CN110158675A - 改建工程中地下室外墙抗侧支撑加固系统及其施工方法 - Google Patents
改建工程中地下室外墙抗侧支撑加固系统及其施工方法 Download PDFInfo
- Publication number
- CN110158675A CN110158675A CN201910480019.3A CN201910480019A CN110158675A CN 110158675 A CN110158675 A CN 110158675A CN 201910480019 A CN201910480019 A CN 201910480019A CN 110158675 A CN110158675 A CN 110158675A
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- basement
- bracing members
- pipe support
- prestressing force
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D37/00—Repair of damaged foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/08—Wrecking of buildings
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Mining & Mineral Resources (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
本发明公开了一种改建工程中地下室水平结构拆除后外墙抗侧支撑加固系统及其施工方法,涉及建筑施工加固技术领域,针对地下室拆改施工,设计了一套有效的抗侧力加固系统控制结构变形,简化施工流程,加快施工进度。所述系统,由型钢固定端、钢管支撑、预应力活络头、锚筋预埋件及钢支撑牛腿组成,所述钢管支撑安放到位后,在活络顶压位置对钢管支撑施加预应力,所述固定活络头处放入钢楔块,使侧向土压力通过钢管支撑传递至支撑牛腿,达到受力平衡状态。
Description
技术领域
本发明涉及建筑施工加固技术领域,特别是涉及一种大面积地下室水平结构拆除后外墙抗侧支撑加固系统及其施工方法。
背景技术
改建工程是指将原有建筑或构筑物局部拆除,再按新的用途和要求进行建筑安装的工程。
改建工程中通常要涉及地下室大量水平和竖向构件的拆除和加固,对于大面积的地下室拆除工程,大面积水平构件拆除后,地下室等同于一个基坑,无内支撑平衡外侧水平土压力,地下室顺作结构施工危险性比较高。通常采用拆除结构→添加传力支撑→施工结构→拆除传力支撑的施工流程,此施工流程涉及多个工序的转换,流程较为繁琐;同时结构和传力支撑转化的不及时,易造成土压力不平衡,不可避免地会出现地下室向内整体变形,施加预应力又会造成结构损坏。
因此,针对地下室拆改施工,如何设计一套有效的抗侧力加固系统有效控制结构变形,同时能简化施工流程,加快改建工程施工进度的目的,成为了本领域亟待解决的技术难题。
发明内容
本发明所要解决的技术问题就是提供一种改建工程中地下室水平结构拆除后外墙抗侧支撑加固系统及其施工方法。地下室水平结构拆除前,将地下室外墙加固到位,通过钢支撑将水平土压力传递到地下室底板上,全部拆除完毕后留出足够的空间进行结构顺作加固和施工,加快施工进度的同时确保了地下室施工安全。
为解决上述技术问题,本发明采用如下技术方案:一种改建工程中地下室水平结构拆除后外墙抗侧支撑加固系统,包括由型钢固定端、钢管支撑、预应力活络头、锚筋预埋件及钢支撑牛腿。钢管支撑安放到位后,在活络顶压位置对钢管支撑施加预应力,预应力施加到位后,放入钢楔块固定活络头,使侧向土压力通过钢管支撑传递至支撑牛腿,达到受力平衡状态。
作为优选,所述钢管支撑间采用法兰盘对接,与型钢固定端采用焊接,与预应力活络头采用钢楔单箱连接。
一种改建工程中地下室水平结构拆除后外墙抗侧支撑加固系统及其施工方法,其特征在于包括如下步骤:
步骤一:底板植筋,绑扎混凝土牛腿钢筋,并预埋钢板,焊接到位,支模浇筑混凝土成型,同时地下室外墙钻孔、清孔、灌浆,安装锚筋预埋件;
步骤二:地面分段预拼装钢管支撑到设计长度,端头焊接型钢固定端;
步骤三:地下室顶板拆除区开设吊装洞,用汽车吊或塔吊把预拼装的支撑拆解分节分段通过吊装东吊到制定底板区域进行安装;
步骤四:上层开φ100洞口、从洞囗上口横栓1根φ100*8钢管横穿在洞口上锁定,从上层φ100*8钢管上穿钢丝绳千斤锁挂手拉葫芦梱住支撑提升至设计安装高度;
步骤五:钢支撑吊装到位后,不要松开吊钩,将活络头子拉出顶住钢垫箱,再将2台液压千斤顶用专用托架固定成一整体,将其骑放在活络头上,接通油管后开泵,按设计要求逐渐施加预应力。预应力施加到位后,放入钢楔块楔紧并烧焊牢固以固定活络头;
步骤六:回油松开千斤顶,解开起吊钢丝绳,完成单根钢支撑的安装,其它钢支撑吊装顺序以此类推;
步骤七:从地下室顶板开始从上到下分层拆除水平结构,然后再从下到上顺序补全地下室水平结构,混凝土强度达到设计强度后,拆除钢支撑;
步骤八:用两台手拉葫芦吊住钢支撑,并用2台液压千斤顶在活络头处施加预应力,取出钢楔快,释放预应力;
步骤九:气割割除钢支撑端头连接,将钢支撑放到底板上,拆除法兰螺丝,分段分解拆除;
步骤十:将钢支撑铲到指定垂直通道处,采用汽车吊或塔吊将钢支撑吊出地面。
与现有技术对比,本发明的有益效果是:
本发明提供的外墙抗侧支撑加固系统,系统的组装构配件尺寸规格标准化,广泛应用于市政、房建的基坑工程中,市面上较易租赁和采购,同时拆除下来的支撑系统构配件损坏率较低,回收价值较高。在拆除施工前用钢支撑将地下室外墙加固到位,避免了传统的水平结构拆除后每根梁都需要支撑加固,换支撑不及时造成地下室外墙变形,确保施工安全;提供足够的开敞顺作地下室结构的施工空间,避免繁琐的拆换主体结构和支撑的工序转换,适合大面积的拆除作业和结构施工,加快施工进度。
附图说明
下面结合附图对本发明作进一步说明:
图1是本发明实施例提供的外墙抗侧支撑加固系统吊装完成后的剖面布置图;
图2是本发明实施例提供地下室水平结构拆除后的剖面布置图;
图3是本发明实施例提供的的预应力活络头构造;
图4是本发明实施例提供的钢支撑牛腿剖面布置图。
附图中各部件的标记如下:1、型钢固定端;2、钢管支撑;3、活络头;4、锚筋预埋件;5、钢支撑牛腿;6、地下室顶板;7、地下室楼板、8、地下室底板;9、吊装洞口;10、φ100洞口;11、钢楔块;12、千斤顶;13、植筋。
Claims (3)
1.一种改建工程中地下室水平结构拆除后外墙抗侧支撑加固系统,其特征在于:包括由型钢固定端、钢管支撑、预应力活络头、锚筋预埋件及钢支撑牛腿,所述钢管支撑安放到位后,在活络顶压位置对钢管支撑施加预应力,所述固定活络头处放入钢楔块,使侧向土压力通过钢管支撑传递至支撑牛腿,达到受力平衡状态。
2.根据权利要求1所述的一种改建工程中地下室水平结构拆除后外墙抗侧支撑加固系统,其特征在于:所述钢管支撑间采用法兰盘对接,与所述型钢固定端采用焊接,与所述预应力活络头采用钢楔单箱连接。
3.一种改建工程中地下室水平结构拆除后外墙抗侧支撑加固系统的施工方法,其特征在于包括如下步骤:
步骤一:底板植筋,绑扎混凝土牛腿钢筋,并预埋钢板,焊接到位,支模浇筑混凝土成型,同时地下室外墙钻孔、清孔、灌浆,安装锚筋预埋件;
步骤二:地面分段预拼装钢管支撑到设计长度,端头焊接型钢固定端;
步骤三:地下室顶板拆除区开设吊装洞,用汽车吊或塔吊把预拼装的支撑拆解分节分段通过吊装东吊到制定底板区域进行安装;
步骤四:上层开φ100洞口、从洞囗上口横栓1根φ100*8钢管横穿在洞口上锁定,从上层φ100*8钢管上穿钢丝绳千斤锁挂手拉葫芦梱住支撑提升至设计安装高度;
步骤五:钢支撑吊装到位后,不要松开吊钩,将活络头子拉出顶住钢垫箱,再将2台液压千斤顶用专用托架固定成一整体,将其骑放在活络头上,接通油管后开泵,按设计要求逐渐施加预应力;预应力施加到位后,放入钢楔块楔紧并烧焊牢固以固定活络头;
步骤六:回油松开千斤顶,解开起吊钢丝绳,完成单根钢支撑的安装,其它钢支撑吊装顺序以此类推;
步骤七:从地下室顶板开始从上到下分层拆除水平结构,然后再从下到上顺序补全地下室水平结构,混凝土强度达到设计强度后,拆除钢支撑;
步骤八:用两台手拉葫芦吊住钢支撑,并用2台液压千斤顶在活络头处施加预应力,取出钢楔快,释放预应力;
步骤九:气割割除钢支撑端头连接,将钢支撑放到底板上,拆除法兰螺丝,分段分解拆除;
步骤十:将钢支撑铲到指定垂直通道处,采用汽车吊或塔吊将钢支撑吊出地面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910480019.3A CN110158675A (zh) | 2019-06-04 | 2019-06-04 | 改建工程中地下室外墙抗侧支撑加固系统及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910480019.3A CN110158675A (zh) | 2019-06-04 | 2019-06-04 | 改建工程中地下室外墙抗侧支撑加固系统及其施工方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN110158675A true CN110158675A (zh) | 2019-08-23 |
Family
ID=67627275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910480019.3A Pending CN110158675A (zh) | 2019-06-04 | 2019-06-04 | 改建工程中地下室外墙抗侧支撑加固系统及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN110158675A (zh) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112195936A (zh) * | 2020-11-06 | 2021-01-08 | 上海巨鲲科技有限公司 | 张弦梁预应力施加装置和方法 |
CN112609735A (zh) * | 2020-12-17 | 2021-04-06 | 浙江精工钢结构集团有限公司 | 半埋入式柱脚定位安装装置及其施工方法 |
CN114232639A (zh) * | 2021-12-10 | 2022-03-25 | 中国一冶集团有限公司 | 用于深基坑支撑后拆的施工方法 |
CN116575480A (zh) * | 2023-07-13 | 2023-08-11 | 中国建筑第六工程局有限公司 | 一种贯穿地下室楼板的深基坑钢管支撑施工方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733429A (zh) * | 2012-06-29 | 2012-10-17 | 广州市胜特建筑科技开发有限公司 | 新修隧道穿越既有建筑物的托换方法及托换系统 |
CN103470026A (zh) * | 2013-09-04 | 2013-12-25 | 中建三局第一建设工程有限责任公司 | 一种地下室外墙单面支模系统及施工方法 |
CN204825927U (zh) * | 2015-08-11 | 2015-12-02 | 中铁建大桥工程局集团第五工程有限公司 | 一种墙体斜撑加固钢柱 |
CN106639346A (zh) * | 2016-10-10 | 2017-05-10 | 上海岩土工程勘察设计研究院有限公司 | 一种利用斜撑托换结构的既有建筑向下增层施工方法 |
-
2019
- 2019-06-04 CN CN201910480019.3A patent/CN110158675A/zh active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102733429A (zh) * | 2012-06-29 | 2012-10-17 | 广州市胜特建筑科技开发有限公司 | 新修隧道穿越既有建筑物的托换方法及托换系统 |
CN103470026A (zh) * | 2013-09-04 | 2013-12-25 | 中建三局第一建设工程有限责任公司 | 一种地下室外墙单面支模系统及施工方法 |
CN204825927U (zh) * | 2015-08-11 | 2015-12-02 | 中铁建大桥工程局集团第五工程有限公司 | 一种墙体斜撑加固钢柱 |
CN106639346A (zh) * | 2016-10-10 | 2017-05-10 | 上海岩土工程勘察设计研究院有限公司 | 一种利用斜撑托换结构的既有建筑向下增层施工方法 |
Non-Patent Citations (1)
Title |
---|
