CN103485263A - Concrete road arc striking device in power transformation construction station - Google Patents
Concrete road arc striking device in power transformation construction station Download PDFInfo
- Publication number
- CN103485263A CN103485263A CN201310409730.2A CN201310409730A CN103485263A CN 103485263 A CN103485263 A CN 103485263A CN 201310409730 A CN201310409730 A CN 201310409730A CN 103485263 A CN103485263 A CN 103485263A
- Authority
- CN
- China
- Prior art keywords
- arc
- round steel
- steel pipes
- vibrator
- concrete road
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Road Paving Machines (AREA)
Abstract
The invention discloses a concrete road arc striking device in a power transformation construction station. The concrete road arc striking device is characterized by comprising an attached vibrator, a pedestal for arc striking and a reinforcing frame, wherein the pedestal for arc striking comprises two cambered circular steel pipes with the same radian and arc striking radian; connecting links are connected between the two steel pipes which are parallel to each other; a vibrator installation seat is fixedly connected at the middle part of the two steel pipes; both ends of each circular steel pipe are respectively provided with a cord drawhook; the reinforcing frame comprises two arc arched girders which are respectively located at right above the two circular steel pipes, struts are longitudinally welded between each arc arched girder and the corresponding circular steel pipe, the two ends of the two arc arched girders are respectively welded at the two ends of the two circular steel pipes in one-to-one correspondence; stiffeners are connected between the two arc arched girders, and a vibrator installation opening is formed at the middle top of the vibrator installation seat. By utilizing the concrete road arc striking device in the power transformation construction station provided by the invention, the road arc striking efficiency in the station can be improved, the arc striking radian of the concrete road in the same station can be unitized as far as possible.
Description
Technical field
The present invention relates to power transformation civil engineering device, specifically a kind of Substation construction station inner concrete road starting the arc device.
Background technology
In Substation construction, the interior road construction of standing is essential, and in order to prevent road ponding, in standing, road is generally taked certain radian, rather than a horizontal plane, and middle slightly projection, have certain radian.
At present, the radian of transformer station's inner concrete road need to, after concreting having vibrated, manually be repaired, both wasted manpower and materials, efficiency is low, is difficult to again make the road gradient of certain-length to reach a standard, be difficult to accomplish that all road gradients are consistent, starting the arc quality is low.
Summary of the invention
The shortcoming existed in order to overcome above-mentioned prior art, the object of the present invention is to provide a kind of Substation construction station inner concrete road starting the arc device, and it can improve the starting the arc radian of road starting the arc efficiency in station, the unified same station of maximum possible inner concrete road.
In order to address the above problem, the present invention by the following technical solutions: inner concrete road starting the arc device in Substation construction station comprises:
Form vibrator,
Starting the arc base, comprise two round steel pipes that axis is curved, and the radian of this round steel pipe is consistent with starting the arc radian; Two round steel pipes be arranged in parallel, between two round steel pipes, are connected with connecting rod; Between the middle part of described two round steel pipes, be connected with for the vibrator mount pad of described form vibrator is installed; The two ends of every round steel pipe arrange respectively a hanger with rope;
Reinforce and use framework, comprise two arc arched girders, two arc arched girders lay respectively at be positioned at two round steel pipes directly over, longitudinally be welded with pole between described arc arched girder and corresponding round steel pipe, the two ends of two arc arched girders also are welded on respectively the two ends of two round steel pipes one to one; Be connected with bracing piece between two arc arched girders; And position is provided with the vibrator installing port directly over the vibrator mount pad.
The improvement of technical solution of the present invention: the described starting the arc is with in base, and the connecting rod between two round steel pipes is arranged in parallel, and all vertical with two round steel pipes.
The improvement of technical solution of the present invention: described vibrator mount pad comprises two blocks of angle steel, and two blocks of angle steel are symmetrically welded between described two round steel pipes; One side panel of angle steel is horizontally disposed with, and the opposite side panel of angle steel vertically arranges, and wherein on horizontally disposed side panel, is provided with to install to use through hole.
The improvement of technical solution of the present invention: in described vibrator mount pad, the side panel arranged outside of the vertical setting of angle steel has reinforcing rib.
The invention has the beneficial effects as follows:
1, improved the efficiency of the rigid pavement starting the arc, mechanization degree increases;
2, owing to having adopted mechanical arc to form the radian on ground, therefore with manually compare, the radian on whole road surface can be accomplished high unity, has improved starting the arc quality.
The accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is described further:
The front view that Fig. 1 is the embodiment of the present invention;
Fig. 2 is the top view that in the embodiment of the present invention, base is used in the starting the arc;
The main sectional view that Fig. 3 is vibrator mount pad in the embodiment of the present invention;
Reinforce the top view with framework in Fig. 4 embodiment of the present invention;
In figure: 1 form vibrator, 2 starting the arc bases, 21 round steel pipes, 22 connecting rods, 23 vibrator mount pads, 24 hanger with ropes, 25 angle steel, 26 through holes, 27 reinforcing ribs,
3 reinforcings are used framework, 31 arc arched girders, 32 bracing pieces, 33 vibrator installing ports, 34 poles.
The specific embodiment
As shown in Figure 1, this Substation construction station inner concrete road starting the arc device, mainly comprise form vibrator 1, base 2 for the starting the arc, reinforce with framework 3.
Form vibrator 1 is known existing equipment.
As shown in Figure 2, base 2 for the starting the arc, comprise two round steel pipes 21 that axis is curved, and the radian of this round steel pipe 21 is consistent with starting the arc radian; Two round steel pipes 21 be arranged in parallel, between two round steel pipes 21, are connected with connecting rod 22; Between the middle part of described two round steel pipes 21, be connected with for the vibrator mount pad 23 of described form vibrator 1 is installed; The two ends of every round steel pipe 21 arrange respectively a hanger with rope 24.The length of round steel pipe 21 equates with the rigid pavement width L that will build, as shown in Figure 1.
Two round steel pipes 21 have certain radian, in use with concrete surface, contact the cambered effect of shape of playing.
Connecting rod 22 connects into two round steel pipes 21 as a whole, makes equipment meet the rigidity requirement while using.
Hanger with rope 24 is mainly the rope fixedly used, and allows Whole Equipment constantly advance along road surface under the effect of external force mobile (the direction vertical with two round steel pipes 21 moves), can continuously allow rigid pavement complete starting the arc action.
Form vibrator 1, by the vibration of its power generation, add the deadweight of equipment, makes the radian on road surface be able to evenly produce continuously.
The improvement of technical solution of the present invention: the described starting the arc is with in base 2, and the connecting rod 22 between two round steel pipes 21 is arranged in parallel, and all vertical with two round steel pipes 21, as shown in Figure 2.Stressed so more reasonable, consolidation effect is good, and makes simple.
The improvement of technical solution of the present invention: described vibrator mount pad 23 comprises that 25, two blocks of angle steel 25 of two blocks of angle steel are symmetrically welded between described two round steel pipes 21; One side panel of angle steel 25 is horizontally disposed with, and the opposite side panel of angle steel 25 vertically arranges, and as shown in Figure 3, wherein on horizontally disposed side panel, is provided with and installs with through hole 26.Form vibrator is installed convenient, reliable.
The improvement of technical solution of the present invention: in described vibrator mount pad 23, the side panel arranged outside of the vertical setting of angle steel 25 has reinforcing rib 27, increases intensity and the rigidity of vibrator mount pad 23, guarantees the reliability of using.
As shown in Figure 4, reinforce with framework 3, comprise two arc arched girders 31, two arc arched girders 31 lay respectively at be positioned at two round steel pipes 21 directly over, longitudinally be welded with pole 34 between described arc arched girder and corresponding round steel pipe, the two ends of two arc arched girders 31 also are welded on respectively the two ends of two round steel pipes 21 one to one, as shown in Figure 1; Be connected with bracing piece 32 between two arc arched girders 31; And position is provided with vibrator installing port 33 directly over vibrator mount pad 23.
Claims (4)
1. Substation construction station inner concrete road starting the arc device, is characterized in that, comprising:
Form vibrator,
Starting the arc base, comprise two round steel pipes that axis is curved, and the radian of this round steel pipe is consistent with starting the arc radian; Two round steel pipes be arranged in parallel, between two round steel pipes, are connected with connecting rod; Between the middle part of described two round steel pipes, be connected with for the vibrator mount pad of described form vibrator is installed; The two ends of every round steel pipe arrange respectively a hanger with rope;
Reinforce and use framework, comprise two arc arched girders, two arc arched girders lay respectively at be positioned at two round steel pipes directly over, longitudinally be welded with pole between described arc arched girder and corresponding round steel pipe, the two ends of two arc arched girders also are welded on respectively the two ends of two round steel pipes one to one; Be connected with bracing piece between two arc arched girders; And position is provided with the vibrator installing port directly over the vibrator mount pad.
2. Substation construction according to claim 1 station inner concrete road starting the arc device is characterized in that: the described starting the arc is with in base, and the connecting rod between two round steel pipes is arranged in parallel, and all vertical with two round steel pipes.
3. Substation construction according to claim 1 and 2 station inner concrete road starting the arc device, it is characterized in that: described vibrator mount pad comprises two blocks of angle steel, two blocks of angle steel are symmetrically welded between described two round steel pipes; One side panel of angle steel is horizontally disposed with, and the opposite side panel of angle steel vertically arranges, and wherein on horizontally disposed side panel, is provided with to install to use through hole.
4. Substation construction according to claim 3 station inner concrete road starting the arc device, it is characterized in that: in described vibrator mount pad, the side panel arranged outside of the vertical setting of angle steel has reinforcing rib.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310409730.2A CN103485263B (en) | 2013-09-10 | 2013-09-10 | Substation construction station inner concrete road starting the arc device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310409730.2A CN103485263B (en) | 2013-09-10 | 2013-09-10 | Substation construction station inner concrete road starting the arc device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103485263A true CN103485263A (en) | 2014-01-01 |
CN103485263B CN103485263B (en) | 2015-09-02 |
Family
ID=49825819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310409730.2A Active CN103485263B (en) | 2013-09-10 | 2013-09-10 | Substation construction station inner concrete road starting the arc device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103485263B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729320A (en) * | 2018-07-23 | 2018-11-02 | 山东众甫新材料有限公司 | A kind of mining tunnel road deck and preparation, method for paving |
CN114541218A (en) * | 2022-02-21 | 2022-05-27 | 安徽送变电工程有限公司 | Telescopic adjustable slope arch scraping ruler for concrete pavement and use method thereof |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2579943Y (en) * | 2002-11-05 | 2003-10-15 | 衡水益通金属制品有限责任公司 | Engineering member for building culvert |
CN202500077U (en) * | 2012-01-10 | 2012-10-24 | 衡水益通金属制品有限责任公司 | Large-span steel corrugated plate arc-shaped supporting structure |
CN203462387U (en) * | 2013-09-10 | 2014-03-05 | 山东送变电工程公司 | Concrete road arc striking device in constructing substation |
-
2013
- 2013-09-10 CN CN201310409730.2A patent/CN103485263B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2579943Y (en) * | 2002-11-05 | 2003-10-15 | 衡水益通金属制品有限责任公司 | Engineering member for building culvert |
CN202500077U (en) * | 2012-01-10 | 2012-10-24 | 衡水益通金属制品有限责任公司 | Large-span steel corrugated plate arc-shaped supporting structure |
CN203462387U (en) * | 2013-09-10 | 2014-03-05 | 山东送变电工程公司 | Concrete road arc striking device in constructing substation |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108729320A (en) * | 2018-07-23 | 2018-11-02 | 山东众甫新材料有限公司 | A kind of mining tunnel road deck and preparation, method for paving |
CN114541218A (en) * | 2022-02-21 | 2022-05-27 | 安徽送变电工程有限公司 | Telescopic adjustable slope arch scraping ruler for concrete pavement and use method thereof |
CN114541218B (en) * | 2022-02-21 | 2024-01-16 | 安徽送变电工程有限公司 | Telescopic adjustable slope arch scraping rule for concrete pavement and use method thereof |
Also Published As
Publication number | Publication date |
---|---|
CN103485263B (en) | 2015-09-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205231660U (en) | Fixing device of pre -buried electric terminal box of wall body | |
CN103291065B (en) | A kind of assembly concrete bracing or strutting arrangement and lifting localization method | |
CN204186123U (en) | Mast type communication head tower mast | |
CN105040591A (en) | Positioning device for waveform steel web and positioning method thereof | |
CN207010043U (en) | A kind of JP cabinets inspection platform | |
CN103485263A (en) | Concrete road arc striking device in power transformation construction station | |
CN203865934U (en) | Temporary suspension device of pulley lifting mechanism for electric pole | |
CN203462387U (en) | Concrete road arc striking device in constructing substation | |
CN204875521U (en) | Hang blue jib preformed hole plugging device | |
CN202785387U (en) | Indoor cantilever crane | |
CN204282391U (en) | A kind of heel foundation formwork erecting structure | |
CN204024430U (en) | Adopt the bamboo ladder stand of contiguous block overlapping | |
CN203846512U (en) | Supporting device for long edges of strip-shaped and rectangular foundation pit | |
CN204265337U (en) | Vehicle frame and engineering machinery | |
CN104818995A (en) | Method for assembling confined concrete arch frames | |
CN202064679U (en) | High-voltage wire pole stabilizing device | |
CN204024443U (en) | Adopt the bamboo ladder stand of connector overlapping | |
CN205875737U (en) | Adopt single side wall body construction of flexible pull rod to use single -side supporting formwork system | |
CN204312094U (en) | A kind of tunnel excavation construction grid steel frame | |
CN209323952U (en) | Overhanging scaffold | |
CN204780611U (en) | Positioner of wave form steel web | |
CN205689897U (en) | A kind of detachable cable support | |
CN105317216A (en) | Wall body reversed construction method and wall body and concrete framework casting structure | |
CN204456164U (en) | A kind of spliced pedestal of communication tower | |
CN204282920U (en) | A kind of communication tower being furnished with spliced pedestal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |