency of freight container dramatically, improve the loading and unloading capacity at harbour.

Description

With the container handling system of bilayer trestle over strait
Technical field
The present invention relates to a kind of container handling system with bilayer trestle over strait, belong to port mechanical field.
Background technology
Container Transport is the transportation mode do not replaced in modern port, and normalisation, the internationalization of freight container impel the logistics transportation at harbour to move towards mechanization and automation.After China enters World Trade Organization, in marine carriage of container cargo, proportion is in continuous increase, and the loading and unloading capacity growth year after year of freight container, proposes new requirement and challenge to the transport efficacy of harbour container.
Deposit in process at the sea transport of freight container and goods yard, freight container is sling by the control step of the loading and unloading system be widely used at present mainly bank bridge lifting dolly, then move horizontally, container crane is transported on truck, by truck, freight container is transported to goods yard again, then overlays in goods yard by the hoisting crane in goods yard by freight container, whole handling efficiency is extremely low, if there is seawater to intercept between bank bridge and goods yard, traditional handling efficiency is lower.The loading and unloading capacity at the whole harbour of serious impact.In order to improve the handling efficiency of freight container, especially improve the container handling efficiency at the harbour that bank bridge and goods yard are blocked, research and development are a kind of, and container handling system is imperative efficiently.
Summary of the invention
The object of the present invention is to provide a kind of container handling system with bilayer trestle over strait, this container handling system can shorten the handling time of freight container effectively, improves the handling efficiency of freight container, and then improves the loading and unloading capacity at harbour.
Technical scheme of the present invention: a kind of container handling system with bilayer trestle over strait, comprise An Qiao and Chang Qiao, double-deck trestle over strait is provided with between An Qiao and field bridge, bank bridge and bilayer trestle over strait are connected by bank bridge bridge of ferrying, field bridge is connected by field bridge ferry-boat bridge with bilayer trestle over strait, double-deck trestle over strait comprises longitudinal bearer and support post, longitudinal bearer is located at the top of support post, longitudinal bearer comprises carrier bar and lower carrier bar, upper carrier bar is connected by being connected support with lower carrier bar, track b on track a on upper carrier bar and lower carrier bar is equipped with trestle transport carriage over strait, wherein descending the trestle transport carriage over strait on carrier bar directly can directly run the field bridge transport carriage of showing up bridge from bank bridge ferry-boat bridge can the position of lifting container.
In the aforesaid container handling system with bilayer trestle over strait, bank bridge ferry-boat bridge comprises steel structure frame a and portal crane a, steel structure frame a comprises supporting construction frame a and carrier bar a, carrier bar a is provided with track c, portal crane a is located on track c, and portal crane a can backhaul row on track c.
In the aforesaid container handling system with bilayer trestle over strait, field bridge ferry-boat bridge comprises steel structure frame b and portal crane b, steel structure frame b comprises supporting construction frame b and carrier bar b, carrier bar b is provided with track d, portal crane b is located on track d, and portal crane b can backhaul row on track d.
In the aforesaid container handling system with bilayer trestle over strait, bank bridge comprises structure stand, bottom crossbeam and top crossbeam, bottom crossbeam and top crossbeam are located on structure stand, bottom crossbeam is provided with bank bridge transport carriage, top crossbeam is provided with bank bridge lifting dolly and afterbody crane, and afterbody crane is located at bridge of ferrying with bank bridge and is connected side.
In the aforesaid container handling system with bilayer trestle over strait, described bottom crossbeam and the outside of top crossbeam are provided with floor stringer, bottom crossbeam, top crossbeam and floor stringer are by attaching parts a, attaching parts b is connected with attaching parts c, track e is provided with inside the crossbeam of bottom, track f is provided with inside the crossbeam of top, bank bridge lifting dolly and bank bridge transport carriage are located on track f and track e respectively, bottom crossbeam, top crossbeam, floor stringer, attaching parts a, the attaching parts b Formation cross-section that is connected with attaching parts c is leg-of-mutton overall crossbeam, increase the load-carrying capacity of overall crossbeam.
In the aforesaid container handling system with bilayer trestle over strait, described field bridge comprises steel structure support body, lifting carriage walking track B and transport carriage walking track B, lifting carriage walking track B is arranged on the top of steel structure support body, transport carriage walking track B is arranged on the below of lifting carriage walking track B, the below of transport carriage walking track B is container stacking region, transport carriage walking track B is provided with a bridge transport carriage, and lifting carriage walking track B is provided with a bridge lifting dolly; The middle part of steel structure support body is provided with container set and clears out a harbour overhead hoist.
In the aforesaid container handling system with bilayer trestle over strait, described container set clear out a harbour overhead hoist comprise freight container transition overhead traveling crane and overhead traveling crane walking track, overhead traveling crane walking track is fixed on steel structure support body, and freight container transition overhead traveling crane is arranged on overhead traveling crane walking track.
Compared with conventional art, the invention provides a kind of container handling system with bilayer trestle over strait, be provided with ferry bridge and bank bridge of a bridge between bridge on the scene and bank bridge to ferry bridge, double-deck trestle over strait is also provided with between field bridge ferry-boat bridge and bank bridge ferry-boat bridge, the setting of double-deck trestle over strait, solve traditional obstruct problem due to the seawater between Chang Qiao and bank bridge, and the two-layer up and down of double-deck trestle over strait is equipped with trestle transport carriage over strait, trestle transport carriage over strait can run simultaneously, improve the handling efficiency of freight container dramatically, the handling capacity of container handling system is made to have had qualitative leap, improve the loading and unloading capacity at harbour.
Accompanying drawing explanation
Fig. 1 is the constructional drawing of the container handling system with bilayer trestle over strait;
Fig. 2 is the birds-eye view of the container handling system with bilayer trestle over strait;
Fig. 3 is the B-B cutaway view of the container handling system with bilayer trestle over strait;
Fig. 4 is the bank bridge schematic diagram of the container handling system with bilayer trestle over strait;
Fig. 5 is the field bridge schematic diagram of the container handling system with bilayer trestle over strait;
Fig. 6 is the C-C cutaway view of the container handling system with bilayer trestle over strait;
Fig. 7 is the E-E cutaway view of the container handling system with bilayer trestle over strait;
Fig. 8 is the D-D cutaway view of the container handling system with bilayer trestle over strait;
Fig. 9 is the A-A cutaway view of the container handling system with bilayer trestle over strait;
Figure 10 to clear out a harbour overhead hoist schematic diagram with the container set of the container handling system of bilayer trestle over strait.
Being labeled as in accompanying drawing: 1-bank bridge, 2-bank bridge ferry-boat bridge, 3-field bridge ferry-boat bridge, 4-field bridge, the double-deck trestle over strait of 5-, 6-longitudinal bearer, 7-support post, the upper carrier bar of 8-, carrier bar under 9-, 10-trestle transport carriage over strait, 11-track a, 12-track b, 13-steel structure frame a, 14-portal crane a, 15-supporting construction frame a, 16-carrier bar a, 17-track c, 18-steel structure frame b, 19-portal crane b, 20-supporting construction frame b, 21-carrier bar b, 22-track d, 23-structure stand, 24-bottom crossbeam, 25-top crossbeam, 26-bank bridge transport carriage, 27-bank bridge lifting dolly, 28-afterbody crane, 29-connects support, 30-steel structure support body, 31-lifts by crane carriage walking track B, 32-transport carriage walking track B, 33-container stacking region, 34-field bridge transport carriage, 35-field bridge lifting dolly, 36-container set is cleared out a harbour overhead hoist, 37-freight container transition overhead traveling crane, 38-overhead traveling crane walking track, 39-floor stringer, 40-attaching parts a, 41-attaching parts b, 42-attaching parts c, 43-track e, 44-track f.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further illustrated.
Embodiments of the invention: as shown in Fig. 1 ~ Figure 10, a kind of container handling system with bilayer trestle over strait, comprise bank bridge 1 and field bridge 4, double-deck trestle over strait 5 is provided with between bank bridge 1 and field bridge 4, bank bridge 1 and bilayer trestle 5 over strait are connected by bank bridge bridge 2 of ferrying, field bridge 4 is connected by field bridge ferry-boat bridge 3 with bilayer trestle 5 over strait, double-deck trestle 5 over strait comprises longitudinal bearer 6 and support post 7, longitudinal bearer 6 is located at the top of support post 7, longitudinal bearer 6 comprises carrier bar 8 and lower carrier bar 9, upper carrier bar 8 is connected by being connected support 29 with lower carrier bar 9, track b12 on track a11 on upper carrier bar 8 and lower carrier bar 9 is equipped with trestle transport carriage 10 over strait.Bank bridge ferry-boat bridge 2 comprises steel structure frame a13 and portal crane a14, and steel structure frame a13 comprises supporting construction frame a15 and carrier bar a16, and carrier bar a16 is provided with track c17, and portal crane a14 is located on track c17.Field bridge ferry-boat bridge 3 comprises steel structure frame b18 and portal crane b19, and steel structure frame b18 comprises supporting construction frame b20 and carrier bar b21, and carrier bar b21 is provided with track d22, and portal crane b19 is located on track d22.Bank bridge 1 comprises structure stand 23, bottom crossbeam 24 and top crossbeam 25, bottom crossbeam 24 and top crossbeam 25 are located on structure stand 23, bottom crossbeam 24 is provided with bank bridge transport carriage 26, top crossbeam 25 is provided with bank bridge lifting dolly 27 and afterbody crane 28, and afterbody crane 28 is located at bridge 2 of ferrying with bank bridge and is connected side.Described bottom crossbeam 24 and the outside of top crossbeam 25 are provided with floor stringer 39, bottom crossbeam 24, top crossbeam 25 and floor stringer 39 are connected with attaching parts c42 by attaching parts a40, attaching parts b41, track e43 is provided with inside bottom crossbeam 24, be provided with track f44 inside top crossbeam 25, bank bridge lifting dolly 27 and bank bridge transport carriage 26 are located on track f44 and track e43 respectively.Described field bridge 4 comprises steel structure support body 30, lifting carriage walking track B31 and transport carriage walking track B32, lifting carriage walking track B31 is arranged on the top of steel structure support body 30, transport carriage walking track B32 is arranged on the below of lifting carriage walking track B31, the below of transport carriage walking track B32 is container stacking region 33, transport carriage walking track B32 is provided with a bridge transport carriage 34, and lifting carriage walking track B31 is provided with a bridge lifting dolly 35; The middle part of steel structure support body 30 is provided with container set and clears out a harbour overhead hoist 36.Described container set clear out a harbour overhead hoist 36 comprise freight container transition overhead traveling crane 37 and overhead traveling crane walking track 38, overhead traveling crane walking track 38 be fixed on steel structure support body 30, freight container transition overhead traveling crane 37 be arranged on overhead traveling crane walking track 38 on.
Principle of work of the present invention: unloading ship time, on the top crossbeam 25 of bank bridge 1 bank bridge lifting dolly 27 to sling freight container freight container is placed on the bank bridge transport carriage 26 on the bottom crossbeam 24 of bank bridge 1, freight container is transported to the below of bank bridge ferry-boat bridge 2 one end by bank bridge transport carriage 26, container crane is placed on the trestle transport carriage 10 over strait of the upper carrier bar 8 on double-deck trestle over strait 5 by the portal crane a14 on bank bridge ferry-boat bridge 2, under the effect of trestle transport carriage 10 over strait, the side of bridge that transporting container is shown up ferry-boat bridge 3, freight container is sling and places on the field bridge transport carriage 34 on bridge 4 on the scene by the portal crane b19 on field bridge ferry-boat bridge 3, then the below of bridge lifting dolly 35 of showing up carried by freight container by field bridge transport carriage 34, freight container on transport carriage 34 is sling and is stacked together in goods yard by bridge lifting dolly 35 on the scene.Meanwhile, unloaded trestle transport carriage 10 over strait turns back to the below of bank bridge ferry-boat bridge 2 one end along former road, prepare the carrying of next freight container.
Container crane is placed on the trestle transport carriage 10 over strait of the lower carrier bar 9 on double-deck trestle over strait 5 by the portal crane a14 in addition on bank bridge ferry-boat bridge 2, at trestle transport carriage 10 over strait, freight container is directly carried the field bridge of showing up on bridge 4 to lift by crane below dolly 35, freight container is sling and is stacked together in goods yard by field bridge lifting dolly 35, meanwhile, unloaded trestle transport carriage 10 over strait turns back to the position at lower carrier bar 9 place of bank bridge ferry-boat bridge 2 one end along former road, prepare the carrying of next freight container.
Load onto ship time, its working process is the inverse process unloading ship time, and trestle over strait upper and lower two-layer all can individually by trestle transport carriage over strait.

Claims (7)

1. the container handling system with bilayer trestle over strait, comprise bank bridge (1) He Changqiao (4), it is characterized in that: between bank bridge (1) He Changqiao (4), be provided with double-deck trestle over strait (5), bank bridge (1) and bilayer trestle over strait (5) are connected by bank bridge bridge (2) of ferrying, field bridge (4) is connected by field bridge ferry-boat bridge (3) with bilayer trestle over strait (5), double-deck trestle over strait (5) comprises longitudinal bearer (6) and support post (7), longitudinal bearer (6) is located at the top of support post (7), longitudinal bearer (6) comprises carrier bar (8) and lower carrier bar (9), upper carrier bar (8) is connected by being connected support (29) with lower carrier bar (9), track a(11 on upper carrier bar (8)) and lower carrier bar (9) on track b(12) on be equipped with trestle transport carriage (10) over strait.
2. the container handling system with bilayer trestle over strait according to claim 1, it is characterized in that: bank bridge ferry-boat bridge (2) comprises steel structure frame a(13) and portal crane a(14), steel structure frame a(13) comprise supporting construction frame a(15) and carrier bar a(16), carrier bar a(16) be provided with track c(17), portal crane a(14) be located at track c(17) on.
3. the container handling system with bilayer trestle over strait according to claim 1, it is characterized in that: field bridge ferry-boat bridge (3) comprises steel structure frame b(18) and portal crane b(19), steel structure frame b(18) comprise supporting construction frame b(20) and carrier bar b(21), carrier bar b(21) be provided with track d(22), portal crane b(19) be located at track d(22) on.
4. the container handling system with bilayer trestle over strait according to claim 1, it is characterized in that: bank bridge (1) comprises structure stand (23), bottom crossbeam (24) and top crossbeam (25), bottom crossbeam (24) and top crossbeam (25) are located on structure stand (23), bottom crossbeam (24) is provided with bank bridge transport carriage (26), top crossbeam (25) is provided with bank bridge lifting dolly (27) and afterbody crane (28), and afterbody crane (28) is located at bridge (2) of ferrying with bank bridge and is connected side.
5. the container handling system with bilayer trestle over strait according to claim 4, it is characterized in that: described bottom crossbeam (24) and the outside of top crossbeam (25) are provided with floor stringer (39), bottom crossbeam (24), top crossbeam (25) and floor stringer (39) are by attaching parts a(40), attaching parts b(41) with attaching parts c(42) be connected, bottom crossbeam (24) and floor stringer (39) are by attaching parts b(41) be connected, bottom crossbeam (24) and top crossbeam (25) are by attaching parts c(42) be connected, top crossbeam (25) and floor stringer (39) are by attaching parts a(40) be connected, bottom crossbeam (24) inner side is provided with track e(43), top crossbeam (25) inner side is provided with track f(44), bank bridge lifting dolly (27) and bank bridge transport carriage (26) are located at track f(44 respectively) and track e(43) on.
6. the container handling system with bilayer trestle over strait according to claim 1, it is characterized in that: described field bridge (4) comprises steel structure support body (30), lifting carriage walking track B(31) and transport carriage walking track B(32), lifting carriage walking track B(31) be arranged on the top of steel structure support body (30), transport carriage walking track B(32) be arranged on lifting carriage walking track B(31) below, transport carriage walking track B(32) below be container stacking region (33), transport carriage walking track B(32) be provided with a bridge transport carriage (34), lifting carriage walking track B(31) be provided with bridge lifting dolly (35), the middle part of steel structure support body (30) is provided with container set and clears out a harbour overhead hoist (36).
7. the container handling system with bilayer trestle over strait according to claim 6, it is characterized in that: described container set clear out a harbour overhead hoist (36) comprise freight container transition overhead traveling crane (37) and overhead traveling crane walking track (38), overhead traveling crane walking track (38) is fixed on steel structure support body (30), and freight container transition overhead traveling crane (37) is arranged on overhead traveling crane walking track (38).
CN201310479370.3A 2013-10-14 2013-10-14 With the container handling system of bilayer trestle over strait Active CN103523679B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310479370.3A CN103523679B (en) 2013-10-14 2013-10-14 With the container handling system of bilayer trestle over strait

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310479370.3A CN103523679B (en) 2013-10-14 2013-10-14 With the container handling system of bilayer trestle over strait

Publications (2)

Publication Number Publication Date
CN103523679A CN103523679A (en) 2014-01-22
CN103523679B true CN103523679B (en) 2015-08-05

Family

ID=49926110

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310479370.3A Active CN103523679B (en) 2013-10-14 2013-10-14 With the container handling system of bilayer trestle over strait

Country Status (1)

Country Link
CN (1) CN103523679B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106115283B (en) * 2016-07-06 2019-04-19 武汉理工大学 A kind of automated container terminal handling method
CN108166378A (en) * 2018-02-06 2018-06-15 广州智网联运物流有限公司 A kind of novel low latitude logistics transportation runway
DE102019126615A1 (en) * 2019-10-02 2021-04-08 Krones Ag Linear transport system with minimal transport division

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2293361A (en) * 1994-09-20 1996-03-27 Fantuzzi Reggiane Spa Freight handling plant
DE19703282A1 (en) * 1997-01-30 1998-08-06 Estebanez Eva Garcia Ship-to-shore container crane system with multiple loading trolleys
CN102139831A (en) * 2011-01-25 2011-08-03 三一集团有限公司 Container crane and method for loading and unloading containers using crane
CN102424277A (en) * 2011-08-01 2012-04-25 张占成 Assembling and disassembling system for port container and assembling and disassembling technology thereoffor
CN103010767A (en) * 2012-12-13 2013-04-03 武汉理工大学 Novel container handling system
CN203529772U (en) * 2013-10-14 2014-04-09 华电重工股份有限公司 Container loading and unloading system with double-layer cross-sea trestle

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002145453A (en) * 2000-11-09 2002-05-22 Ishikawajima Harima Heavy Ind Co Ltd Container tiering storing device
DE10307579A1 (en) * 2003-02-22 2004-09-09 Gottwald Port Technology Gmbh Handling facility in a sea or inland port

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2293361A (en) * 1994-09-20 1996-03-27 Fantuzzi Reggiane Spa Freight handling plant
DE19703282A1 (en) * 1997-01-30 1998-08-06 Estebanez Eva Garcia Ship-to-shore container crane system with multiple loading trolleys
CN102139831A (en) * 2011-01-25 2011-08-03 三一集团有限公司 Container crane and method for loading and unloading containers using crane
CN102424277A (en) * 2011-08-01 2012-04-25 张占成 Assembling and disassembling system for port container and assembling and disassembling technology thereoffor
CN103010767A (en) * 2012-12-13 2013-04-03 武汉理工大学 Novel container handling system
CN203529772U (en) * 2013-10-14 2014-04-09 华电重工股份有限公司 Container loading and unloading system with double-layer cross-sea trestle

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
港口集装箱π型装卸系统的设备及工艺;张滨等;《港口装卸》;武汉理工大学;20030831(第4期);第5-8页 *

Also Published As

Publication number Publication date
CN103523679A (en) 2014-01-22

Similar Documents

Publication Publication Date Title
JP5676338B2 (en) Container terminal and its control method
JP6215323B2 (en) Elevated crane and assembly of at least two elevated cranes
JP5793323B2 (en) Container terminal and its control method
JP5755404B2 (en) Container terminal
CN103818734B (en) A kind of Quayside container conveyer method and movement system
WO2013169110A1 (en) Overhead crane, assembly of at least two overhead cranes, automated guided vehicle, and assembly thereof
CN203740624U (en) Novel quayside container handling quay crane and ferry crane combined system
CN203529772U (en) Container loading and unloading system with double-layer cross-sea trestle
CN103523680A (en) Container loading and unloading shore bridge with lifting type double-layer girder and three trolleys
CN103523541A (en) Container loading and unloading method and elevation type double-layer girder shore crane container loading and unloading system
CN106029547A (en) Stacker crane with an intermediate storage area for containers
CN103523679B (en) With the container handling system of bilayer trestle over strait
CN103910200B (en) Shore container transfer method and transfer system
JP5969095B2 (en) Container terminal and its control method
US7004338B2 (en) Empty container storage for the intermediate storage of empty ISO containers
CN103407900A (en) Efficient loading and unloading system and process for harbor containers
CN203529469U (en) Container loading and unloading system of lifting type double-layer girder quay crane
KR20150020351A (en) Goods carriage system and method by rail guided vehicle
CN203529777U (en) Container loading and unloading quay crane with lifting double-layer girder and three trolleys
CN203877524U (en) High-efficiency transit system for shoreside container
CN103466459B (en) Container handling technology over strait and the container handling system with trestle over strait
CN101020540A (en) Container loading and unloading process
CN102923491A (en) Container wharf operation and management method
JP5589512B2 (en) Container terminal
US20050226713A1 (en) Process for handling cargo and cargo handling facility

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20211011

Address after: 100160 8th floor, building 1, yard 6, East Road, Automobile Museum, Fengtai District, Beijing

Patentee after: Huadian Lanke Technology Co.,Ltd.

Address before: 100071 Building 2, No. 9, Haiying Road, Science City, Fengtai District, Beijing

Patentee before: HUADIAN HEAVY INDUSTRIES Co.,Ltd.

TR01 Transfer of patent right