CN106049644A - Detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and restoration method thereof - Google Patents
Detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and restoration method thereof Download PDFInfo
- Publication number
- CN106049644A CN106049644A CN201610590198.2A CN201610590198A CN106049644A CN 106049644 A CN106049644 A CN 106049644A CN 201610590198 A CN201610590198 A CN 201610590198A CN 106049644 A CN106049644 A CN 106049644A
- Authority
- CN
- China
- Prior art keywords
- connecting rod
- plate
- baffle plate
- baffle
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
-
- E—FIXED CONSTRUCTIONS
- E03—WATER SUPPLY; SEWERAGE
- E03F—SEWERS; CESSPOOLS
- E03F3/00—Sewer pipe-line systems
- E03F3/06—Methods of, or installations for, laying sewer pipes
- E03F2003/065—Refurbishing of sewer pipes, e.g. by coating, lining
Abstract
The invention discloses a detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and a restoration method thereof. The apparatus includes a first baffle plate, a second baffle plate, a third baffle plate, a first fixing connection pole, a second fixing connection pole, a third fixing connection pole, a fourth fixing connection pole and a connection pole positioning assembly. The apparatus obviates the need for workers to enter the drain pipe culvert for conducting support mould in the implementation, which reduces cost and construction risks. The boring bottom baffle plate can entirely cover the bottom part of the entire boring, which can prevent slurry leakage with the enclosure formed by a water sealing material. For a short term, under circumstances that the grouting material or a high-early-strength cement mortar in the boring is not dry, if the internal water pressure within the pipe culvert is restored, the boring bottom baffle plate can bear the water pressure and prevent leakage of the polluted water. For a long term, under the circumstances when the boring is full grouted after restoration, the concrete formed after grouting the boring has a thickness the same as that of an adjacent pipe wall, can bear intra-pipe water pressure and is conductive to structure bearing.
Description
Technical field
The present invention relates to the recovery technique field of draining pipe culvert in municipal works, be specifically related to a kind of concrete drain tile and contain
Erecting device and restorative procedure thereof are quickly repaired in detection boring.
Background technology
Concrete drain tile is contained during life-time service, under internal hydrogen sulfide gas and sewage long-term corrosion, and pipe culvert
The major structural defects such as inside progressively occurs in that concrete roof corrosion spalling, and reinforcing bar rust breaks, come off, bearing capacity is cut significantly
Weak, affect pipe culvert safe operation, structure detection need to be carried out.During pipe culvert structure is detected, generally require mixed
Solidifying soil pipe culvert top board core boring sampling.After drill core completes, before pipe culvert recovers operation hydraulic pressure, boring quickly should be repaired.Repair
It is critical only that formwork at aperture inside pipe culvert after, from aperture, outside cast grouting material or high-early (strength) cement mortar to aperture mark
High.
Comparatively ideal erecting device need to meet 2 requirements:
(1) prevent the grouting material in hand-hole or high-early (strength) cement mortar from leaking outside with at form joint from the bottom of hole;
(2) pipe culvert inside water pressure power effect can be born in short-term after repair completes and long term time.
In the technical literature of existing announcement, not yet find concrete drain tile is contained the report of detection boring quick-restoring device
Road.In Practical Project, the formwork during mainly two kinds of devices of employing carry out boring repair process:
One is to utilize stopper to carry out formwork at the bottom of hole, can be from the outside enforcement of pipe culvert.During enforcement, outside pipe culvert, according to hole
The degree of depth, diameter is squeezed in hole at certain depth slightly larger than the round log plug in aperture, between stopper and hole wall under frictional force effect,
Stopper is placed in specifying position not fall, and then between stopper and aperture, hole inner region injects grouting material or the strongest water
Cement mortar is to aperture absolute altitude.This device shortcoming be stopper with sewage Long Term Contact in pipe culvert after easily occur rotten, after-pouring in hole
Concrete directly bears hydraulic pressure, and its thickness weakens less than other position concrete wall thickness, bearing capacity, easily causes local hidden
Suffer from;
Another kind is to carry out propping up in pipe culvert boring repair process with the tube of a base diameter expansion and closing
Mould, need to be from pipe culvert internal implementation.During enforcement, the professional that need to be equipped with diving and oxygen supply equipment enters draining pipe culvert, by this dress
Putting diameter small end to fix with switch after boring from pipe culvert inside, device end diameter expansion segment can be blocked bottom hole,
Prevent grouting material or high-early (strength) cement mortar from leaking outside from the bottom of hole, thus reach to repair purpose.This device shortcoming is need to be inside pipe culvert
Implementing, cost is bigger.
Pipe culvert detection boring is quickly repaired erecting device for the problems referred to above and is carried out by technical scheme
Improve.
Summary of the invention
In order to overcome deficiency of the prior art, the present invention provides a kind of concrete drain tile to contain detection boring and quickly repairs
Erecting device and restorative procedure thereof, have employed combination erecting device, is split as more than the hole end template of hole area by required area
Three baffle plates, and angle of flap is adjustable, can easily put into inside pipe culvert through boring, launches to can be combined to a hole end template,
Realize quickly tube wall drilling being carried out formwork outside concrete pipe culvert, it is ensured that after the grouting material that pours into or high-early (strength) cement mortar not
Can leak outside, and pipe culvert inside water pressure power effect can be born in device short-term after repair completes and long term time
Target.
In order to reach foregoing invention purpose, solve the technical scheme that its technical problem used as follows:
The invention discloses a kind of concrete drain tile culvert detection boring and quickly repair erecting device, be used for repairing pipe culvert top
On plate detection boring, including the first baffle plate, second baffle, third gear plate, first fix connecting rod, second fix connecting rod, the 3rd
Fixing connecting rod, the 4th fix connecting rod and connecting rod positioning component, wherein:
Described second fixes connecting rod and the 3rd fixes the lower end of connecting rod respectively by corresponding hinge member and described second
Baffle plate is corresponding with third gear plate hinged, and described first fixes connecting rod and the 4th fixes connecting rod and be located on described first baffle plate, and
Length direction along described first baffle plate is arranged, and described first fixes connecting rod and the 4th fixes the lower end of connecting rod respectively by corresponding
Hinge member corresponding hinged with described first baffle plate, altogether form three, left, center, right independent attachment structure;
Three independent attachment structures pass sequentially through described detection boring and are deep into the inside of described draining pipe culvert, and then make
Obtain after described first baffle plate, second baffle and third gear plate launch inside pipe culvert and be mutually twisted connection, be combined into a hole bed die
Plate, described hole end template is connected to described draining pipe culvert inwall and covers the lower surface of described detection boring;
Described first fix connecting rod, second fix connecting rod, the 3rd fix connecting rod and the 4th and fix the upper end of connecting rod with described
Connecting rod positioning component is fixing to be connected, and the sectional area of described connecting rod positioning component is more than the hole area of described detection boring, to cover
The upper surface of described detection boring.
Further, the left and right sides of described first baffle plate is symmetrically arranged with some integrated positioning posts, described second baffle
On the side of described first baffle plate, it is correspondingly provided with quantity phase relative to the position of several integrated positioning posts with third gear plate
Several same integrated positioning holes, the integrated positioning post on described first baffle plate is each passed through described second baffle and third gear plate
On integrated positioning hole so that described first baffle plate, second baffle and third gear plate are connected, combine pore-forming end template.
Further, the cross section of described first baffle plate is convex shape, and two ends form step-like structure around, and described the
Two baffle plates and third gear plate are positioned at above the left and right sides of described first baffle plate, and by described step-like structure and described first
Baffle plate is engaged.
Preferably, also include that hermetic seal material, described hermetic seal material are respectively coated with in the platform of described first baffle plate
On stepped structure and upper surface thereof, and the medial surface that described second baffle is relative with the upper surface of third gear plate and both
On.
Further, the cross section of described first baffle plate is rectangular, and described second baffle and third gear plate are positioned at described
Above the left and right sides of one baffle plate, two medial surface that described second baffle is relative with third gear plate are pressed on institute after mutually abutting
State above the first baffle plate.
Preferably, also include that hermetic seal material, described hermetic seal material are respectively coated with in the upper surface of the first baffle plate
On, and on the described second baffle medial surface relative with the upper surface of third gear plate and both.
Further, described connecting rod positioning component includes that a connecting rod location-plate, described connecting rod location-plate are provided with a slip casting
Hole and hole, four connecting rod location, wherein:
Hole, four described connecting rod location is uniformly distributed around described injected hole square or rectangular, and is respectively positioned on described inspection
Survey in boring drop shadow spread on described connecting rod location-plate.
Further, described first fix connecting rod, second fix connecting rod, the 3rd fix connecting rod and the 4th and fix the upper of connecting rod
End is equipped with screw thread, and it is threaded to be each passed through four described connecting rod location Kong Houyu nuts, and then makes described first admittedly
Determine connecting rod, second fix connecting rod, the 3rd fix connecting rod and the 4th and fix that connecting rod and described connecting rod location-plate are fixing to be connected.
Further, described connecting rod location-plate is also evenly arranged with several hole for the expansion bolts, with some described expansions
Described connecting rod location-plate is fixed on described drain pipe through described hole for the expansion bolt by the corresponding expansion bolt of number of bolt hole
Contain on top board outer surface, in order to prevent described connecting rod location-plate occurred level from moving.
The invention discloses a kind of concrete drain tile and contain detection boring fast repairing method, comprise the following steps:
Step 1: fix connecting rod and the 3rd by second and fix the lower end of connecting rod respectively by corresponding hinge member and second
Baffle plate is corresponding with third gear plate hinged, and by be located on the first baffle plate and along the length direction of the first baffle plate arrange first solid
Determining connecting rod and the 4th, to fix the lower end of connecting rod corresponding hinged with the first baffle plate by corresponding hinge member respectively, forms left, center, right
Three independent attachment structures;
Step 2: fix connecting rod and the 4th by first and fix the first attachment structure of connecting rod and the formation of the first baffle plate through inspection
Survey drills into inside pipe culvert, then fixes connecting rod and the second attachment structure of second baffle formation by second, and the 3rd consolidates
The 3rd attachment structure determining connecting rod and the formation of third gear plate drills into inside pipe culvert through detection, and is positioned at described first connection
The left and right sides of structure;
Step 3: the first baffle plate, second baffle and third gear plate are mutually twisted connection after launching inside pipe culvert, are combined into
One hole end template, hole end template is connected to draining pipe culvert inwall and covers the lower surface of detection boring;
Step 4: sectional area fixes connecting rod, second company of fixing more than the connecting rod positioning component and first of detection drilling hole area
Bar, the 3rd fix connecting rod and the 4th and fix that the upper end of connecting rod is fixing to be connected, to cover the upper surface of detection boring;
Step 5: be in the milk by the injected hole on connecting rod positioning component, to repair detection boring.
Further, in step 3, described first baffle plate, second baffle and the tool of third gear plate combination pore-forming end template
Body step includes:
Several integrated positioning posts being symmetricly set in the described first baffle plate left and right sides are each passed through and are positioned at described
Two baffle plates and third gear plate quantity relative to several integrated positioning post institute relative set on the side of described first baffle plate
Several identical integrated positioning holes, realize described first baffle plate, second baffle and third gear plate with this and are connected, be combined into
Hole end template.
Further, in step 3, further comprising the steps of:
Selection cross section is the first baffle plate of convex shape so that it is two ends, left and right form step-like structure, and then make described
Second baffle and third gear plate are engaged with described first baffle plate by described step-like structure.
Further, in step 3, further comprising the steps of:
Hermetic seal material is respectively coated with on the step-like structure and upper surface thereof of described first baffle plate, and described
On the medial surface that second baffle is relative with the upper surface of third gear plate and both, in order to prevent spillage.
Further, in step 3, further comprising the steps of:
Select rectangular the first baffle plate of cross section so that be positioned at described the above the left and right sides of described first baffle plate
Two medial surface that two baffle plates are relative with third gear plate are pressed on above described first baffle plate after mutually abutting.
Further, in step 3, further comprising the steps of:
Hermetic seal material is respectively coated with on the upper surface of described first baffle plate, and described second baffle and the 3rd
On the upper surface of baffle plate and the relative medial surface of both, in order to prevent spillage.
Further, in step 4, further comprising the steps of:
Offer four on connecting rod location-plate in connecting rod positioning component uniformly to divide around injected hole square or rectangular
The hole, connecting rod location of cloth so that hole, four described connecting rod location is respectively positioned on detection boring projection model on described connecting rod location-plate
In enclosing.
Further, in step 4, further comprising the steps of:
Fix connecting rod by described first, second fix connecting rod, the 3rd fix connecting rod and the 4th upper end fixing connecting rod is all provided with
Become helicitic texture, and it is threaded to be each passed through four described connecting rod location Kong Houyu nuts, and then make described first to fix
Connecting rod, second fix connecting rod, the 3rd fix connecting rod and the 4th and fix that connecting rod and described connecting rod location-plate are fixing to be connected.
Further, in step 4, further comprising the steps of:
By several expansion bolts through corresponding with some described expansion bolt quantity and be uniformly arranged on described company
Several hole for the expansion bolts on bar location-plate, make described connecting rod location-plate be fixed on described draining pipe culvert top board appearance with this
On face, in order to prevent described connecting rod location-plate occurred level from moving.
Further, step 6 is also included: pouring a layer concrete outside described connecting rod positioning component, it is right to realize with this
Repair the protection of erecting device.
Due to the fact that the above technical scheme of employing, be allowed to compared with prior art, have the following advantages that and actively imitate
Really:
1, concrete drain tile disclosed by the invention contain detection boring quickly repair erecting device in implementation process without
Staff enters and carries out formwork inside draining pipe culvert, reduces cost and construction risk;
2, the hole bottom baffle during concrete drain tile disclosed by the invention contains detection boring quickly reparation erecting device can be complete
The whole foot of hole of whole covering, under the sealing process of hermetic seal material, it is to avoid spillage;
3, concrete drain tile disclosed by the invention contains the implementation result of detection boring quickly reparation erecting device, from short-term
From the point of view of, in the case of bore inner grouting material or high-early (strength) cement mortar are the most dry, if pipe culvert inside water pressure is recovered, hole bottom baffle can
Bear hydraulic pressure, and prevent sewage from leaking outside;From the point of view of for a long time, all it is in the milk in repairing hole, the Concrete Thick formed after slip casting in hole
Degree, with neighbouring pipe wall position thickness, can hold inner pipe water pressure, favourable to structure stress.
Accompanying drawing explanation
In order to be illustrated more clearly that the technical scheme of the embodiment of the present invention, required use in embodiment being described below
Accompanying drawing be briefly described.It is clear that the accompanying drawing in describing below is only some embodiments of the present invention, for ability
From the point of view of field technique personnel, on the premise of not paying creative work, it is also possible to obtain other accompanying drawing according to these accompanying drawings.Attached
In figure:
Fig. 1 is the overall structure signal that a kind of concrete drain tile of the present invention contains detection boring quickly reparation erecting device
Figure;
Fig. 2 is the use state diagram that a kind of concrete drain tile of the present invention contains detection boring quickly reparation erecting device;
Fig. 3 is that each baffle plate and the company of fixing in erecting device are quickly repaired in one concrete drain tile of the present invention culvert detection boring
The sectional drawing of bar;
Fig. 4 is that each baffle plate and the company of fixing in erecting device are quickly repaired in one concrete drain tile of the present invention culvert detection boring
The top view of bar;
Fig. 5 is each baffle combination peace that a kind of concrete drain tile of the present invention contains that detection boring is quickly repaired in erecting device
Dress floor map;
Fig. 6 is that a kind of concrete drain tile of the present invention contains the knot of connecting rod location-plate in detection boring quickly reparation erecting device
Structure schematic diagram;
Fig. 7 is the partial process view that a kind of concrete drain tile of the present invention contains detection boring fast repairing method;
Fig. 8 is the entire flow figure that a kind of concrete drain tile of the present invention contains detection boring fast repairing method.
[primary symbols explanation]
1-pipe culvert top board;
2-the first baffle plate;
3-second baffle;
4-third gear plate;
5-first fixes connecting rod;
6-second fixes connecting rod;
7-the 3rd fixes connecting rod;
8-pipe culvert inwall;
9-integrated positioning post;
10-integrated positioning hole;
11-hermetic seal material;
12-the 4th fixes connecting rod;
13-connecting rod location-plate;
14-injected hole;
Hole, 15-connecting rod location;
16-nut;
17-hole for the expansion bolt;
18-expansion bolt;
19-hinge member.
Detailed description of the invention
Below with reference to the accompanying drawing of the present invention, the technical scheme in the embodiment of the present invention is carried out clear, complete description
And discussion, it is clear that a part of example of the only present invention as described herein, is not whole examples, based on the present invention
In embodiment, the every other enforcement that those of ordinary skill in the art are obtained on the premise of not making creative work
Example, broadly falls into protection scope of the present invention.
The present invention provides a kind of concrete drain tile to contain detection boring and quickly repairs erecting device and restorative procedure thereof, uses
Combination erecting device, is split as three baffle plates by required area more than the hole end template of hole area, and angle of flap is adjustable, can
Easily put into inside pipe culvert through boring, launch to can be combined to a hole end template, it is achieved the most right outside concrete pipe culvert
Tube wall drilling carries out formwork, it is ensured that after the grouting material that pours into or high-early (strength) cement mortar will not leak outside, and device is repairing work
The target of pipe culvert inside water pressure power effect can be born in short-term after completing and long term time.
Embodiment one
As shown in Fig. 1,2,4 and 5, the invention discloses a kind of concrete drain tile quick formwork of repairing of culvert detection boring and fill
Put, for repairing the detection boring on pipe culvert top board 1, including the first baffle plate 2, second baffle 3, third gear plate 4, first company of fixing
Bar 5, second fix connecting rod the 6, the 3rd and fix connecting rod the 7, the 4th and fix connecting rod 12 and connecting rod positioning component, wherein:
Described second fixes connecting rod 6 and the 3rd fixes the lower end of connecting rod 7 respectively by corresponding hinge member and described the
Two baffle plates 3 and third gear plate 4 are corresponding hinged, and described first fixes connecting rod 5 and the 4th fixes connecting rod 12 and be located on described first gear
On plate 2, and arranging along the length direction of described first baffle plate 2, described first fixes connecting rod 5 and the 4th fixes the lower end of connecting rod 12
Corresponding hinged with described first baffle plate 2 by corresponding hinge member respectively, altogether form three, left, center, right independent connection knot
Structure, in the present embodiment, the angle of baffle plate and fixing connecting rod is adjustable, and its angular range is between 0-90 °;Additionally, it is described
Hinge member 19 can be that hinge, articulated joint etc. can realize parts hinged for two devices;
Three independent attachment structures pass sequentially through described detection boring and are deep into the inside of described draining pipe culvert, and then make
Obtain after described first baffle plate 2, second baffle 3 and third gear plate 4 launch inside pipe culvert and be mutually twisted connection, be combined at the bottom of a hole
Template, described hole end template is connected to described draining pipe culvert inwall 8 and covers the lower surface of described detection boring;
Described first fix connecting rod 5, second fix connecting rod the 6, the 3rd fix connecting rod 7 and the 4th fix the upper end of connecting rod 12 with
Described connecting rod positioning component is fixing to be connected, the hole area that the sectional area of described connecting rod positioning component is holed more than described detection, with
Cover the upper surface of described detection boring.
With reference to Fig. 3-5, further, the left and right sides of described first baffle plate 2 is symmetrically arranged with some integrated positioning posts 9,
Described second baffle 3 and third gear plate 4 position relative to several integrated positioning posts 9 on the side of described first baffle plate 2
Being correspondingly provided with several integrated positioning holes 10 that quantity is identical, the integrated positioning post 9 on described first baffle plate 2 is each passed through institute
State the integrated positioning hole 10 on second baffle 3 and third gear plate 4 so that described first baffle plate 2, second baffle 3 and third gear plate 4
It is connected, combines pore-forming end template.In the present embodiment, the quantity of described integrated positioning post 9 is 4, is distributed in described two-by-two
The left and right sides of the first baffle plate 2, the quantity of integrated positioning hole 10 is similarly 4 simultaneously, is distributed in described second baffle 3 He two-by-two
Third gear plate 4 is on the side of described first baffle plate 2.Preferably, it is distributed on described second baffle 3 and third gear plate 4
Two integrated positioning holes 10 are symmetricly set in described second and fix connecting rod 6 and the 3rd and fix the both sides up and down of connecting rod 7 so that respectively keep off
Plate is prone to occlusion after deployment.Certainly, at this, we can arrange greater number of integrated positioning post 9 and integrated positioning hole 10,
Bring with this and between each baffle plate, be engaged better technique effect, but bring each baffle plate equally and implement not during occlusion
Just unfavorable effect.The present embodiment is based on occlusion effect and occlusion difficulty comprehensive consideration, by integrated positioning post 9 and integrated positioning
The quantity in hole 10 is arranged to 4, has optimized effect.Certainly, about integrated positioning post 9 and combination in the present embodiment
The different setting of the quantity in hole 10, location belongs to protection scope of the present invention.
As Figure 1-3, further, the cross section of described first baffle plate 2 is convex shape, and two ends form step around
Shape structure, described second baffle 3 and third gear plate 4 are positioned at above the left and right sides of described first baffle plate 2, and pass through described step
Shape structure is engaged with described first baffle plate 2.Cross section is that the first baffle plate 2 of convex shape can make second baffle the 3, first baffle plate 2
Form a horizontal plane with the upper surface of third gear plate 4 and be directly connected to pipe culvert inwall 8 and detection boring lower end, in follow-up grouting
During so that the thickness of grouting part and the consistency of thickness of pipe culvert top board, repairing effect is good.
With continued reference to Fig. 2,3 and 5, it is preferred that also include that hermetic seal material 11, described hermetic seal material 11 are coated with respectively
It is overlying on step-like structure and the upper surface thereof of described first baffle plate 2, and described second baffle 3 and the upper table of third gear plate 4
On face and the relative medial surface of both.Under the sealing function of described hermetic seal material 11, the occlusion between baffle plate is stitched, is respectively kept off
Gap between plate and pipe culvert inwall 8 can by hermetic seal material 11 fill more tight, prevent the follow-up grouting material poured into
Or high-early (strength) cement mortar generation spillage.In the present embodiment, described hermetic seal material 11 can use hydro-expansive rubber.
Additionally, in an other embodiment, the cross section of described first baffle plate 2 is rectangular, described second baffle 3 and third gear
Plate 4 is positioned at above the left and right sides of described first baffle plate 2, two medial surface phases that described second baffle 3 is relative with third gear plate 4
It is pressed on above described first baffle plate 2 after abutting mutually.Preferably, hermetic seal material 11, described hermetic seal material are also included
11 are respectively coated with on the upper surface of the first baffle plate 2, and described second baffle 3 and the upper surface of third gear plate 4 and both
On relative medial surface.The most in the present embodiment, described hermetic seal material 11 can use hydro-expansive rubber.
With further reference to Fig. 6, described connecting rod positioning component includes a connecting rod location-plate 13, and described connecting rod location-plate 13 sets
There are an injected hole 14 and hole 15, four connecting rod location, wherein:
Hole 15, four described connecting rod location is uniformly distributed around described injected hole 14 square or rectangular, and is respectively positioned on institute
State in detection boring drop shadow spread on described connecting rod location-plate 13.That is, hole, four described connecting rod location 15 is corresponding to be connected
Four fixing connecting rods be respectively positioned on detection boring in.In the present embodiment, described injected hole 14 is preferably disposed on described connecting rod location
Plate 13 center.
In conjunction with Fig. 3 and 5, further, described first fix connecting rod 5, second fix connecting rod 6, the 3rd fix connecting rod 7 and
Four upper ends fixing connecting rod 12 are equipped with screw thread, and are each passed through behind hole 15, four described connecting rods location with nut 16 screw thread even
Connect, and then make described first to fix connecting rod 5, second fix connecting rod the 6, the 3rd and fix connecting rod 7 and the 4th and fix connecting rod 12 and institute
State the fixing connection of connecting rod location-plate 13.In this step, use the design of nut that fixing connecting rod can be made to produce drawing upwards
Power so that between each baffle plate, the tightst between baffle plate and pipe culvert inwall 8, sealing effectiveness is more preferably.Additionally, nut to
Under counteracting force under, connecting rod location-plate 13 can be fitted tightly over the outer surface of pipe culvert top board 1.
As shown in Figure 6, further, described connecting rod location-plate 13 is also evenly arranged with several hole for the expansion bolts 17,
The expansion bolt 18 corresponding with some described hole for the expansion bolt 17 quantity is fixed by described connecting rod through described hole for the expansion bolt 17
Position plate 13 is fixed on described draining pipe culvert top board 1 outer surface, in order to prevent described connecting rod location-plate 13 occurred level from moving.This
In embodiment, the quantity of described hole for the expansion bolt 17 and expansion bolt 18 is 4, and is uniformly distributed in connecting rod location-plate 13
On four direction, by connecting rod location-plate 13 and pipe culvert top board 1 fixation procedure so that connecting rod location-plate 13 is on four direction
Uniform force, fixed effect is more preferably.Certainly, the quantity of described hole for the expansion bolt 17 and expansion bolt 18 is the most, fixing effect
The best, but for cost and fixed effect comprehensive consideration, only need to arrange on the four direction up and down of connecting rod location-plate 13
Hole for the expansion bolt 17, and coordinate expansion bolt 18 to be fixed can to reach desired effects.
Embodiment two
As it is shown in fig. 7, the invention discloses a kind of concrete drain tile to contain detection boring fast repairing method, including following
Step:
Step 1: fix second connecting rod 6 and the 3rd fix the lower end of connecting rod 7 respectively by corresponding hinge member 19 with
Second baffle 3 and third gear plate 4 are corresponding hinged, and will be located on the first baffle plate 2 and arrange along the length direction of the first baffle plate 2
First fix connecting rod 5 and the 4th to fix the lower end of connecting rod 12 corresponding with the first baffle plate 2 by corresponding hinge member 19 respectively
Hinged, form the independent attachment structure in three, left, center, right;
Step 2: fix the first attachment structure that connecting rod 12 fixed by connecting rod 5 and the 4th and the first baffle plate 2 is formed by first and wear
Cross detection and drill into inside pipe culvert, then fix connecting rod 6 by second and the second attachment structure that second baffle 3 is formed, and
3rd the 3rd attachment structure fixing connecting rod 7 and third gear plate 4 formation drills into inside pipe culvert through detection, and is positioned at described
The left and right sides of the first attachment structure;
Step 3: the first baffle plate 2, second baffle 3 and third gear plate 4 are mutually twisted connection after launching inside pipe culvert, combination
Cheng Yikong end template, hole end template is connected to draining pipe culvert inwall 8 and covers the lower surface of detection boring;
Step 4: sectional area is fixed connecting rod 5, second more than the connecting rod positioning component and first of detection drilling hole area and fixed
Connecting rod 7 fixed by connecting rod the 6, the 3rd and the 4th upper end fixing connecting rod 12 is fixed and connected, to cover the upper surface of detection boring;
Step 5: be in the milk by the injected hole 14 on connecting rod positioning component, to repair detection boring.
In the present embodiment, before implementing step 2, first the angle between each baffle plate and each fixing connecting rod is adjusted to
0 °, each attachment structure is facilitated to put in detection boring.
For in step 2, the second attachment structure and the 3rd attachment structure drill into the priority within pipe culvert through detection
Order is not construed as limiting, and only need to ensure that the first attachment structure first passes through detection and drills into pipe culvert inside.
Further, before implementing step 3, by pulling each fixing connecting rod, simultaneously by the retroaction of pipe culvert inwall 8
Power so that the angle between each baffle plate and each fixing connecting rod is sequentially adjusted in being 90 °.
In step 3, described first baffle plate 2, second baffle 3 and third gear plate 4 combine the concrete steps of pore-forming end template
Including:
By the fixing connecting rod each baffle plate of adjustment relative to position, described first baffle plate 2 left and right sides can will be symmetricly set in
Several integrated positioning posts 9 are each passed through the side being positioned at described second baffle 3 and third gear plate 4 near described first baffle plate 2
Several integrated positioning holes 10 that the quantity of several 9 relative set of integrated positioning post is identical the most relatively, realize described with this
First baffle plate 2, second baffle 3 and third gear plate 4 are connected, and combine pore-forming end template.
Further, in step 3, further comprising the steps of:
Selection cross section is the first baffle plate 2 of convex shape so that it is two ends, left and right form step-like structure, and then make described
Second baffle 3 and third gear plate 4 are engaged with described first baffle plate 2 by described step-like structure.
Further, in step 3, further comprising the steps of:
Hermetic seal material 11 is respectively coated with on the step-like structure and upper surface thereof of described first baffle plate 2, and
On the medial surface that described second baffle 3 is relative with the upper surface of third gear plate 4 and both, in order to prevent spillage.
Further, in step 3, further comprising the steps of:
Select rectangular the first baffle plate 2 of cross section so that be positioned at above the left and right sides of described first baffle plate 2 is described
Two medial surface that second baffle 3 is relative with third gear plate 4 are pressed on above described first baffle plate 2 after mutually abutting.
Further, in step 3, further comprising the steps of:
Hermetic seal material 11 is respectively coated with on the upper surface of described first baffle plate 2, and described second baffle 3 He
On the upper surface of third gear plate 4 and the relative medial surface of both, in order to prevent spillage.
Further, in step 4, further comprising the steps of:
Offer on connecting rod location-plate 13 in connecting rod positioning component four equal around injected hole 14 square or rectangular
The hole 15, connecting rod location of even distribution so that hole 15, four described connecting rod location is respectively positioned on detection boring at described connecting rod location-plate 13
On drop shadow spread in.
Further, in step 4, further comprising the steps of:
Fix connecting rod 5 by described first, second fix connecting rod the 6, the 3rd and fix connecting rod 7 and the 4th and fix the upper end of connecting rod 12
All it is set as helicitic texture, and threadeds with nut 16 after being each passed through hole 15, four described connecting rods location, and then make described
First fix connecting rod 5, second fix connecting rod the 6, the 3rd and fix connecting rod 7 and the 4th to fix connecting rod 12 solid with described connecting rod location-plate 13
Fixed connection.In this step, the method using nut to be fixed can make fixing connecting rod produce a pulling force upwards, so that respectively
Between baffle plate, the tightst between baffle plate and pipe culvert inwall 8, sealing effectiveness is more preferably.Additionally, in the downward retroaction of nut
Under power, connecting rod location-plate 13 can be fitted tightly over the outer surface of pipe culvert top board 1.
Further, in step 4, further comprising the steps of:
By several expansion bolts 18 through corresponding with some described expansion bolt 18 quantity and be uniformly arranged on institute
State several hole for the expansion bolts 17 on connecting rod location-plate 13, make described connecting rod location-plate 13 be fixed on described drain pipe with this
Contain on top board 1 outer surface, in order to prevent described connecting rod location-plate 13 occurred level from moving.
As shown in Figure 8, further, step 6 is also included: outside described connecting rod positioning component, pour a layer concrete,
Realize the protection repairing erecting device with this.
Concrete drain tile disclosed by the invention contains detection boring quickly reparation erecting device in implementation process without work
Enter as personnel and inside draining pipe culvert, carry out formwork, reduce cost and construction risk.Hole bottom baffle in its device can completely cover
Cover whole foot of hole, under the sealing process of hydro-expansive rubber, it is to avoid spillage.With regard to its implementation result aspect, come from short-term
Saying, in the case of bore inner grouting material or high-early (strength) cement mortar are the most dry, if pipe culvert inside water pressure is recovered, hole bottom baffle can hold
By hydraulic pressure, and prevent sewage from leaking outside;From the point of view of for a long time, all it is in the milk in repairing hole, the concrete thickness formed after slip casting in hole
With neighbouring pipe wall position thickness, inner pipe water pressure can be held, favourable to structure stress.
The above, the only present invention preferably detailed description of the invention, but protection scope of the present invention is not limited thereto,
Any those familiar with the art in the technical scope that the invention discloses, the change that can readily occur in or replacement,
All should contain within protection scope of the present invention.Therefore, protection scope of the present invention should be with scope of the claims
It is as the criterion.
Claims (19)
1. an erecting device is quickly repaired in concrete drain tile culvert detection boring, bores for repairing the detection on pipe culvert top board
Hole, it is characterised in that include the first baffle plate, second baffle, third gear plate, first fix connecting rod, second fix connecting rod, the 3rd solid
Determine connecting rod, the 4th fix connecting rod and connecting rod positioning component, wherein:
Described second fixes connecting rod and the 3rd fixes the lower end of connecting rod respectively by corresponding hinge member and described second baffle
Corresponding with third gear plate hinged, described first fixes connecting rod and the 4th fixes connecting rod and is located on described first baffle plate, and along institute
The length direction stating the first baffle plate is arranged, and described first fixes connecting rod and the 4th fixes the lower end of connecting rod respectively by corresponding hinge
Relay part is corresponding hinged with described first baffle plate, altogether forms the independent attachment structure in three, left, center, right;
Three independent attachment structures pass sequentially through described detection boring and are deep into the inside of described draining pipe culvert, and then make institute
State after the first baffle plate, second baffle and third gear plate launch inside pipe culvert and be mutually twisted connection, be combined into a hole end template, institute
State hole end template be connected to described draining pipe culvert inwall and cover the lower surface of described detection boring;
Described first fix connecting rod, second fix connecting rod, the 3rd fix connecting rod and the 4th and fix the upper end of connecting rod and described connecting rod
Positioning component is fixing to be connected, and the sectional area of described connecting rod positioning component is more than the hole area of described detection boring, described to cover
The upper surface of detection boring.
Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring the most according to claim 1, and its feature exists
In, it is close that the left and right sides of described first baffle plate is symmetrically arranged with some integrated positioning posts, described second baffle and third gear plate
It is correspondingly provided with, relative to the position of several integrated positioning posts, several combinations that quantity is identical on the side of described first baffle plate
Hole, location, the integrated positioning post on described first baffle plate is each passed through the integrated positioning on described second baffle and third gear plate
Hole so that described first baffle plate, second baffle and third gear plate are connected, combines pore-forming end template.
Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring the most according to claim 1, and its feature exists
In, the cross section of described first baffle plate is convex shape, and two ends form step-like structure, described second baffle and third gear around
Plate is positioned at above the left and right sides of described first baffle plate, and is engaged with described first baffle plate by described step-like structure.
Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring the most according to claim 3, and its feature exists
In, also include hermetic seal material, described hermetic seal material be respectively coated with in described first baffle plate step-like structure and
On upper surface, and on the described second baffle medial surface relative with the upper surface of third gear plate and both.
Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring the most according to claim 1, and its feature exists
In, the cross section of described first baffle plate is rectangular, and described second baffle and third gear plate are positioned at the left and right two of described first baffle plate
Above side, two medial surface that described second baffle is relative with third gear plate are pressed on described first baffle plate after mutually abutting
Side.
Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring the most according to claim 5, and its feature exists
In, also include that hermetic seal material, described hermetic seal material are respectively coated with on the upper surface of the first baffle plate, and described
On the medial surface that two baffle plates are relative with the upper surface of third gear plate and both.
Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring the most according to claim 1, and its feature exists
In, described connecting rod positioning component includes that a connecting rod location-plate, described connecting rod location-plate are provided with an injected hole and four connecting rods are fixed
Hole, position, wherein:
Hole, four described connecting rod location is uniformly distributed around described injected hole square or rectangular, and is respectively positioned on described detection brill
In the drop shadow spread on described connecting rod location-plate of the hole.
Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring the most according to claim 7, and its feature exists
In, described first fix connecting rod, second fix connecting rod, the 3rd fix connecting rod and the 4th upper end fixing connecting rod is equipped with screw thread,
And it is threaded to be each passed through four described connecting rods location Kong Houyu nuts, and then described first is made to fix connecting rod, second solid
Determine connecting rod, the 3rd fix connecting rod and the 4th and fix that connecting rod and described connecting rod location-plate are fixing to be connected.
Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring the most according to claim 7, and its feature exists
In, described connecting rod location-plate is also evenly arranged with several hole for the expansion bolts, relative with some described expansion bolt hole number
Described connecting rod location-plate is fixed on described draining pipe culvert top board outer surface by the expansion bolt answered through described hole for the expansion bolt,
In order to prevent described connecting rod location-plate occurred level from moving.
10. a concrete drain tile contains detection boring fast repairing method, it is characterised in that comprise the following steps:
Step 1: fix connecting rod and the 3rd by second and fix the lower end of connecting rod respectively by corresponding hinge member and second baffle
Corresponding with third gear plate hinged, and by be located on the first baffle plate and along the length direction of the first baffle plate arrange first fixing even
The lower end that connecting rod fixed by bar and the 4th is corresponding hinged with the first baffle plate by corresponding hinge member respectively, forms three, left, center, right
Independent attachment structure;
Step 2: fix connecting rod by first and the 4th fixing the first attachment structure formed with the first baffle plate that connects is bored through detection
Hole enters inside pipe culvert, then fixes connecting rod and the second attachment structure of second baffle formation, and the 3rd company of fixing by second
The 3rd attachment structure that bar and third gear plate are formed drills into inside pipe culvert through detection, and is positioned at described first attachment structure
The left and right sides;
Step 3: the first baffle plate, second baffle and third gear plate are mutually twisted connection after launching inside pipe culvert, are combined into a hole
End template, hole end template is connected to draining pipe culvert inwall and covers the lower surface of detection boring;
Step 4: sectional area more than detection drilling hole area connecting rod positioning component and first fix connecting rod, second fix connecting rod,
3rd fixes connecting rod and the 4th fixes the fixing connection in upper end of connecting rod, to cover the upper surface of detection boring;
Step 5: be in the milk by the injected hole on connecting rod positioning component, to repair detection boring.
11. a kind of concrete drain tiles according to claim 10 contain detection boring fast repairing method, it is characterised in that
In step 3, the concrete steps of described first baffle plate, second baffle and third gear plate combination pore-forming end template include:
Several integrated positioning posts being symmetricly set in the described first baffle plate left and right sides are each passed through and are positioned at described second gear
Plate and third gear plate are identical relative to the quantity of several integrated positioning post institute relative set on the side of described first baffle plate
Several integrated positioning holes, realize described first baffle plate, second baffle and third gear plate with this and be connected, combination pore-forming at the bottom of
Template.
12. a kind of concrete drain tiles according to claim 10 contain detection boring fast repairing method, it is characterised in that
In step 3, further comprising the steps of:
Selection cross section is the first baffle plate of convex shape so that it is two ends, left and right form step-like structure, and then make described second
Baffle plate and third gear plate are engaged with described first baffle plate by described step-like structure.
13. a kind of concrete drain tiles according to claim 12 contain detection boring fast repairing method, it is characterised in that
In step 3, further comprising the steps of:
Hermetic seal material is respectively coated with on the step-like structure and upper surface thereof of described first baffle plate, and described second
On the medial surface that baffle plate is relative with the upper surface of third gear plate and both, in order to prevent spillage.
14. a kind of concrete drain tiles according to claim 10 contain detection boring fast repairing method, it is characterised in that
In step 3, further comprising the steps of:
Select the first baffle plate that cross section is rectangular so that be positioned at the described second gear above the left and right sides of described first baffle plate
Two medial surface that plate is relative with third gear plate are pressed on above described first baffle plate after mutually abutting.
15. a kind of concrete drain tiles according to claim 14 contain detection boring fast repairing method, it is characterised in that
In step 3, further comprising the steps of:
Hermetic seal material is respectively coated with on the upper surface of described first baffle plate, and described second baffle and third gear plate
Upper surface and the relative medial surface of both on, in order to prevent spillage.
16. a kind of concrete drain tiles according to claim 10 contain detection boring fast repairing method, it is characterised in that
In step 4, further comprising the steps of:
Offer on connecting rod location-plate in connecting rod positioning component four equally distributed around injected hole square or rectangular
Hole, connecting rod location so that hole, four described connecting rod location is respectively positioned on detection boring drop shadow spread on described connecting rod location-plate
In.
17. a kind of concrete drain tiles according to claim 10 contain detection boring fast repairing method, it is characterised in that
In step 4, further comprising the steps of:
Fix connecting rod by described first, second fix connecting rod, the 3rd fix connecting rod and the 4th upper end fixing connecting rod is all set as spiral shell
Stricture of vagina structure, and it is threaded to be each passed through four described connecting rods location Kong Houyu nuts, so make described first fix connecting rod,
Second fix connecting rod, the 3rd fix connecting rod and the 4th and fix that connecting rod and described connecting rod location-plate are fixing to be connected.
18. a kind of concrete drain tiles according to claim 10 contain detection boring fast repairing method, it is characterised in that
In step 4, further comprising the steps of:
By several expansion bolts through corresponding with some described expansion bolt quantity and to be uniformly arranged on described connecting rod fixed
Several hole for the expansion bolts on the plate of position, make described connecting rod location-plate be fixed on described draining pipe culvert top board outer surface with this
On, in order to prevent described connecting rod location-plate occurred level from moving.
19. a kind of concrete drain tiles according to claim 10 contain detection boring fast repairing method, it is characterised in that
Also include step 6: outside described connecting rod positioning component, pour a layer concrete, realize the guarantor repairing erecting device with this
Protect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610590198.2A CN106049644B (en) | 2016-07-25 | 2016-07-25 | A kind of concrete drain tile contains the quick reparation erecting device of detection drilling and its restorative procedure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610590198.2A CN106049644B (en) | 2016-07-25 | 2016-07-25 | A kind of concrete drain tile contains the quick reparation erecting device of detection drilling and its restorative procedure |
Publications (2)
Publication Number | Publication Date |
---|---|
CN106049644A true CN106049644A (en) | 2016-10-26 |
CN106049644B CN106049644B (en) | 2018-04-17 |
Family
ID=57417045
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610590198.2A Active CN106049644B (en) | 2016-07-25 | 2016-07-25 | A kind of concrete drain tile contains the quick reparation erecting device of detection drilling and its restorative procedure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN106049644B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107832491A (en) * | 2017-09-27 | 2018-03-23 | 上海岩土工程勘察设计研究院有限公司 | A kind of effective specific retention computational methods that underground water is repaired for extraction process |
CN109252457A (en) * | 2018-10-22 | 2019-01-22 | 中国冶集团有限公司 | Concrete drain tile contains quick blocking prosthetic device |
CN109540247A (en) * | 2018-12-13 | 2019-03-29 | 南昌大学 | A kind of drilling level of ground water real-time monitoring device |
CN109877945A (en) * | 2019-01-23 | 2019-06-14 | 南昌大学 | A kind of pore-forming positioning construction method of beams of concrete reserving hole channel |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006057545A1 (en) * | 2004-11-29 | 2006-06-01 | Dong-Hyun Seo | Tunnelling method using pre-support concept and an adjustable apparatus thereof |
US20070107791A1 (en) * | 2004-12-03 | 2007-05-17 | Illinois Tool Works Inc. | System and method for pipe repair |
CN102242850A (en) * | 2011-05-27 | 2011-11-16 | 天津市银龙预应力钢材集团有限公司 | Emergency-repair tool for pipe line of prestress steel cylinder concrete pipe |
CN103291072A (en) * | 2013-05-31 | 2013-09-11 | 上海宝冶集团有限公司 | Method for reserving holes in floors by aid of PVC (polyvinyl chloride) sleeves |
CN204875521U (en) * | 2015-03-23 | 2015-12-16 | 王豪 | Hang blue jib preformed hole plugging device |
CN205804559U (en) * | 2016-07-25 | 2016-12-14 | 上海市城市排水有限公司 | Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring |
-
2016
- 2016-07-25 CN CN201610590198.2A patent/CN106049644B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2006057545A1 (en) * | 2004-11-29 | 2006-06-01 | Dong-Hyun Seo | Tunnelling method using pre-support concept and an adjustable apparatus thereof |
US20070107791A1 (en) * | 2004-12-03 | 2007-05-17 | Illinois Tool Works Inc. | System and method for pipe repair |
CN102242850A (en) * | 2011-05-27 | 2011-11-16 | 天津市银龙预应力钢材集团有限公司 | Emergency-repair tool for pipe line of prestress steel cylinder concrete pipe |
CN103291072A (en) * | 2013-05-31 | 2013-09-11 | 上海宝冶集团有限公司 | Method for reserving holes in floors by aid of PVC (polyvinyl chloride) sleeves |
CN204875521U (en) * | 2015-03-23 | 2015-12-16 | 王豪 | Hang blue jib preformed hole plugging device |
CN205804559U (en) * | 2016-07-25 | 2016-12-14 | 上海市城市排水有限公司 | Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107832491A (en) * | 2017-09-27 | 2018-03-23 | 上海岩土工程勘察设计研究院有限公司 | A kind of effective specific retention computational methods that underground water is repaired for extraction process |
CN107832491B (en) * | 2017-09-27 | 2021-02-02 | 上海勘察设计研究院(集团)有限公司 | Effective water holding rate calculation method for underground water restoration by extraction method |
CN109252457A (en) * | 2018-10-22 | 2019-01-22 | 中国冶集团有限公司 | Concrete drain tile contains quick blocking prosthetic device |
CN109252457B (en) * | 2018-10-22 | 2021-04-02 | 中国一冶集团有限公司 | Quick plugging and repairing device for concrete drainage pipe culvert |
CN109540247A (en) * | 2018-12-13 | 2019-03-29 | 南昌大学 | A kind of drilling level of ground water real-time monitoring device |
CN109877945A (en) * | 2019-01-23 | 2019-06-14 | 南昌大学 | A kind of pore-forming positioning construction method of beams of concrete reserving hole channel |
Also Published As
Publication number | Publication date |
---|---|
CN106049644B (en) | 2018-04-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106049644A (en) | Detection boring rapid restoration support mould apparatus for concrete drain pipe culvert and restoration method thereof | |
CN109898533A (en) | The built-in Precipitation Structure of raft plate, the shut-in well structure of dewatering well and shut-in well method | |
CN109025899B (en) | Well sealing device | |
CN104652495B (en) | Internal support of foundation pit column and base plate node waterproof construction technology | |
CN208778877U (en) | Non- preset water string device | |
CN106193644B (en) | Basement reconstruction structure with raft foundation building | |
CN205804559U (en) | Erecting device is quickly repaired in a kind of concrete drain tile culvert detection boring | |
CN106759485A (en) | A kind of prefabricated piping lane of two-piece unit formula and installation method | |
CN112681535B (en) | Waterproof sealing assembly for vertical floor penetrating pipeline and leakage detection and construction method thereof | |
CN109138116A (en) | Concrete expires packet drainage pipeline tubine construction method | |
CN113028139B (en) | Combined type connector of rain and sewage pipe and construction method | |
CN206752632U (en) | Plastic reinforcing steel composite construction municipal drainage inspection shaft | |
CN110424458A (en) | Tunneling boring PC piping lane piece construction and its closed-water test method | |
CN107288141B (en) | A kind of seamless flexible water construction technology of contrary sequence method | |
CN215166592U (en) | Horizontal support for building construction embedded component | |
KR102242347B1 (en) | Manhole | |
CN210684746U (en) | Modified precipitation well plugging device | |
CN207597443U (en) | A kind of prefabricated pipe gallery water sealing structure and piping lane | |
CN104727275B (en) | Method for application of concrete work expansion joint vertical water sealing structure fixing element | |
CN208579038U (en) | A kind of sealing device of the double walls of Pipeline Crossing Program differential settlement | |
CN208604616U (en) | A kind of soil cement casing composite pile | |
CN112628477A (en) | Drain pipe pre-embedding device with stretching and water drainage preventing functions and installation method | |
CN207376843U (en) | Expansion joint leakage-proof structure | |
CN105863125A (en) | Mounting joint for external wall panel | |
CN206090640U (en) | Underground pipe gallery major structure expansion joint substitute means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |