CN107117529B - A kind of safety jaw stake device and pile hanging method - Google Patents
A kind of safety jaw stake device and pile hanging method Download PDFInfo
- Publication number
- CN107117529B CN107117529B CN201710303120.2A CN201710303120A CN107117529B CN 107117529 B CN107117529 B CN 107117529B CN 201710303120 A CN201710303120 A CN 201710303120A CN 107117529 B CN107117529 B CN 107117529B
- Authority
- CN
- China
- Prior art keywords
- pile
- collision
- prefabricated
- sliding cylinder
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/42—Gripping members engaging only the external or internal surfaces of the articles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/24—Prefabricated piles
- E02D5/30—Prefabricated piles made of concrete or reinforced concrete or made of steel and concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明公开了一种安全吊桩装置,包括套配于预制桩桩身外周的滑筒装置和固定于端板上的限位装置,滑筒装置包括有滑筒、分别对称设置于滑筒上的一对主吊耳和一对副吊环以及径向设置于滑筒上的滚轮,滚轮与所述预制桩桩身的外壁滚动配合;限位装置包括至少三块与端板的张拉孔相固定的受力筋板,受力筋板的内沿伸入所述滑筒的上方,受力筋板设置有防撞排孔,防撞排孔内设置有防撞螺栓,防撞螺栓的下端低于所述端板的上沿。其结构简单,使用方便,利用该吊桩装置吊桩能够避免高空作业,降低作业强度,消除安全隐患,提高综合工作效率。
The invention discloses a safe pile-hanging device, which comprises a sliding cylinder device fitted on the outer periphery of a prefabricated pile body and a limit device fixed on an end plate. The sliding cylinder device includes sliding cylinders which are symmetrically arranged on the sliding cylinders respectively. A pair of main lifting lugs, a pair of auxiliary lifting rings, and rollers arranged radially on the sliding cylinder, the rollers are rollingly matched with the outer wall of the prefabricated pile body; the limit device includes at least three Fixed stress ribs, the inner edge of the stress ribs extends above the sliding cylinder, the stress ribs are provided with anti-collision holes, anti-collision bolts are arranged in the anti-collision holes, and the lower ends of the anti-collision bolts lower than the upper edge of the end plate. The utility model has the advantages of simple structure and convenient use. Using the pile hanging device to hang piles can avoid high-altitude operations, reduce operation intensity, eliminate potential safety hazards, and improve overall work efficiency.
Description
技术领域technical field
本发明涉及预制桩施工技术领域,尤其指一种安全吊桩装置及吊桩方法。The invention relates to the technical field of prefabricated pile construction, in particular to a safe pile-hanging device and a pile-hanging method.
背景技术Background technique
预制混凝土管桩施工时,需要将预制桩一节节地连接起来,并在连接处焊接固定而形成一根整桩。施工过程中,需要用钢丝绳将预制桩捆绑固定,然后用吊车配合完成吊桩、对桩、接桩等一系列动作。During the construction of prefabricated concrete pipe piles, it is necessary to connect the prefabricated piles one by one, and weld and fix the joints to form a whole pile. During the construction process, it is necessary to bind and fix the prefabricated piles with steel wire ropes, and then use a crane to complete a series of actions such as lifting piles, aligning piles, and connecting piles.
目前预制混凝土管桩施工现场吊桩的方法一般都钢丝绳捆绑吊桩,这种吊桩方法存在着以下问题:钢丝绳直径比较粗,质量较大,一般需要多人配合完成,施工操作不方便;捆绑钢丝绳损耗大,成本较高,起吊过程中桩身容易滑动,存在较大的安全隐患。At present, the method of hanging piles on the construction site of precast concrete pipe piles is generally to bind the piles with steel wire ropes. This method of hanging piles has the following problems: the diameter of the steel wire ropes is relatively thick, and the quality is relatively large. Generally, it requires the cooperation of multiple people to complete the construction operation. Bundling The wire rope has a large loss and high cost, and the pile body is easy to slide during the lifting process, which poses a great safety hazard.
另外,钢丝绳在捆桩过程中,两个绳头很难对称,偏心受力,造成吊起的管桩倾斜,为下一步对桩、接桩增加较大的难度;在接桩焊接及焊缝冷却过程中,存在着长时间占用吊车,如要脱钩使用吊车,又需要人工高空脱钩、挂钩,这样造成劳动强度大、工作效率低,而且存在重大安全风险;在施工完成后需要拆解沉重钢丝绳,增加了劳动强度。In addition, during the pile binding process of the steel wire rope, the two rope heads are difficult to be symmetrical, and the force is eccentrically applied, which causes the hoisted pipe pile to tilt, which increases the difficulty of the pile and pile connection in the next step; During the cooling process, there is a long-term occupation of the crane. If the crane is to be unhooked and used, manual unhooking and hooking at high altitude are required, which results in high labor intensity, low work efficiency, and major safety risks; after the construction is completed, the heavy wire rope needs to be disassembled , increased labor intensity.
发明内容Contents of the invention
本发明所要解决的技术问题是针对现有技术的现状,提供了一种安全吊桩装置及吊桩方法,其结构简单,使用方便,能够避免高空作业,降低作业强度,消除安全隐患,提高综合工作效率。The technical problem to be solved by the present invention is to provide a safe pile-hanging device and a pile-hanging method aiming at the status quo of the prior art. work efficiency.
本发明解决上述技术问题所采用的技术方案为:The technical solution adopted by the present invention to solve the problems of the technologies described above is:
一种安全吊桩装置,包括套配于预制桩桩身外周的滑筒装置和固定于端板上的限位装置,滑筒装置包括有滑筒、分别对称设置于滑筒上的一对主吊耳和一对副吊环以及径向设置于滑筒上的滚轮,滚轮与所述预制桩桩身的外壁滚动配合;限位装置包括至少三块与端板的张拉孔相固定的受力筋板,受力筋板的内沿伸入所述滑筒的上方,受力筋板设置有防撞排孔,防撞排孔内设置有防撞螺栓,防撞螺栓的下端低于所述端板的上沿。A safety pile-hanging device, comprising a sliding tube device fitted on the outer periphery of a prefabricated pile body and a limit device fixed on an end plate, the sliding tube device includes a sliding tube, and a pair of main shafts symmetrically arranged on the sliding tube respectively. Lifting lugs, a pair of auxiliary lifting rings and rollers arranged radially on the sliding cylinder, the rollers roll and fit with the outer wall of the prefabricated pile body; the limit device includes at least three force Rib plate, the inner edge of the stressed rib plate extends above the sliding cylinder, the stressed rib plate is provided with anti-collision row holes, anti-collision bolts are arranged in the anti-collision row holes, and the lower end of the anti-collision bolt is lower than the described top edge of the end plate.
为优化上述技术方案,采取的具体措施还包括:In order to optimize the above technical solutions, the specific measures taken also include:
上述的滑筒外周间隔设置有横向肋环。Transverse rib rings are arranged at intervals on the outer periphery of the above-mentioned sliding cylinder.
上述的滑筒上沿半径方向设置有竖向肋板。The above-mentioned sliding cylinder is provided with vertical ribs along the radial direction.
上述的主吊耳所在直线与所述副吊环所在直线相垂直。The above-mentioned straight line where the main lifting lug is located is perpendicular to the straight line where the auxiliary lifting ring is located.
上述的受力筋板的截面呈“Ⅱ”字形结构。The cross-section of the above-mentioned stressed ribs is in the shape of "II".
上述的受力筋板通过高强螺栓与所述端板的张拉孔相固定。The above-mentioned stressed ribs are fixed to the tension holes of the end plates through high-strength bolts.
上述的受力筋板的固定孔的两侧分别设置有加强肋板。Reinforcing ribs are respectively provided on both sides of the fixing holes of the above-mentioned stress ribs.
上述的受力筋板的数目为三块,三块受力筋板均匀分布于圆周面上。The number of the above-mentioned stressed ribs is three, and the three stressed ribs are evenly distributed on the circumferential surface.
