CN103498476A - Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method - Google Patents

Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method Download PDF

Info

Publication number
CN103498476A
CN103498476A CN201310476802.5A CN201310476802A CN103498476A CN 103498476 A CN103498476 A CN 103498476A CN 201310476802 A CN201310476802 A CN 201310476802A CN 103498476 A CN103498476 A CN 103498476A
Authority
CN
China
Prior art keywords
pier
concrete
foundation
hole
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201310476802.5A
Other languages
Chinese (zh)
Other versions
CN103498476B (en
Inventor
成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HAOJIA HENGYE CONSTRUCTION DEVELOPMENT CO., LTD.
Jiangsu Tongzhou Forth Construction Group Co., Ltd.
Nantong University
Original Assignee
成军
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 成军 filed Critical 成军
Priority to CN201310476802.5A priority Critical patent/CN103498476B/en
Publication of CN103498476A publication Critical patent/CN103498476A/en
Application granted granted Critical
Publication of CN103498476B publication Critical patent/CN103498476B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses a major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method. The method comprises the steps of earth excavating, foundation slab pouring, pier position cave reserving, waterstop installing, pier foundation constructing, pier foundation waterproof treatment and the like. By means of the method, construction is convenient, and the construction effect is good. The stability of pile legs is guaranteed through the self-weight of a net foundation slab, and the stability of a foundation pit support is guaranteed through a support inner brace. The processing technique is advanced, and the method is safe, reliable, obvious in economic benefit and social benefit and worth popularizing and applying.

Description

Major diameter drilling pile pier foundation and netted sole plate reversed construction method
Technical field
The present invention relates to a kind of major diameter drilling pile pier foundation and netted sole plate reversed construction method.
Background technology
In deep foundation pit of tall buildings work progress at some with major diameter drilling pile pier foundation; often can run into the design alteration that the basement structure level is added or embedded depth of foundation is deepened; if the change of this type occurs in foundation pit supporting system constructed after; can be because of the further intensification of design elevation at the bottom of the major diameter pier foundation; and causing the supporting depth requirements also to be deepened thereupon, original support system can't meet the supporting requirement.If rethink the construction supporting system, certainly will cause larger economic loss and construction delay to engineering, even take some strengthening measures also to have larger difficulty on former supporting basis, and may not necessarily guarantee long-term supporting effect, how the appropriate problem of handling this pattern foundation pit supporting structure in particular cases well has just become a difficult problem in the engineering construction.
Summary of the invention
The object of the present invention is to provide a kind of easy construction, the major diameter drilling pile pier foundation that construction effect is good and netted sole plate reversed construction method.
Technical solution of the present invention is:
A kind of major diameter drilling pile pier foundation and netted sole plate reversed construction method, is characterized in that: comprise the following steps:
(1) soil excavation
(1) soil excavation requires machinery once to be excavated to the above 20mm of back-plane design absolute altitude place, manually repair and dig to design elevation, after completing, check of foundation subsoil carries out immediately building of bed course, waterproof roll and netted underplate concrete, shorten as far as possible drying in the air the groove time of foundation ditch, discharge and reduce because of dry in the air resistance to shear of soil that the groove overlong time causes of foundation ditch preventing, or rainwater soaks the impact that the special circumstances such as foundation ditch cause support system, thereby guarantee the stability of support system;
(2) carry out the drainage works that falls of foundation ditch during soil excavation, the foundation ditch base arranges gutter and sump, to prevent that rainwater from soaking foundation ditch and causing the destruction to support system;
(2) build sole plate
(1) must be ferreted out+1.0m absolute altitude control line on wall, post reinforcing bar, and draw upper red triangle with red paint and make marks, scene has level gauge, to sump absolute altitude priority control, so that levelling is at any time grasped absolute altitude dynamic;
(2), when building the sole plate concrete in mass, take balance pouring at reserved opening, from bottom to top, vibration compacting;
(3) after concrete surface makes real rubbing and pressure with wood float, then use the plasterer's trowel press polish, guarantee surperficial compactness and fineness, slow down the concrete surface dehydrating speed, prevent surface checking; After slightly due-in water, cover layer of plastic film at concrete surface in time after the press polish of surface, additional two-layer exhausted combustion straw screen or mat quilt, prevent the appearance in crack;
(3) hole, pier position is stayed and is established and the waterstop setting
(1) in the time of construction of bottom plates, first on foundation pad, adopt the transit setting-out to go out the pile pier bit position, then with the framed pile pier position opening mould plate of reserving of customization, to prop, exact position the final location of finally checking template are fixing again, accurate to guarantee the pier position;
(2) before sole plate is built, base plate and steel plate water stopper together with pier foundation hole seam adopts with together with the double-deck waterproof of rubber swelling sealing rod
(3) after the place's form removable of hole, reserved pier position, clear up in time residual concrete and the scum silica frost on tape edge and reinforcing bar, carry out interface waterproof roll Protection, and the interface concrete surface is picked and cuts a hole into pitted skin, effective adhesive arranged when guaranteeing the follow-up concreting in pile pier position;
(4) pile pier foundation construction
(1) before pile foundation construction, adopt transit to carry out setting-out by design pier position, guarantee that the pile pier position is accurate, and guarantee that spot face position and the biased difference of design pier are not more than 5cm;
(2) establish gutter, collecting well in pier mouth surrounding before the construction, prevent that surface water from entering in hole; Dun Kou goes along with sb. to guard him than the high 30cm in ground, prevents that soil, stone, foreign material from rolling in hole and hurting sb.'s feelings; Employing interval, Wa Dun hole borehole method, influence each other while avoiding constructing, and keeps the stable of the pier hole wall soil body;
(3) pier hole excavation adopts merogenesis shoveling method, and artificial hand-held pneumatic pick or pick be successively merogenesis excavation and retaining wall from top to bottom, and every joint cutting depth is 0.5m to 1m; When rock must bursting work in pier, adopt the short hole blasting method, borehole depth is no more than 0.4m at hard formation, and incompetent bed is no more than 0.8m; Explosion adopts specialized team, and adds strong supporting near borehole, prevents shock collapse Dun Bi;
(4) while lifting means being installed, make wire rope center and the pier axially bored line position consistency of well-bucket, rough control central line during as shoveling; Establish the cross control point on every joint retaining wall, ceiling hammer is done center line, with horizontal rod, determines the pier footpath;
(5) retaining wall adopts inner bearing type template, external tooth type concrete guard wall, breast wall concrete job mix machine mix, and the diesel dumper transportation, the steel tumbling barrel enters mould, and the internal vibration rod is made firm by ramming; Mix accelerating admixture in breast wall concrete, dado template is removed after 24h; After borehole reaches projected depth, the departments such as notice management in time, design carry out an acceptance inspection, qualified rear rapid back cover;
(6) to adopt tower crane whole once to lift hand-hole in place for reinforcing cage, and during lifting, Heave Here is located at and strengthens the stirrup position, hangs directly to hold up surely, aims at the pier hole and slowly sink, and avoids colliding Dun Bi, and the hoisted in position deviation is not more than 5cm; The topping of cage of reinforcement, by penetrate center drilling on spiral bar, the circular C30 cement mortar bedding block of thick 5cm guarantees, the mortar piece is by vertically establishing together every 2m, often penetrates 6 layouts along circumference together;
(7) concrete adopts commercial concrete, concrete delivery truck transportation, and with the perfusion of deceleration tumbling barrel, the tumbling barrel bottom is not more than 2m with pier inner bottom part or concrete surface height; After pore-forming, pour into immediately the pier shaft concrete, and the same day disposable completing; The method of taking continuous stratification perfusion, layering to vibrate, every layer of influx height must not surpass 1.5m, and the every layer of thickness that vibrates must not surpass 0.5m; It is real that concrete adopts perfusion limit, internal vibration rod limit to insert, to guarantee concrete compactness; Pier top concrete is smeared and is flattened before initial set, and surface will cut to guarantee to be connected well with the top pier cap if any laitance layer;
