CN2832763Y - Hoisting clamp for hoisting ocean platform H-shaped spud leg - Google Patents

Hoisting clamp for hoisting ocean platform H-shaped spud leg Download PDF

Info

Publication number
CN2832763Y
CN2832763Y CN 200520129896 CN200520129896U CN2832763Y CN 2832763 Y CN2832763 Y CN 2832763Y CN 200520129896 CN200520129896 CN 200520129896 CN 200520129896 U CN200520129896 U CN 200520129896U CN 2832763 Y CN2832763 Y CN 2832763Y
Authority
CN
China
Prior art keywords
hoisting
framework
spud leg
shape
shaped
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200520129896
Other languages
Chinese (zh)
Inventor
王杰平
杨洁冬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghaiguan Shipbuilding Industry Co., Ltd.
Original Assignee
SHANDHAIGUAN SHIP FACTORY
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANDHAIGUAN SHIP FACTORY filed Critical SHANDHAIGUAN SHIP FACTORY
Priority to CN 200520129896 priority Critical patent/CN2832763Y/en
Application granted granted Critical
Publication of CN2832763Y publication Critical patent/CN2832763Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a hoisting clamp for hoisting ocean platform H-shaped spud legs, particularly an accessory for hoisting objects, which is characterized in that two opening frameworks with the same shape and structure are connected into a closed quadrangular framework in an opening to opening mode, the middle parts of two borders, which are not used for connection, of the framework are oppositely provided with hanging lugs and each of the opening frameworks is in the shape of a U formed by that both ends of a long border are respectively connected with a short border vertically. In the hoisting clamp of the utility model, the two U-shaped frameworks with the same structure are oppositely connected into a quadrangular framework, and the quadrangular framework is tightly connected and buckled in a strip slot of an H-shaped spud leg, so that not only do the installation of the hoisting clamp and the hoisting of spud legs become convenient, but also the working procedures of the welding, the removal and the flaw detection of the procedure hanging lugs are eliminated. As a result, the labor cost and the time cost are saved and risk factors in highrise operation are avoided. Besides, because the U-shaped frameworks can be assembled and disassembled repeated for use, the material consumption is saved relatively.

Description

The stone tongs of lifting platform H type spud leg
Technical field
The utility model relates to the appurtenance that lifts object, is meant a kind of stone tongs that lifts by crane platform H type spud leg especially.
Background technology
Spud leg is the primary member of building in the platform, and commonly used having is cylindrical, square column type and triangular prism shaped, and its axial dimension is not only long, and structural weight is general all at hundred tons even more than hundreds of ton.Therefore, desire is more complicated with the hoisting that spud leg erects.Method commonly used is a welding process hanger on the member of lifting in advance, realizes and finish the lifting task of erectting spud leg according to this.After treating that the spud leg setting puts in place, again the technology hanger is excised.The weak point of this method is: the technology hanger is installed with the complex process and the work capacity of excision big; Hanger excision back is big to technical requirements height, the work capacity of the non-destructive flaw detection of member otch, and influences job schedule because of the restriction of the time code requirement of being detected a flaw; Secondly, the personnel of the different technical ability of the flaw detection operation of the excision of hanger and otch needs operate construction, and not only the potential safety hazard of aloft work is grown but also existed to the engineering time.In addition, for spud leg that lifts by crane the hundreds of tons of weight that weigh and the structural strength that guarantees job safety, choosing of technology hanger material and structure must have the dimensional characteristic that adapts with the member of lifting, and also established technology Lifting Lug Structure size is also bigger with the material weight that takies.Therefore, the hanger after the excision certainly will cause the waste of material.The spud leg that a kind of its section form commonly used is the square column type in the construction of platform is shaped on the chi bar of several outstanding spaces on four cylinders of this spud leg, the method for the lifting of this spud leg also is to adopt " technology hanger " method of above-mentioned interim welding.So, exist shortcoming and deficiency as hereinbefore so equally.
The utility model content
The purpose of this utility model, be for overcoming existing defective and deficiency in existing lifting overlength and the overweight H type spud leg construction operation, and a kind of stone tongs that lifts by crane platform H type spud leg is proposed, this stone tongs adopts following technical scheme: a kind of stone tongs that lifts by crane platform H type spud leg, comprise hanger, it is characterized in that two identical open framework counterparts of shape and structure are connected to the osed top quadrilateral frame, the middle part of two frames that this framework does not connect is equipped with hanger relatively; Open framework be a long margin frame two ends each vertical connect a minor face frame " [" shape, " two open ends of [" shape framework respectively are provided with connecting panel, and the edge of connecting panel is shaped on bolt hole; " [" shape framework long margin frame and two minor face frames are tetragonal pipe, and " long margin frame of [" shape framework is the vertical reinforced rib that is equipped with one or more in the tube wall up and down, and " at interval even is provided with some horizontal dividing plates in [" shape framework quadrangle pipe; Be that two minor face frames are being provided with a widened section near the inboard with the long margin frame coupling end.
Press the stone tongs that this programme is implemented, since have two structures identical " it is one " [] " shape framework that [" shape framework connects and composes relatively, " [] " shape framework leak-tight joint is buckled in the chi bar groove of H shape spud leg, the installation of these anchor clamps on spud leg and the lifting of spud leg had both been made things convenient for, the operations such as welding, excision and flaw detection of " technology hanger " have been exempted again, not only save manpower and time cost and avoided the danger factor in the aloft work, and because of " [" shape framework can load and unload repeatedly to use and save material consumption relatively.
Description of drawings
Fig. 1 is the schematic appearance of a kind of embodiment of the utility model;
Fig. 2 is the utility model running condition scheme drawing;
Fig. 3 overlooks and partial schematic sectional view for Fig. 1's;
Fig. 4 is the A-A sectional schematic diagram of Fig. 3;
Fig. 5 is installed on the preceding constitution diagram of spud leg lifting for the utility model;
Fig. 6 is the constitution diagram in the lifting spud leg process;
Fig. 7 slings constitution diagram behind the spud leg.
The specific embodiment
Be further described in detail with regard to this embodiment in conjunction with the accompanying drawings.The utility model is an example with the H type spud leg 2 that lifts its surface and be equipped with chi bar 21; " [" shape framework 1 is made of long margin frame 11 and 12 welding of two minor face frames, long margin frame 11 and two minor face frames 12 are welded into tetragonal pipe by panels, the open end of minor face frame 12 is welded with connecting panel 13, and the suitable position of this panel edges is shaped on the hole 130 of tie bolt; Hanger 10 is welded in the middle part of long margin frame 11, and the two sides of hanger 10 can be welded with compound plate 101 respectively to gain in strength; " scantling of structure of [" shape framework has enough strength and stiffness except that assurance lifting spud leg 2 must possess, and the height that constitutes the pipe of framework also should be as the criterion to embed chi bar groove 20.For increase " strength and stiffness of [" shape framework, except that two of welding in the tube wall of long margin frame 11 about longitudinally the reinforced rib 123, the horizontal dividing plate 122 of even welding at interval in the pipe more also." [" shape framework should use in pairs, and promptly two " [" shape framework becomes " [] " shape in the chi bar groove that embeds the suitable position of lifting spud leg, the hole of passing connecting panel with bolt is " [] " shape framework of one with its leak-tight joint again.For the installation or removal of giving bolt stay the operations necessary space, " the minor face frame 12 of [" shape framework has a widened section 121 near the inboard of long margin frame 11 coupling ends, also be that four chi bar limits 21 of spud leg 2 have both sides to be overlapped on that " on the long margin frame 11 of [" shape framework, the both sides in addition of chi bar then have four arms of angle to be overlapped in " above [" shape framework minor face frame widened section 121.The utility model structure is simple and direct, reasonable, is a kind of effective and failure-free lifting accessory easy to use, safe.

Claims (6)

1, a kind of stone tongs that lifts by crane platform H type spud leg comprises hanger, it is characterized in that two identical open framework counterparts of shape and structure are connected to the osed top quadrilateral frame, and the middle part of two frames that this framework does not connect is equipped with hanger relatively.
2, press the stone tongs of the described lifting platform of claim 1 H type spud leg, it is characterized in that open framework is each vertical " [" shape that connects a minor face frame of two ends of a long margin frame, " two open ends of [" shape framework respectively are provided with connecting panel, and the edge of connecting panel is shaped on bolt hole.
3, by the stone tongs of the described lifting platform of claim 2 H type spud leg, it is characterized in that " [" shape framework long margin frame and two minor face frames are tetragonal pipe.
4,, it is characterized in that " long margin frame of [" shape framework is indulged the reinforced rib that is equipped with one or more in the tube wall up and down by the stone tongs of the described lifting platform of claim 3 H type spud leg.
5,, it is characterized in that " at interval even is provided with some horizontal dividing plates in [" shape framework quadrangle pipe by the stone tongs of the described lifting platform of claim 3 H type spud leg.
6,, it is characterized in that two minor face frames are being provided with a widened section near the inboard with the long margin frame coupling end by the stone tongs of claim 2 or 3 described lifting platform H type spud legs.
CN 200520129896 2005-10-20 2005-10-20 Hoisting clamp for hoisting ocean platform H-shaped spud leg Expired - Fee Related CN2832763Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200520129896 CN2832763Y (en) 2005-10-20 2005-10-20 Hoisting clamp for hoisting ocean platform H-shaped spud leg

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200520129896 CN2832763Y (en) 2005-10-20 2005-10-20 Hoisting clamp for hoisting ocean platform H-shaped spud leg

Publications (1)

Publication Number Publication Date
CN2832763Y true CN2832763Y (en) 2006-11-01

Family

ID=37197077

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200520129896 Expired - Fee Related CN2832763Y (en) 2005-10-20 2005-10-20 Hoisting clamp for hoisting ocean platform H-shaped spud leg

Country Status (1)

Country Link
CN (1) CN2832763Y (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102275057A (en) * 2010-06-13 2011-12-14 烟台中集来福士海洋工程有限公司 Assembling clamp for main sheering tube in spud leg and welding method using same
CN101723240B (en) * 2009-12-29 2012-01-25 广东省工业设备安装公司 Special fixture for hoisting rectangular section steel column and hoisting method by using same
CN104444808A (en) * 2014-12-03 2015-03-25 舟山长宏国际船舶修造有限公司 Method for hoisting ultrahigh spud leg by stock gantry crane
CN105174020A (en) * 2015-07-16 2015-12-23 上海外高桥造船有限公司 Pile leg rack protection device for pile leg lifting
CN107117529A (en) * 2017-05-03 2017-09-01 中淳高科桩业股份有限公司 A kind of safety jaw stake device and pile hanging method
CN114132830A (en) * 2021-12-13 2022-03-04 上海振华重工启东海洋工程股份有限公司 Pile leg section displacement lifting construction method

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101723240B (en) * 2009-12-29 2012-01-25 广东省工业设备安装公司 Special fixture for hoisting rectangular section steel column and hoisting method by using same
CN102275057A (en) * 2010-06-13 2011-12-14 烟台中集来福士海洋工程有限公司 Assembling clamp for main sheering tube in spud leg and welding method using same
CN102275057B (en) * 2010-06-13 2014-04-16 烟台中集来福士海洋工程有限公司 Assembling clamp for main sheering tube in spud leg and welding method using same
CN104444808A (en) * 2014-12-03 2015-03-25 舟山长宏国际船舶修造有限公司 Method for hoisting ultrahigh spud leg by stock gantry crane
CN105174020A (en) * 2015-07-16 2015-12-23 上海外高桥造船有限公司 Pile leg rack protection device for pile leg lifting
CN105174020B (en) * 2015-07-16 2017-06-27 上海外高桥造船有限公司 For the spud leg tooth bar protection device of spud leg handling
CN107117529A (en) * 2017-05-03 2017-09-01 中淳高科桩业股份有限公司 A kind of safety jaw stake device and pile hanging method
CN107117529B (en) * 2017-05-03 2018-06-29 宁波东淳预制桩有限公司 A kind of safety jaw stake device and pile hanging method
CN114132830A (en) * 2021-12-13 2022-03-04 上海振华重工启东海洋工程股份有限公司 Pile leg section displacement lifting construction method
CN114132830B (en) * 2021-12-13 2023-08-29 上海振华重工启东海洋工程股份有限公司 Pile leg section deflection lifting construction method

Similar Documents

Publication Publication Date Title
CN2832763Y (en) Hoisting clamp for hoisting ocean platform H-shaped spud leg
CN201474292U (en) Midsize template assembled large template
CN206233639U (en) movable shed
CN203783170U (en) Detachable protective shed
CN110512766B (en) Fabricated structure system of steel plate concrete shear wall and construction method thereof
CN217500734U (en) Large-span and large-space hyperboloid assembled aluminum plate drop ceiling for station room waiting hall
CN208618791U (en) A kind of construction formwork for placing
CN102677912A (en) Temporary supporting device
CN206942160U (en) Steel bar truss floor support plate lifting device
CN205669326U (en) A kind of architectural engineering modular guard canopy
CN214575642U (en) Shear wall post template reinforcing steel back ridge
CN213898218U (en) Anti-falling building fence net for engineering construction
CN211257761U (en) Lifting type elevator shaft operating platform
CN210713765U (en) Wall connecting piece for special-shaped curtain wall building scaffold
CN208749071U (en) A kind of reinforcing heightening type hanging basket connection system
CN207144152U (en) A kind of socket joint attachment structure for burst steel skeleton integral assembling
CN202575686U (en) Self-tightening type lifting appliance
CN219263853U (en) Heavy equipment hanging bracket suitable for store rapid transformation
CN205184732U (en) Collection device of aluminium alloy
CN216428739U (en) Assembled light gauge steel structure
CN217518040U (en) Reversibly-mounted assembly type horizontal supporting system
CN203846861U (en) Rapid-assembled type construction fence
CN213951950U (en) Sleeve type steel box girder guardrail upright rod
CN209863079U (en) Civil air defense try-on door installation frame structure
CN204590650U (en) The flexible reinforcing construction of steam-pressing aero-concrete wall body door or window hole

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHANHAIGUAN SHIPBUILDING INDUSTRY CO., LTD.

Free format text: FORMER NAME OR ADDRESS: SHANHAIGUAN SHIPYARD

CP03 Change of name, title or address

Address after: 066206 Qinhuangdao Development Zone (east area) Shanhaiguan shipyard, Hebei, China

Patentee after: Shanghaiguan Shipbuilding Industry Co., Ltd.

Address before: 066206 Qinhuangdao Development Zone (east area) Shanhaiguan shipyard, Hebei, China

Patentee before: Shandhaiguan Ship Factory

C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20061101

Termination date: 20131020