CN203865934U - Temporary suspension device of pulley lifting mechanism for electric pole - Google Patents

Temporary suspension device of pulley lifting mechanism for electric pole Download PDF

Info

Publication number
CN203865934U
CN203865934U CN201420234088.9U CN201420234088U CN203865934U CN 203865934 U CN203865934 U CN 203865934U CN 201420234088 U CN201420234088 U CN 201420234088U CN 203865934 U CN203865934 U CN 203865934U
Authority
CN
China
Prior art keywords
electric pole
support
hoop
fixed
pulley
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201420234088.9U
Other languages
Chinese (zh)
Inventor
周杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201420234088.9U priority Critical patent/CN203865934U/en
Application granted granted Critical
Publication of CN203865934U publication Critical patent/CN203865934U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)

Abstract

The utility model discloses a temporary suspension device of a pulley lifting mechanism for an electric pole, and is used for solving the mounting problem of the pulley lifting mechanism during the transmission line erection process. The temporary suspension device comprises an electric pole hoop and a bracket, wherein the electric pole hoop comprises two parts connected through a bolt assembly and adopting a bilaterally symmetrical structure; the bracket comprises a horizontal support, a vertical support and an inclined support; one end of the horizontal support is fixed on the outer side wall of the electric pole hoop, and a pulley mounting seat is arranged at the other end of the horizontal support; the vertical support is fixed on the outer side wall of the electric pole hoop, and the upper end face of the vertical support is welded with the bottom face of the horizontal support; the inclined support is fixed between the horizontal support and the vertical support. The temporary suspension device has the characteristics of simple structure and high convenience in mounting, can reduce the labor intensity and danger coefficient of aloft operation workers, and remarkably improves the working efficiency.

Description

The interim suspension gear of pulley lift system for a kind of electric pole
Technical field
The utility model relates to a kind of suspended device, and especially a kind of interim suspension gear of pulley lift system being applied on high-tension pole, belongs to transmission of electricity, power transformation or distribution technique field.
Background technology
In transmission line of electricity erection process, terminal pole, angle pole, high-low pressure are very large with the work capacity on the complicated electric poles such as bridge, and operating personal needs aloft work to complete the installation of gold utensil, porcelain piece.At present, being arranged on the materials such as gold utensil on above-mentioned electric pole, porcelain piece is generally that the mode upwards lifting by aloft work personnel is carried, and so not only make aloft work personnel's labour intensity and danger coefficient further strengthen, and work efficiency is lower.For the problems referred to above, people imagination realizes the transmission of material by pulley lift system, by ground staff's operation by material lifting to desired height, therefore, can the installation question of pulley lift system become the key link that realize this solution.
Utility model content
The purpose of this utility model is for the installation question at transmission line of electricity erection process middle pulley lift system, the interim suspension gear of pulley lift system for electric pole of provide a kind of simple in structure, easy for installation, labour intensity that can reduce aloft work personnel and danger coefficient, increasing work efficiency.
Problem described in the utility model realizes with following technical proposals:
The interim suspension gear of pulley lift system for electric pole, it comprises Hoop for electric pole and support; Described Hoop for electric pole is comprised of the two parts that connect by bolt assembly, and they are symmetrical structure; Described support comprises stull, perpendicular support and diagonal brace, described stull one end is fixed on the lateral wall of Hoop for electric pole, the other end in stull arranges pulley mount pad, described perpendicular support is fixed on the lateral wall of Hoop for electric pole, its upper surface and stull bottom surface are welded, and described diagonal brace is fixed between stull and perpendicular support.
The interim suspension gear of pulley lift system for above-mentioned electric pole, every part of described Hoop for electric pole forms by circular arc anchor ear body and Connection Block, and described anchor ear body mates with electric pole cross sectional dimensions, and described Connection Block is elongate structure.
The interim suspension gear of pulley lift system for above-mentioned electric pole, described perpendicular support is angle bar structure, its rectangular edge is toward the outer side.
The interim suspension gear of pulley lift system for above-mentioned electric pole, described Hoop for electric pole is fixed on electric pole, and on described support, two sides of perpendicular support are fitted with the outer wall of electric pole.
The utility model is provided with pulley mount pad at the external side end of set girt(h), when the gold utensil on electric pole and porcelain piece installation or repair and replacement, can be by support being fixed on electric pole with the anchor ear of the fixing assembling of support, and on the pulley mount pad of support equipped pulley lift system, by ground staff operate pulley lift system by material lifting to suitable height; The utility model is designed to elongate structure by the Connection Block of Hoop for electric pole, can be used for placing electric pole cross-arm or other gold utensil temporarily.In a word, the utlity model has feature simple in structure, easy for installation, it can not only reduce aloft work personnel's labour intensity and danger coefficient, and has significantly improved work efficiency.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the utility model is described in further detail.
Fig. 1 is the utility model structural representation;
Fig. 2 is front view of the present utility model;
Fig. 3 is birds-eye view of the present utility model;
Fig. 4 is right side view of the present utility model;
Fig. 5 is A-A cross-sectional view in Fig. 4;
Fig. 6 is the utility model working state schematic representation.
In figure, each list of reference numerals is: 1, Hoop for electric pole, 1-1, bolt assembly, 1-2, anchor ear body, 1-3, Connection Block, 2, support, 2-1, stull, 2-2, perpendicular support, 2-3, diagonal brace, 2-4, pulley mount pad, 3, electric pole, 3-1, electric pole cross-arm, 4, pulley lift system, 5, material.
The specific embodiment
Referring to Fig. 1, Fig. 2, Fig. 3, Fig. 4, the utility model Hoop for electric pole 1 and support 2; Described Hoop for electric pole 1 is comprised of the two parts that connect by bolt assembly 1-1, and they are symmetrical structure; Described support 2 comprises stull 2-1, perpendicular support 2-2 and diagonal brace 2-3, described stull 2-1 one end is fixed on the lateral wall of Hoop for electric pole 1, the other end in stull arranges pulley mount pad 2-4, described perpendicular support 2-2 is fixed on the lateral wall of Hoop for electric pole 1, its upper surface and stull 2-1 bottom surface are welded, and described diagonal brace 2-3 is fixed between stull 2-1 and perpendicular support 2-2.
Referring to Fig. 1, Fig. 3, every part of Hoop for electric pole 1 of the present utility model forms by circular arc anchor ear body 1-2 and Connection Block 1-3, and described anchor ear body 1-2 mates with electric pole cross sectional dimensions, and described Connection Block 1-3 is elongate structure.
Referring to Fig. 4, Fig. 5, the perpendicular support 2-2 on the utility model support 2 is angle bar structure, and its rectangular edge toward the outer side.
Referring to Fig. 1, Fig. 6, when the utility model is in running order, described Hoop for electric pole 1 is fixed on electric pole 3, and on described support 2, two sides of perpendicular support 2-2 are fitted with the outer wall of electric pole 3.
Referring to Fig. 1~Fig. 6, the utility model is provided with pulley mount pad 2-4 at the external side end of set girt(h) 2-1, when the gold utensil on electric pole 3 and porcelain piece installation or repair and replacement, can be by support 2 being fixed on electric pole 3 with the Hoop for electric pole 1 of support 2 fixing assemblings, and on pulley mount pad 2-4, be equipped with pulley lift system 4, by ground staff, operate pulley lift system 4 material 5 is promoted to suitable height; The utility model is designed to elongate structure by the Connection Block 1-3 of Hoop for electric pole 1, can be used for placing electric pole cross-arm 3-1 or other gold utensil temporarily.

Claims (4)

1. the interim suspension gear of pulley lift system for electric pole, is characterized in that, it comprises Hoop for electric pole (1) and support (2); Described Hoop for electric pole (1) is comprised of the two parts that connect by bolt assembly (1-1), and they are symmetrical structure; Described support (2) comprises stull (2-1), perpendicular support (2-2) and diagonal brace (2-3), described stull (2-1) one end is fixed on the lateral wall of Hoop for electric pole (1), the other end in stull arranges pulley mount pad (2-4), described perpendicular support (2-2) is fixed on the lateral wall of Hoop for electric pole (1), its upper surface and stull (2-1) bottom surface is welded, and described diagonal brace (2-3) is fixed between stull (2-1) and perpendicular support (2-2).
2. the interim suspension gear of pulley lift system for a kind of electric pole according to claim 1, it is characterized in that, every part of described Hoop for electric pole (1) forms by circular arc anchor ear body (1-2) and Connection Block (1-3), described anchor ear body (1-2) mates with the cross sectional dimensions of electric pole (3), and described Connection Block (1-3) is elongate structure.
3. a kind of electric pole interim suspension gear of pulley lift system according to claim 2, is characterized in that, described perpendicular support (2-2) is angle bar structure, and its rectangular edge toward the outer side.
4. the interim suspension gear of pulley lift system for a kind of electric pole according to claim 3, it is characterized in that, when in running order, it is upper that described Hoop for electric pole (1) is fixed on electric pole (3), and two sides of the upper perpendicular support of described support (2) (2-2) are fitted with the outer wall of electric pole (3).
CN201420234088.9U 2014-05-09 2014-05-09 Temporary suspension device of pulley lifting mechanism for electric pole Expired - Fee Related CN203865934U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420234088.9U CN203865934U (en) 2014-05-09 2014-05-09 Temporary suspension device of pulley lifting mechanism for electric pole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420234088.9U CN203865934U (en) 2014-05-09 2014-05-09 Temporary suspension device of pulley lifting mechanism for electric pole

