CN103270983A - Method for constructing schizothoracinae artificial spawning site in natural river - Google Patents

Method for constructing schizothoracinae artificial spawning site in natural river Download PDF

Info

Publication number
CN103270983A
CN103270983A CN2013101917403A CN201310191740A CN103270983A CN 103270983 A CN103270983 A CN 103270983A CN 2013101917403 A CN2013101917403 A CN 2013101917403A CN 201310191740 A CN201310191740 A CN 201310191740A CN 103270983 A CN103270983 A CN 103270983A
Authority
CN
China
Prior art keywords
river
spawning
spawning ground
fish
site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101917403A
Other languages
Chinese (zh)
Other versions
CN103270983B (en
Inventor
刘明典
刘绍平
陈大庆
段辛斌
王珂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yangtze River Fisheries Research Institute CAFS
Original Assignee
Yangtze River Fisheries Research Institute CAFS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yangtze River Fisheries Research Institute CAFS filed Critical Yangtze River Fisheries Research Institute CAFS
Priority to CN201310191740.3A priority Critical patent/CN103270983B/en
Publication of CN103270983A publication Critical patent/CN103270983A/en
Application granted granted Critical
Publication of CN103270983B publication Critical patent/CN103270983B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A40/00Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
    • Y02A40/80Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in fisheries management
    • Y02A40/81Aquaculture, e.g. of fish
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P60/00Technologies relating to agriculture, livestock or agroalimentary industries
    • Y02P60/60Fishing; Aquaculture; Aquafarming

Landscapes

  • Revetment (AREA)
  • Farming Of Fish And Shellfish (AREA)

Abstract

The invention provides a method for constructing a schizothoracinae artificial spawning site a natural river. The method comprises a first step of carrying out previous preparation, a second step of selecting a construction site of the spawning site, a third step of determining parameters, a fourth step of determining the scale and the structure of the spawning site, a fifth step of determining the paving method of a structural unit, a sixth step of constructing auxiliary facilities and a seventh step of managing and maintaining. According to the method, under the condition that normal operation of a hydropower station is not affected, a shoal can be constructed manually in an appropriate river reach to provide the site of egg reproduction for the schizothoracinae, and the schizothoracinae can be successfully multiplied. The contradiction between river hydroelectric development and ecological protection can be effectively relieved. The scale and the appropriate river reach of the artificial spawning site can be determined according to reach fish resource quantity, labor management serves as an auxiliary means, and the sustainable utilization of the reach fish resources can be well maintained.

Description

The construction method of natural river schizothoracin class artificial spawning field
Technical field
The present invention relates to the fishery conservation field, specially refer to the construction method of a kind of natural river schizothoracin class artificial spawning field.
Background technology
Entered since the new century, China has begun one and has taken turns unprecedented river hydroelectric development upsurge.Along with development of the West Regions and the nation-building growth to energy demand, step power station is all built in western river to some extent.Western river belongs to type river, valley more, and The turbulent river crashes its way through, has simultaneously that some current are slow, more " beach " and " a small bay in a river " of gravel, and the flow condition that this emergency replaces can satisfy the breeding requirement of different fish.For the schizothoracin class, after the ovum output, general development time is longer, and ovum is dispersed on the ruckle more, and major part falls in the stone slit.Gravel shoal dissolved oxygen is abundant, and water quality is good, is conducive to the normal development of schizothoracin fertilized egg.These multiplication characteristics are a kind of adaptations that environment, weather, the hydrology characteristics with the basin interrelate.
Yet the construction in power station is very important to the influence of river Mesichthyes, and its influence mode mainly comprises: (1) hydrologic regime changes.After dam builds up retaining, make most of section become silent oscillation by original flowing water type.The change of hydrologic regime, the fish that make some adapt to the habitat, happiness torrent shoal in habitat, former river course have lost original habitat, because the reservoir area is flooded, " beach " that flow condition, the gravel that causes original emergency to replace is more and " a small bay in a river " disappear, and therefore are that breeding condition, gravel are that the spawning ground of oviposition substrate significantly reduces with current; (2) habitat fragmentation.Dam Construction to the influence of fish the most deep be the systematicness of having destroyed the river, cause the fragmentation effect in habitat.Dam is built and has not only been changed flowing water environment, has also intercepted its passage that traces back, and tracing back lays eggs is that the part fish finish its history of life, guarantee that the enough effective filial generation quantity of species is necessary.Another harm of habitat segmentization is that the search capability of reservoir area fish is reduced, and may accelerate decline and the extinction of population quantity;
For the ecology influence that the construction of hydropower stations brings, people have taked a lot of protection countermeasures, and the mode by artificial construction reduces hydroelectric development to the influence of the stock of fish, as build fish pass structure, build artificial fecundation pouring station etc.Fish pass structure is to help fish to trace back smoothly by dam smoothly or descending function building thing.Its type mainly contains fish pass, fish lock, fish lift, boat for collection and transportation of fish.Its principle is to utilize the flow direction property of fish, produces one at the fish inlet place than bigger current of flow velocity on every side, and fish is lured into.The setting of fish inlet and how smoothly fish to be lured into the fish passage be fish pass structure design key of success.It is exactly that cost is high that fish pass structure also has characteristics; It is one of important measures of protecting at present species, increase fish population quantity that artificial fecundation is released, and can relax river construction to a certain extent to the adverse effect of fish population resource quantity.Whether the breakthrough of artificial propagation techniques is the precondition that can the artificial fecundation measure of releasing be implemented.Especially for the schizothoracin class that has adapted to torrent habitat, mountain area, valley, artificial propagation techniques is a bottleneck of present fish research, has hindered the release development of safeguard measure of artificial fecundation to a certain extent.
Summary of the invention
The object of the present invention is to provide the construction method of a kind of natural river schizothoracin class artificial spawning field, its purpose one is: be chosen in suitable section, copy in the natural environment schizothoracin class characteristics of laying eggs to make up the artificial spawning field; Its purpose two is: build suitable spawning ground of breeding for being subjected to the schizothoracin in the effect of human activity section.
For achieving the above object, technical scheme of the present invention is:
The construction method of a kind of natural river schizothoracin class artificial spawning field, described method is carried out as follows:
1, early-stage preparations comprise: 1. determine spawning ground target fish according to stock of fish investigation result; 2. understand the ecological habit of target fish, comprise fish reproduction period, spawning season spawning ground water temperature, flow velocity, oxygen dissolved and transparency; 3. field condition is investigated, and understands and plans to build section, spawning ground state of ecological environment;
2, the spawning ground building site is selected: should consider following condition when selecting to build the site, spawning ground: 1. section flow velocity; 2. with the distance in dam, power station; 3. river course one side has level land or the river shoal greater than the integral body of 500 ㎡;
3, determining of parameter comprises: the 1. geographical position at effluent section place, determine surface, spawning ground elevation according to riverbed absolute elevation and the target fish required depth of water of laying eggs; 2. the section flow velocity is 0.5m/s-2.0m/s, and spawning season spawning ground water temperature is 13-22 ℃, with the distance in dam, power station greater than 2 kilometers; 3. the spawning ground host material is cobble, silt mixing substrate, and the diameter of cobble is 50-200mm;
4, spawning ground scale and structure: 1. determine the area in spawning ground according to the construction of section zone landform, the spawning ground be shaped as irregular semicircle or ellipse; 2. the spawning ground construction unit is rectangle, and laying depth is the cobble of 50-200mm for the 400mm diameter, and the top layer re-lays the natural river sand that thickness is 50mm;
5, the paving mode of construction unit: laying is integrated in the shape bar structure unit according to selected river shoal, site, construction unit being " product " font mode inlays mutually, fill with scattered cobble and silt adjacent space and marginal portion, after all construction unit plate interlockings are finished, form the river shoal of a monoblock, the sandy beach tilts to the middle of the river from the bank, and its ramp slope is 1/40;
6, affiliated facility construction: comprise and protect river purse seine and soundproof wall;
7, management maintenance: 1. daily inspection; 2. periodic monitoring water temperature, water quality; 3. the maintenance of flood season and maintenance.
Good effect of the present invention is:
1, can be under the situation that does not influence the power station normal operation, suitable section is artificial under the dam builds a shoal, for the schizothoracin class provides the place of egg reproduction, guarantees the smooth procreation of fish;
2, can effectively alleviate contradiction between river hydroelectric development and the ecological protection.Usually after the power station is built up, can cause the decline of lower reache water level, flow velocity to reduce, cause natural spawning ground to disappear, transform or build again by artificial means, for fish provide suitable spawning place;
3, also can determine scale and the suitable section of artificial spawning field according to section stock of fish amount, be aided with labor management, can safeguard the sustainable use of the section stock of fish better;
4, this method cost is low, and specification requirement is low, implement easily, and floor space is little, is an important additional measure that protects the fish resources.
Description of drawings
Fig. 1, artificial spawning field structure unit section schematic diagram;
Fig. 2, natural river schizothoracin class artificial spawning field vertical view.
Embodiment
Below in conjunction with attached Fig. 1 and 2, further specify the specific embodiment of the present invention with embodiment.
Be reference frame with river, Yalongjiang River land owned by officials section.Referring to Fig. 1, Fig. 2.
Embodiment one
1, early-stage preparations
(1), the target fish is selected: by field investigation and historical document, determine that the Sichuan schizothoracin is the target fish, the Sichuan schizothoracin is one of main economic fish of Yalongjiang River land owned by officials power station lower reache, because resource is excessively utilized, this species resource amount significantly descends.
(2), understand the ecological habit of target fish: the Sichuan schizothoracin egg-laying period, mid or late March was breeding period in annual 3-4 month.There is the cluster behavior in egg-laying period, the milter habit of nesting, and right the laying eggs of shoal tool cobble silt mixing substrate, the toughness of laying eggs, Sichuan schizothoracin weight range 30-121g, average weight 65.6g, the long scope 12.5-17cm of body, average body is long to be 13.8cm.
2, the spawning ground building site is selected: on the river section in 20 kilometer range of downstream, dam, power station, land owned by officials, initial option the suitable sections of building the fish spawning grounds, three places, by comparing, filter out the site of relatively suitable transformation and construction, the screening comparing data sees Table one:
Section artificial spawning field, river, table 1 Yalongjiang River land owned by officials building site is than choosing
Than selecting index A-beat sieve B-pine tree Ping Qiao C-big salt pond
Apart from the dam site distance 3km 8km 14km
The riverbank The left bank Left bank, right bank all have The left bank
The substrate feature Cobble and silt Cobble, a small amount of fine sand Cobble, a large amount of silt
Can build area About 8000 m 2 About 800 m 2 About 7000 m 2
Surrounding environment One tributary is arranged, and the bank is the slag field Debris flow scour out sandy beach. One tributary is arranged, but almost dry.Nearer from campsite, power station, land owned by officials.
Existing problems Nearer apart from dam site, be subject to mankind's activity and disturb. Be subject to the debris flow influence. Be campsite, power station, land owned by officials on the slope, bank, the sanitary sewage discharging is planned to build zone, spawning ground water quality with influence.Be subject to the debris flow influence.
Comprehensive conclusion Feasible Unsuitable More feasible
Through relatively comprehensive, the A place is decided to be with respect to suitable transformation and builds into schizothoracin artificial spawning field, Sichuan.
3, the coherent reference data determines
(1) surface, spawning ground elevation: according to the ecological habit of Sichuan schizothoracin, determine that artificial spawning field elevation is 1201.2-1201.5m, laying elevation reduces gradually from the bank to korneforos heart direction, namely the horizontal elevation near bank one side is 1201.5m, and the horizontal elevation of close center, river course one side is 1201.2m;
(2) flow rate of water flow: the flow rates of determining section, artificial spawning field is 0.5-2.0m/s;
(3) spawning season spawning ground water temperature is 13-22 ℃;
(4) the spawning ground host material is cobble, silt mixing substrate, and wherein the cobble diameter is 50-200mm.
4, spawning ground scale and structure
(1) spawning ground scale: beat the available area 8000m of sieve section by the A site 2Determine construction scale;
(2) construction unit: construction unit is rectangle, the cobble 1 of laying depth 400mm diameter 50-200mm, and the top layer need re-lay the thick natural river sand of one deck 50mm 2.
5, the paving mode of construction unit
Laying is integrated in shape bar structure unit according to 8000 ㎡ river shoals, A site, construction unit being " product " font mode rabbets mutually, fill with scattered cobble and silt adjacent space and marginal portion, and the sandy beach is the slope that tilts to the middle of the river from the bank, and the gradient is 1/40.
6, affiliated facility construction
If artificial spawning field building site is frequent regional near mankind's activity, or closes on highway, then need protect the river purse seine in the riverbank construction, stop people and animals to enter the waters, spawning ground, bigger as the highway car flow, also need set up the soundproof wall device, avoid noise to the influence of fish reproduction.
7, management maintenance
(1) after the spawning ground is built up and put into operation, must strengthen inspecting, in time remove large-scale branch and other foreign material of section, spawning ground, guarantee that suitable current are unimpeded;
(2) periodic monitoring water quality condition is in time understood the scope whether zone, spawning ground water body water temperature remains on 13-22 ℃, and flow rate of water flow remains on the 0.5-2.0 meter per second, increases or reduces and block the water device according to monitoring result;
(3) after each flood season, carry out comprehensive examination and maintenance, in time clear up pollutant, removing cobble surface mud that flood brings, replenish silt and fine sand, check whether baffle device for water is damaged on-call maintenance and reinforcing;
(4) forbid that unrelated person enters the section, spawning ground and is engaged in and paddles and the fishery activity, especially schizothoracin 3-4 mating season in Sichuan is between the month.
Embodiment two
Referring to Fig. 1 and Fig. 2
1, early-stage preparations
(1), the target fish is selected: by field investigation and historical document, determine that the short hairs schizothoracin is the target fish, the short hairs schizothoracin is one of main economic fish of Yalongjiang River land owned by officials power station lower reache, because resource is excessively utilized, this species resource amount significantly descends.
(2), understand the ecological habit of target fish: the short hairs schizothoracin egg-laying period is in annual 3-4 month.There is the cluster behavior in egg-laying period, the milter habit of nesting, and right the laying eggs of shoal tool cobble silt mixing substrate, the toughness of laying eggs, short hairs schizothoracin weight range 36-135g, average weight 69.6g, the long scope 12.2-18.2cm of body, average body is long to be 14.2cm.
2, the spawning ground building site is selected: on the river section in 20 kilometer range of downstream, dam, power station, land owned by officials, initial option the suitable sections of building the fish spawning grounds, three places, by comparing, filter out the site of relatively suitable transformation and construction, the screening comparing data sees Table two:
Section artificial spawning field, river, table 2 Yalongjiang River land owned by officials building site is than choosing
Than selecting index A-beat sieve B-pine tree Ping Qiao C-big salt pond
Apart from the dam site distance 3km 8km 14km
The riverbank The left bank Left bank, right bank all have The left bank
The substrate feature Cobble and silt Cobble, a small amount of fine sand Cobble, a large amount of silt
Can build area About 8000 m 2 About 800 m 2 About 7000 m 2
Surrounding environment One tributary is arranged, and the bank is the slag field Debris flow scour out sandy beach. One tributary is arranged, but almost dry.Nearer from campsite, power station, land owned by officials.
Existing problems Nearer apart from dam site, be subject to mankind's activity and disturb. Be subject to the debris flow influence. Be campsite, power station, land owned by officials on the slope, bank, the sanitary sewage discharging is planned to build zone, spawning ground water quality with influence.Be subject to the debris flow influence.
Comprehensive conclusion Feasible Unsuitable More feasible
Through relatively comprehensive, the A place is decided to be with respect to suitable transformation and builds into schizothoracin artificial spawning field, Sichuan.
3, the coherent reference data determines
(1) surface, spawning ground elevation: according to the ecological habit of short hairs schizothoracin, determine that artificial spawning field elevation is 1201.2-1201.5m, laying elevation reduces gradually from the bank to korneforos heart direction, namely the horizontal elevation near bank one side is 1201.5m, and the horizontal elevation of close center, river course one side is 1201.2m;
(2) flow rate of water flow: the flow rates of determining section, artificial spawning field is 0.5-2.0m/s;
(3) spawning season spawning ground water temperature is 13-22 ℃;
(4) the spawning ground host material is cobble, silt mixing substrate, and wherein the cobble diameter is 50-200mm.
4, spawning ground scale and structure
(1) spawning ground scale: beat the available area 8000m of sieve section by the A site 2Determine construction scale;
(2) construction unit: construction unit is rectangle, the cobble 1 of laying depth 400mm diameter 50-200mm, and the top layer need re-lay the thick natural river sand of one deck 50mm 2.
5, the paving mode of construction unit
Laying is integrated in shape bar structure unit according to 8000 ㎡ river shoals, A site, construction unit being " product " font mode rabbets mutually, fill with scattered cobble and silt adjacent space and marginal portion, and the sandy beach is the slope that tilts to the middle of the river from the bank, and the gradient is 1/40.
6, affiliated facility construction
If artificial spawning field building site is frequent regional near mankind's activity, or closes on highway, then need protect the river purse seine in the riverbank construction, stop people and animals to enter the waters, spawning ground, bigger as the highway car flow, also need set up the soundproof wall device, avoid noise to the influence of fish reproduction.
7, management maintenance
(1) after the spawning ground is built up and put into operation, must strengthen inspecting, in time remove large-scale branch and other foreign material of section, spawning ground, guarantee that suitable current are unimpeded;
(2) periodic monitoring water quality condition is in time understood zone, spawning ground water body water temperature and whether is remained on 13-22 ℃, and flow rate of water flow remains on the 0.5-2.0 meter per second;
(3) after each flood season, carry out comprehensive examination and maintenance, in time clear up pollutant, removing cobble surface mud that flood brings, replenish silt and fine sand, check whether baffle device for water is damaged on-call maintenance and reinforcing;
(4) forbid that unrelated person enters the section, spawning ground and is engaged in and paddles and the fishery activity, especially short hairs schizothoracin 3-4 mating season is between the month.
Embodiment three
Referring to Fig. 1 and Fig. 2
1, early-stage preparations
(1), the target fish is selected: by field investigation and historical document, determine that thin squama schizothoracin is the target fish, thin squama schizothoracin once was one of main economic fish of Yalongjiang River land owned by officials power station lower reache, because resource is excessively utilized, this species resource amount significantly descends.
(2), understand the ecological habit of target fish: the thin squama schizothoracin egg-laying period concentrates on annual late March.Thin squama schizothoracin weight range 32-139g, average weight 70.6g, the long scope 12.8-18.8cm of body, average body is long to be 14.2cm.
2, the spawning ground building site is selected: on the river section in 20 kilometer range of downstream, dam, power station, land owned by officials, initial option the suitable sections of building the fish spawning grounds, three places, by comparing, filter out the site of relatively suitable transformation and construction, the screening comparing data sees Table three:
Section artificial spawning field, river, table 3 Yalongjiang River land owned by officials building site is than choosing
Than selecting index A-beat sieve B-pine tree Ping Qiao C-big salt pond
Apart from the dam site distance 3km 8km 14km
The riverbank The left bank Left bank, right bank all have The left bank
The substrate feature Cobble and silt Cobble, a small amount of fine sand Cobble, a large amount of silt
Can build area About 8000 m 2 About 800 m 2 About 7000 m 2
Surrounding environment One tributary is arranged, and the bank is the slag field Debris flow scour out sandy beach. One tributary is arranged, but almost dry.Nearer from campsite, power station, land owned by officials.
Existing problems Nearer apart from dam site, be subject to mankind's activity and disturb. Be subject to the debris flow influence. Be campsite, power station, land owned by officials on the slope, bank, the sanitary sewage discharging is planned to build zone, spawning ground water quality with influence.Be subject to the debris flow influence.
Comprehensive conclusion Feasible Unsuitable More feasible
Through relatively comprehensive, the A place is decided to be with respect to suitable transformation and builds into thin squama schizothoracin artificial spawning field.
3, the coherent reference data determines
(1) surface, spawning ground elevation: according to the ecological habit of thin squama schizothoracin, determine that artificial spawning field elevation is 1201.2-1201.5m, laying elevation reduces gradually from the bank to korneforos heart direction, namely the horizontal elevation near bank one side is 1201.5m, and the horizontal elevation of close center, river course one side is 1201.2m;
(2) flow rate of water flow: the flow rates of determining section, artificial spawning field is 0.5-2.0m/s;
(3) spawning season spawning ground water temperature is 13-18 ℃;
(4) the spawning ground host material is cobble, silt mixing substrate, and wherein the cobble diameter is 50-200mm.
4, spawning ground scale and structure
(1) spawning ground scale: beat the available area 8000m of sieve section by the A site 2Determine construction scale;
(2) construction unit: construction unit is rectangle, the cobble 1 of laying depth 400mm diameter 50-200mm, and the top layer need re-lay the thick natural river sand of one deck 50mm 2.
5, the paving mode of construction unit
Laying is integrated in shape bar structure unit according to 8000 ㎡ river shoals, A site, construction unit being " product " font mode rabbets mutually, fill with scattered cobble and silt adjacent space and marginal portion, and the sandy beach is the slope that tilts to the middle of the river from the bank, and the gradient is 1/40.
6, affiliated facility construction
If artificial spawning field building site is frequent regional near mankind's activity, or closes on highway, then need protect the river purse seine in the riverbank construction, stop people and animals to enter the waters, spawning ground, bigger as the highway car flow, also need set up the soundproof wall device, avoid noise to the influence of fish reproduction.
7, management maintenance
(1) after the spawning ground is built up and put into operation, must strengthen inspecting, in time remove large-scale branch and other foreign material of section, spawning ground, guarantee that suitable current are unimpeded;
(2) periodic monitoring water quality condition is in time understood zone, spawning ground water body water temperature and whether is remained on 13-18 ℃, and flow rate of water flow remains on the 0.5-2.0 meter per second;
(3) after each flood season, carry out comprehensive examination and maintenance, in time clear up pollutant, removing cobble surface mud that flood brings, replenish silt and fine sand, check whether baffle device for water is damaged on-call maintenance and reinforcing;
(4) forbid that unrelated person enters the section, spawning ground and is engaged in and paddles and the fishery activity, especially thin squama schizothoracin mating season.
The above only is non-limiting embodiment of the present invention; for the person of ordinary skill of the art; not breaking away from the invention design and not making under the prerequisite of creative work, can also make some distortion and improvement, these all belong to protection scope of the present invention.

Claims (1)

1. the construction method of a natural river schizothoracin class artificial spawning field, it is characterized in that: described method is carried out as follows:
(1), early-stage preparations, comprising: 1. determine spawning ground target fish according to stock of fish investigation result; 2. understand the ecological habit of target fish, comprise fish reproduction period, spawning season spawning ground water temperature, flow velocity, oxygen dissolved and transparency; 3. field condition is investigated, and understands and plans to build section, spawning ground state of ecological environment;
(2), the spawning ground building site is selected: should consider following condition when selecting to build the site, spawning ground: 1. section flow rate of water flow; 2. with the distance in dam, power station; 3. river course one side has level land or the river shoal greater than the integral body of 500 ㎡;
(3), the determining of parameter, comprising: the 1. geographical position at effluent section place, determine surface, spawning ground elevation according to riverbed absolute elevation and the target fish required depth of water of laying eggs; 2. the section flow velocity is 0.5m/s-2.0m/s, and spawning season spawning ground water temperature is 13-22 ℃, with the distance in dam, power station greater than 2 kilometers; 3. the spawning ground host material is cobble, silt mixing substrate, and the diameter of cobble is 50-200mm;
(4), spawning ground scale and structure: 1. determine the area in spawning ground according to the construction zone landform of section, the spawning ground be shaped as irregular semicircle or ellipse; 2. the spawning ground construction unit is rectangle, and laying depth is the cobble of 50-200mm for the 400mm diameter, and the top layer re-lays the natural river sand that thickness is 50mm;
(5), the paving mode of construction unit: laying is integrated in the shape bar structure unit according to selected river shoal, site, construction unit being " product " font mode inlays mutually, fill with scattered cobble and silt adjacent space and marginal portion, after all construction unit plate interlockings are finished, form the river shoal of a monoblock, the sandy beach tilts to the middle of the river from the bank, and its ramp slope is 1/40;
(6), affiliated facility construction: comprise and protect river purse seine and soundproof wall;
(7), management maintenance: 1. daily inspection; 2. periodic monitoring water temperature, water quality; 3. the maintenance of flood season and maintenance.
CN201310191740.3A 2013-05-22 2013-05-22 Method for constructing schizothoracinae artificial spawning site in natural river Expired - Fee Related CN103270983B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310191740.3A CN103270983B (en) 2013-05-22 2013-05-22 Method for constructing schizothoracinae artificial spawning site in natural river

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310191740.3A CN103270983B (en) 2013-05-22 2013-05-22 Method for constructing schizothoracinae artificial spawning site in natural river

Publications (2)

Publication Number Publication Date
CN103270983A true CN103270983A (en) 2013-09-04
CN103270983B CN103270983B (en) 2014-09-03

Family

ID=49053231

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310191740.3A Expired - Fee Related CN103270983B (en) 2013-05-22 2013-05-22 Method for constructing schizothoracinae artificial spawning site in natural river

Country Status (1)

Country Link
CN (1) CN103270983B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104113739A (en) * 2014-08-12 2014-10-22 中国水产科学研究院长江水产研究所 Method for underwater observing natural oviposition of schizothoracins
CN104938377A (en) * 2015-06-01 2015-09-30 中国科学院东北地理与农业生态研究所 Manual spawning ground constructing method for recovering Songhua river fish resources and evaluation method of effect thereof
CN105248335A (en) * 2015-11-25 2016-01-20 中国水产科学研究院长江水产研究所 Schizothoracinae fish fertilized egg incubation method
CN106049347A (en) * 2016-05-25 2016-10-26 山东省淡水渔业研究院 Constructing method for fish shelter under stress of high silt concentration flood
CN106417120A (en) * 2016-12-14 2017-02-22 中国电建集团贵阳勘测设计研究院有限公司 Artificial fish spawning bed
CN106651468A (en) * 2017-01-04 2017-05-10 中国水产科学研究院珠江水产研究所 Scale estimation method for spawning ground of river fishes capable of laying adhesive eggs
CN107273645A (en) * 2017-07-25 2017-10-20 中国水利水电科学研究院 A kind of computational methods of fish egg-laying season ecological water demand of rivers process
WO2018223787A1 (en) * 2017-06-05 2018-12-13 云南大学 Reservoir tail reverse regulation method for native fish protection
CN110651744A (en) * 2019-10-25 2020-01-07 长江水利委员会长江科学院 Artificial overwintering farm site selection and construction method for plateau fishes
CN110663597A (en) * 2019-10-12 2020-01-10 长江水利委员会长江科学院 Site selection and construction method for muddy artificial spawning site of schizothorax prenanti in plateau river
CN113598099A (en) * 2021-08-10 2021-11-05 中国电建集团华东勘测设计研究院有限公司 Design method of artificial fish spawning site with water depth-flow velocity coupling
CN114698576A (en) * 2022-05-23 2022-07-05 中国长江三峡集团有限公司 Natural propagation incubation protection device for special rare fishes at upper reaches of Yangtze river and use method

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065033A (en) * 2012-01-11 2013-04-24 戴会超 Reservoir ecological scheduling method giving consideration to Chinese sturgeon reproductive demands

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1750527A1 (en) * 1990-04-02 1992-07-30 Всесоюзное проектно-изыскательское и научно-исследовательское объединение "Гидропроект" им.С.Я.Жука Artificial spawning site for phytophillous fishes

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103065033A (en) * 2012-01-11 2013-04-24 戴会超 Reservoir ecological scheduling method giving consideration to Chinese sturgeon reproductive demands

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
&: "人工产卵场的建造", 《淡水渔业科技动态》, no. 2, 15 February 1971 (1971-02-15), pages 5 *
J.F.RUBIN: "Characteristics and rehabilitation of the spawning habitats of the sea trout, Salmo trutta in Gotland (Sweden)", 《FISHERIES MANAGEMENT AND ECOLOGY》, no. 11, 22 January 2004 (2004-01-22), pages 15 - 22 *
夏娟等: "水电工程建设对齐口裂腹鱼栖息地的影响分析", 《四川水利》, no. 2, 15 April 2010 (2010-04-15), pages 59 - 62 *
徐伟毅等: "云南裂腹鱼繁殖生物学研究", 《水利渔业》, vol. 26, no. 2, 25 March 2006 (2006-03-25), pages 32 - 33 *
谭民强等: "人工再造鱼类适宜生境", 《中国三峡》, no. 3, 15 March 2011 (2011-03-15), pages 70 - 72 *

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104113739A (en) * 2014-08-12 2014-10-22 中国水产科学研究院长江水产研究所 Method for underwater observing natural oviposition of schizothoracins
CN104938377A (en) * 2015-06-01 2015-09-30 中国科学院东北地理与农业生态研究所 Manual spawning ground constructing method for recovering Songhua river fish resources and evaluation method of effect thereof
CN105248335A (en) * 2015-11-25 2016-01-20 中国水产科学研究院长江水产研究所 Schizothoracinae fish fertilized egg incubation method
CN106049347A (en) * 2016-05-25 2016-10-26 山东省淡水渔业研究院 Constructing method for fish shelter under stress of high silt concentration flood
CN106417120A (en) * 2016-12-14 2017-02-22 中国电建集团贵阳勘测设计研究院有限公司 Artificial fish spawning bed
CN106651468B (en) * 2017-01-04 2020-06-09 中国水产科学研究院珠江水产研究所 Method for estimating size of spawning site of fishes laying muco-sinking eggs in rivers
CN106651468A (en) * 2017-01-04 2017-05-10 中国水产科学研究院珠江水产研究所 Scale estimation method for spawning ground of river fishes capable of laying adhesive eggs
WO2018223787A1 (en) * 2017-06-05 2018-12-13 云南大学 Reservoir tail reverse regulation method for native fish protection
CN107273645A (en) * 2017-07-25 2017-10-20 中国水利水电科学研究院 A kind of computational methods of fish egg-laying season ecological water demand of rivers process
CN110663597A (en) * 2019-10-12 2020-01-10 长江水利委员会长江科学院 Site selection and construction method for muddy artificial spawning site of schizothorax prenanti in plateau river
CN110663597B (en) * 2019-10-12 2021-04-23 长江水利委员会长江科学院 Site selection and construction method for muddy artificial spawning site of schizothorax prenanti in plateau river
CN110651744A (en) * 2019-10-25 2020-01-07 长江水利委员会长江科学院 Artificial overwintering farm site selection and construction method for plateau fishes
CN110651744B (en) * 2019-10-25 2021-04-23 长江水利委员会长江科学院 Artificial overwintering farm site selection and construction method for plateau fishes
CN113598099A (en) * 2021-08-10 2021-11-05 中国电建集团华东勘测设计研究院有限公司 Design method of artificial fish spawning site with water depth-flow velocity coupling
CN114698576A (en) * 2022-05-23 2022-07-05 中国长江三峡集团有限公司 Natural propagation incubation protection device for special rare fishes at upper reaches of Yangtze river and use method

Also Published As

Publication number Publication date
CN103270983B (en) 2014-09-03

Similar Documents

Publication Publication Date Title
CN103270983B (en) Method for constructing schizothoracinae artificial spawning site in natural river
CN107165136B (en) For the storehouse tail counter regulation method of indigenous strains protection
CN106049347A (en) Constructing method for fish shelter under stress of high silt concentration flood
Moridi et al. Sediment flushing of reservoirs under environmental considerations
CN108520132A (en) A kind of section barrier property feature recognition and the method for barrier degree classification
Charmasson et al. Mitigation measures against hydropeaking effects
Deng et al. Mechanism study on the impacts of hydraulic alteration on fish habitat induced by spur dikes in a tidal reach
van Loon-Steensma et al. Wide Green Dikes: A sustainable adaptation option with benefits for both nature and landscape values?
Sukhodolov et al. Implications of channel processes for juvenile fish habitats in Alpine rivers
Langford et al. Upstream hydraulics of a run-of-the river hydropower facility for fish entrainment risk assessment
Anderson et al. Culvert effects on stream and stream-side salamander habitats
Cocchiglia et al. Evaluation of the effects of fine sediment inputs from stream culverts on brown trout egg survival through field and laboratory assessments
Williams et al. Quantifying activated floodplains on a lowland regulated river: its application to floodplain restoration in the Sacramento Valley
Cajot et al. Reservoir sediment management using replenishment: a numerical study of Nunome Dam
Huang et al. Three Gorges Dam
Patocka Environmental impacts of pumped storage hydro power plants
AUTHORITY Environmental Protection Authority
Burgess et al. Steart coastal management project: Engineering challenges in a hyper-tidal environment
Liu et al. Can the regulation of Golden Inland Waterways meet the needs of navigation, flood control, and ecology? A model-based case study
Milan Controls on spatial and temporal variations in sand delivery to salmonid spawning riffles
CN103392630A (en) Structure and substrate optimization method for forming terrain beneficial to egg laying of Chinese sturgeons
Panthi Generation and Fate of Fine Sediment from Dam Flushing
Burt Cardiff Bay Barrage: overview of hydraulic studies
Team Ross Island Lagoon Harmful Algal Bloom Final Report
Huang et al. TGP Environmental Impact Evalution

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140903

Termination date: 20150522

EXPY Termination of patent right or utility model