CN103381994A - Pile hoisting method for precast piles - Google Patents

Pile hoisting method for precast piles Download PDF

Info

Publication number
CN103381994A
CN103381994A CN2013102679258A CN201310267925A CN103381994A CN 103381994 A CN103381994 A CN 103381994A CN 2013102679258 A CN2013102679258 A CN 2013102679258A CN 201310267925 A CN201310267925 A CN 201310267925A CN 103381994 A CN103381994 A CN 103381994A
Authority
CN
China
Prior art keywords
pile
precast
precast pile
steel rope
ropes
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013102679258A
Other languages
Chinese (zh)
Other versions
CN103381994B (en
Inventor
张日红
陈洪雨
吴磊磊
邱风雷
孙小雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ningbo Zhong Chun Pile Foundation Engineering Technology Co., Ltd.
Original Assignee
ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd filed Critical ZHONGCHUN GAOKE PILE INDUSTRY Co Ltd
Priority to CN201310267925.8A priority Critical patent/CN103381994B/en
Publication of CN103381994A publication Critical patent/CN103381994A/en
Application granted granted Critical
Publication of CN103381994B publication Critical patent/CN103381994B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a pile hoisting method for precast piles. The method comprises following steps: step a, choosing a plurality of steel wire ropes, which are enclosed ropes; step b, choosing one of the steel ropes picked in the step a, then winding the rope on a precast pile for two circles, making the rope ring of one end of the steel rope go through the looped eye of the rope ring of the other end; step c, winding the rest steel ropes round the precast pile by the method in the step b, and making all the rope rings, which have gone through the looped eyes, distribute in a circle, taking the axis of the pile body of the precast pile as the symmetrical center; step d, hanging all the roped rings, which have gone through the looped eyes, on a hook; step e, slowly lifting the hook until all steel ropes have locked the precast pile; step f, going on lifting the hook to lift the precast pile. The pile hoisting method for precast piles has the advantages that: a precast pile is wound by steel ropes, the steel ropes are slowly lifted by a hook, after the steel ropes lock the pile body of the precast pile, the precast is lifted by going on lifting the hook, the whole construction process is simple and practicable, and furthermore, because of the softness of the steel ropes, no harm will be done to the pile body of the precast pile.

Description

The precast pile pile hanging method
Technical field
The present invention relates to a kind of construction of prefabricated piles method, especially relate to a kind of precast pile pile hanging method.
Background technology
Traditional construction of prefabricated piles method mainly contains static pressure method and hammering method, but these two kinds of methods produce damage to pile body on the one hand, can produce soil compaction effect on the other hand, impact stake self construction quality and ambient environment.For addressing these problems, engineering circles has been developed the flush type construction method of replanting by holing in advance into precast pile.Wherein, pile body need to be sling when implanting precast pile.
In existing pile hanging method, use mechanical arm or the gripper precast pile of slinging, can be to the pile body injury of precast pile, and after the welding of precast pile pile body or connecting the steel member, then by the lifting steel member precast pile of slinging, also can be to the pile body injury of precast pile, and operation is more loaded down with trivial details.
Summary of the invention
Technical matters to be solved by this invention is to provide a kind of process of hanging to the pile body zero damage, and simple and easy to do precast pile pile hanging method.
The present invention solves the problems of the technologies described above the technical scheme that adopts: a kind of precast pile pile hanging method, and concrete steps are: a, choose many steel ropes, the two ends of described steel rope are the becket bridle of sealing; B, steel rope that step a is chosen wherein one along the precast pile pile body after two circles, the becket bridle of this steel rope one end is passed from the eye of the becket bridle of the other end; C, remaining steel rope is wound around the precast pile pile body with the method for step b, and the becket bridle that all pass is suspended on suspension hook; D, slow lifting hook are until all steel ropes locking precast pile; E, continuation lifting hook are sling precast pile.
Compared with prior art, the invention has the advantages that: this method wirerope-winding precast pile pile body, with the slow hoisting cable of suspension hook, after steel rope locking precast pile pile body, continuing lifting hook slings precast pile, whole work progress is simple and easy to do, and due to the elasticity of steel rope, can be to precast pile pile body injury.
As preferably, described steel rope is 2, and is symmetrical with the precast pile axis after described steel rope locking precast pile pile body, and two steel ropes exceed the equal in length of precast pile pile body part.The precast pile pile body is stressed steadily, is difficult for when slinging rocking.
As preferably, described steel rope is 3, after described steel rope locking precast pile, evenly distributes centered by the precast pile axis.The precast pile pile body is stressed more steady, and still can hang precast pile after the unexpected fracture of steel cable therein.
As preferably, the length of annulus is 20 centimetres~50 centimetres.According to the size of wirerope diameter, suitable annulus is set, can causes steel rope to be difficult to lock the precast pile pile body when annulus is excessive.
As preferably, the length of described steel rope is 200 centimetres~600 centimetres.Select suitable steel rope according to precast pile pile body size and length, and during the steel rope of selection different length, can prevent from disturbing between steel rope.
Description of drawings
Fig. 1 is construction of wire rope schematic diagram of the present invention.
Fig. 2 is wirerope-winding precast pile pile body schematic diagram of the present invention.
Fig. 3 is work schematic diagram of the present invention.
As shown in the figure: 1, steel rope, 11, becket bridle, 2, pile body.
The specific embodiment
Embodiment is described in further detail the present invention below in conjunction with accompanying drawing.
The concrete steps of this precast pile pile hanging method are: a, choose many steel ropes 1, the two ends of steel rope 1 are the becket bridle 11 of sealing; B, steel rope 1 that step a is chosen wherein one along precast pile 2 pile bodies apart from 1/5 place, top after two circles, the becket bridle 11 of these steel rope 1 one ends is passed from the eye of the becket bridle 11 of the other end; C, with remaining steel rope with the method for step b be wound around the precast pile pile body should the place near, and all becket bridles that pass 11 are suspended on suspension hook; D, slow lifting hook are until all steel rope 1 locking precast piles 2; E, continuation lifting hook are sling precast pile 2.Whole work progress is simple and easy to do.Wherein, when slow lifting hook, due to the weight effect of precast pile, all steel ropes 1 can progressively be revised, and make all steel ropes 1 all lock precast pile 2.
Wherein, steel rope 1 is preferably 2~5.When steel rope is 2, can be in the slow lifting hook process of steps d suspension hook, adjust the steel rope position, symmetrical with the precast pile axis after making 2 steel ropes locking precast pile pile bodies, and two steel ropes exceed the equal in length of precast pile pile body part.When steel rope is 3, can be in the slow lifting hook process of steps d suspension hook, adjustment steel rope position, after making 3 steel rope locking precast piles, evenly distribute centered by the precast pile axis, the precast pile pile body is stressed more steady, and still can hang precast pile after the unexpected fracture of steel cable therein.
Select the thickness of steel rope 1 according to the weight of precast pile 2, the diameter of steel rope 1 is generally 5 millimeters~30 millimeters.The length of annulus 11 is generally 20 centimetres~50 centimetres according to the size setting of steel rope 1 diameter.The length of steel rope 1 is selected according to precast pile 2 pile body sizes and length, and length generally is generally 200 centimetres~600 centimetres.
This method adopts steel rope 1 as twister, is to consider that steel rope 1 has good elasticity, can be to precast pile pile body injury.

Claims (5)

1. a precast pile pile hanging method, is characterized in that, concrete steps are:
A, choose many steel ropes, the two ends of described steel rope are the becket bridle of sealing;
B, steel rope that step a is chosen wherein one along the precast pile pile body after two circles, the becket bridle of this steel rope one end is passed from the eye of the becket bridle of the other end;
C, remaining steel rope is wound around the precast pile pile body with the method for step b, and the becket bridle that all pass is suspended on suspension hook;
D, slow lifting hook are until all steel ropes locking precast pile;
E, continuation lifting hook are sling precast pile.
2. precast pile pile hanging method according to claim 1, it is characterized in that: described steel rope is 2, and is symmetrical with the precast pile axis after described steel rope locking precast pile pile body, and two steel ropes exceed the equal in length of precast pile pile body part.
3. precast pile pile hanging method according to claim 1, it is characterized in that: described steel rope is 3, after described steel rope locking precast pile, evenly distributes centered by the precast pile axis.
4. precast pile pile hanging method according to claim 1, it is characterized in that: the length of described annulus is 20 centimetres~50 centimetres.
5. precast pile pile hanging method according to claim 1, it is characterized in that: the length of described steel rope is 200 centimetres~600 centimetres.
CN201310267925.8A 2013-06-28 2013-06-28 Precast pile pile hanging method Active CN103381994B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310267925.8A CN103381994B (en) 2013-06-28 2013-06-28 Precast pile pile hanging method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310267925.8A CN103381994B (en) 2013-06-28 2013-06-28 Precast pile pile hanging method

Publications (2)

Publication Number Publication Date
CN103381994A true CN103381994A (en) 2013-11-06
CN103381994B CN103381994B (en) 2016-01-27

Family

ID=49489962

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310267925.8A Active CN103381994B (en) 2013-06-28 2013-06-28 Precast pile pile hanging method

Country Status (1)

Country Link
CN (1) CN103381994B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107117529A (en) * 2017-05-03 2017-09-01 中淳高科桩业股份有限公司 A kind of safety jaw stake device and pile hanging method
CN110065884A (en) * 2019-05-08 2019-07-30 中国二十冶集团有限公司 A kind of pile press machine hello stake hanging method and lifting device
CN111731541A (en) * 2020-07-03 2020-10-02 浙江金星螺杆制造有限公司 Bundling method for heat treatment of screw of plastic extruding machine

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2176351Y (en) * 1993-08-21 1994-09-07 上海华通装卸机具修造厂 Hanger with pulley and hook
JP2521598Y2 (en) * 1988-12-21 1996-12-25 株式会社 技研製作所 Hanging device
CN201458517U (en) * 2009-07-16 2010-05-12 郑州铁路局机车车辆配件厂 End horizontal pull type rail tank car hanger
CN202265302U (en) * 2011-08-26 2012-06-06 中天建设集团有限公司 Hoisting structure of reinforcement cage
CN102577906A (en) * 2012-03-05 2012-07-18 河北农业大学 Tree transplanting method
CN102776705A (en) * 2012-08-13 2012-11-14 葫芦岛天力工业有限公司 Weaving technology for steel wire rope strip

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2521598Y2 (en) * 1988-12-21 1996-12-25 株式会社 技研製作所 Hanging device
CN2176351Y (en) * 1993-08-21 1994-09-07 上海华通装卸机具修造厂 Hanger with pulley and hook
CN201458517U (en) * 2009-07-16 2010-05-12 郑州铁路局机车车辆配件厂 End horizontal pull type rail tank car hanger
CN202265302U (en) * 2011-08-26 2012-06-06 中天建设集团有限公司 Hoisting structure of reinforcement cage
CN102577906A (en) * 2012-03-05 2012-07-18 河北农业大学 Tree transplanting method
CN102776705A (en) * 2012-08-13 2012-11-14 葫芦岛天力工业有限公司 Weaving technology for steel wire rope strip

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107117529A (en) * 2017-05-03 2017-09-01 中淳高科桩业股份有限公司 A kind of safety jaw stake device and pile hanging method
CN107117529B (en) * 2017-05-03 2018-06-29 宁波东淳预制桩有限公司 A kind of safety jaw stake device and pile hanging method
CN110065884A (en) * 2019-05-08 2019-07-30 中国二十冶集团有限公司 A kind of pile press machine hello stake hanging method and lifting device
CN111731541A (en) * 2020-07-03 2020-10-02 浙江金星螺杆制造有限公司 Bundling method for heat treatment of screw of plastic extruding machine

Also Published As

Publication number Publication date
CN103381994B (en) 2016-01-27

Similar Documents

Publication Publication Date Title
CN105645248A (en) Reinforcement cage lifting device and method
CN103381994A (en) Pile hoisting method for precast piles
CN105905815B (en) The method of work of seat ground self-balancing pole
CN109914267B (en) Prefabricated upright post lifting appliance structure
CN105464456A (en) Method and lifting sling for assembling extra-high voltage transmission iron tower through helicopter
CN204342257U (en) A kind of large-scale component turning device
CN103708360B (en) Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method
CN205132903U (en) Steel wire slings
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN202390075U (en) Simple lifting device special for PHC (prestress high-strength concrete) tubular pile
CN201027135Y (en) Hanging tool mechanism for swinging 55mPHC pipe pile
CN201907924U (en) Spreading wing-type winding drum lifting device
CN203269351U (en) Forceps clip used on crane and used for lifting barrel-shaped objects
CN202558444U (en) Steel penstock hoisting balance beam device
CN210013129U (en) Prefabricated stand hoist structure
CN208980168U (en) A kind of suspender claw hook device
CN207645607U (en) A kind of anchor winch experiment loading unit
CN205257765U (en) Loader switching valve special lifting device device
CN104386598A (en) Dismantling method for tower crane jib
CN201605579U (en) Tubular pile industrial steel cage suspending device
CN101734549A (en) Lifting sling
CN207259054U (en) A kind of band carries the hoist rope of dynamic compaction machinery and the attachment device of hammer ram
CN202175739U (en) Device for hoisting crystal rod
CN201619944U (en) Sling instrument
CN102919096B (en) Tree transplant-based hoisting earth ball net bag and use steps thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 315145 Zhejiang Province Economic Development Zone, Yinzhou, Linjiang Road, No. 166, hi tech pile industry Limited by Share Ltd

Applicant after: Zhongchun Gaoke Pile Industry Co., Ltd.

Address before: 315145, Zhejiang, Yinzhou District, Ningbo (Binhai Pioneering Center) sailing South Road, Sino hi tech pile industry Limited by Share Ltd

Applicant before: Zhongchun Gaoke Pile Industry Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180910

Address after: 315105 159 building 23, Qiming Road, Yinzhou District, Ningbo, Zhejiang, 159

Patentee after: Ningbo Zhong Chun Pile Foundation Engineering Technology Co., Ltd.

Address before: 315145 Zhong Chun Gao Ke pile Limited by Share Ltd, No. 166 Linjiang Road, Yinzhou Economic Development Zone, Ningbo, Zhejiang

Patentee before: Zhongchun Gaoke Pile Industry Co., Ltd.

TR01 Transfer of patent right