CN204875521U - Hang blue jib preformed hole plugging device - Google Patents

Hang blue jib preformed hole plugging device Download PDF

Info

Publication number
CN204875521U
CN204875521U CN201520161854.8U CN201520161854U CN204875521U CN 204875521 U CN204875521 U CN 204875521U CN 201520161854 U CN201520161854 U CN 201520161854U CN 204875521 U CN204875521 U CN 204875521U
Authority
CN
China
Prior art keywords
preformed hole
suspension rod
template
concrete
rod preformed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520161854.8U
Other languages
Chinese (zh)
Inventor
王豪
修林岩
高丰新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201520161854.8U priority Critical patent/CN204875521U/en
Application granted granted Critical
Publication of CN204875521U publication Critical patent/CN204875521U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to a hang blue jib preformed hole plugging device is particularly useful for bridge engineering and hangs blue construction. A hang blue jib preformed hole plugging device, includes the concrete that has the jib preformed hole, characterized in that the upper portion of jib preformed hole be equipped with the frame solid in the support of concrete, be connected with thin wire rope through the euphroe on the support, thin wire rope's end can be dismantled and be connected with the template, thin wire rope's lower part end is separated to two ends, the template is formed by two semicircle boards and loose -leaf combination, two ends are connected respectively on two semicircle boards, the upper portion of two semicircle boards and seam crossing all are equipped with the one deck concrete template cloth that permeates water. The utility model discloses can pursue the hole construction, convenient nimble, the plug -hole is thorough, and the method is simple, convenient for material collection, and low in cost, the effect is obvious.

Description

The blue suspension rod preformed hole plugging device of a kind of extension
Technical field
The utility model relates to the blue suspension rod preformed hole plugging device of a kind of extension, is particularly useful for the suspension rod preformed hole shutoff engineering in the blue construction of bridge engineering extension.
Background technology
Suspension rod preformed hole is hole reserved on bridge main beam, and its cross section is generally circular, for building period fixing mobile formwork at bridge.After bridge has been built, for ensureing monolithic concrete intensity, the boom hole that dismounting suspension rod stays just needs concreting to carry out shutoff.Because suspension rod preformed hole is many and horizontal plane, shutoff difficulty, is difficult to use template block and carry out concrete shutoff in below.
The method generally adopted at present blocked bottom with rag plug to hole end before concreting shutoff, but the method is defectiveness still, namely because preformed hole end is plugged with rag, cause concrete cannot fill completely whole preformed hole cavity, to such an extent as to the shutoff of suspender belt preformed hole is not thorough, affect monolithic concrete intensity, also unsightly.The solution that this problem is still not good at present.
Summary of the invention
The purpose of this utility model is that the suspension rod preformed hole shutoff solving the existence of above-mentioned prior art is not thorough, affect the technical problem of monolithic concrete intensity, and then provide a kind of reasonable in design, construction method simple, to the shutoff of suspension rod preformed hole thoroughly and the extension blue suspension rod preformed hole plugging device of monolithic concrete intensity can be ensured.
The utility model is achieved through the following technical solutions:
The blue suspension rod preformed hole plugging device of a kind of extension, comprise the concrete 1 with suspension rod preformed hole 2, special character is, the support 3 that frame is fixed in described concrete 1 is provided with on the top of described suspension rod preformed hole 2, described support 3 is connected with seizing wire 5 by euphroe 4, the end of described seizing wire 5 is removably connected with the template 8 be plugged in for fitting bottom suspension rod preformed hole, the top of described seizing wire 5 is an overall rope, it is two ends that lower end is separated, described template 8 is combined by two semi-circular plates and the loose-leaf 9 be movably connected between two semi-circular plates, two semi-circular plates can be folding to being combined around described loose-leaf 9, two ends of described seizing wire 5 end are removably connected on two semi-circular plates of described template 8 respectively, the top of described two semi-circular plates, and the seam crossing therebetween after folding is equipped with one deck concrete permeable formwork cloth 8,
Two ends of described seizing wire 5 end are connected with described template 8 respectively by self-tapping screw 7;
The size of described template 8 should can be greater than described suspension rod preformed hole 2 be advisable by described suspension rod preformed hole 2, the rear diameter of expansion smoothly after folding.
The utility model one hangs blue suspension rod preformed hole plugging device, and should not set up template when effectively solving preformed hole shutoff, preformed hole shutoff is not thorough, affect the defects such as concrete bulk strength, do not affect the construction of monolithic concrete, do not need again to set up integral mold plate in concrete base, can hole-specifically construct, convenient, flexible, plug-hole is thorough, and method is simple, draws materials conveniently, cheap, successful.
Accompanying drawing explanation
Fig. 1: the utility model one hangs blue suspension rod preformed hole plugging device structural representation;
The left view of Fig. 2: Fig. 1;
The top view of Fig. 3: Fig. 1.
Detailed description of the invention
Referring to accompanying drawing, provide detailed description of the invention of the present utility model, be used for being further described structure of the present utility model.
Embodiment 1
The one of the present embodiment hangs blue suspension rod preformed hole plugging device with reference to figure 1-3, comprise the concrete 1 with suspension rod preformed hole 2, the support 3 that frame is fixed in described concrete 1 is provided with on the top of described suspension rod preformed hole 2, described support 3 is connected with seizing wire 5 by euphroe 4, the end of described seizing wire 5 is removably connected with the template 8 be plugged in for fitting bottom suspension rod preformed hole, the top of described seizing wire 5 is an overall rope, it is two ends that lower end is separated, described template 8 is combined by two semi-circular plates and the loose-leaf 9 be movably connected between two semi-circular plates, two semi-circular plates can be folding to being combined around described loose-leaf 9, two ends of described seizing wire 5 end are removably connected on two semi-circular plates of described template 8 respectively, the top of described two semi-circular plates, and the seam crossing therebetween after folding is equipped with one deck concrete permeable formwork cloth 8, two ends of described seizing wire 5 end are connected with described template 8 respectively by self-tapping screw 7, the size of described template 8 should can be greater than described suspension rod preformed hole 2 be advisable by described suspension rod preformed hole 2, the rear diameter of expansion smoothly after folding.
The utility model is realized by following structural principle: because described suspension rod preformed hole is generally circular hole, therefore intercepting is greater than Circularhole diameter template, after centre is cut apart with a knife or scissors, loose-leaf is installed, pastes formwork cloth, self-tapping screw is installed, be connected with wire rope, connect euphroe, after template is folding, pass in preformed hole, euphroe is installed, support, tense wire rope, until template horizontal, and block at the bottom of all well, just can carry out preformed hole shutoff by concreting.
Concrete construction method of the present utility model is as follows:
In practical operation, seizing wire 5 is tied up on self-tapping screw 7, sticky note permeable template cloth 6 in template 8, the other end of seizing wire 5 is connected with euphroe 4, template 8 is folded, by suspension rod preformed hole 2, after template 8 is completely by suspension rod preformed hole 2, template 8 and suspension rod preformed hole 2 are in plumbness, draw high seizing wire 5, template 8 is launched, and be close on concrete 1, euphroe 4 is fixed on support 3, that can carry out suspension rod preformed hole 2 builds as placed concrete shutoff, utilize loose-leaf to fold template 8 and decrease template 8 not by the problem of suspension rod preformed hole 2, utilize wire rope 2 climbing shuttering 8 and be fixed on concrete 1, solve and hang in blue concrete construction, after hanging blue walking, concrete base cannot installation form, manually-operated problem cannot be carried out in concrete base, there is the selection of material simple, convenient, cheap, method is simple, be easy to operation, the feature that feasibility is strong.
Except the technical characteristic described in manual, be the known technology of those skilled in the art.

Claims (3)

1. hang blue suspension rod preformed hole plugging device for one kind, comprise the concrete 1 with suspension rod preformed hole (2), be characterised in that, the support (3) that frame is fixed in described concrete (1) is provided with on the top of described suspension rod preformed hole (2), described support (3) is connected with seizing wire (5) by euphroe (4), the end of described seizing wire (5) is removably connected with the template (8) be plugged in for fitting bottom suspension rod preformed hole, the top of described seizing wire (5) is an overall rope, it is two ends that lower end is separated, described template (8) is combined by two semi-circular plates and the loose-leaf (9) be movably connected between two semi-circular plates, two semi-circular plates can be folding to being combined around described loose-leaf (9), two ends of described seizing wire (5) end are removably connected on two semi-circular plates of described template (8) respectively, the top of described two semi-circular plates, and the seam crossing therebetween after folding is equipped with one deck concrete permeable formwork cloth (8).
2. one hangs blue suspension rod preformed hole plugging device as claimed in claim 1, and it is characterized in that, two ends of described seizing wire (5) end are connected with described template (8) respectively by self-tapping screw (7).
3. one hangs blue suspension rod preformed hole plugging device as claimed in claim 2, it is characterized in that, the size of described template (8) should can be greater than described suspension rod preformed hole (2) by diameter after described suspension rod preformed hole (2), expansion smoothly after folding.
CN201520161854.8U 2015-03-23 2015-03-23 Hang blue jib preformed hole plugging device Expired - Fee Related CN204875521U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520161854.8U CN204875521U (en) 2015-03-23 2015-03-23 Hang blue jib preformed hole plugging device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520161854.8U CN204875521U (en) 2015-03-23 2015-03-23 Hang blue jib preformed hole plugging device

Publications (1)

Publication Number Publication Date
CN204875521U true CN204875521U (en) 2015-12-16

Family

ID=54819913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520161854.8U Expired - Fee Related CN204875521U (en) 2015-03-23 2015-03-23 Hang blue jib preformed hole plugging device

Country Status (1)

Country Link
CN (1) CN204875521U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106049644A (en) * 2016-07-25 2016-10-26 上海市城市排水有限公司 Detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and restoration method thereof
CN106087705A (en) * 2016-07-08 2016-11-09 南京工业大学 Concrete hole post-treatment structure and construction method thereof
CN107245933A (en) * 2017-07-06 2017-10-13 中建六局土木工程有限公司 A kind of method for cast-in-situ box girder top plate preformed hole construction
CN115233882A (en) * 2022-07-05 2022-10-25 重庆大学 Close piece together and exempt from to support coincide floor based on additional rigidity piece of bottom drop-down spring

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106087705A (en) * 2016-07-08 2016-11-09 南京工业大学 Concrete hole post-treatment structure and construction method thereof
CN106049644A (en) * 2016-07-25 2016-10-26 上海市城市排水有限公司 Detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and restoration method thereof
CN106049644B (en) * 2016-07-25 2018-04-17 上海市城市排水有限公司 A kind of concrete drain tile contains the quick reparation erecting device of detection drilling and its restorative procedure
CN107245933A (en) * 2017-07-06 2017-10-13 中建六局土木工程有限公司 A kind of method for cast-in-situ box girder top plate preformed hole construction
CN115233882A (en) * 2022-07-05 2022-10-25 重庆大学 Close piece together and exempt from to support coincide floor based on additional rigidity piece of bottom drop-down spring

Similar Documents

Publication Publication Date Title
CN204875521U (en) Hang blue jib preformed hole plugging device
CN207312925U (en) A kind of adjustable multifunctional suspender
CN207121928U (en) A kind of new prefabricated assembled piping lane
CN204450819U (en) Template retractor device
CN206060035U (en) A kind of releasing pulley hanger
CN202577169U (en) Integral mobile arch ring steel die frame for reinforced concrete arch culvert
CN208981167U (en) Suspension type constructing tie beam device
CN208650505U (en) The integrated template type attachment device of lifting platform
CN203531381U (en) Temporary hanging and supporting device used for steel bar truss formworks
CN204959606U (en) Hang blue suspender preformed hole plugging device
CN205089028U (en) Weight type four -column communication base station tower
CN205203568U (en) Sack opening device
CN205713050U (en) A kind of scaffold protection network of municipal works
CN205426603U (en) Experiment mould of preparation rubber granule concrete sample
CN103485263B (en) Substation construction station inner concrete road starting the arc device
CN211775988U (en) Steel construction high-rise tower high altitude protector
CN204530441U (en) A kind of easy device of joint steel pipe buttress
CN108551917A (en) A kind of Landscape River movable green belt
CN206538759U (en) It is a kind of to prevent the device of rising of steel cage
CN204311768U (en) A kind of building operations rain cover sun-proof device
CN208792755U (en) It climbs the traverse measurement operating platform of formwork system suitable for monoblock type
CN211194355U (en) Folded cascade three-cabin piping lane evaporates foster structure
CN204002511U (en) A kind of three-dimensional arrangement ladder
CN204398095U (en) A kind of post stretching precast beam pipe dredging device
CN208380067U (en) A kind of assembled architecture assembling device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151216

Termination date: 20170323