CN103308015B - 混凝土振捣有效覆盖范围实时监测方法 - Google Patents
混凝土振捣有效覆盖范围实时监测方法 Download PDFInfo
- Publication number
- CN103308015B CN103308015B CN201310181131.XA CN201310181131A CN103308015B CN 103308015 B CN103308015 B CN 103308015B CN 201310181131 A CN201310181131 A CN 201310181131A CN 103308015 B CN103308015 B CN 103308015B
- Authority
- CN
- China
- Prior art keywords
- vibrating
- equipment
- real
- vibrates
- time
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Position Fixing By Use Of Radio Waves (AREA)
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310181131.XA CN103308015B (zh) | 2013-05-16 | 2013-05-16 | 混凝土振捣有效覆盖范围实时监测方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310181131.XA CN103308015B (zh) | 2013-05-16 | 2013-05-16 | 混凝土振捣有效覆盖范围实时监测方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103308015A CN103308015A (zh) | 2013-09-18 |
CN103308015B true CN103308015B (zh) | 2016-05-25 |
Family
ID=49133508
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310181131.XA Active CN103308015B (zh) | 2013-05-16 | 2013-05-16 | 混凝土振捣有效覆盖范围实时监测方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103308015B (zh) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103676754B (zh) * | 2013-12-25 | 2016-08-24 | 中国电建集团成都勘测设计研究院有限公司 | 平仓机施工行为监控方法 |
CN103646186B (zh) * | 2013-12-25 | 2016-08-17 | 中国电建集团成都勘测设计研究院有限公司 | 混凝土施工中振捣机工作效率的分析方法 |
CN103643679B (zh) * | 2013-12-25 | 2015-11-04 | 中国电建集团成都勘测设计研究院有限公司 | 平仓机工作效率的分析方法 |
CN103696426B (zh) * | 2013-12-26 | 2015-09-30 | 中国电建集团成都勘测设计研究院有限公司 | 混凝土浇筑振捣坯层综合识别方法 |
CN103711127B (zh) * | 2013-12-27 | 2015-12-02 | 中国电建集团成都勘测设计研究院有限公司 | 振捣机实时监测定位系统及方法 |
CN104008272B (zh) * | 2014-04-29 | 2017-02-08 | 中国电建集团成都勘测设计研究院有限公司 | 基于计算机图形技术的混凝土振捣可视化监控方法 |
CN104950791A (zh) * | 2015-06-29 | 2015-09-30 | 中国电建集团成都勘测设计研究院有限公司 | 混凝土平仓质量的控制方法 |
CN106760549A (zh) * | 2016-12-29 | 2017-05-31 | 天津大学 | 一种振捣台车定位及插入深度的实时监控系统及监控方法 |
CN110850458A (zh) * | 2019-11-29 | 2020-02-28 | 中国电建集团成都勘测设计研究院有限公司 | 基于gnss-rtk和uwb融合定位的振捣检测方法及系统 |
CN113310392B (zh) * | 2021-07-02 | 2023-02-03 | 中国电建集团成都勘测设计研究院有限公司 | 一种小型化智能振捣设备振捣关键指标感知的方法 |
CN116480153B (zh) * | 2023-06-25 | 2023-09-19 | 四川公路桥梁建设集团有限公司 | 一种梁厂混凝土成型管控方法、系统及存储介质 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0861944A1 (de) * | 1997-02-26 | 1998-09-02 | Wilhelm Dr. Degen | Vorrichtung zum Herstellen von Materialsäulen im Boden |
CN101230575A (zh) * | 2007-12-28 | 2008-07-30 | 中国水电顾问集团中南勘测设计研究院 | 用于碾压混凝土应变计组埋设的网箱及施工方法 |
CN102444289A (zh) * | 2011-11-18 | 2012-05-09 | 河海大学 | 混凝土浇筑振捣动态可视化监测方法 |
CN102505857A (zh) * | 2011-11-18 | 2012-06-20 | 河海大学 | 基于gps实时定位振捣棒在混凝土中振捣轨迹的方法 |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4576174B2 (ja) * | 2004-08-04 | 2010-11-04 | 光洋機械産業株式会社 | 骨材判別装置 |
DE102007041280B3 (de) * | 2007-08-31 | 2008-11-13 | Wacker Construction Equipment Ag | Anordnung und Verfahren zum Überwachen eines Betonverdichtungsprozesses mit einer Schallkamera |
-
2013
- 2013-05-16 CN CN201310181131.XA patent/CN103308015B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0861944A1 (de) * | 1997-02-26 | 1998-09-02 | Wilhelm Dr. Degen | Vorrichtung zum Herstellen von Materialsäulen im Boden |
CN101230575A (zh) * | 2007-12-28 | 2008-07-30 | 中国水电顾问集团中南勘测设计研究院 | 用于碾压混凝土应变计组埋设的网箱及施工方法 |
CN102444289A (zh) * | 2011-11-18 | 2012-05-09 | 河海大学 | 混凝土浇筑振捣动态可视化监测方法 |
CN102505857A (zh) * | 2011-11-18 | 2012-06-20 | 河海大学 | 基于gps实时定位振捣棒在混凝土中振捣轨迹的方法 |
Also Published As
Publication number | Publication date |
---|---|
CN103308015A (zh) | 2013-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103308015B (zh) | 混凝土振捣有效覆盖范围实时监测方法 | |
CN203113805U (zh) | 手持式混凝土振捣器 | |
CN104008272B (zh) | 基于计算机图形技术的混凝土振捣可视化监控方法 | |
CN106707932A (zh) | 一种常态混凝土振捣质量可视化实时监控系统及方法 | |
Tian et al. | Development of real-time visual monitoring system for vibration effects on fresh concrete | |
CN203908662U (zh) | 爆破振动传感器固定装置 | |
CN107764492A (zh) | 一种研究框架结构振动响应特征的模型试验方法及系统 | |
CN103148824A (zh) | 一种振捣有效深度智能检测方法 | |
CN105421172B (zh) | 一种单侧形式运营双线铁路轨道控制网的测量方法 | |
Gong et al. | Real-time tracking of concrete vibration effort for intelligent concrete consolidation | |
CN108469364A (zh) | 水工混凝土隐蔽缺陷检测的模型试验装置及方法 | |
CN104317263B (zh) | 混凝土施工振捣轨迹控制方法 | |
JP2015214838A (ja) | 改良地盤の品質管理方法及び品質管理装置 | |
CN103696426B (zh) | 混凝土浇筑振捣坯层综合识别方法 | |
CN103902842A (zh) | 混凝土坯层覆盖时间的分析方法 | |
CN104237095B (zh) | 一种道路清扫过程中扬尘排放测量系统及测量方法 | |
CN103696425B (zh) | 混凝土施工中振捣有序性的分析方法 | |
CN207571130U (zh) | 一种用于模拟多洞隧道相互影响的试验设备 | |
CN104266625A (zh) | 混凝土坯层厚度监测方法 | |
KR20090129736A (ko) | 지반 다짐 작업 관리 장치 및 그 방법 | |
CN103676754B (zh) | 平仓机施工行为监控方法 | |
CN103669361B (zh) | 混凝土施工中振捣机与缆机匹配的方法 | |
CN203084536U (zh) | 混凝土振捣质量智能监控仪 | |
CN103643679B (zh) | 平仓机工作效率的分析方法 | |
CN207366506U (zh) | 水工混凝土隐蔽缺陷检测的模型试验装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072 Applicant after: Chengdu Hydroelectric Investigation & Design Institute of SPC Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072 Applicant before: Chengdu Hydroelectric Investigation & Design Institute of China Hydropower Consu |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF CHINA HYDROPOWER CONSU TO: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC |
|
C53 | Correction of patent for invention or patent application | ||
CB02 | Change of applicant information |
Address after: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072 Applicant after: Co., Ltd of Chengdu survey and design academy of electricity Jian group of China Address before: The North Qingyang District of Chengdu City, Sichuan Province, No. 610072 Applicant before: Chengdu Hydroelectric Investigation & Design Institute of SPC |
|
COR | Change of bibliographic data |
Free format text: CORRECT: APPLICANT; FROM: CHENGDU HYDROELECTRIC INVESTIGATION + DESIGN INSTITUTE OF SPC TO: CHINA POWER GROUP CHENGDU INVESTIGATION DESIGN + RESEARCH INSTITUTE CO., LTD. |
|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |