CN203213022U - Mobile temporary prestress tensioning anchor block - Google Patents

Mobile temporary prestress tensioning anchor block Download PDF

Info

Publication number
CN203213022U
CN203213022U CN 201320218732 CN201320218732U CN203213022U CN 203213022 U CN203213022 U CN 203213022U CN 201320218732 CN201320218732 CN 201320218732 CN 201320218732 U CN201320218732 U CN 201320218732U CN 203213022 U CN203213022 U CN 203213022U
Authority
CN
China
Prior art keywords
anchor
base plate
anchor block
prestressed
plates
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320218732
Other languages
Chinese (zh)
Inventor
高明昌
曹增华
杨少军
吴延伟
马有强
刘建萍
罗红枝
刘淑丽
沈晓峰
万更新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
China State Railway Group Co Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN 201320218732 priority Critical patent/CN203213022U/en
Application granted granted Critical
Publication of CN203213022U publication Critical patent/CN203213022U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a mobile temporary prestress tensioning anchor block. Concrete anchor blocks are utilized for temporary prestress tensioning of a conventional precast segment assembled bridge, cannot be moved or reutilized, and are large in weight and not beneficial to stress of the precast segment assembled bridge. The mobile temporary prestress tensioning anchor block is provided with a baseplate which is fixed on a precast segment box girder via an embedded fixing piece, two opposite anchor plates are vertically welded on the baseplate, two rib plates perpendicular to the anchor plates are welded between the anchor plates, anchor plate through holes provided with penetrating prestressing thick steel bars are formed in the anchor plates, the prestressing thick steel bars are penetratingly arranged among four anchor plates of two anchor blocks on two adjacent precast segment box girders, and ends of the prestressing thick steel bars are anchored on the anchor plates at far ends of the two adjacent anchor plates via prestressing thick steel bar bundling wires. The mobile temporary prestress tensioning anchor block is simple in structure, large in rigidity, low in cost, convenient to construct, assemble and disassemble, movable, capable of being reutilized repeatedly and good in universality.

Description

The interim prestressed stretch-draw anchor block of a kind of movable type
Technical field
The utility model belongs to road traffic construction technique field, is specifically related to the interim prestressed stretch-draw anchor block of a kind of movable type.
Background technology
The job practices of glueing joint seam formula precast segment assembly unit bridge is that the some sections unit that vertically the beam body is divided into along bridge carries out batch production production, be transported to bridge location more piecemeal, carry out assembly unit at traversing carriage bridge fabrication machine or the mobile indigo plant of hanging, the assembly unit seam adopts epoxy sealing between each sections, between sections by the compacted epoxy resin sealant of the interim prestressing force of stretch-draw, connect into each prefabricated subsection as a whole by the permanent prestressing force of stretch-draw then, remove interim stretch-draw prestressing force, finish the construction of a sections or a hole beam, so circulation is finished until the full-bridge construction.
At present, the interim prestressed stretch-draw of conventional precast segment assembly unit bridge adopts concrete anchor block, can not move repeatedly recycling, and concrete anchor block weight is big, and is stressed unfavorable to the precast segment spliced girder.In concrete anchor block, also need bury ground tackle, spiral bar and reserving hole channel underground, the sequence of construction complexity, utilization rate of equipment and installations is low, and economy is not high, is difficult for after the bridge moulding removing, and aesthetic property is poor, also is unfavorable for environmental protection.
Summary of the invention
The purpose of this utility model provides a kind of for precast segment assembly unit bridge, the interim prestressed stretch-draw anchor block of the reusable movable type of dismantled and assembled movement.
The technical scheme that the utility model adopts is:
The interim prestressed stretch-draw anchor block of a kind of movable type is characterized in that:
Described anchor block is provided with base plate, base plate is fixed on the prefabricated subsection case beam by pre-buried firmware, plate upper surface uprightly is welded with two relative anchor slabs, is welded with two floors perpendicular to anchor slab between the anchor slab, and anchor slab is provided with the anchor slab through hole that wears prestressed thick reinforcement.
Described pre-buried firmware comprises pre-embedded bolt and the bolt nut of pre-buried leveling steel plate, U-shaped;
Pre-buried leveling steel plate is preset in the prefabricated subsection case beam of floor below, be provided with the bolt duct of position correspondence on base plate and the pre-buried leveling steel plate, be preset in that pre-embedded bolt in the prefabricated subsection case beam passes both bolt ducts and the bolt nut of base plate top fixes.
Described floor and base plate welding are fixing.
Described prestressed thick reinforcement is located in four anchor slabs of two anchor blocks on the adjacent two joint prefabricated subsection case beams, and the termination of prestressed thick reinforcement is pricked silk by prestressed thick reinforcement and is anchored on the anchor slab of adjacent two anchor block far-ends.
The utlity model has following advantage:
Anchor block simple structure, rigidity that the utility model adopts are big, and dismantled and assembled movement repeatedly reuses, easy construction, and economy is higher; versatility is good, has saved prestressed anchor backing plate and spiral bar, and prestressing force is anchoring on the anchor block anchor slab directly; steel using amount is economized, and more is conducive to environmental protection, saves investment.
Description of drawings
Fig. 1 is that anchor block is at the cross sectional arrangement figure of prefabricated subsection box girder tensioning anchoring.
Fig. 2 is that anchor block is at the side arrangement figure of prefabricated subsection box girder tensioning anchoring.
Fig. 3 is anchor block elevation (II-II sectional view).
Fig. 4 is anchor block lateral view (I-I sectional view).
Among the figure, the 1-floor, the 2-bolt nut, the 3-base plate, the pre-buried leveling steel plate of 4-, the 5-pre-embedded bolt, 6-prefabricated subsection case beam, 7-anchor slab, 8-prestressed thick reinforcement are pricked silk anchor, 9-prestressed thick reinforcement.
The specific embodiment
Below in conjunction with the specific embodiment the utility model is described in detail.
The interim prestressed stretch-draw anchor block of a kind of movable type that the utility model is related is provided with base plate 3, and base plate 3 is fixed on the prefabricated subsection case beam 6 by pre-buried firmware.Pre-buried firmware comprises pre-embedded bolt 5 and the bolt nut 2 of pre-buried leveling steel plate 4, U-shaped, pre-buried leveling steel plate 4 is preset in the prefabricated subsection case beam 6 of base plate 3 belows, be provided with the bolt duct of position correspondence on base plate 3 and the pre-buried leveling steel plate 4, be preset in that pre-embedded bolt 5 in the prefabricated subsection case beam 6 passes both bolt ducts and the bolt nut 2 of base plate 3 tops fixes.Pre-embedded bolt 5 can arrange many groups, and as shown in Figure 2 four groups are strengthened the fixed effect of anchor block on prefabricated subsection case beam 6.
Base plate 3 upper surfaces uprightly are welded with two relative anchor slabs 7, are welded with two floors 1 perpendicular to anchor slab 7 between the anchor slab 7, and floor 1 also can be fixing with base plate 3 welding, to strengthen the rigidity of anchor block.Anchor slab 7 is provided with the anchor slab through hole that wears prestressed thick reinforcement 9, and interlaced arrangement, but the equal interim prestressing force of stretch-draw in both sides both can be used as stretch-draw end anchor block, also can be used as the fixed end anchor block.The rhombus arrangement that adopts as four anchor slab through holes among Fig. 3.Article two, prestressed thick reinforcement 9 is located in four anchor slabs 7 of two anchor blocks on the adjacent two joint prefabricated subsection case beams 6, and the termination of prestressed thick reinforcement 9 is pricked silk anchor 8 by prestressed thick reinforcement and is fixed on the anchor slab 7 of adjacent two anchor block far-ends.As a, b, c three joint prefabricated subsection case beams, if one group of prestressed thick reinforcement 9 that a, b two save between the prefabricated subsection case beams is that vertical direction is arranged, 9 of one group of prestressed thick reinforcements between b, the c two joint prefabricated subsection case beams 6 are that horizontal direction is arranged so.
The construction sequence of the portable interim prestressed stretch-draw anchor block that the utility model is related is as described below:
Default pre-embedded bolt 5 and pre-buried leveling steel plate 6 when 1, box girder segment is prefabricated.
2, press the design attitude perforate at the ready base plate 3 of blanking and anchor slab 7, and base plate 3, floor 1, anchor slab 7 soldering group are combined into a whole anchor block.
3, steel being made up anchor block is installed on the prefabricated subsection case back plate and base plate that needs stretch-draw prestressing force by pre-embedded bolt 5 and bolt nut 2.
4, the pre-assembly unit of prefabricated subsection case beam puts in place, after finishing joint face epoxy resin and smearing, wears prestressed thick reinforcement 9, is stretched to prestressed thick reinforcement to designing stretching force, and prestressed thick reinforcement is pricked a silk anchor 8.
5, after whole hole beam assembly unit is finished, behind the permanent prestressing force of stretch-draw, remove whole anchor block, according to step 2 circulation until, all beam sections assembly units are finished.
When the interim prestressing force of stretch-draw, mobile anchor block is fixed on the prefabricated subsection case beam by pre-buried firmware, removes and move to the next interim prestressed sections of the stretch-draw position that needs after stretch-draw is finished.
It is cited that content of the present utility model is not limited to embodiment, and the conversion of any equivalence that those of ordinary skills take technical solutions of the utility model by reading the utility model manual is claim of the present utility model and contains.

Claims (4)

1. interim prestressed stretch-draw anchor block of movable type is characterized in that:
Described anchor block is provided with base plate (3), base plate (3) is fixed on the prefabricated subsection case beam (6) by pre-buried firmware, base plate (3) upper surface uprightly is welded with two relative anchor slabs (7), be welded with two floors (1) perpendicular to anchor slab (7) between the anchor slab (7), anchor slab (7) is provided with the anchor slab through hole that wears prestressed thick reinforcement (9).
2. the interim prestressed stretch-draw anchor block of a kind of movable type according to claim 1 is characterized in that:
Described pre-buried firmware comprises pre-embedded bolt (5) and the bolt nut (2) of pre-buried leveling steel plate (4), U-shaped;
Pre-buried leveling steel plate (4) is preset in the prefabricated subsection case beam (6) of base plate (3) below, be provided with the bolt duct of position correspondence on base plate (3) and the pre-buried leveling steel plate (4), the pre-embedded bolt (5) that is preset in the prefabricated subsection case beam (6) passes both bolt ducts, and the bolt nut (2) of base plate (3) top fixes.
3. the interim prestressed stretch-draw anchor block of a kind of movable type according to claim 1 and 2 is characterized in that:
Described floor (1) is fixing with base plate (3) welding.
4. the interim prestressed stretch-draw anchor block of a kind of movable type according to claim 3 is characterized in that:
Described prestressed thick reinforcement (9) is located in four anchor slabs (7) of last two anchor blocks of adjacent two joint prefabricated subsection case beams (6), and the termination of prestressed thick reinforcement (9) is pricked silk anchor (8) by prestressed thick reinforcement and is fixed on the anchor slab (7) of adjacent two anchor block far-ends.
CN 201320218732 2013-04-26 2013-04-26 Mobile temporary prestress tensioning anchor block Expired - Lifetime CN203213022U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320218732 CN203213022U (en) 2013-04-26 2013-04-26 Mobile temporary prestress tensioning anchor block

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320218732 CN203213022U (en) 2013-04-26 2013-04-26 Mobile temporary prestress tensioning anchor block

Publications (1)

Publication Number Publication Date
CN203213022U true CN203213022U (en) 2013-09-25

Family

ID=49202571

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320218732 Expired - Lifetime CN203213022U (en) 2013-04-26 2013-04-26 Mobile temporary prestress tensioning anchor block

Country Status (1)

Country Link
CN (1) CN203213022U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215894A (en) * 2013-04-26 2013-07-24 中铁第一勘察设计院集团有限公司 Mobile temporary prestress tension anchor block
CN109468946A (en) * 2018-04-12 2019-03-15 上海公路投资建设发展有限公司 A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103215894A (en) * 2013-04-26 2013-07-24 中铁第一勘察设计院集团有限公司 Mobile temporary prestress tension anchor block
CN103215894B (en) * 2013-04-26 2015-10-28 中铁第一勘察设计院集团有限公司 Portable interim prestressed stretch-draw anchor block
CN109468946A (en) * 2018-04-12 2019-03-15 上海公路投资建设发展有限公司 A kind of steel construction temporary fastening device and technique for large-scale bent cap free cantilever erection
CN109468946B (en) * 2018-04-12 2024-04-12 上海公路投资建设发展有限公司 Steel structure temporary fixing device and process for large-scale bent cap cantilever assembly

Similar Documents

Publication Publication Date Title
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN103924505A (en) Prefabricated steel-concrete combination T beam with corrugated steel web and construction method
CN103938546A (en) Simple-supported continuous construction method and structure thereof
CN109505222A (en) A kind of netted sunpender bowstring arch bridge of assembled
CN103194982B (en) Construction method for short cantilever support at bridge side span cast-in-situ segment
CN203213022U (en) Mobile temporary prestress tensioning anchor block
CN103967332B (en) The construction method of a kind of building site enclosing
CN203603073U (en) Reinforced concrete lattice type composite platform beam of elevated station
CN106351429B (en) A kind of Process for Heavy Support system and its construction method
CN103132640B (en) Detachable steel-concrete composite floor
CN204940144U (en) A kind of Wavelike steel webplate temporary reinforcing device
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN204687050U (en) A kind of mould of precast concrete rectangular beam
CN204825945U (en) A fixture for fixing buried bolt in advance
CN104032861A (en) Hybrid coupled wall type steel column and non-energy-dissipation beam connection node structure and construction method thereof
CN103741857B (en) U-shaped girder steel and steel bar truss floor support plate floor system
CN203145273U (en) Dismountable steel-concrete composite floor
CN204703350U (en) A kind of assembling composite floor
CN212771950U (en) Movable operation platform for mounting transverse beam of I-shaped steel-concrete combined beam
CN205348214U (en) Column formula reinforced concrete and shaped steel hybrid portal crane basis
CN102418417B (en) Long-slab-span cast-in-situ beam ribbed floor early-dismantling template formwork system
CN204590261U (en) A kind of novel prefabricated assembling frame structure
CN203834692U (en) Connection node structure of section steel column and non-energy-dissipation section steel short beam of mixed coupled wall
CN208717939U (en) A kind of efficiently molding building hoist foundation structure
CN203684703U (en) Assembly jig frame for main truss spare parts of large-span steel structure roof cover

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: CHINA RAILWAY FIRST SURVEY + DESIGN INSTITUTE GROU

Effective date: 20150610

Owner name: CHINA RAILWAY CORPORATION

Free format text: FORMER OWNER: CHINA RAILWAY FIRST SURVEY + DESIGN INSTITUTE GROUP CO., LTD.

Effective date: 20150610

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20150610

Address after: 100844 No. 10 Fuxing Road, Haidian District, Beijing, Haidian District

Patentee after: CHINA RAILWAY Corp.

Patentee after: CHINA RAILWAY FIRST SURVEY AND DESIGN INSTITUTE GROUP Co.,Ltd.

Address before: 710043 Shaanxi province Xi'an Xiying Road No. two