张喨: "复杂环境下既有地下建筑改建过程中的换撑集成技术", 《建筑施工》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112195936A (zh) * | 2020-11-06 | 2021-01-08 | 上海巨鲲科技有限公司 | 张弦梁预应力施加装置和方法 |
CN112609735A (zh) * | 2020-12-17 | 2021-04-06 | 浙江精工钢结构集团有限公司 | 半埋入式柱脚定位安装装置及其施工方法 |
CN112609735B (zh) * | 2020-12-17 | 2022-07-22 | 浙江精工钢结构集团有限公司 | 半埋入式柱脚定位安装装置及其施工方法 |
CN114232639A (zh) * | 2021-12-10 | 2022-03-25 | 中国一冶集团有限公司 | 用于深基坑支撑后拆的施工方法 |
CN114232639B (zh) * | 2021-12-10 | 2023-08-25 | 中国一冶集团有限公司 | 用于深基坑支撑后拆的施工方法 |
CN116575480A (zh) * | 2023-07-13 | 2023-08-11 | 中国建筑第六工程局有限公司 | 一种贯穿地下室楼板的深基坑钢管支撑施工方法 |
CN116575480B (zh) * | 2023-07-13 | 2023-10-10 | 中国建筑第六工程局有限公司 | 一种贯穿地下室楼板的深基坑钢管支撑施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110158675A (zh) | 改建工程中地下室外墙抗侧支撑加固系统及其施工方法 | |
CN111456023B (zh) | 一种地下预应力支护结构的施工方法 | |
CN111764379B (zh) | 一种应用于逆作钢管桩的施工方法及其结构 | |
KR101070426B1 (ko) | 마이크로 파일을 이용한 개량형 언더피닝 공법 | |
CN109537579B (zh) | 钻孔灌注桩的施工方法 | |
CN112458918A (zh) | 一种高墩液压顶升整体式钢架平台翻模施工系统及施工方法 | |
KR100775767B1 (ko) | Src골조의 기둥용 수직철근을 이용한 역타설 축조공법 | |
CN105672337A (zh) | 现浇沉井支模体系的施工方法 | |
JP4164857B2 (ja) | 既存地下躯体を用いた改築工法 | |
JP2020060000A (ja) | 躯体構築方法 | |
KR101406259B1 (ko) | 언더피닝 공법의 최종단계 하중전이 방법 | |
JPH11193641A (ja) | 建造物の建て替え方法 | |
CN210106749U (zh) | 一种软土地基超大断面顶管顶进作业的反力结构 | |
CN113266019B (zh) | 一种基坑钢管支撑体系的施工工法 | |
CN112813988B (zh) | 一种基于轴力伺服系统的混凝土基坑支护及监测施工技术 | |
CN109706848B (zh) | 一种利用穿心式千斤顶顶进桥涵的施工方法 | |
CN210216455U (zh) | 围护结构的斜支撑组件 | |
CN102900099A (zh) | 地下混凝土结构降模施工工艺 | |
CN218758507U (zh) | 一种深基坑中电梯井支护结构 | |
CN218148364U (zh) | 一种人工挖孔桩强支护结构 | |
CN216007263U (zh) | 一种梁柱连接结构 | |
CN220815633U (zh) | 同一始发井内顶管双向顶进后背体系 | |
CN219060055U (zh) | 一种用于预制实心桩的桩端联合挤密注浆系统 | |
JP3770716B2 (ja) | 建造物の建て替え方法 | |
CN214656379U (zh) | 一种高墩液压顶升整体式钢架平台翻模施工系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190823 |
|
WD01 | Invention patent application deemed withdrawn after publication |