CN201605579U CN2010200036443U CN201020003644U CN201605579U CN 201605579 U CN201605579 U CN 201605579U CN 2010200036443 U CN2010200036443 U CN 2010200036443U CN 201020003644 U CN201020003644 U CN 201020003644U CN 201605579 U CN201605579 U CN 201605579U
Authority
CN
China
Prior art keywords
steel cage
manipulator
tubular pile
cage
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN2010200036443U
Other languages
Chinese (zh)
Inventor
韦泽林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Sanhe Pile Co Ltd
Original Assignee
GUANGDONG SANHE TUBULAR PILE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG SANHE TUBULAR PILE CO Ltd filed Critical GUANGDONG SANHE TUBULAR PILE CO Ltd
Priority to CN2010200036443U priority Critical patent/CN201605579U/en
Application granted granted Critical
Publication of CN201605579U publication Critical patent/CN201605579U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Abstract

The utility model discloses a tubular pile industrial steel cage suspending device which includes two or more than two steel wires connected with a crane; a bracket is hung below the steel wires; a clamping mechanism is fixedly arranged on the bracket; the two ends of the clamping mechanism are expansion links; the tail ends of the expansion links are connected with a manipulator; the suspending process of the steel cage does not need to hook the cage manually, but adopts the manipulator for clamping, which leads each point of the steel cage to be uniformly strained and can not cause the steel cage from deformation or cause the appearance of phenomena like desoldering or cracking, etc; therefore, the installation process is safer and more efficient.

Description

A kind of steel cage lifting device for tubular pile industry
Technical field
The utility model relates to a kind of building trade job practices, particularly a kind of steel cage lifting device for tubular pile industry.
Background technology
China's pile tube is used very extensive, and just the data of grasping has at present covered whole building field substantially.Will beat the pile tube consolidated subsoil as civilian construction (this field use pile tube maximum) in the poor building of area more than 5 layers of ground.Big in addition industrial construction engineering such as iron and steel works, power plant, chemical industry, paper mill or the like all use pile tube as the basis stake in a large number.Along with the fast development of port works, the handling capacity at China harbour in this year can reach the construction of the first in the world harbour and Large Ship Dock, uses the quantity of big specification tubular pile increasing in recent years, and pile tube single-unit length is also more and more longer.
The steel cage is after completing, and the two ends of steel cage are manually hooked in many uses during transportation, arrives the predetermined area by Bridge Crane steel cage again.But along with the increase that building operations requires, employed pile tube length was more and more longer during viaduct and water project used, and the length of needed steel cage also increases accordingly.Therefore, in traditional lifting means of transportation, by manually hooking the method that steel cage two ends promote, because its stress point is mainly born by two ends, cause the distortion of steel cage stress point and steel cage middle bent easily, the serious solder joint disengaging that also can influence causes the distortion of steel cage to be fallen apart, and brings unnecessary loss, and, also can bring serious threat to constructor's personal safety because the steel cage falls apart and drops.
The utility model content
In order to overcome the deficiencies in the prior art, the utility model provides a kind of lifting efficient and convenient, safe in utilization steel cage lifting method
The technical scheme that its technical problem that solves the utility model adopts is:
A kind of steel cage lifting device for tubular pile industry, comprise the wire rope that is connected on the crane, be lifted with support under the described wire rope, described wire rope is more than two or two, be installed with clamp mechanism on the support, described clamp mechanism two ends are expansion link, and described expansion link end is connected with manipulator.
The kind of drive of described clamp mechanism is a power transmission shaft.
Described manipulator front end is installed with arc.
The beneficial effects of the utility model are: use the wire rope hoisting bracket, fix to clamp mechanism on support, by the latter half of clamp mechanism control manipulator clamping steel cage, mention the steel cage then.Whole process does not need manually to go the hook cage, and adopts the manipulator clamping, makes steel cage each point stressed evenly, can not make the distortion of steel cage, the perhaps appearance of phenomenon such as sealing-off and fracture, and the course of work is more safe and efficient.
The clamp mechanism kind of drive is a power transmission shaft, realizes control to manipulator behavior by power transmission shaft, because adopt the power transmission shaft transmission more accurate, energy loss is few, and no transmission lag can realize characteristics such as the crawl point stops, no transmission lag makes the distortion of steel cage after preventing from excessively to clamp; And adopt the extension of arc, strengthened the contact area with the steel cage, reduced local pressure, play the effect of protection steel cage as manipulator.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is a perspective view of the present utility model;
Fig. 2 is a lateral view of the present utility model.
The specific embodiment
With reference to Fig. 1, Fig. 2, a kind of steel cage lifting device for tubular pile industry, comprise the wire rope 1 that is connected on the crane, wire rope is lifted with support 21 time, wire rope is more than two or two, be installed with clamp mechanism 3 on the support 2, clamp mechanism 3 two ends are expansion link 31, and expansion link 31 ends are connected with manipulator 4.
Its lifting step is as follows:
A, support 2 is lifted on the wire rope 1;
Thereby b, put down support 2 by transferring wire rope 1, the expansion link 31 elongation control manipulators 4 of clamp mechanism 3 open, and make manipulator 4 can hold steel cage 5 and enter;
C, transfer support 2 and make manipulator 4 be lower than steel cage 5 first halves bottom; Make that after manipulator draws in the more than half part of steel cage all can be wrapped in the manipulator.
D, control clamp mechanism 3 clamp, and expansion link 31 shrinks, and draw in thereby drive manipulator 4, make the spacing of manipulator 4 less than steel cage 5 diameters;
E, boom hoist cable 1 are mentioned steel cage 5 thereby drive support 2.
As optimal way of the present utility model: the preferred kind of drive of clamp mechanism 3 is a power transmission shaft, realize control by power transmission shaft to manipulator behavior, because adopt the power transmission shaft transmission more accurate, energy loss is few, can realize characteristics such as the crawl point stops, make the distortion of steel cage after preventing from excessively to clamp.
As other embodiments of the present utility model: clamp mechanism 3 also can adopt chain drive, the friction pulley transmission, and worm drive, pneumatic actuator, belt pulley transmission or the like mode realizes the control to manipulator.
As optimal way of the present utility model: wire rope 1 is two, and symmetry is fixed on the two ends of support 2 respectively, is convenient to keep the balance of support 2.Two suspension centres are simultaneously stressed during handling, rise and fall slowly, avoided vibration, prevent that steel cage 5 from damaging.Manipulator 4 adopts two arcs 41, has increased the contact area of manipulator 4 with steel cage 5, thereby has reduced the local pressure of steel cage 5.Whole hoisting process does not need manually to go the hook cage, and adopts manipulator 4 clampings, makes steel cage each point stressed even, can not make the appearance of phenomenons such as the distortion of steel cage, sealing-off and fracture, and the course of work is more safe and efficient.
Adopt the steel cage of such method lifting tubular pile industry, can satisfy present viaduct and water project use in employed pile tube length more and more longer, the requirement that the length of needed steel cage also increases accordingly, and substituted artificial work with machinery, realized labor-intensive transition process to Intensive economy.

Claims (4)

1. steel cage lifting device for tubular pile industry, comprise the wire rope (1) that is connected on the crane, it is characterized in that: be lifted with support (2) under the described wire rope (1), described wire rope is more than two or two, be installed with clamp mechanism (3) on the support (2), described clamp mechanism (3) two ends are expansion link (31), and described expansion link (31) end is connected with manipulator (4).
2. a kind of steel cage lifting device for tubular pile industry according to claim 1 is characterized in that: the kind of drive of described clamp mechanism (3) is a power transmission shaft.
3. a kind of steel cage lifting device for tubular pile industry according to claim 1 is characterized in that: described manipulator (4) front end is installed with arc (41).
4. a kind of steel cage lifting device for tubular pile industry according to claim 1 is characterized in that: described wire rope (1) is two, and symmetry is fixed on the two ends of support (2) respectively.
CN2010200036443U 2010-01-08 2010-01-08 Tubular pile industrial steel cage suspending device Expired - Lifetime CN201605579U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010200036443U CN201605579U (en) 2010-01-08 2010-01-08 Tubular pile industrial steel cage suspending device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010200036443U CN201605579U (en) 2010-01-08 2010-01-08 Tubular pile industrial steel cage suspending device

Publications (1)

Publication Number Publication Date
CN201605579U true CN201605579U (en) 2010-10-13

Family

ID=42950288

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010200036443U Expired - Lifetime CN201605579U (en) 2010-01-08 2010-01-08 Tubular pile industrial steel cage suspending device

Country Status (1)

Country Link
CN (1) CN201605579U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103979412A (en) * 2014-04-04 2014-08-13 建华建材(安徽)有限公司 Steel reinforcement cage hanger
CN104294837A (en) * 2014-10-24 2015-01-21 中建六局土木工程有限公司 Reinforcement cage stirrup installation construction method achieved through supports

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103979412A (en) * 2014-04-04 2014-08-13 建华建材(安徽)有限公司 Steel reinforcement cage hanger
CN104294837A (en) * 2014-10-24 2015-01-21 中建六局土木工程有限公司 Reinforcement cage stirrup installation construction method achieved through supports

Similar Documents

Publication Publication Date Title
CN201501729U (en) Air turning device of equipment
CN201923783U (en) Half mould lifting appliance of tubular pile mould
CN101659369A (en) Triangle-type hanger
CN201473192U (en) Lifting tool
CN201605579U (en) Tubular pile industrial steel cage suspending device
CN201334306Y (en) Hoisting machine for upright post member
CN202918796U (en) Hanging protecting string bag based on tree transplanting
CN212198153U (en) Lifting hook for building construction tower crane
CN101774504A (en) Steel cage lifting device for tubular pile industry
CN206088728U (en) Novel large -scale gallows of taking a trial run
CN205132903U (en) Steel wire slings
CN201027135Y (en) Hanging tool mechanism for swinging 55mPHC pipe pile
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN203624822U (en) Marine hanging beam with variable stay bar crotch
CN202245716U (en) Cylindrical blank clamping and hoisting device
CN201762053U (en) Simple automatic derrick
CN204490327U (en) Joist steel hoisting clamp
CN201619944U (en) Sling instrument
CN208869199U (en) A kind of overturning Lift-on/Lift-off System for horizontal equipment
CN101734549A (en) Lifting sling
CN207361602U (en) A kind of steel structure hoisting instrument
CN203319500U (en) Reinforcing cage abutting-joint adjusting device
CN204917623U (en) Long anchor rope hoisting accessory
CN201495022U (en) Steel tube lifting appliance
CN104609293A (en) Stator hoisting tooling

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Assignee: Nanjing three and pipe pile Co., Ltd.

Assignor: Guangdong Sanhe Tubular Pile Co., Ltd.

Contract record no.: 2012440000095

Denomination of utility model: Steel cage lifting device for tubular pile industry

Granted publication date: 20101013

License type: Exclusive License

Record date: 20120316

C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: Tongxing road 528414 Guangdong city of Zhongshan Province Dongsheng Town, No. 28

Patentee after: GUANGDONG SANHE PILES CO., LTD.

Address before: Tongxing road 528414 Guangdong city of Zhongshan Province Dongsheng Town, No. 28

Patentee before: Guangdong Sanhe Tubular Pile Co., Ltd.

CX01 Expiry of patent term

Granted publication date: 20101013

CX01 Expiry of patent term