CN101230575A - 用于碾压混凝土应变计组埋设的网箱及施工方法 - Google Patents

用于碾压混凝土应变计组埋设的网箱及施工方法 Download PDF

Info

Publication number
CN101230575A
CN101230575A CNA2007103034457A CN200710303445A CN101230575A CN 101230575 A CN101230575 A CN 101230575A CN A2007103034457 A CNA2007103034457 A CN A2007103034457A CN 200710303445 A CN200710303445 A CN 200710303445A CN 101230575 A CN101230575 A CN 101230575A
Authority
CN
China
Prior art keywords
net cage
layer
strain gauge
concrete
spread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2007103034457A
Other languages
English (en)
Inventor
邱山鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hydrochina Zhongnan Engineering Corp
Original Assignee
Hydrochina Zhongnan Engineering Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hydrochina Zhongnan Engineering Corp filed Critical Hydrochina Zhongnan Engineering Corp
Priority to CNA2007103034457A priority Critical patent/CN101230575A/zh
Publication of CN101230575A publication Critical patent/CN101230575A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本发明涉及一种碾压混凝土中埋设应变计组的施工方法,本发明同时还涉及该施工方法所用的一种装置。首先开挖大小与网箱相配方坑,将支架中心杆插入次下层混凝土中,安装支杆和应变计,安装网箱,整理电缆;碾压混凝土料坑内回填和摊铺,采用振捣泵振捣;每一层应变计组区域采用人工摊铺,人工振动泵振捣,第二层摊铺之前按要求引出电缆,摊铺和振捣同每一层,并立标志,以免下一层碾压直碾;每三层采用通仓摊铺。实际施工证明,本发明提供的碾压混凝土中埋设应变计组的施工方法代表性强,工作量小,工具简单。

Description

用于碾压混凝土应变计组埋设的网箱及施工方法
技术领域
本发明涉及一种碾压混凝土中埋设应变计组的施工方法,本发明同时还涉及该施工方法所用的一种装置。
背景技术
在所有碾压混凝土监测仪器埋设中,应变计组埋设是难度最大的,一是占用空间大、二是准确定位困难,三是应变计及应变计组整体结构强度弱,不可经受高强度的振动和碾压。
在碾压混凝土中埋设仪器的基本方法有三种类型:一是直接埋设,即直接将应变计埋设在碾压混凝土中;二是回填法,即在碾压好的混凝土上钻孔,在将应变计置于其中,或挖坑回填;三是预制法,即将应变计用常规混凝土预制,然后在施工中将预制块放入碾压混凝土中。上述三种方法,都存在比较严重的缺点。直接埋设最大的问题是应变计的存活率低,因为,应变计轴向的抗压强度不高,所以在碾压过程中极易损坏;回填法存在施工过程繁杂、仪器代表性差等问题;而预制法都存在预制件与碾压混凝土力学参数存在较大差别、测量成果不准确的问题。
发明内容
本发明提供一种能保证应变计组存活率高,测量又准确的埋设方法。该方法中利用本发明提供的一种网箱。
用于碾压混凝土应变计组埋设的网箱,由多根杆组成上下两部分,形成一个箱形结构,上下两部分活动联接。
与网箱配套使用的有应变计支架,该支架包括一基座以及基座上按设计要求方向设置的支杆。支架基座和支杆由应变计生产厂家提供。
施工时,首先开挖大小与网箱相配方坑,将支架中心杆插入次下层混凝土中,安装支杆和应变计,安装网箱,整理电缆;碾压混凝土料坑内回填和摊铺,采用振捣泵振捣;每一层应变计组区域采用人工摊铺,人工振动泵振捣,第二层摊铺之前按要求引出电缆,摊铺和振捣同每一层,并立标志,以免下一层碾压直碾;每三层采用通仓摊铺。
实际施工证明,本发明提供的碾压混凝土中埋设应变计组的施工方法代表性强,工作量小,工具简单。
附图说明
图1是本发明中提供网箱结构示意图;
图2是本发明中施工过程示意图。
具体实施方式
实施例1
加工网箱:
加工网箱的目的是有硬性标志,有效保证应变计组在施工过程不被破坏,同时在混凝土摊铺时能直接进入箱1内,大小规格为900mm×600mm×900mm(长×宽×高,按装配后应变计组大小,六面均留50mm空隙),上下分2节便于第一、二层混凝土摊铺,框架用Φ20螺纹钢2,网格用Φ6钢筋8,网格约120mm×120mm,加工后作防锈处理,如图1。
按仪器设计位置和高程,尽量保证应变计6组支架心在层面处,在下层6初凝之前(试验时在本层摊铺之前开挖),开挖大小与网箱相配方坑,将支架中心杆7插入次下层混凝土中(采用辅助工具、本次试验时直接锤入)安装支杆和应变计,安装网箱,整理电缆。
利用挖坑的碾压混凝土料坑内回填和摊铺,采用振捣泵振捣。
第一层3应变计组区域采用人工摊铺,人工振动泵振捣,振捣在仓面整体碾压完成后进行。
第二层4摊铺之前按要求引出电缆,摊铺和振捣同每一层,并立标志,以免下一层碾压直碾。
第三层5采用通仓摊铺。
完成后,施工主体的剖面图如图2所示。

Claims (3)

1.用于碾压混凝土应变计组埋设的网箱,其特征在于该网箱由多根杆组成上下两部分,形成一个箱形结构。
2.根据权利要求1所述的网箱,其特征在于上下两部分是活动联接。
3.利用权利要求1或2所述的网箱埋设应变计组的方法,其特征在于首先开挖大小与网箱相配方坑,将支架中心杆插入次下层混凝土中,安装支杆和应变计,安装网箱,整理电缆;碾压混凝土料坑内回填和摊铺,采用振捣泵振捣;每一层应变计组区域采用人工摊铺,人工振动泵振捣,第二层摊铺之前按要求引出电缆,摊铺和振捣同每一层,并立标志,以免下一层碾压直碾;每三层采用通仓摊铺。
CNA2007103034457A 2007-12-28 2007-12-28 用于碾压混凝土应变计组埋设的网箱及施工方法 Pending CN101230575A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2007103034457A CN101230575A (zh) 2007-12-28 2007-12-28 用于碾压混凝土应变计组埋设的网箱及施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2007103034457A CN101230575A (zh) 2007-12-28 2007-12-28 用于碾压混凝土应变计组埋设的网箱及施工方法

Publications (1)

Publication Number Publication Date
CN101230575A true CN101230575A (zh) 2008-07-30

Family

ID=39897358

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2007103034457A Pending CN101230575A (zh) 2007-12-28 2007-12-28 用于碾压混凝土应变计组埋设的网箱及施工方法

Country Status (1)

Country Link
CN (1) CN101230575A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103308015A (zh) * 2013-05-16 2013-09-18 中国水电顾问集团成都勘测设计研究院 混凝土振捣有效覆盖范围实时监测方法
CN104120726A (zh) * 2014-07-16 2014-10-29 中国电建集团西北勘测设计研究院有限公司 一种胶结颗粒料斜坡碾压装置及其施工方法
CN104154855A (zh) * 2014-07-31 2014-11-19 桂林理工大学 混凝土结构物的应变测量方法

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103308015A (zh) * 2013-05-16 2013-09-18 中国水电顾问集团成都勘测设计研究院 混凝土振捣有效覆盖范围实时监测方法
CN103308015B (zh) * 2013-05-16 2016-05-25 中国电建集团成都勘测设计研究院有限公司 混凝土振捣有效覆盖范围实时监测方法
CN104120726A (zh) * 2014-07-16 2014-10-29 中国电建集团西北勘测设计研究院有限公司 一种胶结颗粒料斜坡碾压装置及其施工方法
CN104120726B (zh) * 2014-07-16 2016-04-13 中国电建集团西北勘测设计研究院有限公司 一种胶结颗粒料斜坡碾压装置及其施工方法
CN104154855A (zh) * 2014-07-31 2014-11-19 桂林理工大学 混凝土结构物的应变测量方法

Similar Documents

Publication Publication Date Title
CN108072570B (zh) 不同位移模式下锚定板类挡土墙土压力试验装置及方法
CN106758831B (zh) 跨铁路桥转体连续梁施工方法
Zotsenko et al. Long-term settlement of buildings erected on driven cast-in-situ piles in loess soil
CN107179396A (zh) 多功能拼装式岩土工程物理相似试验系统
CN106930319A (zh) 一种高边坡框架式挡土墙及其施工方法
CN111910679B (zh) 复杂地形下超长超高衡重式挡土墙施工方法
Pakbaz et al. Characteristics of diaphragm wall lateral deformations and ground surface settlements: Case study in Iran-Ahwaz metro
CN101781896A (zh) 混凝土垫上制作沉井的施工方法
CN102430277B (zh) 一种用于污水物理处理的粗格栅沉井及其施工方法
CN111119195A (zh) 一种基坑土钉喷锚支护施工方法
CN113026715A (zh) 高填方路基强夯施工方法
CN203247614U (zh) 锚拉式挡土墙模型试验装置
CN207331740U (zh) 一种在役钢筋混凝土挡土墙的加高加固结构
Su Laboratory pull-out testing study on soil nails in compacted completely decomposed granite fill
JP7029149B1 (ja) 既設石積み擁壁の耐震補強工法
CN107905609A (zh) 地下人防施工方法
CN101230575A (zh) 用于碾压混凝土应变计组埋设的网箱及施工方法
Weng et al. Design and performance of the deep excavation of a substation constructed by top-down method in Shanghai soft soils
JP2688560B2 (ja) 地下躯体の構築工法
Mundell et al. Behaviour of drystone retaining structures
CN207003483U (zh) 一种明挖隧道异型结构的基底加固体系
Zhang et al. Observed deformation characteristics of a deep excavation for the spring area in Jinan, China
CN104695460A (zh) 小半径曲线现浇梁横断面方向设不对称支架体系施工方法
CN212316984U (zh) 一种适用于填方工程的装配式轻型支挡结构
CN106245659A (zh) 自嵌式砌块加筋结构高填方边坡防护方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20080730