一种安全吊桩装置的吊装方法,包括以下步骤:A hoisting method for a safe hanging pile device, comprising the following steps:
步骤一、滑筒装置的安装:使用吊机的挂钩利用副吊环将滑筒吊起,并将滑筒套入预制桩桩身上,滑筒装置安装完成后松开副吊环上的吊钩;Step 1. Installation of the slider device: Use the hook of the crane to lift the slider with the auxiliary ring, and put the slider into the prefabricated pile body. After the installation of the slider device is completed, loosen the hook on the auxiliary ring;
步骤二、限位装置的安装:将受力筋板固定于端板的张拉孔上,并在防撞排孔上装上防撞螺栓;Step 2. Installation of the limit device: fix the stressed rib plate on the tension hole of the end plate, and install anti-collision bolts on the anti-collision row holes;
步骤三、吊桩、接桩:将吊车挂钩挂在滑筒的一对主吊耳上即可进行吊桩,将预制桩吊至指定位置后,便可以进行接桩了;Step 3: Hanging piles and connecting piles: hang the crane hook on a pair of main lifting lugs of the sliding cylinder to carry out pile hanging, and after the prefabricated piles are hoisted to the designated position, the piles can be connected;
步骤四、直立桩脱钩:上一节桩与下一节桩进行四角电焊固定,接着慢慢降落吊机的吊钩,滑筒装置在自重的作用下会随之下滑,将滑筒装置由预制桩上端滑落到工作平台上,用夹桩装置夹住预制桩,由工人在工作平台上完成摘钩和接桩焊接;Step 4. Uncoupling of the upright piles: The previous section of piles and the next section of piles are fixed by electric welding at four corners, and then the hook of the crane is slowly lowered. The sliding cylinder device will slide down under the action of its own weight. The upper end of the pile slides down to the working platform, and the prefabricated pile is clamped by the pile clamping device, and the worker completes the unhooking and pile welding on the working platform;
步骤五、二次挂钩吊桩:接桩焊接完成后,调动吊机将主臂靠近直立的预制桩,吊钩靠近预制桩上的滑筒,人工在工作平台上完成挂钩,将滑筒装置沿预制桩上升至与限位装置相抵,松开夹桩装置,进行植桩,当预制桩沉到预定高度时,夹桩装置将预制桩夹住固定,拆除限位装置后,用吊机将安装滑筒从预制桩的上端吊出。Step 5. Secondary hook hanging pile: After the pile welding is completed, mobilize the crane to bring the main arm close to the upright prefabricated pile, and the hook close to the slider on the prefabricated pile. Manually complete the hook on the working platform, and place the slider device along the The prefabricated pile rises until it reaches the limit device, loosen the clamping device, and plant the pile. When the prefabricated pile sinks to the predetermined height, the clamping device clamps and fixes the prefabricated pile. After removing the limiting device, use a crane to install the pile. The sliding cylinder is hung out from the upper end of the prefabricated pile.
上述的防撞螺栓安装于防撞排孔中最靠近预制桩桩身内壁的一个安装孔内。The above-mentioned anti-collision bolt is installed in an installation hole closest to the inner wall of the prefabricated pile body in the anti-collision row of holes.
与现有技术相比,本发明一种安全吊桩装置,其包括滑筒装置和限位装置,滑筒装置利用滑筒内径向设置的滚轮能够沿预制桩桩身上下滑动,而与端板固定的限位装置在吊桩过程中限制滑筒装置脱离预制桩,本吊桩装置结构简单,使用方便、安全;通过对称设置的主吊耳起吊预制桩,能够保证吊桩过程中桩身保持竖直,使植桩、接桩的工作更易进行。Compared with the prior art, the present invention is a safe pile-hanging device, which includes a sliding tube device and a limit device. The sliding tube device can slide up and down along the prefabricated pile body by using the radially arranged rollers inside the sliding tube, and the end plate The fixed limit device restricts the sliding cylinder device from the prefabricated pile during the pile lifting process. The pile lifting device is simple in structure, easy to use and safe; the prefabricated pile is lifted by the symmetrically arranged main lifting lugs, which can ensure that the pile body remains stable during the pile lifting process. Vertical, so that the work of pile planting and pile connection is easier to carry out.
本安全吊桩装置的吊装方法,先将滑筒装置套于预制桩上,将限位装置固定于端板上,利用主吊耳进行吊桩,吊桩过程中,预制桩保持竖直,吊桩到位后,在工作平台上进行脱钩、接桩作业,二次挂钩吊桩后进行植桩,植桩完成后,将限位装置拆除,并将滑筒装置从预制桩上端取出;整个操作过程避免了高空作业,降低作业强度,消除安全隐患,提高综合工作效率。The hoisting method of the safety pile hanging device first puts the sliding cylinder device on the prefabricated pile, fixes the limit device on the end plate, and uses the main lifting lug to hang the pile. During the pile hanging process, the prefabricated pile remains vertical and After the piles are in place, unhook and connect the piles on the working platform, and then plant the piles after hanging the piles with the second hook. It avoids high-altitude operations, reduces operation intensity, eliminates potential safety hazards, and improves overall work efficiency.
附图说明Description of drawings
图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;
图2是图1中A部放大图;Fig. 2 is an enlarged view of part A in Fig. 1;
图3是图1的俯视图;Fig. 3 is the top view of Fig. 1;
图4是图1中受力筋板的结构示意图;Fig. 4 is a schematic structural view of the stressed rib plate in Fig. 1;
图5是图1中受力筋板的剖视结构示意图。Fig. 5 is a schematic cross-sectional structure diagram of the stressed rib in Fig. 1 .
具体实施方式Detailed ways
以下结合附图实施例对本发明作进一步详细描述。The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments.
如图1至图5所示的实施例,The embodiment shown in Figure 1 to Figure 5,
图标号说明:预制桩桩身1、端板2、张拉孔2a、滑筒31、主吊耳32、副吊环33、滚轮34、横向肋环35、竖向肋板36、受力筋板41、防撞排孔41a、防撞螺栓42、高强螺栓43、加强肋板44。Explanation of icon numbers: prefabricated pile body 1, end plate 2, tension hole 2a, sliding cylinder 31, main lifting lug 32, auxiliary lifting ring 33, roller 34, transverse rib ring 35, vertical rib 36, stress rib 41. Anti-collision row holes 41a, anti-collision bolts 42, high-strength bolts 43, and reinforcing ribs 44.
如图1至图5所示,As shown in Figure 1 to Figure 5,
一种安全吊桩装置,包括套配于预制桩桩身1外周的滑筒装置和固定于端板2上的限位装置,滑筒装置包括有滑筒31、分别对称设置于滑筒31上的一对主吊耳32和一对副吊环33以及径向设置于滑筒31上的滚轮34,滚轮34与所述预制桩桩身1的外壁滚动配合;限位装置包括至少三块与端板2的张拉孔2a相固定的受力筋板41,受力筋板41的内沿伸入所述滑筒31的上方,受力筋板41设置有防撞排孔41a,防撞排孔41a内设置有防撞螺栓42,防撞螺栓42的下端低于所述端板2的上沿。A safety pile-hanging device, comprising a sliding tube device fitted on the outer periphery of the prefabricated pile body 1 and a limit device fixed on the end plate 2, the sliding tube device includes sliding tubes 31, which are respectively symmetrically arranged on the sliding tubes 31 A pair of main lifting lugs 32, a pair of auxiliary lifting rings 33 and a roller 34 arranged radially on the sliding cylinder 31, the roller 34 is rollingly matched with the outer wall of the prefabricated pile body 1; The tension rib 41 fixed to the tension hole 2a of the plate 2, the inner edge of the stress rib 41 extends into the top of the sliding tube 31, the stress rib 41 is provided with an anti-collision row hole 41a, and the anti-collision row An anti-collision bolt 42 is arranged in the hole 41 a, and the lower end of the anti-collision bolt 42 is lower than the upper edge of the end plate 2 .
实施例中,滑筒31外周间隔设置有横向肋环35。In the embodiment, transverse rib rings 35 are arranged at intervals on the outer circumference of the sliding cylinder 31 .
实施例中,滑筒31上沿半径方向设置有竖向肋板36。In the embodiment, vertical ribs 36 are arranged on the sliding cylinder 31 along the radial direction.
设置横向肋环35和竖向肋板36能够增加滑筒31的整体刚度,使滑筒31在吊桩过程中具有更好地承受力。The arrangement of the transverse rib ring 35 and the vertical rib plate 36 can increase the overall rigidity of the sliding cylinder 31, so that the sliding cylinder 31 can better bear force during the pile-hanging process.
实施例中,主吊耳32所在直线与所述副吊环33所在直线相垂直。In the embodiment, the straight line where the main lifting lug 32 is located is perpendicular to the straight line where the auxiliary lifting ring 33 is located.
对称设置的主吊耳32使吊桩过程中,预制桩能够保持竖直状态;而对称设置的副吊环33,在利用两个副吊环33起吊滑筒装置时,能够保证滑筒装置的平衡。The symmetrically arranged main lifting lugs 32 enable the prefabricated pile to maintain a vertical state during the pile hanging process; and the symmetrically arranged secondary lifting rings 33 can ensure the balance of the sliding tube device when two secondary lifting rings 33 are used to lift the sliding tube device.
实施例中,受力筋板41的截面呈“Ⅱ”字形结构。如此结构,能够提高受力筋板41的刚度和抗弯、抗剪强度,同时又能减轻装置自重。In the embodiment, the cross section of the stressed rib 41 is in the shape of "II". With such a structure, the rigidity, bending resistance and shear strength of the stressed rib 41 can be improved, and at the same time, the self-weight of the device can be reduced.
实施例中,受力筋板41通过高强螺栓43与所述端板2的张拉孔2a相固定。In the embodiment, the stressed rib plate 41 is fixed to the tension hole 2 a of the end plate 2 through high-strength bolts 43 .
设置防撞排孔41a,使限位装置能够适用于不同壁厚的预制桩;当受力筋板41通过高强螺栓43固定于端板2的张拉孔2a上,并在防撞排孔41a合适的孔内(防撞螺栓42位于预制桩的内壁以内)安装上防撞螺栓42后,当受力筋板41收到撞击,防撞螺栓42能够限制受力筋板41的转动,从而保证受力筋板41的内沿伸入滑筒31的上方,进而保证吊桩过程中,滑筒装置不会从预制桩上脱离。Anti-collision row holes 41a are set so that the limit device can be applied to prefabricated piles with different wall thicknesses; After the anti-collision bolt 42 is installed in a suitable hole (the anti-collision bolt 42 is located within the inner wall of the prefabricated pile), when the stressed rib 41 receives an impact, the anti-collision bolt 42 can limit the rotation of the stressed rib 41, thereby ensuring The inner edge of the stressed rib plate 41 extends into the top of the sliding tube 31, thereby ensuring that the sliding tube device will not break away from the prefabricated pile during the pile hanging process.
实施例中,受力筋板41的固定孔的两侧分别设置有加强肋板44。设置加强肋板44,能够进一步提高受力筋板41的强度。In the embodiment, reinforcing ribs 44 are respectively provided on both sides of the fixing hole of the stressed ribs 41 . The reinforcement ribs 44 are provided to further increase the strength of the stressed ribs 41 .
实施例中,受力筋板41的数目为三块,三块受力筋板41均匀分布于圆周面上。In the embodiment, the number of stressed ribs 41 is three, and the three stressed ribs 41 are evenly distributed on the circumferential surface.
滑筒31上的4个滚轮34也均匀分布于圆周面上。4 rollers 34 on the sliding cylinder 31 are also evenly distributed on the circumferential surface.
一种安全吊桩装置的吊装方法,包括以下步骤:A hoisting method for a safe hanging pile device, comprising the following steps:
步骤一、滑筒装置的安装:使用吊机的挂钩利用副吊环33将滑筒31吊起,并将滑筒31套入预制桩桩身1上,滑筒装置安装完成后松开副吊环33上的吊钩;Step 1. Installation of the sliding tube device: use the hook of the crane to lift the sliding tube 31 with the auxiliary lifting ring 33, and put the sliding tube 31 on the prefabricated pile body 1. After the sliding tube device is installed, loosen the auxiliary lifting ring 33 on the hook;
滑筒装置安装时,根据待吊预制桩的摆放状态选择副吊环33的使用:当预制桩平躺时,仅用挂钩勾住一个副吊环33,而当预制桩直立时,需用两个挂钩分别勾住对应的副吊环33,从而使工人能够很方便地将滑筒31套入预制桩。When the sliding cylinder device is installed, the use of the auxiliary lifting ring 33 is selected according to the placement state of the prefabricated pile to be hoisted: when the prefabricated pile is lying flat, only one auxiliary lifting ring 33 is hooked with a hook, and when the prefabricated pile is upright, two auxiliary lifting rings 33 are needed. The hooks hook the corresponding auxiliary rings 33 respectively, so that the worker can easily insert the sliding cylinder 31 into the prefabricated pile.
步骤二、限位装置的安装:将受力筋板41固定于端板2的张拉孔2a上,并在防撞排孔41a上装上防撞螺栓42;防撞螺栓42安装于防撞排孔41a中最靠近预制桩桩身1内壁的一个安装孔内;Step 2. Installation of the limit device: fix the stressed rib plate 41 on the tension hole 2a of the end plate 2, and install the anti-collision bolt 42 on the anti-collision row hole 41a; the anti-collision bolt 42 is installed on the anti-collision row In the installation hole closest to the inner wall of the prefabricated pile body 1 in the hole 41a;
受力筋板41的安装数量根据预制桩的直径、自重等因素而定,安装过程,受力筋板41均匀设置以保证受力的平均性。The installation quantity of stressed ribs 41 is determined according to factors such as the diameter and self-weight of the prefabricated piles. During installation, the stressed ribs 41 are evenly arranged to ensure the uniformity of stress.
步骤三、吊桩、接桩:将吊车挂钩挂在滑筒31的一对主吊耳32上即可进行吊桩,将预制桩吊至指定位置后,便可以进行接桩了;由于主吊耳32对称设置,吊桩过程中,两侧的主吊耳32均匀受力,以保证预制桩呈竖直状态,这样有利于后续接桩、植桩作业的进行,吊桩时,滑筒装置沿桩身上移至预制桩的上端,并与限位装置相抵。Step 3, hanging piles and connecting piles: hang the crane hook on a pair of main lifting lugs 32 of the sliding tube 31 to carry out pile hanging, after hanging the prefabricated piles to the designated position, the piles can be connected; since the main hanger The lugs 32 are arranged symmetrically. During the pile-hanging process, the main lifting lugs 32 on both sides are evenly stressed to ensure that the prefabricated piles are in a vertical state, which is conducive to the subsequent pile-connecting and pile-planting operations. Move to the upper end of the prefabricated pile along the pile body, and offset against the limit device.
步骤四、直立桩脱钩:上一节桩与下一节桩进行四角电焊固定,将吊机稍微向滚轮侧摆动,吊钩铅垂线置于预制桩外侧,接着慢慢降落吊机的吊钩,滑筒装置在自重的作用下会随之下滑,将滑筒装置由预制桩上端滑落到工作平台上,用夹桩装置夹住预制桩,由工人在工作平台上完成摘钩和接桩焊接;滑筒装置移动时,滚轮34与预制桩的外壁滚动配合,既减小了装置的磨损,也避免了滑筒31倾斜而卡住。Step 4. Unhook the upright pile: The previous section of pile and the next section of pile are fixed by electric welding at four corners, the crane is slightly swung to the side of the roller, the plumb line of the hook is placed outside the prefabricated pile, and then the hook of the crane is slowly lowered , the sliding cylinder device will slide down under the action of its own weight, slide the sliding cylinder device from the upper end of the prefabricated pile to the working platform, clamp the prefabricated pile with the pile clamping device, and the worker will complete the hook removal and pile welding on the working platform ; When the slider device moves, the rollers 34 roll and cooperate with the outer wall of the prefabricated pile, which not only reduces the wear of the device, but also prevents the slider 31 from tilting and getting stuck.
步骤五、二次挂钩吊桩:接桩焊接完成后,调动吊机将主臂靠近直立的预制桩,吊钩靠近预制桩上的滑筒31(此时吊钩方位应与脱钩时一致),人工在工作平台上完成挂钩,将滑筒装置沿预制桩上升至与限位装置相抵受力,松开夹桩装置,进行植桩,当预制桩沉到预定高度时,夹桩装置将预制桩夹住固定,采用手提风炮电钻拆除限位装置后,用吊机将安装滑筒从预制桩的上端吊出。Step 5. Secondary hook hanging pile: After the pile welding is completed, mobilize the crane to bring the main arm close to the upright prefabricated pile, and the hook close to the sliding cylinder 31 on the prefabricated pile (at this time, the position of the hook should be consistent with that when decoupling), Manually complete the hook on the working platform, raise the sliding cylinder device along the prefabricated pile to resist the force of the limit device, loosen the pile clamping device, and start pile planting. Clamp and fix, use a portable jackhammer electric drill to remove the limit device, and use a crane to lift the installation slide from the upper end of the prefabricated pile.
这样一次吊桩作业变完成了,拆除的滑筒装置和限位装置转移至备料区,进行下一次吊桩;上述的整个过程中,避免了高空作业,降低作业强度,消除安全隐患,提高综合工作效率;设备磨损也大大减小,能够有效降低施工成本。In this way, the pile lifting operation is completed, and the dismantled sliding cylinder device and limit device are transferred to the material preparation area for the next pile lifting; in the above-mentioned whole process, high-altitude operations are avoided, operation intensity is reduced, potential safety hazards are eliminated, and comprehensive performance is improved. Work efficiency; equipment wear is also greatly reduced, which can effectively reduce construction costs.
本发明的最佳实施例已被阐明,由本领域普通技术人员做出的各种变化或改型都不会脱离本发明的范围。The preferred embodiment of the present invention has been illustrated, and various changes or modifications may be made by those skilled in the art without departing from the scope of the present invention.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710303120.2A CN107117529B (en) | 2017-05-03 | 2017-05-03 | A kind of safety jaw stake device and pile hanging method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201710303120.2A CN107117529B (en) | 2017-05-03 | 2017-05-03 | A kind of safety jaw stake device and pile hanging method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN107117529A CN107117529A (en) | 2017-09-01 |
| CN107117529B true CN107117529B (en) | 2018-06-29 |
Family
ID=59726641
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201710303120.2A Active CN107117529B (en) | 2017-05-03 | 2017-05-03 | A kind of safety jaw stake device and pile hanging method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107117529B (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110065884B (en) * | 2019-05-08 | 2021-01-01 | 中国二十冶集团有限公司 | Pile feeding hoisting method and hoisting tool of pile pressing machine |
| CN114000506B (en) * | 2021-11-27 | 2023-07-04 | 金匠建设集团有限公司 | Pile feeding and lifting method and lifting tool for pile pressing machine |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2832763Y (en) * | 2005-10-20 | 2006-11-01 | 山海关船厂 | Hoisting clamp for hoisting ocean platform H-shaped spud leg |
| CN101590976A (en) * | 2009-06-25 | 2009-12-02 | 上海交通大学 | Heavy-duty steel pile lifting clamp of cutter-suction dredge |
| CN103381994A (en) * | 2013-06-28 | 2013-11-06 | 中淳高科桩业股份有限公司 | Pile hoisting method for precast piles |
| CN203373736U (en) * | 2013-06-27 | 2014-01-01 | 中淳高科桩业股份有限公司 | Precast pile hoisting structure |
| CN203668932U (en) * | 2013-12-23 | 2014-06-25 | 中淳高科桩业股份有限公司 | Lifting structure for tube pile |
| CN206692204U (en) * | 2017-05-03 | 2017-12-01 | 中淳高科桩业股份有限公司 | A kind of safety jaw stake device |
-
2017
- 2017-05-03 CN CN201710303120.2A patent/CN107117529B/en active Active
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2832763Y (en) * | 2005-10-20 | 2006-11-01 | 山海关船厂 | Hoisting clamp for hoisting ocean platform H-shaped spud leg |
| CN101590976A (en) * | 2009-06-25 | 2009-12-02 | 上海交通大学 | Heavy-duty steel pile lifting clamp of cutter-suction dredge |
| CN203373736U (en) * | 2013-06-27 | 2014-01-01 | 中淳高科桩业股份有限公司 | Precast pile hoisting structure |
| CN103381994A (en) * | 2013-06-28 | 2013-11-06 | 中淳高科桩业股份有限公司 | Pile hoisting method for precast piles |
| CN203668932U (en) * | 2013-12-23 | 2014-06-25 | 中淳高科桩业股份有限公司 | Lifting structure for tube pile |
| CN206692204U (en) * | 2017-05-03 | 2017-12-01 | 中淳高科桩业股份有限公司 | A kind of safety jaw stake device |
Also Published As
| Publication number | Publication date |
|---|---|
| CN107117529A (en) | 2017-09-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN109987546B (en) | Self-propelled pipeline transportation installation vehicle in corridor and construction method thereof | |
| CN104480930B (en) | A Construction Method for Hanging and Fixing Cast-in-situ Pile Reinforcement Cage | |
| CN113387267A (en) | Safe hoisting and lowering method for underground diaphragm wall reinforcement cage | |
| CN206267139U (en) | A kind of pile foundation steel bar cage positioning and concrete pouring support | |
| CN107117529A (en) | A kind of safety jaw stake device and pile hanging method | |
| CN214326895U (en) | Steel reinforcement cage location installation suspension system | |
| CN110438993A (en) | A kind of steel-pipe pile pile extractor and its construction technology | |
| CN112227378B (en) | Auxiliary device for hoisting reinforcement cage | |
| CN114590727A (en) | Confined space suspended pipeline device and method | |
| CN210597308U (en) | A steel pipe pile puller | |
| CN217350368U (en) | Steel bar hoisting tool for construction | |
| CN214192283U (en) | Large-diameter pipe jacking lifting device | |
| CN104528519A (en) | Clamping tool for assisting in hoisting cement electric poles | |
| CN209554627U (en) | Negative ring segment removal spreader | |
| CN204781892U (en) | Combined elevator shaft lifting operation platform | |
| CN210340091U (en) | Column main reinforcement hoisting tool of concrete cast-in-place steel rib column | |
| CN210193201U (en) | A special fixture for hoisting prefabricated blocks for construction | |
| CN208071167U (en) | A kind of column combination formula cantilever crane | |
| CN220165620U (en) | Simple and easy hoist device of pit shaft | |
| CN221739731U (en) | Pulley type pipeline lifting equipment | |
| CN222699845U (en) | Grapple devices and grapple systems | |
| CN207108239U (en) | A kind of Novel steel profile hoisting device | |
| CN220467316U (en) | Cast-in-place pile reinforcement cage hoisting device | |
| CN220618098U (en) | Wedge plate clip type hoisting clamp | |
| CN219384451U (en) | Culvert lifting device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20180319 Address after: 315145 Ningbo East Chun prefabricated pile Co., Ltd., Ningbo Yinzhou Economic Development Zone Linjiang Road, Yinzhou Economic Development Zone, Zhejiang Applicant after: Ningbo Dong Chun prefabricated pile Co.,Ltd. Address before: 315145, Linjiang Road, Yinzhou Economic Development Zone, Zhejiang, Ningbo 166, China Applicant before: ZCONE HIGH-TECH PILE INDUSTRY HOLDING CO.,LTD. |
|
| TA01 | Transfer of patent application right | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20180910 Address after: 315105 159 building 23, Qiming Road, Yinzhou District, Ningbo, Zhejiang, 159 Patentee after: Ningbo Zhong Chun Pile Foundation Engineering Technology Co.,Ltd. Address before: 315145 Ningbo East Spring precast pile Co., Ltd., No. 166 Linjiang Road, Yinzhou Economic Development Zone, Ningbo, Zhejiang Patentee before: Ningbo Dong Chun prefabricated pile Co.,Ltd. |
|
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20260324 Address after: 315100 No. 166 Linjiang Road, Yinzhou Economic Development Zone, Ningbo, Zhejiang Patentee after: NINGBO ZCONE HIGH-TECH Co.,Ltd. Country or region after: China Address before: 315105 159 building 23, Qiming Road, Yinzhou District, Ningbo, Zhejiang, 159 Patentee before: Ningbo Zhong Chun Pile Foundation Engineering Technology Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right |