CN107288141B - A kind of seamless flexible water construction technology of contrary sequence method - Google Patents
A kind of seamless flexible water construction technology of contrary sequence method Download PDFInfo
- Publication number
- CN107288141B CN107288141B CN201710682750.5A CN201710682750A CN107288141B CN 107288141 B CN107288141 B CN 107288141B CN 201710682750 A CN201710682750 A CN 201710682750A CN 107288141 B CN107288141 B CN 107288141B
- Authority
- CN
- China
- Prior art keywords
- concrete structure
- foundation pit
- shear wall
- draining board
- composite
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/06—Restraining of underground water
- E02D19/10—Restraining of underground water by lowering level of ground water
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D31/00—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution
- E02D31/02—Protective arrangements for foundations or foundation structures; Ground foundation measures for protecting the soil or the subsoil water, e.g. preventing or counteracting oil pollution against ground humidity or ground water
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Hydrology & Water Resources (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Environmental & Geological Engineering (AREA)
- Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
The present invention relates to a kind of seamless flexible water construction technologies of contrary sequence method, include at least: the smooth, compacting by the element soil of building foundation pit bottom forms bed course;Composite water draining board is laid on bed course;Installation built-in type leads slurry pipe;It is laid with the reinforcing steel bar shelf on concrete structure basis;Concrete structure basis is carried out to pour;It sets up foundation pit side concrete structure shear wall formwork, be laid with reinforcing steel bar shelf, pour foundation pit side concrete structure shear wall;Dismantling concrete structural shear wall template;Concrete structure shear wall periphery is installed by composite water draining board;Installation rear-loading type leads slurry pipe;Foundation pit surrounding ash earthen backfill;When the main body construction or after the completion of building structure, imports flexible waterproof material slurry, the formation seamless waterproof layer of flexible sealing into reserved cavity by leading slurry pipe;Precipitation apparatus is removed, while utilizing the ground water pressure force inspecting to go up;Ne-leakage is delivered.This Waterproof Construction Technique is not influenced by ambient temperature, and short time limit, safe and reliable and primary construct are not leaked all the life.
Description
Technical field
The present invention relates to waterproof technology technical fields, and in particular to a kind of seamless flexible water construction technology of contrary sequence method.
Background technique
With city-building flourish, ground living space expand with cultivated area hold the two it is full of contradictions, shallowly
The development and utilization of the layer underground space is particularly important.Currently, Urban Rail Transit Project and subterranean commercial area are opened
It sends out like a raging fire, and is carried out in city in underground engineering construction, because waterproof construction progress is compared with slow, waterproof effect is poor etc.
Factor has seriously affected construction speed and construction quality.
The building field of China nearly more than ten years is developing rapidly, and annual building basement is because seepy question brings nothing
Several property losses and civil disputation.By Engineering Projects analysis main reasons is that: at waterproof material quality and material joints
Reason problem, material is for the sealing problem in concrete structure base surface crack, and the problems such as construction, the above problem causes building external
Shield, protects the water-proof function of waterproof layer to fail, so as to cause the shortening of building structure life and building function and structural safety
It is affected.
For this purpose, we have proposed a kind of seamless flexible water construction technologies of contrary sequence method, to solve the above problems.
Summary of the invention
A primary object of the present invention is to overcome at least one defect in the prior art, provide a kind of contrary sequence method without
Seam flexible water construction technology, influence when solving building waterproof layer construction by environment temperature and rainwater lead to construction week
The problem of phase long problem and building cost rise, while solving the problems, such as the material joints processing of building waterproof layer, coagulation soil matrix
The waterproof sealing problem of plinth facial cleft seam and rejected region.
In order to realize above-mentioned technical proposal, the invention adopts the following technical scheme:
According to an aspect of the present invention, a kind of seamless flexible water construction technology of contrary sequence method is provided, include at least with
Lower step:
S01: the smooth, compacting by the element soil of building foundation pit bottom forms bed course;
S02: composite water draining board is laid on the bed course;
S03: installation built-in type leads slurry pipe;
Wherein, the built-in type leads the bottom end of slurry pipe and the composite water draining board is connected and leads slurry pipe in the built-in type
Bottom end be equipped with lead slurry mouth;
S04: it is laid with the reinforcing steel bar shelf on concrete structure basis;
Wherein, the reinforcing steel bar shelf be mounted on the upside of the composite water draining board, the reinforcing steel bar shelf with it is described compound
Reserved cavity is formed between drain bar;Chamber is poured by installation concrete structure foundation forms formation around the reinforcing steel bar shelf
Body;
S05: it is described pour in cavity carry out concrete structure basis pour;
S06: it sets up foundation pit side concrete structure shear wall formwork, be laid with reinforcing steel bar shelf, while in adjacent reinforced frame
It is provided with removable lacing wire anchor pole between body, pours foundation pit side concrete structure shear wall;
S07: after concrete structure shear wall solidification, the concrete structure shear wall formwork is removed;
S08: removing removable lacing wire anchor pole in the concrete structure shear wall, and in corresponding position, setting rear-loading type leads slurry
Pipe;
S09: composite water draining board, the composite water draining board and concrete are installed in the concrete structure shear wall lateral surface
Reserved cavity is formed between structural shear wall;The outer end that the composite water draining board and the rear-loading type lead slurry pipe is connected, equally,
The outer end that the rear-loading type leads slurry pipe, which is equipped with, leads slurry mouth;
S10: foundation pit surrounding ash earthen backfill;
S11: when the main body construction of building structure or after the completion, slurry pipe is led by built-in type, rear-loading type leads slurry pipe to pre-
It stays and imports flexible waterproof material slurry in cavity, form the seamless waterproof layer of flexible sealing;
S12: base pit dewatering equipment Removal, while using the ground water pressure force inspecting to go up using the flexible sealing of contrary sequence method
The waterproof effect of seamless waterproof layer;
S13: ne-leakage is delivered.
According to an embodiment of the present invention, it when the building foundation pit bottom is equipped with pile foundation, needs to pre-process node,
Step includes:
(1) pile crown and the part pile body of the downward 500mm of pile crown are cleared up after foundation pit pile crown broken pile;
(2) transition processing is carried out using composite self-adhering flat drainage plate, can guarantees the composite, water-drain being arranged on bed course
Plate and pile body form the waterproof sealing system of an entirety;
Specifically, composite self-adhering flat drainage plate is welded to by pile body using hot gas welding connection, at the same by it is described it is compound from
Viscous flat drainage plate is welded as a whole with the composite water draining board on the upside of the bed course;
Wherein, the pile body of the downward 100mm of the pile crown and composite self-adhering flat drainage plate use missing solder mode, while in sky
Position is welded to fill using sealant;And it is welded in the pile body part below the pile crown 100mm using real weldering mode.
According to an embodiment of the present invention, when the flexible waterproof material slurry is constructed, by the way of subregion construction.
According to an embodiment of the present invention, it is led into the reserved cavity between concrete structure basis and composite water draining board
When entering flexible waterproof material slurry, by the way of gradually being promoted to another side since concrete structure basis is on one side.
According to an embodiment of the present invention, into the reserved cavity between concrete structure shear wall and composite water draining board
Import flexible waterproof material slurry when, using from concrete shear force wall from bottom to top and horizontal direction simultaneously promote by the way of.
According to an embodiment of the present invention, in the S03, the height that the built-in type leads slurry pipe is greater than concrete knot
The thickness on structure basis.
According to an embodiment of the present invention, after the completion of the S03, base plate of foundation pit protection superimposed layer, the base are poured
Hole base plate protection superimposed layer is set between the composite water draining board and concrete structure basis.
According to an embodiment of the present invention, base plate of foundation pit protection superimposed layer with a thickness of 20mm -100mm.
According to an embodiment of the present invention, base plate of foundation pit protection superimposed layer with a thickness of 30mm.
As shown from the above technical solution, the present invention has at least one of following advantages and good effect:
The seamless flexible water construction technology of contrary sequence method of the present invention is not influenced by ambient temperature, and speed of application is fast, pole
The earth shortens construction period.Due to using flexible seamless construction so seam problems are not present, while under pressure
Crack and the defect seal leakage problem that concrete structure can be repaired achieve the purpose that once to construct lifelong carefree.
Using the seamless flexible water construction technology of contrary sequence method of the present invention, so that building structure waterproof performance safely may be used
It leans on, it is ensured that with building structure with the protection purpose in service life, while also having achieved the purpose that reduce investment outlay.
The seamless flexible water construction technology of contrary sequence method of the present invention and obvious technical effects, according to multiple repair capsules
Case and for many years return visit.The technical security is reliable, reaches primary construction, and lifelong leak-free effect is preferably widelyd popularize, market prospects
It is wide.
Detailed description of the invention
Fig. 1 is the foundation pit cross-section structure signal using the seamless flexible water construction technology building of contrary sequence method of the present invention
Figure.
The reference numerals are as follows:
1- bed course;
2- composite water draining board;
The seamless waterproof layer of 3- flexible sealing;
4- concrete structure basis;
41- concrete structure shear wall;
5- built-in type leads slurry pipe;
6- rear-loading type leads slurry pipe;
7- backfill;
100- foundation pit periphery soil layer.
Specific embodiment
In the description of the present invention, unless otherwise indicated, the meaning of " plurality " is two or more.Term "inner",
The orientation or state relation of the instructions such as "upper", "lower" are orientation based on the figure or state relation, are merely for convenience of retouching
It states the present invention and simplifies description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with specific
Orientation construction and operation, therefore be not considered as limiting the invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation " " connects
Connect " it shall be understood in a broad sense, for example, it may be being fixedly connected, it may be a detachable connection, or be integrally connected;It can be machine
Tool connection, is also possible to be electrically connected;It can be directly connected, it can also be indirectly connected through an intermediary.For this field
For those of ordinary skill, the concrete meaning of above-mentioned term in the present invention is understood as the case may be.
With reference to the accompanying drawing and specific embodiment invention is further described in detail.
Referring to Fig. 1, Fig. 1 is the foundation pit section using the seamless flexible water construction technology building of contrary sequence method of the present invention
Structural schematic diagram.
The seamless flexible water construction technology of a kind of contrary sequence method of the present invention, comprising the following steps:
S01: the smooth, compacting by the element soil of building foundation pit bottom forms bed course 1.It should be noted that the building foundation pit
When bottom is equipped with pile foundation, need to pre-process node.
Further, the node pre-treatment step includes:
(1) pile crown and the part pile body of the downward 500mm of pile crown are cleared up after foundation pit pile crown broken pile;
(2) transition processing is carried out using composite self-adhering flat drainage plate, can guarantees the composite, water-drain being arranged on bed course
Plate and pile body form the waterproof sealing system of an entirety;
Specifically, composite self-adhering flat drainage plate is welded to by pile body using hot gas welding connection, at the same by it is described it is compound from
Viscous flat drainage plate is welded as a whole with the composite water draining board on the upside of the bed course;
Wherein, the pile body of the downward 100mm of the pile crown and composite self-adhering flat drainage plate use missing solder mode, while in sky
Position is welded to fill using sealant;And it is welded in the pile body part below the pile crown 100mm using real weldering mode.
S02: composite water draining board 2 is laid on the bed course 1;
S03: installation built-in type leads slurry pipe 5;
Wherein, the built-in type leads the bottom end of slurry pipe 5 and the composite water draining board 2 is connected and leads slurry in the built-in type
The bottom end of pipe 5 is equipped with and leads slurry mouth.Wherein, the height that the built-in type leads slurry pipe 5 is greater than the thickness on concrete structure basis 4.
