CN103175995A - 半自动升降绝缘支架 - Google Patents

半自动升降绝缘支架 Download PDF

Info

Publication number
CN103175995A
CN103175995A CN2013100760630A CN201310076063A CN103175995A CN 103175995 A CN103175995 A CN 103175995A CN 2013100760630 A CN2013100760630 A CN 2013100760630A CN 201310076063 A CN201310076063 A CN 201310076063A CN 103175995 A CN103175995 A CN 103175995A
Authority
CN
China
Prior art keywords
semi
insulating support
automatic lifting
lifting insulating
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013100760630A
Other languages
English (en)
Inventor
刘国斌
王清昊
刘博�
黄延海
葛长鑫
湛树广
崔晓宇
张宁
刘潇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Fushun Power Supply Co of Liaoning Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Fushun Power Supply Co of Liaoning Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN2013100760630A priority Critical patent/CN103175995A/zh
Publication of CN103175995A publication Critical patent/CN103175995A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Handcart (AREA)

Abstract

本发明涉及一种半自动升降绝缘支架,其结构为,底板的上部设有支架平台,底板的下方设有滑轮。本发明能安全、轻松、便捷地完成叠落试验变压器或电抗器工作,提高试验效率,达到灵活方便调整至需求高度及最佳试验位置,更换试验接线方便的目的。

Description

半自动升降绝缘支架
技术领域
本发明涉及一种升降绝缘支架,尤其涉及一种半自动升降绝缘支架,应用于耐压使用的电抗器叠落工作,属于智能变电站技术领域。
背景技术
用于串级试验变压器、谐振耐压使用的电抗器,一般由三节或四节叠落组成,每节重约40kg左右,高度约50cm,由于高度与重量的的原因,落叠至第三或第四节时,需要两个体力健壮的员工完成,这样给试验工作带来不便和难度。随着职工体质的下降及女性职工数量的增多,在叠落试验变压器或电抗器时,出现多人次腰脱和手脚伤害事故,目前这项工作已经成为职工的负担,所以,应当及早解决这个问题。
发明内容
本发明针对上述现有技术中存在的问题,为了安全、轻松、便捷地完成叠落试验变压器或电抗器工作,提供了一种半自动升降绝缘支架,解决了现有技术中劳动强度大,难道高,存在安全隐患的问题,而且提高了试验效率。
本发明的技术方案如下;
底板的上部设有支架平台,底板的下方设有滑轮。
所述的底板与支架平台之间设有至少一个升降装置。
所述的升降装置为,升降板的两端设有助力升降器,升降板上设有滑槽,固定支板在滑槽内滑动,固定支板通过挡销固定在滑槽上。
本发明的优点效果如下:
1、本发明具备搬运车功能,可以短距离搬运、挪动试验变压器或电抗器,使其调整到最佳试验位置,按需求调节高度,完成试验接线,使更换试验接线更加方便。 
2、可以升高50cm,承重60kg;或升高100cm,承重120kg;或者更高,适用范围广。
3、安全可靠,试验人员由6人减少到3人,达到省时省力的目的。
附图说明
图1为本发明结构示意图。
图2为本发明实施例结构示意图。
图3为本发明实施例结构示意图。
图中,1、底板,2、支架平台,3、滑轮,4、升降板,5、助力升降器,6、固定支板,7、挡销,8、电抗器。
具体实施方式
 本发明参照附图,通过具体实施例,描述如下。
实施例1
如图1所示,底板1的上部设有支架平台2,底板1的下方设有滑轮3,承重60kg。
实施例2
如图2所示,底板1的上部设有支架平台2,底板1的下方设有滑轮3,所述的底板1与支架平台2之间设有一个升降装置。所述的升降装置为,升降板4的两端设有助力升降器5,升降板4上设有滑槽,固定支板6在滑槽内滑动,固定支板6通过挡销7固定在滑槽上。可以升高50cm,承重60kg。
实施例3
如图3所示,所述的底板1与支架平台2之间设有两个升降装置,可以升高100cm,承重120kg;如果由4节电抗器组成,3、4叠落后放在此支架上。
本发明在使用时,安置稳电抗器,启动助力升降器,使固定支板在滑槽内滑动,升到要求的高度时,插上挡销,固定牢固便可开始试验。本发明试验于上夹河66kV母线及66kV相关电气设备交流串联谐振耐压、望花变66kV主变更换交流串联谐振耐压等试验工作中,3人便可完成耐压试验工作,达到短距离搬运、挪动电抗器,灵活方便调整至需求高度及最佳试验位置,更换试验接线方便的目的。

Claims (3)

1.半自动升降绝缘支架,其特征在于底板的上部设有支架平台,底板的下方设有滑轮。
2.根据权利要求1所述的半自动升降绝缘支架,其特征在于所述的底板与支架平台之间设有至少一个升降装置。
3.根据权利要求2所述的半自动升降绝缘支架,其特征在于所述的升降装置为,升降板的两端设有助力升降器,升降板上设有滑槽,固定支板在滑槽内滑动,固定支板通过挡销固定在滑槽上。
CN2013100760630A 2013-03-11 2013-03-11 半自动升降绝缘支架 Pending CN103175995A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013100760630A CN103175995A (zh) 2013-03-11 2013-03-11 半自动升降绝缘支架

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013100760630A CN103175995A (zh) 2013-03-11 2013-03-11 半自动升降绝缘支架

Publications (1)

Publication Number Publication Date
CN103175995A true CN103175995A (zh) 2013-06-26

Family

ID=48635990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013100760630A Pending CN103175995A (zh) 2013-03-11 2013-03-11 半自动升降绝缘支架

Country Status (1)

Country Link
CN (1) CN103175995A (zh)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0881160A (ja) * 1994-09-14 1996-03-26 Toda Constr Co Ltd 自動移載機を有する揚重装置
CN2442427Y (zh) * 2000-09-27 2001-08-08 西安凯顺电气有限责任公司 高压带电作业工作台
CN2903013Y (zh) * 2005-12-24 2007-05-23 马鞍山市双益机械制造有限公司 一种回转液压升降车
CN201437502U (zh) * 2009-07-08 2010-04-14 中国人民解放军95202部队 一种调节方便的液压升降车
CN201501764U (zh) * 2009-09-21 2010-06-09 王敏奇 一种多功能升降机
CN201722108U (zh) * 2010-07-08 2011-01-26 福州天一同益电气有限公司 开关柜用液压升降服务手车
CN203133117U (zh) * 2013-03-11 2013-08-14 辽宁省电力有限公司抚顺供电公司 半自动升降绝缘支架

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0881160A (ja) * 1994-09-14 1996-03-26 Toda Constr Co Ltd 自動移載機を有する揚重装置
CN2442427Y (zh) * 2000-09-27 2001-08-08 西安凯顺电气有限责任公司 高压带电作业工作台
CN2903013Y (zh) * 2005-12-24 2007-05-23 马鞍山市双益机械制造有限公司 一种回转液压升降车
CN201437502U (zh) * 2009-07-08 2010-04-14 中国人民解放军95202部队 一种调节方便的液压升降车
CN201501764U (zh) * 2009-09-21 2010-06-09 王敏奇 一种多功能升降机
CN201722108U (zh) * 2010-07-08 2011-01-26 福州天一同益电气有限公司 开关柜用液压升降服务手车
CN203133117U (zh) * 2013-03-11 2013-08-14 辽宁省电力有限公司抚顺供电公司 半自动升降绝缘支架

Similar Documents

Publication Publication Date Title
CN103777122B (zh) 一种耐压试验系统及其组装方法
CN102882208B (zh) 一种电气化铁路电能质量综合治理装置控制方法
CN205229411U (zh) 一种开关元件负载特性试验台
CN206774358U (zh) 一种方便安装的干式变压器
CN203133117U (zh) 半自动升降绝缘支架
CN207275924U (zh) 一种岸电高压电缆带电收放绞车
CN209175571U (zh) 一种工件的对称夹紧机构
CN204529242U (zh) 变压器风扇电机更换专用平台
CN103175995A (zh) 半自动升降绝缘支架
CN103346451A (zh) 220kV变压器试验短路线连接器
CN203759189U (zh) 超大容量高压变频谐振电缆耐压试验装置
CN203119360U (zh) 高压柜维修绝缘凳
CN203551618U (zh) 移动式电气试验电源箱
CN203326326U (zh) 220kV变压器试验短路线连接器
CN201656783U (zh) 用于机车主变流柜例行试验站的可调高压电源
CN206300971U (zh) 一种多功能继电保护试验台
CN207489625U (zh) 一种便于维护的变压器
CN103612864A (zh) 一种用于电机定子铁芯打标的新型供料装置
CN203391825U (zh) 一种搬运车
CN207134594U (zh) 一种接地线悬挂装置
CN202930237U (zh) 电容器注油工作台
CN203596239U (zh) 大型变压器地下基础
CN205582672U (zh) 一种油浸式电流互感器膨胀器提升装置
CN204241636U (zh) 一种工频交流耐压试验装置
CN204441762U (zh) 一种电力检修折叠式平台

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130626