The annular two-tube formula pipe chain conveying mechanism of conduit loading tail sealing machine
Technical field
The present invention relates to a kind of conduit loading tail sealing machine, specifically relate to a kind of pipe chain conveying mechanism being mainly used in paste medicine conduit loading tail sealing machine.
Background technology
At present, paste medicine conduit loading tail sealing machine a kind ofly carries out the high-end equipment of intelligence of sealing to cylindrical metallic flexible pipe or the filling plaster material of plastic composite hose, for single tube unidirectional type cutting mode, it comprises Shang Guan mechanism, pressure pipe structure, pipe chain conveying mechanism, to marking machine structure, filling mechanism, sealing mechanism, Chu Guan mechanism and microcomputerized control mechanism etc., completes the blanking of flexible pipe, pressure pipe, conveying successively, to mark, filling, sealing, goes out the operations such as pipe.Wherein pipe chain conveying mechanism is that disc type rotates conveying, and by indexing case calibration tapping mode disc rotary, production efficiency is lower, and the hose product output in the unit time is less; If be directly adapted as two-tube reversible blanking, then this conduit loading tail sealing machine volume is comparatively huge, and institute takes up space large, heavy, and input cost is higher, and practicality is poor.
Summary of the invention
The object of the invention is to overcome above-mentioned deficiency, and a kind of loop type conveyor line, two-tube synchronous transport are provided, the annular two-tube formula pipe chain conveying mechanism of the little conduit loading tail sealing machine that takes up room.
Object of the present invention realizes by following technical solution: the annular two-tube formula pipe chain conveying mechanism of conduit loading tail sealing machine, comprise frame, hypanthium and base assembly set, described frame is loop type conveyor line, around the annular of this frame, mid-ambles conveyer is housed, described hypanthium and base assembly set are contained on the Timing Belt of mid-ambles conveyer, and a pair adjacent hypanthium and base assembly set are one group.
Described frame is equipped with bent plate above hypanthium and base assembly set, at the side of described hypanthium and base assembly set, tapping channel frame is housed.
After adopting the present invention, often organize hypanthium and carry out synchronous continus convergence with base assembly set by the Timing Belt of mid-ambles conveyer, there is not intermittent delivery problem, often organize hypanthium and base assembly set to carry out the blanking of flexible pipe, pressure pipe, conveying successively, to marking, filling, sealing, go out the operations such as pipe, delivery speed is fast, work efficiency is high, yield is large, and loop type conveyor line frame takes up room not quite, improves the degree of utilization of production site.
Accompanying drawing explanation
Below in conjunction with accompanying drawing and embodiment, the present invention is described in further detail.
Fig. 1 is structural representation of the present invention.
Fig. 2 is the A-A cutaway view of Fig. 1.
Detailed description of the invention
With reference to Fig. 1, Fig. 2, the annular two-tube formula pipe chain conveying mechanism of conduit loading tail sealing machine of the present invention, comprise frame 29 (comprising bracket, bottom bracket, guide rail etc.), hypanthium and base assembly set 31, described frame 29 is loop type conveyor line (prolate shape), around the annular of this frame 29, mid-ambles conveyer 30 is housed, described hypanthium and base assembly set 31 are contained on the Timing Belt 12 of mid-ambles conveyer 30, and a pair adjacent hypanthium and base assembly set are one group.
Described frame 29 is equipped with bent plate 20 (two pieces) above hypanthium and base assembly set 31, at the side (by supporting seat 23) of described hypanthium and base assembly set 31, tapping channel frame 21 (two pieces) is housed.Be then Chu Guan mechanism (stamp carried out upwards of the flexible pipe after the sealing in base 1 being gone out and realize out plumber's sequence) in the below of hypanthium and base assembly set 31.
Wherein: hypanthium and base assembly set 31 comprise hypanthium 2, base 1; Frame 29 comprises bracket, bottom bracket, guide rail 22 etc.; Mid-ambles conveyer 30 comprises the imput shaft 28 and driving wheel 6, driven shaft 18 and flower wheel 16 that are contained in frame two ends respectively, and driving wheel 6 with flower wheel 16 are equipped with Timing Belt 12, and described imput shaft 28 is connected with the main drive gear of this conduit loading tail sealing machine.The Timing Belt 12 of described mid-ambles conveyer 30 posts on the guide rail 22 of described frame 29.
As shown in the figure, a pair adjacent hypanthium and base assembly set are one group, and existing is one group with the two pieces hypanthium below bent plate 20 and base assembly set, has 20 groups.Often organize hypanthium and carry out synchronous continus convergence with base assembly set by the Timing Belt of mid-ambles conveyer 30, there is not intermittent delivery problem, often organize hypanthium and base assembly set to carry out the blanking of flexible pipe, pressure pipe, conveying successively, to marking, filling, sealing, go out the operations such as pipe, delivery speed is fast, work efficiency is high, yield is large, and loop type conveyor line (prolate shape) frame 29 takes up room not quite, improves the degree of utilization of production site.The stamp carried out upwards facing to the end-sealed hose in base by Chu Guan mechanism during hose pipe goes out, and can encounter bent plate top and naturally fall on tapping channel frame and glide, thus realize out plumber's sequence due to this flexible pipe.