(5) pier foundation waterproofing work
After pile pier place cushion construction completes, be the subsidy construction waterproof roll, reinforcing bar and steel pipe adopt the welding steel waterproof through the base plate place, and the waterproof roll paving is on waterproof steel plate, and the waterproof steel plate root on steel pipe and reinforcing bar is sticked on one deck enhancement Layer.
Easy construction of the present invention, construction effect is good; By netted base plate, deadweight has guaranteed the stable of footing part, and has doubled as the stability that one supporting inner support guaranteed pattern foundation pit supporting structure.Technology advanced person, safe and reliable, economic benefit and social benefit are obvious, are worthy of popularization.
Below in conjunction with embodiment, the invention will be further described.
The specific embodiment
A kind of major diameter drilling pile pier foundation and netted sole plate reversed construction method, comprise the following steps:
(1) soil excavation
(1) soil excavation requires machinery once to be excavated to the above 20mm of back-plane design absolute altitude place, manually repair and dig to design elevation, after completing, check of foundation subsoil carries out immediately building of bed course, waterproof roll and netted underplate concrete, shorten as far as possible drying in the air the groove time of foundation ditch, discharge and reduce because of dry in the air resistance to shear of soil that the groove overlong time causes of foundation ditch preventing, or rainwater soaks the impact that the special circumstances such as foundation ditch cause support system, thereby guarantee the stability of support system;
(2) carry out the drainage works that falls of foundation ditch during soil excavation, the foundation ditch base arranges gutter and sump, to prevent that rainwater from soaking foundation ditch and causing the destruction to support system;
(2) build sole plate
(1) must be ferreted out+1.0m absolute altitude control line on wall, post reinforcing bar, and draw upper red triangle with red paint and make marks, scene has level gauge, to sump absolute altitude priority control, so that levelling is at any time grasped absolute altitude dynamic;
(2), when building the sole plate concrete in mass, take balance pouring at reserved opening, from bottom to top, vibration compacting;
(3) after concrete surface makes real rubbing and pressure with wood float, then use the plasterer's trowel press polish, guarantee surperficial compactness and fineness, slow down the concrete surface dehydrating speed, prevent surface checking; After slightly due-in water, cover layer of plastic film at concrete surface in time after the press polish of surface, additional two-layer exhausted combustion straw screen or mat quilt, prevent the appearance in crack;
(3) hole, pier position is stayed and is established and the waterstop setting
(1) in the time of construction of bottom plates, first on foundation pad, adopt the transit setting-out to go out the pile pier bit position, then with the framed pile pier position opening mould plate of reserving of customization, to prop, exact position the final location of finally checking template are fixing again, accurate to guarantee the pier position;
(2) before sole plate is built, base plate and steel plate water stopper together with pier foundation hole seam adopts with together with the double-deck waterproof of rubber swelling sealing rod
(3) after the place's form removable of hole, reserved pier position, clear up in time residual concrete and the scum silica frost on tape edge and reinforcing bar, carry out interface waterproof roll Protection, and the interface concrete surface is picked and cuts a hole into pitted skin, effective adhesive arranged when guaranteeing the follow-up concreting in pile pier position;
(4) pile pier foundation construction
(1) before pile foundation construction, adopt transit to carry out setting-out by design pier position, guarantee that the pile pier position is accurate, and guarantee that spot face position and the biased difference of design pier are not more than 5cm;
(2) establish gutter, collecting well in pier mouth surrounding before the construction, prevent that surface water from entering in hole; Dun Kou goes along with sb. to guard him than the high 30cm in ground, prevents that soil, stone, foreign material from rolling in hole and hurting sb.'s feelings; Employing interval, Wa Dun hole borehole method, influence each other while avoiding constructing, and keeps the stable of the pier hole wall soil body;
(3) pier hole excavation adopts merogenesis shoveling method, and artificial hand-held pneumatic pick or pick be successively merogenesis excavation and retaining wall from top to bottom, and every joint cutting depth is 0.5m to 1m; When rock must bursting work in pier, adopt the short hole blasting method, borehole depth is no more than 0.4m at hard formation, and incompetent bed is no more than 0.8m; Explosion adopts specialized team, and adds strong supporting near borehole, prevents shock collapse Dun Bi;
(4) while lifting means being installed, make wire rope center and the pier axially bored line position consistency of well-bucket, rough control central line during as shoveling; Establish the cross control point on every joint retaining wall, ceiling hammer is done center line, with horizontal rod, determines the pier footpath;
(5) retaining wall adopts inner bearing type template, external tooth type concrete guard wall, breast wall concrete job mix machine mix, and the diesel dumper transportation, the steel tumbling barrel enters mould, and the internal vibration rod is made firm by ramming; Mix accelerating admixture in breast wall concrete, dado template is removed after 24h; After borehole reaches projected depth, the departments such as notice management in time, design carry out an acceptance inspection, qualified rear rapid back cover;
(6) to adopt tower crane whole once to lift hand-hole in place for reinforcing cage, and during lifting, Heave Here is located at and strengthens the stirrup position, hangs directly to hold up surely, aims at the pier hole and slowly sink, and avoids colliding Dun Bi, and the hoisted in position deviation is not more than 5cm; The topping of cage of reinforcement, by penetrate center drilling on spiral bar, the circular C30 cement mortar bedding block of thick 5cm guarantees, the mortar piece is by vertically establishing together every 2m, often penetrates 6 layouts along circumference together;
(7) concrete adopts commercial concrete, concrete delivery truck transportation, and with the perfusion of deceleration tumbling barrel, the tumbling barrel bottom is not more than 2m with pier inner bottom part or concrete surface height; After pore-forming, pour into immediately the pier shaft concrete, and the same day disposable completing; The method of taking continuous stratification perfusion, layering to vibrate, every layer of influx height must not surpass 1.5m, and the every layer of thickness that vibrates must not surpass 0.5m; It is real that concrete adopts perfusion limit, internal vibration rod limit to insert, to guarantee concrete compactness; Pier top concrete is smeared and is flattened before initial set, and surface will cut to guarantee to be connected well with the top pier cap if any laitance layer;
(5) pier foundation waterproofing work
After pile pier place cushion construction completes, be the subsidy construction waterproof roll, reinforcing bar and steel pipe adopt the welding steel waterproof through the base plate place, and the waterproof roll paving is on waterproof steel plate, and the waterproof steel plate root on steel pipe and reinforcing bar is sticked on one deck enhancement Layer.

Claims (1)

1. a major diameter drilling pile pier foundation and netted sole plate reversed construction method, is characterized in that: comprise the following steps:
(1) soil excavation
(1) soil excavation requires machinery once to be excavated to the above 20mm of back-plane design absolute altitude place, manually repaiies and digs to design elevation, carries out immediately building of bed course, waterproof roll and netted underplate concrete after check of foundation subsoil completes;
(2) carry out the drainage works that falls of foundation ditch during soil excavation, the foundation ditch base arranges gutter and sump, to prevent that rainwater from soaking foundation ditch and causing the destruction to support system;
(2) build sole plate
(1) must be ferreted out+1.0m absolute altitude control line on wall, post reinforcing bar, and draw upper red triangle with red paint and make marks, scene has level gauge, to sump absolute altitude priority control, so that levelling is at any time grasped absolute altitude dynamic;
(2), when building the sole plate concrete in mass, take balance pouring at reserved opening, from bottom to top, vibration compacting;
(3) after concrete surface makes real rubbing and pressure with wood float, then use the plasterer's trowel press polish, guarantee surperficial compactness and fineness, slow down the concrete surface dehydrating speed, prevent surface checking; After slightly due-in water, cover layer of plastic film at concrete surface in time after the press polish of surface, additional two-layer exhausted combustion straw screen or mat quilt, prevent the appearance in crack;
(3) hole, pier position is stayed and is established and the waterstop setting
(1) in the time of construction of bottom plates, first on foundation pad, adopt the transit setting-out to go out the pile pier bit position, then with the framed pile pier position opening mould plate of reserving of customization, to prop, exact position the final location of finally checking template are fixing again, accurate to guarantee the pier position;
(2) before sole plate is built, base plate and steel plate water stopper together with pier foundation hole seam adopts with together with the double-deck waterproof of rubber swelling sealing rod;
(3) after the place's form removable of hole, reserved pier position, clear up in time residual concrete and the scum silica frost on tape edge and reinforcing bar, carry out interface waterproof roll Protection, and the interface concrete surface is picked and cuts a hole into pitted skin, effective adhesive arranged when guaranteeing the follow-up concreting in pile pier position;
(4) pile pier foundation construction
(1) before pile foundation construction, adopt transit to carry out setting-out by design pier position, guarantee that the pile pier position is accurate, and guarantee that spot face position and the biased difference of design pier are not more than 5cm;
(2) establish gutter, collecting well in pier mouth surrounding before the construction, prevent that surface water from entering in hole; Dun Kou goes along with sb. to guard him than the high 30cm in ground, prevents that soil, stone, foreign material from rolling in hole and hurting sb.'s feelings; Employing interval, Wa Dun hole borehole method, influence each other while avoiding constructing, and keeps the stable of the pier hole wall soil body;
(3) pier hole excavation adopts merogenesis shoveling method, and artificial hand-held pneumatic pick or pick be successively merogenesis excavation and retaining wall from top to bottom, and every joint cutting depth is 0.5m to 1m; When rock must bursting work in pier, adopt the short hole blasting method, borehole depth is no more than 0.4m at hard formation, and incompetent bed is no more than 0.8m; Explosion adopts specialized team, and adds strong supporting near borehole, prevents shock collapse Dun Bi;
(4) while lifting means being installed, make wire rope center and the pier axially bored line position consistency of well-bucket, rough control central line during as shoveling; Establish the cross control point on every joint retaining wall, ceiling hammer is done center line, with horizontal rod, determines the pier footpath;
(5) retaining wall adopts inner bearing type template, external tooth type concrete guard wall, breast wall concrete job mix machine mix, and the diesel dumper transportation, the steel tumbling barrel enters mould, and the internal vibration rod is made firm by ramming; Mix accelerating admixture in breast wall concrete, dado template is removed after 24h; After borehole reaches projected depth, the departments such as notice management in time, design carry out an acceptance inspection, qualified rear rapid back cover;
(6) to adopt tower crane whole once to lift hand-hole in place for reinforcing cage, and during lifting, Heave Here is located at and strengthens the stirrup position, hangs directly to hold up surely, aims at the pier hole and slowly sink, and avoids colliding Dun Bi, and the hoisted in position deviation is not more than 5cm; The topping of cage of reinforcement, by penetrate center drilling on spiral bar, the circular C30 cement mortar bedding block of thick 5cm guarantees, the mortar piece is by vertically establishing together every 2m, often penetrates 6 layouts along circumference together;
(7) concrete adopts commercial concrete, concrete delivery truck transportation, and with the perfusion of deceleration tumbling barrel, the tumbling barrel bottom is not more than 2m with pier inner bottom part or concrete surface height; After pore-forming, pour into immediately the pier shaft concrete, and the same day disposable completing; The method of taking continuous stratification perfusion, layering to vibrate, every layer of influx height must not surpass 1.5m, and the every layer of thickness that vibrates must not surpass 0.5m; It is real that concrete adopts perfusion limit, internal vibration rod limit to insert, to guarantee concrete compactness; Pier top concrete is smeared and is flattened before initial set, and surface will cut to guarantee to be connected well with the top pier cap if any laitance layer;
(5) pier foundation waterproofing work
After pile pier place cushion construction completes, be the subsidy construction waterproof roll, reinforcing bar and steel pipe adopt the welding steel waterproof through the base plate place, and the waterproof roll paving is on waterproof steel plate, and the waterproof steel plate root on steel pipe and reinforcing bar is sticked on one deck enhancement Layer.
CN201310476802.5A 2013-10-14 2013-10-14 Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method Expired - Fee Related CN103498476B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310476802.5A CN103498476B (en) 2013-10-14 2013-10-14 Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310476802.5A CN103498476B (en) 2013-10-14 2013-10-14 Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method

Publications (2)

Publication Number Publication Date
CN103498476A true CN103498476A (en) 2014-01-08
CN103498476B CN103498476B (en) 2014-09-10

Family

ID=49863726

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310476802.5A Expired - Fee Related CN103498476B (en) 2013-10-14 2013-10-14 Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method

Country Status (1)

Country Link
CN (1) CN103498476B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967015A (en) * 2014-05-21 2014-08-06 刘绍国 Water-stopping deep foundation pit excavation method and structure thereof
CN115559299A (en) * 2022-11-23 2023-01-03 中交第一航务工程局有限公司 Pre-hole forming method for foundation concrete cushion pile foundation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100775767B1 (en) * 2006-08-14 2007-11-12 깨뱉시스템주식회사 Top-down method using the vertical steel bar for the src column
CN101538867A (en) * 2009-02-25 2009-09-23 叶长青 Long-short pile composite foundation top-down construction method
CN201901876U (en) * 2010-12-23 2011-07-20 东南大学 Steel sheet pile inversely-constructed foundation ditch supporting structure
CN102425184A (en) * 2011-12-13 2012-04-25 中交第二公路工程局有限公司 Cap preserved hole construction method for deep-water soft soil foundation reverse low pile cap composite foundation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100775767B1 (en) * 2006-08-14 2007-11-12 깨뱉시스템주식회사 Top-down method using the vertical steel bar for the src column
CN101538867A (en) * 2009-02-25 2009-09-23 叶长青 Long-short pile composite foundation top-down construction method
CN201901876U (en) * 2010-12-23 2011-07-20 东南大学 Steel sheet pile inversely-constructed foundation ditch supporting structure
CN102425184A (en) * 2011-12-13 2012-04-25 中交第二公路工程局有限公司 Cap preserved hole construction method for deep-water soft soil foundation reverse low pile cap composite foundation

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103967015A (en) * 2014-05-21 2014-08-06 刘绍国 Water-stopping deep foundation pit excavation method and structure thereof
CN103967015B (en) * 2014-05-21 2016-04-27 刘绍国 A kind of water seal for deep foundation pit excavation method and structure thereof
CN115559299A (en) * 2022-11-23 2023-01-03 中交第一航务工程局有限公司 Pre-hole forming method for foundation concrete cushion pile foundation

Also Published As

Publication number Publication date
CN103498476B (en) 2014-09-10

Similar Documents

Publication Publication Date Title
CN102444142B (en) Pile group column replacement expanded basement and construction method of same
CN100473790C (en) Tower crane foundation for construction and manufacturing method thereof
CN110258538B (en) Soil nail reinforced buffer type manual hole digging pile and construction method thereof
CN111733837B (en) Rock slope filling and sealing protection system and construction method
CN104532957B (en) Existing building sets up basement reversed construction method
CN101446088A (en) Construction method for pole and tower foundation in Gobi Desert gravelly soil area
CN106869548A (en) A kind of newel framework assembled underground parking structural system and construction method
CN109706952A (en) Large-scale well-sinking construction method
CN104652495B (en) Internal support of foundation pit column and base plate node waterproof construction technology
CN206721870U (en) A kind of long auger guncreting pile steel reinforcement cage
CN105862897B (en) Sandy Silt ground shallow foundation original groove pouring construction engineering method
CN107675704A (en) A kind of artificial digging pile assembled retaining wall and its construction technology
CN107100164A (en) A kind of long auger guncreting pile construction method
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN103498476B (en) Major-diameter hole-forming pile pier foundation and net foundation slab reverse building construction method
CN105332386B (en) Structure construction method for tower crane foundation serving as basement bottom plate
CN103469828A (en) Construction method of hydrophobic structure of post-cast strip of bottom plate of basement
CN106149751A (en) Utilize the method that quick lime brick quarrel compaction pile reinforces building construction ground
CN107299640A (en) A kind of variable cross-section well shaft type ground continuous wall base and its construction method
CN209293068U (en) A kind of open trench tunnel falsework system
Grigor'ev et al. Reasons for Deformation and Failure of the Structural Units of an Apartment Building on a Slopeside Site.
CN106884436A (en) A kind of construction method of the waterproof connecting structure of foundation ditch uplift pile and structure base slab
CN207160041U (en) Anchor rod type artificial digging pile
CN103790148A (en) Combined treatment construction method for collapsible loess foundation
CN105756078B (en) One kind extends out lamination type and draws digging spread foundation and its construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: HAOJIA HENGYE CONSTRUCTION DEVELOPMENT CO., LTD. J

Effective date: 20140730

Owner name: NANTONG UNIVERSITY

Free format text: FORMER OWNER: CHENG JUN

Effective date: 20140730

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Cheng Jun

Inventor after: Zhou Binggao

Inventor after: Jiang Haiyan

Inventor after: Ji Hao

Inventor after: Zhou Bo

Inventor after: Shao Xiaofeng

Inventor after: Huang Kunkun

Inventor after: Ge Jia

Inventor before: Cheng Jun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: CHENG JUN TO: CHENG JUN ZHOU BINGGAO JIANG HAIYAN JI HAO ZHOU BO SHAO XIAOFENG HUANG KUNKUN GE JIA

Free format text: CORRECT: ADDRESS; FROM: 226300 NANTONG, JIANGSU PROVINCE TO: 226019 NANTONG, JIANGSU PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20140730

Address after: 226019 Jiangsu city of Nantong province sik Road No. 9

Applicant after: Nantong University

Applicant after: HAOJIA HENGYE CONSTRUCTION DEVELOPMENT CO., LTD.

Applicant after: Jiangsu Tongzhou Forth Construction Group Co., Ltd.

Address before: Tongzhou District Xingyuan road Jiangsu city of Nantong province sunshine mansion 226300 Building No. 63 room 2208

Applicant before: Cheng Jun

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140910

Termination date: 20161014