CN103225307A - 一种深基坑动态钢支撑系统的施工方法 - Google Patents

一种深基坑动态钢支撑系统的施工方法 Download PDF

Info

Publication number
CN103225307A
CN103225307A CN2013101201183A CN201310120118A CN103225307A CN 103225307 A CN103225307 A CN 103225307A CN 2013101201183 A CN2013101201183 A CN 2013101201183A CN 201310120118 A CN201310120118 A CN 201310120118A CN 103225307 A CN103225307 A CN 103225307A
Authority
CN
China
Prior art keywords
steel
layer
support
steel supports
supports
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013101201183A
Other languages
English (en)
Other versions
CN103225307B (zh
Inventor
龚胜
钟国辉
黄喜雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Foundation Engineering Group Co ltd
Original Assignee
GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG PROV FOUNDATION ENGINEERING Co filed Critical GUANGDONG PROV FOUNDATION ENGINEERING Co
Priority to CN201310120118.3A priority Critical patent/CN103225307B/zh
Publication of CN103225307A publication Critical patent/CN103225307A/zh
Application granted granted Critical
Publication of CN103225307B publication Critical patent/CN103225307B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明公开了一种深基坑动态钢支撑系统的施工方法,包括以下步骤:建造基坑围护结构;在基坑围护结构内进行第一层土方开挖,安装第一层钢支撑;进行第二层土方开挖,安装第二层钢支撑;进行第三层土方开挖,安装第三层钢支撑;根据设计要求从第一层钢支撑和/或第二层钢支撑中拆除若干钢支撑并同步安装到第三层钢支撑中,通过在保证整个钢支撑结构受力合理、安全可靠的前提下,提前拆除第一层钢支撑和/或第二层钢支撑中的部分钢支撑,并同步安装到第三层钢支撑中去,提高钢支撑的周转使用率,节省了钢支撑的使用量,加快工程施工进度,本发明用于基坑施工技术领域。

Description

一种深基坑动态钢支撑系统的施工方法
技术领域
本发明涉及基坑施工技术领域,特别涉及一种深基坑动态钢支撑系统的施工方法。
背景技术
在城市狭窄场地施工高层建筑深基础、地下室或地下构筑物,需要开挖基坑,为了防止基坑开挖对临近已有建构物地基造成安全影响和保证工程安全、顺利施工,常常需要在基坑中设置基坑支护结构以保证施工安全。
钢支撑是基坑支护结构中的常用的支撑结构,钢支撑的安装和拆除方便、速度快,能尽快发挥支撑的作用,减小时间效应,使围护结构因时间效应增加的变形减小,且可以重复使用,便于专业化施工,然而采用钢支撑作为支撑结构需要大量钢材。
发明内容
本发明所要解决的技术问题是提供一种可提高施工效率且节省施工材料的深基坑动态钢支撑系统的施工方法。
为解决上述技术问题所采用的技术方案:一种深基坑动态钢支撑系统的施工方法,包括以下步骤:
1)、建造基坑围护结构;
2)、在基坑围护结构内进行第一层土方开挖,安装第一层钢支撑;
3)、进行第二层土方开挖,安装第二层钢支撑;
4)、进行第三层土方开挖,安装第三层钢支撑;
5)、根据设计要求从第一层钢支撑和/或第二层钢支撑中拆除若干钢支撑并同步安装到第三层钢支撑中。
作为本发明的进一步改进,步骤5)中,在拆除钢支撑时调整第一层钢支撑和/或第二层钢支撑的预应力。
作为本发明的进一步改进,步骤5)中,从第一层钢支撑和/或第二层钢支撑中等距间隔或不等距间隔拆除若干钢支撑。
有益效果:此深基坑动态钢支撑系统的施工方法通过在保证整个钢支撑结构受力合理、安全可靠的前提下,提前拆除第一层钢支撑和/或第二层钢支撑中的部分钢支撑,并同步安装到第三层钢支撑中去,提高钢支撑的周转使用率,节省了钢支撑的使用量,加快工程施工进度。
附图说明
下面结合附图和实施例对本发明做进一步的说明;
图1为本发明实施例施工过程的平面图;
图2为图1中A-A的剖视图;
图3为本发明实施例施工完成的平面图;
图4为图3中B-B的剖视图。
具体实施方式
参照图1至图4,本发明一种深基坑动态钢支撑系统的施工方法,包括以下步骤:
1)、建造基坑围护结构4;
2)、在基坑围护结构内进行第一层土方开挖,安装第一层钢支撑1;
3)、进行第二层土方开挖,安装第二层钢支撑2;
4)、进行第三层土方开挖,安装第三层钢支撑3;
5)、根据设计要求从第一层钢支撑1和/或第二层钢支撑2中拆除若干钢支撑并同步安装到第三层钢支撑3中。
利用分层开挖的方法进行基坑开挖时,在进行下一层土方开挖和钢支撑安装时,上一层中的钢支撑所受应力变小,尤其在第三层土方开挖和安装第三层钢支撑3时,第一层钢支撑1所受应力下降更为明显,通过采用深基坑动态钢支撑系统的施工方法,在保证整个钢支撑结构受力合理、安全可靠的前提下,提前拆除第一层钢支撑1和/或第二层钢支撑2中的部分钢支撑,并同步安装到第三层钢支撑3中去,提高钢支撑的周转使用率,节省了钢支撑的使用量,加快工程施工进度。
作为本发明的优选实施方式,步骤5)中,在拆除钢支撑时调整第一层钢支撑1和/或第二层钢支撑2的预应力。
通过调整第一道钢支撑1和/或第二道钢支撑2的预应力以限制基坑围护结构4的变形,保证其变形符合设计要求。
作为本发明的优选实施方式,步骤5)中,从第一层钢支撑1和/或第二层钢支撑2中等距间隔或不等距间隔拆除若干钢支撑。
等距间隔的拆除钢支撑,可使第一层钢支撑1和/或第二层钢支撑2受力更为均匀、合理。
在本实施例中,第三层钢支撑3在基坑内铺设的长度为第一层钢支撑1长度的三分之二,在三分之二的第三层钢支撑3施工完成后,第一层钢支撑1中所受的应力明显变小,于是从第一层钢支撑1中每间隔两根钢支撑拆除一根钢支撑,将拆除的钢支撑同步安装于第三层钢支撑3中剩余的三分之一段,使其长度与第一道钢支撑1的长度相同。
上面结合附图对本发明的实施方式作了详细说明,但是本发明不限于上述实施方式,在所述技术领域普通技术人员所具备的知识范围内,还可以在不脱离本发明宗旨的前提下作出各种变化。

Claims (3)

1.一种深基坑动态钢支撑系统的施工方法,其特征在于,包括以下步骤:
1)、建造基坑围护结构;
2)、在基坑围护结构内进行第一层土方开挖,安装第一层钢支撑;
3)、进行第二层土方开挖,安装第二层钢支撑;
4)、进行第三层土方开挖,安装第三层钢支撑;
5)、根据设计要求从第一层钢支撑和/或第二层钢支撑中拆除若干钢支撑并同步安装到第三层钢支撑中。
2.根据权利要求1所述的深基坑动态钢支撑系统的施工方法,其特征在于:所述步骤5)中,在拆除钢支撑时调整第一层钢支撑和/或第二层钢支撑的预应力。
3.根据权利要求1或2所述的深基坑动态钢支撑系统的施工方法,其特征在于:所述步骤5)中,从第一层钢支撑和/或第二层钢支撑中等距间隔或不等距间隔拆除若干钢支撑。
CN201310120118.3A 2013-04-08 2013-04-08 一种深基坑动态钢支撑系统的施工方法 Expired - Fee Related CN103225307B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310120118.3A CN103225307B (zh) 2013-04-08 2013-04-08 一种深基坑动态钢支撑系统的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310120118.3A CN103225307B (zh) 2013-04-08 2013-04-08 一种深基坑动态钢支撑系统的施工方法

Publications (2)

Publication Number Publication Date
CN103225307A true CN103225307A (zh) 2013-07-31
CN103225307B CN103225307B (zh) 2014-12-24

Family

ID=48835932

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310120118.3A Expired - Fee Related CN103225307B (zh) 2013-04-08 2013-04-08 一种深基坑动态钢支撑系统的施工方法

Country Status (1)

Country Link
CN (1) CN103225307B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711131A (zh) * 2013-12-26 2014-04-09 中铁十三局集团第六工程有限公司 一种超软土质大面积深基坑围护桩换撑方法
CN103981873A (zh) * 2014-05-28 2014-08-13 德清鑫德机械有限公司 一种用于基坑支护的角撑装置
CN105756068A (zh) * 2016-04-06 2016-07-13 中国十七冶集团有限公司 一种大型深基坑支护锚管打管施工方法
CN105804088A (zh) * 2015-12-17 2016-07-27 上海建工建集团有限公司 深基坑分期施工中分期墙及临时支撑拆除的施工方法
CN108612129A (zh) * 2018-05-03 2018-10-02 中国建筑第八工程局有限公司 基于可周转钢平台的逆作法施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5516143A (en) * 1978-07-18 1980-02-04 Yoshihisa Horikoshi Spindle
CN1837506A (zh) * 2006-04-12 2006-09-27 上海市政工程设计研究总院 一种在运营中的隧道上方开挖箱形结构的施工方法
KR100659728B1 (ko) * 2006-09-28 2006-12-20 (주)종합건축사사무소동우건축 건축물 흙막이 구조
CN101718094A (zh) * 2009-11-10 2010-06-02 朱奎 一种带地下室建筑物的基坑支护施工方法

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5516143A (en) * 1978-07-18 1980-02-04 Yoshihisa Horikoshi Spindle
CN1837506A (zh) * 2006-04-12 2006-09-27 上海市政工程设计研究总院 一种在运营中的隧道上方开挖箱形结构的施工方法
KR100659728B1 (ko) * 2006-09-28 2006-12-20 (주)종합건축사사무소동우건축 건축물 흙막이 구조
CN101718094A (zh) * 2009-11-10 2010-06-02 朱奎 一种带地下室建筑物的基坑支护施工方法

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711131A (zh) * 2013-12-26 2014-04-09 中铁十三局集团第六工程有限公司 一种超软土质大面积深基坑围护桩换撑方法
CN103981873A (zh) * 2014-05-28 2014-08-13 德清鑫德机械有限公司 一种用于基坑支护的角撑装置
CN103981873B (zh) * 2014-05-28 2016-01-06 德清鑫德机械有限公司 一种用于基坑支护的角撑装置
CN105804088A (zh) * 2015-12-17 2016-07-27 上海建工建集团有限公司 深基坑分期施工中分期墙及临时支撑拆除的施工方法
CN105756068A (zh) * 2016-04-06 2016-07-13 中国十七冶集团有限公司 一种大型深基坑支护锚管打管施工方法
CN105756068B (zh) * 2016-04-06 2018-02-02 中国十七冶集团有限公司 一种大型深基坑支护锚管打管施工方法
CN108612129A (zh) * 2018-05-03 2018-10-02 中国建筑第八工程局有限公司 基于可周转钢平台的逆作法施工方法

Also Published As

Publication number Publication date
CN103225307B (zh) 2014-12-24

Similar Documents

Publication Publication Date Title
CN106522241B (zh) 超大层高地下室结构的深基坑支护方法
CN103225307B (zh) 一种深基坑动态钢支撑系统的施工方法
CN102383433A (zh) 一种超高层建筑深大基坑的设计方法
CN203547753U (zh) 型钢混凝土井筒壁座
CN204715366U (zh) 一种大面积深基坑分区顺逆工况下的支撑体系
CN109972623A (zh) 一种利用贝雷梁进行管道悬吊的施工方法及装置
CN205476593U (zh) 工具式基坑马道
CN106499199A (zh) 临近地铁超深基坑中隔墙临时换撑及其施工方法
JP2009074272A (ja) 建物建て替え方法
CN110158675A (zh) 改建工程中地下室外墙抗侧支撑加固系统及其施工方法
KR101310677B1 (ko) 레이커 및 합벽 선시공을 이용한 경사대지에서의 역타공법
CN202577344U (zh) 一种l型挡土墙结构
CN201169781Y (zh) 一种盖挖基坑结构
CN204298845U (zh) 一种基于现有地坪的离心机地基及螺旋式防护墙
CN201972711U (zh) 软土地区超深基坑开挖对紧邻地铁隧道变形的控制装置
JP2010255374A (ja) 超高層建物の解体方法
JP4789549B2 (ja) 既存建物の建替工法
CN104963344B (zh) 砼支撑拆除和结构施工同步进行的深基坑地下施工方法
CN204080821U (zh) 一种钢结构基坑换撑装置
CN206722392U (zh) 一种剪力墙结构的模板构造
CN202925551U (zh) 一种坡道异形处基坑换撑施工结构
AU2016102393A4 (en) A Method of constructing a column, a tunnel, and a tunnel made from the method
CN113685226B (zh) 适用于上向水平进路充填法的分层充填体保护装置及方法
CN102587390A (zh) 外增强挡土支护结构
CN103572963B (zh) 二次结构混凝土浇筑方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: GUANGDONG FOUNDATION ENGINEERING GROUP CO., LTD.

Free format text: FORMER NAME: GUANGDONG PROV. FOUNDATION ENGINEERING CO.

CP01 Change in the name or title of a patent holder

Address after: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee after: GUANGDONG FOUNDATION ENGINEERING GROUP CO.,LTD.

Address before: 19-20, No. 510620, Tianhe Road, 99 Tianhe Road, Guangdong, Guangzhou

Patentee before: Guangdong Foundation Engineering Co.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141224

CF01 Termination of patent right due to non-payment of annual fee