Publications (1)

Publication Number Publication Date
CN203865934U true CN203865934U (en) 2014-10-08

Family

ID=51646913

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420234088.9U Expired - Fee Related CN203865934U (en) 2014-05-09 2014-05-09 Temporary suspension device of pulley lifting mechanism for electric pole

Country Status (1)

Country Link
CN (1) CN203865934U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105668446A (en) * 2016-03-25 2016-06-15 国网山东省电力公司济宁供电公司 Device for equipment hoisting on overhead power line pole and installation tool thereof
CN107235436A (en) * 2016-12-21 2017-10-10 国网山东省电力公司龙口市供电公司 A kind of low-voltage distributing line construction lifting device
CN107634483A (en) * 2017-11-13 2018-01-26 河南宏骏通信工程有限公司 A kind of communication equipment support
CN114877224A (en) * 2022-05-10 2022-08-09 国网山东省电力公司莱州市供电公司 Visual monitoring anti-theft support for steel pipe pole and mounting method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105668446A (en) * 2016-03-25 2016-06-15 国网山东省电力公司济宁供电公司 Device for equipment hoisting on overhead power line pole and installation tool thereof
CN105668446B (en) * 2016-03-25 2018-05-11 国网山东省电力公司济宁供电公司 The device and its installation tool of equipment hoisting on overhead power line bar
CN107235436A (en) * 2016-12-21 2017-10-10 国网山东省电力公司龙口市供电公司 A kind of low-voltage distributing line construction lifting device
CN107634483A (en) * 2017-11-13 2018-01-26 河南宏骏通信工程有限公司 A kind of communication equipment support
CN114877224A (en) * 2022-05-10 2022-08-09 国网山东省电力公司莱州市供电公司 Visual monitoring anti-theft support for steel pipe pole and mounting method thereof

Similar Documents

Publication Publication Date Title
CN203865934U (en) Temporary suspension device of pulley lifting mechanism for electric pole
CN203698595U (en) Gantry supporting device for convenient placement of curved linear sections
CN205132955U (en) Hoist and mount operation of electric power industry low latitude is with hoist and mount frame
CN103985509B (en) A kind of placing frame of transformer
CN204324745U (en) A kind of 35KV isolation switch hanging device
CN203571610U (en) Multifunctional vertical rod for construction
CN207108299U (en) A kind of loop wheel machine
CN205999791U (en) A kind of prestressed stretch-draw combination type tensioning stand
CN204024443U (en) Adopt the bamboo ladder stand of connector overlapping
CN202969961U (en) Curtain wall plate vertical hanging tool
CN208280708U (en) A kind of haywire bar for stablizing placement
CN202657876U (en) 110-kV circuit arrester hoisting structure
CN205646624U (en) 10kv and following portable crossing structure
CN203589536U (en) GW6-type disconnecting switch fast-assembling maintenance support
CN205838423U (en) A kind of portable device for lifting of power engineering
CN204299263U (en) Communication view tower connecting platform
CN202808191U (en) Hoist frame
CN203150964U (en) Indoor transformer station equipment maintenance suspension bracket
CN204847756U (en) Special lifting device of box transformer
CN204024432U (en) Adopt the bamboo ladder stand of link overlapping
CN206832854U (en) Insulating bar hanger bracket
CN203284092U (en) Transformer substation insulator lifting frame
CN203288386U (en) Transformer rack overall installation support
CN207200124U (en) A kind of overhead transmission line overhauls mounting auxiliary
CN204024458U (en) The bamboo ladder stand plug-in connection of power communication repairing overlapping

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141008

Termination date: 20180509

CF01 Termination of patent right due to non-payment of annual fee