S04: it is laid with the reinforcing steel bar shelf on concrete structure basis 4;
Wherein, the reinforcing steel bar shelf be mounted on the upside of the composite water draining board 2, the reinforcing steel bar shelf with it is described compound
Reserved cavity is formed between drain bar 2;It is poured around the reinforcing steel bar shelf by installation concrete structure foundation forms formation
Cavity;
S05: it is described pour in cavity carry out concrete structure basis 4 pour;
S06: it sets up the concrete structure shear wall formwork of foundation pit side, be laid with reinforcing steel bar shelf, while in adjacent reinforcing bar
It is provided with removable lacing wire anchor pole between frame body, pours the concrete structure shear wall 41 of foundation pit side;
S07: after the concrete structure shear wall 41 solidification, the concrete structure shear wall formwork is removed;
S08: removable lacing wire anchor pole in the concrete structure shear wall 41 is removed, hole location is formed simultaneously, in corresponding hole
Position setting rear-loading type leads slurry pipe 6;
S09: composite water draining board 2, the composite water draining board 2 are installed in 41 lateral surface of concrete structure shear wall and mixed
Reserved cavity is formed between Xtah Crude Clay structure shear wall 41;The composite water draining board 2 and the outer end that the rear-loading type leads slurry pipe 6 are solid
Even.Equally, it is equipped in the outer end that the rear-loading type leads slurry pipe 6 and leads slurry mouth.
S10: foundation pit surrounding ash earthen backfill.
Specifically, the outside of composite water draining board 2 and foundation pit periphery soil layer 100 of 41 surrounding of concrete structure shear wall it
Between using backfill 7 backfill.The composition of the backfill 7 is ash and soil, weight part ratio 2:8.
S11: when building structure main body construction to 2-3 layers or 4-5 layers or after the completion, by built-in type lead slurry pipe 5, after
Dress formula leads slurry pipe 6 and imports flexible waterproof material slurry into reserved cavity, forms the seamless waterproof layer 3 of flexible sealing.
When the flexible waterproof material slurry is constructed, by the way of subregion construction.Specifically:
When importing flexible waterproof material slurry into the reserved cavity between concrete structure basis 4 and composite water draining board 2,
By the way of gradually being promoted to another side since concrete structure basis 4 is on one side.
Flexible waterproof material slurry is imported into the reserved cavity between concrete structure shear wall 41 and composite water draining board 2
When, using from concrete shear force wall 41 from bottom to top and horizontal direction simultaneously promote by the way of.
S12: base pit dewatering equipment Removal, while using the ground water pressure force inspecting to go up using the flexible sealing of contrary sequence method
The waterproof effect of seamless waterproof layer 3.
S13: ne-leakage is delivered.
It should be noted that pouring base plate of foundation pit protection superimposed layer, the base plate of foundation pit protection after the completion of S03
Superimposed layer is set between the composite water draining board and concrete structure basis.Further, the base plate of foundation pit protection superposition
Layer with a thickness of 30mm.The base plate of foundation pit protection superimposed layer can improve the stability of building structure, especially to flour sand soil property
Foundation pit is highly beneficial.Certainly, in a kind of seamless flexible water construction technology of contrary sequence method of the present invention, the base plate of foundation pit is protected
Shield superimposed layer is constructed according to the actual situation, and small sized multiple story building can not use base plate of foundation pit protection superposition according to design requirement
Layer.
In conclusion the seamless flexible water construction technology of a kind of contrary sequence method of the present invention is not influenced by ambient temperature,
Speed of application is fast, highly shortened construction period.Due to constructing using flexibility is seamless so seam problems are not present, simultaneously
It is lifelong carefree to reach primary construction for crack and the defect seal leakage problem that concrete structure can be repaired under pressure
Purpose.
It should be appreciated that the present invention is not limited in its application to detailed construction and the arrangement side of component proposed in this paper
Formula.The present invention can have other embodiments, and can realize and execute in many ways.Aforesaid deformation form and modification
Form is fallen within the scope of the present invention.It should be appreciated that invention disclosed and defined herein extends in text and/or attached drawing
In mention or all alternative combinations of two or more apparent independent features.Embodiment as described herein illustrates
Know for realizing best mode of the invention, and those skilled in the art will be enable using the present invention.
Claims (9)
1. a kind of seamless flexible water construction technology of contrary sequence method, which is characterized in that at least include the following steps:
S01: the smooth, compacting by the element soil of building foundation pit bottom forms bed course;
S02: composite water draining board is laid on the bed course;
S03: installation built-in type leads slurry pipe;
Wherein, the built-in type leads the bottom end of slurry pipe and the composite water draining board is connected and leads the bottom of slurry pipe in the built-in type
End is equipped with and leads slurry mouth;
S04: it is laid with the reinforcing steel bar shelf on concrete structure basis;
Wherein, the reinforcing steel bar shelf is mounted on the upside of the composite water draining board, the reinforcing steel bar shelf and the composite, water-drain
Reserved cavity is formed between plate;Cavity is poured by installation concrete structure foundation forms formation around the reinforcing steel bar shelf;
S05: it is described pour in cavity carry out concrete structure basis pour;
S06: set up foundation pit side concrete structure shear wall formwork, be laid with reinforcing steel bar shelf, while adjacent reinforcing steel bar shelf it
Between be provided with removable lacing wire anchor pole, pour foundation pit side concrete structure shear wall;
S07: after concrete structure shear wall solidification, the concrete structure shear wall formwork is removed;
S08: removing removable lacing wire anchor pole in the concrete structure shear wall, and in corresponding position, setting rear-loading type leads slurry pipe;
S09: composite water draining board, the composite water draining board and concrete structure are installed in the concrete structure shear wall lateral surface
Reserved cavity is formed between shear wall;The outer end that the composite water draining board and the rear-loading type lead slurry pipe is connected, equally, described
The outer end that rear-loading type leads slurry pipe, which is equipped with, leads slurry mouth;
S10: foundation pit surrounding ash earthen backfill;
S11: when the main body construction of building structure or after the completion, slurry pipe is led by built-in type, rear-loading type leads slurry pipe to reserved chamber
Flexible waterproof material slurry is imported in vivo, forms the seamless waterproof layer of flexible sealing;
S12: base pit dewatering equipment Removal, while using the ground water pressure force inspecting of rise using the flexible sealing of contrary sequence method without connecing
Stitch the waterproof effect of waterproof layer;
S13: ne-leakage is delivered.
2. the seamless flexible water construction technology of a kind of contrary sequence method according to claim 1, which is characterized in that the building
When bottom of foundation ditch is equipped with pile foundation, need to pre-process node;
The node pre-treatment step includes:
(1) pile crown and the part pile body of the downward 500mm of pile crown are cleared up after foundation pit pile crown broken pile;
(2) using composite self-adhering flat drainage plate carry out transition processing, can guarantee the composite water draining board being arranged on bed course with
Pile body forms the waterproof sealing system of an entirety;
Specifically, composite self-adhering flat drainage plate is welded to by pile body using hot gas welding connection, while the composite self-adhering is put down
Face drain bar is welded as a whole with the composite water draining board on the upside of the bed course;
Wherein, the pile body of the downward 100mm of the pile crown and composite self-adhering flat drainage plate use missing solder mode, while in missing solder portion
It is filled using sealant position;And it is welded in the pile body part below the pile crown 100mm using real weldering mode.
3. the seamless flexible water construction technology of a kind of contrary sequence method according to claim 1, which is characterized in that the flexibility
When waterproof material slurry is constructed, by the way of subregion construction.
4. the seamless flexible water construction technology of a kind of contrary sequence method according to claim 3, which is characterized in that concrete
When importing flexible waterproof material slurry in reserved cavity between structure basis and composite water draining board, using from concrete structure base
Plinth starts the mode gradually promoted to another side on one side.
5. the seamless flexible water construction technology of a kind of contrary sequence method according to claim 3, which is characterized in that concrete
When importing flexible waterproof material slurry in reserved cavity between structural shear wall and composite water draining board, using from concrete shear
Wall from bottom to top and horizontal direction simultaneously promote mode.
6. the seamless flexible water construction technology of a kind of contrary sequence method according to claim 1, which is characterized in that described
In S03, the height that the built-in type leads slurry pipe is greater than the thickness on concrete structure basis.
7. the seamless flexible water construction technology of a kind of contrary sequence method according to claim 1, which is characterized in that described
After the completion of S03, pour base plate of foundation pit protection superimposed layer, base plate of foundation pit protection superimposed layer be set to the composite water draining board with
Between concrete structure basis.
8. the seamless flexible water construction technology of a kind of contrary sequence method according to claim 7, which is characterized in that the foundation pit
Base plate protection superimposed layer with a thickness of 20mm -100mm.
9. the seamless flexible water construction technology of a kind of contrary sequence method according to claim 8, which is characterized in that the foundation pit
Base plate protection superimposed layer with a thickness of 30mm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710682750.5A CN107288141B (en) | 2017-08-10 | 2017-08-10 | A kind of seamless flexible water construction technology of contrary sequence method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710682750.5A CN107288141B (en) | 2017-08-10 | 2017-08-10 | A kind of seamless flexible water construction technology of contrary sequence method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107288141A CN107288141A (en) | 2017-10-24 |
CN107288141B true CN107288141B (en) | 2019-06-07 |
Family
ID=60104899
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710682750.5A Active CN107288141B (en) | 2017-08-10 | 2017-08-10 | A kind of seamless flexible water construction technology of contrary sequence method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107288141B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110258456A (en) * | 2019-07-22 | 2019-09-20 | 杨树东 | A kind of dam body and its seamless Waterproof Construction Technique of contrary sequence method |
CN110439014B (en) * | 2019-07-26 | 2021-04-06 | 中国核工业华兴建设有限公司 | Underground layered drainage structure and construction method thereof |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09242080A (en) * | 1996-03-12 | 1997-09-16 | Fujita Corp | Construction method of water cut-off in water area cofferdam work |
CN104963364A (en) * | 2015-07-21 | 2015-10-07 | 天津三建建筑工程有限公司 | Disposing method for topdown structural slab lower side wall construction joint |
-
2017
- 2017-08-10 CN CN201710682750.5A patent/CN107288141B/en active Active
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09242080A (en) * | 1996-03-12 | 1997-09-16 | Fujita Corp | Construction method of water cut-off in water area cofferdam work |
CN104963364A (en) * | 2015-07-21 | 2015-10-07 | 天津三建建筑工程有限公司 | Disposing method for topdown structural slab lower side wall construction joint |
Also Published As
Publication number | Publication date |
---|---|
CN107288141A (en) | 2017-10-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206874310U (en) | Be applicable to high-pressure rich water district tunnel decompression drainage device | |
CN107059903A (en) | Bottom plate plugging dewatering well construction method is worn in foundation ditch | |
CN105862916A (en) | Superimposed assembled type underground pipe gallery system and construction and manufacturing process | |
CN103410175B (en) | A kind of water seepage control construction method for karst water-rich geological underground structure waterproof construction | |
CN203222815U (en) | Composite basement-structure exterior wall construction formed by utilizing underground diaphragm wall | |
CN211665803U (en) | Advanced water stop post-cast strip structure of basement bottom plate | |
CN104652495B (en) | Internal support of foundation pit column and base plate node waterproof construction technology | |
CN211037072U (en) | Piping lane bottom plate waterproof construction | |
CN107740420A (en) | Foundation ditch tears support and support replacement system and method open | |
CN206298900U (en) | A kind of diaphram wall built-in type steel encloses purlin plug system | |
CN110004991A (en) | Underground structure anti-floating system and construction method based on raised type tangs plate | |
CN112832279A (en) | Waterproof structure and method for dewatering well of underground foundation pit | |
CN107288141B (en) | A kind of seamless flexible water construction technology of contrary sequence method | |
CN105756100B (en) | Basement post-pouring zone system and preparation method thereof | |
CN104846935B (en) | Head-tank treating seepage remodeling method | |
CN106223355A (en) | A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box | |
CN109024640A (en) | One kind closing water valve device, shut-in well structure and its construction method | |
CN205369320U (en) | Basement post -cast strip leakage protective system | |
CN209040133U (en) | Well-covering device for dewatering well suitable for rich groundwater region | |
CN104695980A (en) | Hydropower diversion tunnel lining structure applied to rock burst regions with high burial depth, high ground temperature and high ground stress | |
CN103924599A (en) | Method for processing support steel column construction not in place in foundation pits | |
CN110359495A (en) | Comprehensive pipe gallery structure seam construction and its construction method | |
CN110258660A (en) | The manufacture craft and shut-in well technique of the decompression drainage sump of basement anti-floating | |
CN206035044U (en) | Prefabricated assembled underground granary of plastic cover echelonment | |
CN205000296U (en) | Use concrete panel structure of high toe wall |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |