CN103485263B - Substation construction station inner concrete road starting the arc device - Google Patents

Substation construction station inner concrete road starting the arc device Download PDF

Info

Publication number
CN103485263B
CN103485263B CN201310409730.2A CN201310409730A CN103485263B CN 103485263 B CN103485263 B CN 103485263B CN 201310409730 A CN201310409730 A CN 201310409730A CN 103485263 B CN103485263 B CN 103485263B
Authority
CN
China
Prior art keywords
arc
round steel
starting
steel pipes
vibrator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310409730.2A
Other languages
Chinese (zh)
Other versions
CN103485263A (en
Inventor
刘仕民
焦平文
张福友
骆鹏
苏斌
贺鹏
徐旖旎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Electric Power Transmission and Substation Engineering Co
Original Assignee
Shandong Electric Power Transmission and Substation Engineering Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Electric Power Transmission and Substation Engineering Co filed Critical Shandong Electric Power Transmission and Substation Engineering Co
Priority to CN201310409730.2A priority Critical patent/CN103485263B/en
Publication of CN103485263A publication Critical patent/CN103485263A/en
Application granted granted Critical
Publication of CN103485263B publication Critical patent/CN103485263B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Machines (AREA)

Abstract

Substation construction station inner concrete road starting the arc device, is characterized in that, comprising: form vibrator, starting the arc base, comprises the round steel pipe of two arcs and radian is consistent with starting the arc radian; Two steel pipes are parallel, are connected with connecting rod between two round steel pipes; Vibrator mount pad is connected with in the middle part of two steel pipes; The two ends of every root round steel pipe arrange a hanger with rope respectively; Reinforcing framework, comprise two arc arched girders, two arc arched girders lay respectively at directly over two round steel pipes, are longitudinally welded with pole between described arc arched girder and corresponding round steel pipe, and the two ends of two arc arched girders are also welded on the two ends of two round steel pipes respectively one to one; Bracing piece is connected with between two arc arched girders; And position is provided with vibrator installing port directly over vibrator mount pad.It can improve the starting the arc radian of road starting the arc efficiency in station, maximum possible unified same station inner concrete road.

Description

Substation construction station inner concrete road starting the arc device
Technical field
The present invention relates to power transformation civil engineering device, specifically a kind of Substation construction station inner concrete road starting the arc device.
Background technology
In Substation construction, in standing, road construction is essential, and in order to prevent road ponding, in standing, road generally takes certain radian, instead of a horizontal plane, middle slightly protruding, has certain radian.
At present, the radian of transformer station's inner concrete road needs in concreting and after having vibrated, manually repairs, both wasted manpower and materials, efficiency is low, is difficult to again make the road gradient of certain length to reach a standard, namely be difficult to accomplish that all road gradients are consistent, starting the arc quality is low.
Summary of the invention
In order to overcome the shortcoming that above-mentioned prior art exists, the object of the present invention is to provide a kind of Substation construction station inner concrete road starting the arc device, it can improve the starting the arc radian of road starting the arc efficiency in station, maximum possible unified same station inner concrete road.
In order to solve the problem, the present invention by the following technical solutions: Substation construction station inner concrete road starting the arc device, comprising:
Form vibrator,
Starting the arc base, comprises the round steel pipe that two axis are curved, and the radian of this round steel pipe is consistent with starting the arc radian; Two round steel pipes be arranged in parallel, are connected with connecting rod between two round steel pipes; The vibrator mount pad for installing described form vibrator is connected with between the middle part of described two round steel pipes; The two ends of every root round steel pipe arrange a hanger with rope respectively;
Reinforcing framework, comprise two arc arched girders, two arc arched girders lay respectively at and are positioned at directly over two round steel pipes, longitudinally be welded with pole between described arc arched girder and corresponding round steel pipe, the two ends of two arc arched girders are also welded on the two ends of two round steel pipes respectively one to one; Bracing piece is connected with between two arc arched girders; And position is provided with vibrator installing port directly over vibrator mount pad.
The improvement of technical solution of the present invention: in described starting the arc base, the connecting rod between two round steel pipes is arranged in parallel, and all vertical with two round steel pipes.
The improvement of technical solution of the present invention: described vibrator mount pad comprises two blocks of angle steel, two blocks of angle steel are symmetrically welded between two described round steel pipes; The side panel-level of angle steel is arranged, and the opposite side panel of angle steel is vertically arranged, and wherein horizontally disposed side panel is provided with installation through hole.
The improvement of technical solution of the present invention: in described vibrator mount pad, the side panel arranged outside of the vertical setting of angle steel has reinforcing rib.
The invention has the beneficial effects as follows:
1, improve the efficiency of the rigid pavement starting the arc, mechanization degree increases;
2, owing to have employed mechanical arc to form the radian on ground, therefore compared with manually, the radian on whole road surface can accomplish high unity, improves starting the arc quality.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is described further:
Fig. 1 is the front view of the embodiment of the present invention;
Fig. 2 is the top view of starting the arc base in the embodiment of the present invention;
Fig. 3 is the main sectional view of vibrator mount pad in the embodiment of the present invention;
The top view of reinforcing framework in Fig. 4 embodiment of the present invention;
In figure: 1 form vibrator, 2 starting the arc bases, 21 round steel pipes, 22 connecting rods, 23 vibrator mount pads, 24 hanger with ropes, 25 angle steel, 26 through holes, 27 reinforcing ribs,
3 reinforcing frameworks, 31 arc arched girders, 32 bracing pieces, 33 vibrator installing ports, 34 poles.
Detailed description of the invention
As shown in Figure 1, this Substation construction station inner concrete road starting the arc device, mainly comprises form vibrator 1, starting the arc base 2, reinforcing framework 3.
Form vibrator 1 is known existing equipment.
As shown in Figure 2, starting the arc base 2, comprises the round steel pipe 21 that two axis are curved, and the radian of this round steel pipe 21 is consistent with starting the arc radian; Two round steel pipes 21 be arranged in parallel, are connected with connecting rod 22 between two round steel pipes 21; The vibrator mount pad 23 for installing described form vibrator 1 is connected with between the middle part of described two round steel pipes 21; The two ends of every root round steel pipe 21 arrange a hanger with rope 24 respectively.The length of round steel pipe 21 is equal with the rigid pavement width L that will build, as shown in Figure 1.
Two round steel pipes 21 have certain radian, in use contact with concrete surface and play the cambered effect of shape.
Two round steel pipes 21 connect into as a whole by connecting rod 22, rigidity requirement when making equipment meet use.
The rope that hanger with rope 24 mainly fixedly uses, allows Whole Equipment constantly advance along road surface mobile (namely vertical with two round steel pipes 21 direction is moved) under the effect of external force, can continuously allow rigid pavement complete starting the arc action.
Form vibrator 1, the vibration produced by its power, adds the deadweight of equipment, makes the radian on road surface be able to uniformly continous and produces.
The improvement of technical solution of the present invention: in described starting the arc base 2, the connecting rod 22 between two round steel pipes 21 is arranged in parallel, and all vertical with two round steel pipes 21, as shown in Figure 2.Stressed so more reasonable, consolidation effect is good, and makes simple.
The improvement of technical solution of the present invention: described vibrator mount pad 23 comprises two blocks of angle steel, 25, two blocks of angle steel 25 and is symmetrically welded between two described round steel pipes 21; The side panel-level of angle steel 25 is arranged, and the opposite side panel of angle steel 25 is vertically arranged, and as shown in Figure 3, wherein horizontally disposed side panel is provided with installation through hole 26.Form vibrator is installed convenient, reliable.
The improvement of technical solution of the present invention: in described vibrator mount pad 23, the side panel arranged outside of the vertical setting of angle steel 25 has reinforcing rib 27, increases intensity and the rigidity of vibrator mount pad 23, ensures the reliability used.
As shown in Figure 4, reinforce with framework 3, comprise two arc arched girders 31, two arc arched girders 31 lay respectively at and are positioned at directly over two round steel pipes 21, pole 34 is longitudinally welded with between described arc arched girder and corresponding round steel pipe, the two ends of two arc arched girders 31 are also welded on the two ends of two round steel pipes 21 respectively one to one, as shown in Figure 1; Bracing piece 32 is connected with between two arc arched girders 31; And position is provided with vibrator installing port 33 directly over vibrator mount pad 23.

Claims (4)

1. Substation construction station inner concrete road starting the arc device, is characterized in that, comprising:
Form vibrator,
Starting the arc base, comprises the round steel pipe that two axis are curved, and the radian of this round steel pipe is consistent with starting the arc radian; Two round steel pipes be arranged in parallel, are connected with connecting rod between two round steel pipes; The vibrator mount pad for installing described form vibrator is connected with between the middle part of described two round steel pipes; The two ends of every root round steel pipe arrange a hanger with rope respectively;
Reinforcing framework, comprise two arc arched girders, two arc arched girders lay respectively at and are positioned at directly over two round steel pipes, longitudinally be welded with pole between described arc arched girder and corresponding round steel pipe, the two ends of two arc arched girders are also welded on the two ends of two round steel pipes respectively one to one; Bracing piece is connected with between two arc arched girders; And position is provided with vibrator installing port directly over vibrator mount pad.
2. inner concrete road starting the arc device in Substation construction station according to claim 1, is characterized in that: in described starting the arc base, the connecting rod between two round steel pipes is arranged in parallel, and all vertical with two round steel pipes.
3. inner concrete road starting the arc device in Substation construction station according to claim 1 and 2, is characterized in that: described vibrator mount pad comprises two blocks of angle steel, and two blocks of angle steel are symmetrically welded between two described round steel pipes; The side panel-level of angle steel is arranged, and the opposite side panel of angle steel is vertically arranged, and wherein horizontally disposed side panel is provided with installation through hole.
4. inner concrete road starting the arc device in Substation construction station according to claim 3, it is characterized in that: in described vibrator mount pad, the side panel arranged outside of the vertical setting of angle steel has reinforcing rib.
CN201310409730.2A 2013-09-10 2013-09-10 Substation construction station inner concrete road starting the arc device Active CN103485263B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310409730.2A CN103485263B (en) 2013-09-10 2013-09-10 Substation construction station inner concrete road starting the arc device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310409730.2A CN103485263B (en) 2013-09-10 2013-09-10 Substation construction station inner concrete road starting the arc device

Publications (2)

Publication Number Publication Date
CN103485263A CN103485263A (en) 2014-01-01
CN103485263B true CN103485263B (en) 2015-09-02

Family

ID=49825819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310409730.2A Active CN103485263B (en) 2013-09-10 2013-09-10 Substation construction station inner concrete road starting the arc device

Country Status (1)

Country Link
CN (1) CN103485263B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108729320A (en) * 2018-07-23 2018-11-02 山东众甫新材料有限公司 A kind of mining tunnel road deck and preparation, method for paving
CN114541218B (en) * 2022-02-21 2024-01-16 安徽送变电工程有限公司 Telescopic adjustable slope arch scraping rule for concrete pavement and use method thereof

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2579943Y (en) * 2002-11-05 2003-10-15 衡水益通金属制品有限责任公司 Engineering member for building culvert
CN202500077U (en) * 2012-01-10 2012-10-24 衡水益通金属制品有限责任公司 Large-span steel corrugated plate arc-shaped supporting structure
CN203462387U (en) * 2013-09-10 2014-03-05 山东送变电工程公司 Concrete road arc striking device in constructing substation

Also Published As

Publication number Publication date
CN103485263A (en) 2014-01-01

Similar Documents

Publication Publication Date Title
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN203700971U (en) Bridge wet joint construction formwork
CN103485263B (en) Substation construction station inner concrete road starting the arc device
CN207700821U (en) A kind of upright bar stringer
CN204186123U (en) Mast type communication head tower mast
CN205604719U (en) Superelevation, jumbo size board structural template braced system that encorbelments
CN204875521U (en) Hang blue jib preformed hole plugging device
CN204282391U (en) A kind of heel foundation formwork erecting structure
CN203462387U (en) Concrete road arc striking device in constructing substation
CN204186393U (en) Mountainous area highway Tunnel-Type Anchorage of Suspension Bridge heavy stone used as an anchor and highway tunnel correlation structure
CN202064679U (en) High-voltage wire pole stabilizing device
CN204024443U (en) Adopt the bamboo ladder stand of connector overlapping
CN204312094U (en) A kind of tunnel excavation construction grid steel frame
CN204189939U (en) The ruggedized construction of original support lever frame of communication antenna transformation
CN203613654U (en) Connecting structure of steel beam reinforcing bars and steel column
CN103407901B (en) A kind of crane for electric power tower
CN203213022U (en) Mobile temporary prestress tensioning anchor block
CN204456164U (en) A kind of spliced pedestal of communication tower
CN204450817U (en) Pin-connected panel small box girder core mold plate fixture
CN204282920U (en) A kind of communication tower being furnished with spliced pedestal
CN206513097U (en) A kind of new omnipotent auxiliary cross-arm of " D " composite
CN104895391A (en) External inserted cross arm connecting device for steel pipe rods
CN205171525U (en) Trade vertical bracing structure in propping work progress at foundation ditch
CN105317216A (en) Wall body reversed construction method and wall body and concrete framework casting structure
CN204876770U (en) Pole is fixed and is reinforceed device in an opposite direction

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant