CN103174323A - Multifunctional hoisting support frame - Google Patents

Multifunctional hoisting support frame Download PDF

Info

Publication number
CN103174323A
CN103174323A CN2013101096539A CN201310109653A CN103174323A CN 103174323 A CN103174323 A CN 103174323A CN 2013101096539 A CN2013101096539 A CN 2013101096539A CN 201310109653 A CN201310109653 A CN 201310109653A CN 103174323 A CN103174323 A CN 103174323A
Authority
CN
China
Prior art keywords
hoop
hoisting bracket
crossbeam
tower
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2013101096539A
Other languages
Chinese (zh)
Inventor
于义和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panjin Power Supply Co of State Grid Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
Panjin Power Supply Co of Liaoning Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panjin Power Supply Co of Liaoning Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical Panjin Power Supply Co of Liaoning Electric Power Co Ltd
Priority to CN2013101096539A priority Critical patent/CN103174323A/en
Publication of CN103174323A publication Critical patent/CN103174323A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

一种安装在输电线路杆塔上的多功能吊装支架,其特殊之处是它由水平横梁和两根斜杆组成近似等腰三角形的框架,每根斜杆的上端固定在水平横梁上、下端安装近似半圆形的其上有装配孔的箍圈,箍圈上面安装限位板,箍圈的外表面安装挂钩,在横梁的两端分别安装定滑轮。由于该多功能吊装支架安装在杆塔顶端,避开了作业人员,增大了操作人员的作业空间,便于吊装较重、较长的金具。该多功能吊装支架采用两侧滑轮的设计,使被提升物两点受力,减轻了作业人员的劳动强度。该多功能吊装支架结构简单,使用方便,节省人力物力,提高工作效率。

Figure 201310109653

A multifunctional hoisting bracket installed on a power transmission line tower. Its special feature is that it consists of a horizontal beam and two oblique rods to form an approximately isosceles triangle frame. The upper end of each oblique rod is fixed on the upper and lower ends of the horizontal beam. An approximately semicircular hoop with assembly holes on it, a limit plate is installed on the hoop, a hook is installed on the outer surface of the hoop, and fixed pulleys are respectively installed at both ends of the beam. Since the multi-functional hoisting bracket is installed on the top of the pole tower, the operator is avoided, the working space of the operator is increased, and it is convenient for hoisting heavier and longer fittings. The multi-functional hoisting bracket adopts the design of pulleys on both sides, so that the object to be lifted is stressed at two points, which reduces the labor intensity of the operators. The multifunctional hoisting bracket has a simple structure, is convenient to use, saves manpower and material resources, and improves work efficiency.

Figure 201310109653

Description

多功能吊装支架Multi-functional lifting bracket

技术领域 technical field

 本发明属于电力配电线路施工技术领域,特别涉及在电力杆塔上安装金具及传送电力材料时所用的吊装支架。 The invention belongs to the technical field of power distribution line construction, in particular to a hoisting bracket used for installing fittings on power poles and towers and transmitting power materials.

背景技术 Background technique

2007年盘锦供电公司引进燕翅横担.合成绝缘子等新型的电力材料器材.并大量的运用到设备当中,使用原来的器具安装燕翅横担,费时费力。 In 2007, Panjin Power Supply Company introduced Yan-wing cross-arms, synthetic insulators and other new power materials and equipment, and used them in large quantities in the equipment. Using the original equipment to install Yan-wing cross-arms was time-consuming and laborious.

发明内容 Contents of the invention

为了解决了电力系统面临新型燕翅横担安装工艺复杂,耗时长的难题,提出如下技术方案。 In order to solve the problem that the power system is faced with the complex and time-consuming installation process of the new swallow-wing cross-arm, the following technical solutions are proposed.

一种安装在输电线路杆塔上的多功能吊装支架,其特殊之处是它由水平横梁和两根斜杆组成近似等腰三角形的框架,每根斜杆的上端固定在水平横梁上、下端安装近似半圆形的其上有装配孔的箍圈,箍圈上面安装限位板,箍圈的外表面安装挂钩,在横梁的两端分别安装定滑轮。箍圈的高度为200MM。 A multifunctional hoisting bracket installed on a power transmission line tower. Its special feature is that it consists of a horizontal beam and two oblique rods to form an approximately isosceles triangle frame. The upper end of each oblique rod is fixed on the upper and lower ends of the horizontal beam. An approximate semicircular hoop with assembly holes is arranged on it, a limit plate is installed on the hoop, a hook is installed on the outer surface of the hoop, and fixed pulleys are respectively installed at both ends of the beam. The height of the hoop is 200MM.

为了便于将该多功能吊装支架安装在电力杆塔的顶端,将横梁改成可伸缩的结构,即横梁由中间横梁和两块侧横梁组成,中间横梁上有两个长方形孔,每块侧横梁上有通孔,中间横梁与两块侧横梁相互搭接后用螺栓连接,在每块侧横梁的自由端安装定滑轮,每根斜杆的上端分别固定在侧横梁上。 In order to facilitate the installation of the multi-functional hoisting bracket on the top of the power tower, the beam is changed into a telescopic structure, that is, the beam is composed of a middle beam and two side beams, and there are two rectangular holes on the middle beam, and each side beam There are through holes, the middle beam and the two side beams are overlapped and connected with bolts, fixed pulleys are installed on the free ends of each side beam, and the upper ends of each diagonal bar are respectively fixed on the side beams.

使用该多功能吊装支架吊装材料时,首先将它安装在砼杆或木杆的杆塔顶端,通过两个滑轮同时提升材料,这样被提升物受力均衡。使用该多功能吊装支架可以吊装杆塔上需要安装的任何大型金具和材料。 When using the multifunctional hoisting bracket to hoist materials, it is first installed on the top of the concrete pole or wooden pole tower, and the materials are simultaneously lifted by two pulleys, so that the force of the lifted objects is balanced. Use this multifunctional hoisting bracket to hoist any large hardware and materials that need to be installed on the tower.

本发明具有如下优点 The present invention has the following advantages

由于该多功能吊装支架安装在杆塔顶端,避开了作业人员,增大了操作人员的作业空间,便于吊装较重、较长的金具。同时多功能吊装支架的箍圈高度、即箍圈底面距杆塔顶部的距离为200MM,正好符合电力安装工艺规程中规定的杆塔横担与杆塔顶端的距离要求,完全避让了杆塔附属金具的安装位置。该多功能吊装支架采用两侧滑轮的设计,避免了因通常使用单滑轮传递时,一点绑扎被传递物所导致的受力不平衡和不易拆卸的问题,减轻了作业人员的劳动强度。多功能吊装支架的箍圈外侧安装了两个挂钩,这样便于在更换横担或绝缘子时将临时拆卸的导线安放在挂钩上。该多功能吊装支架结构简单,使用方便,节省人力物力,提高工作效率。 Since the multi-functional hoisting bracket is installed on the top of the pole tower, the operator is avoided, the working space of the operator is increased, and it is convenient for hoisting heavier and longer fittings. At the same time, the hoop height of the multi-function hoisting bracket, that is, the distance between the bottom surface of the hoop and the top of the tower is 200MM, which just meets the distance requirements between the cross arm of the tower and the top of the tower specified in the power installation process regulations, and completely avoids the installation position of the accessory hardware of the tower. . The multi-functional hoisting bracket adopts the design of pulleys on both sides, which avoids the problems of unbalanced force and difficult disassembly caused by binding the object at one point when a single pulley is usually used for transmission, and reduces the labor intensity of operators. Two hooks are installed on the outer side of the hoop of the multifunctional hoisting bracket, which is convenient for placing temporarily dismantled conductors on the hooks when replacing cross arms or insulators. The multifunctional hoisting bracket has a simple structure, is convenient to use, saves manpower and material resources, and improves work efficiency.

附图说明 Description of drawings

图1为实施例1的结构示意图,图2为局部放大图A,图3为实施例2的结构示意图,图4为实施例2中的中间横梁6.2的主视图,图5为实施例2中的中间横梁6.2的俯视图。 Fig. 1 is a schematic structural view of embodiment 1, Fig. 2 is a partially enlarged view A, Fig. 3 is a schematic structural view of embodiment 2, Fig. 4 is a front view of the middle beam 6.2 in embodiment 2, and Fig. 5 is an embodiment 2 top view of the intermediate beam 6.2.

具体实施方式 Detailed ways

实施例1 Example 1

一种安装在输电线路杆塔上的多功能吊装支架,它是由水平横梁6和两根斜杆7组成近似等腰三角形的框架,每根斜杆7的上端焊接在水平横梁6上、下端焊接近似半圆形的箍圈3,箍圈3的两端向外弯折成其上设有装配孔3.1的装配部。箍圈3上面安装水平限位板4。箍圈3的外表面安装挂钩1,在横梁6的两端分别安装定滑轮5。箍圈3的高度为200MM。 A multifunctional hoisting bracket installed on a power transmission line tower, which is composed of a horizontal beam 6 and two oblique rods 7 to form an approximately isosceles triangle frame, and the upper end of each oblique rod 7 is welded to the upper and lower ends of the horizontal beam 6 The hoop 3 is approximately semicircular, and the two ends of the hoop 3 are bent outwards to form an assembly part on which an assembly hole 3.1 is provided. Horizontal spacer plate 4 is installed above hoop 3. Hook 1 is installed on the outer surface of hoop 3, and fixed pulley 5 is installed respectively at the two ends of crossbeam 6. The height of hoop 3 is 200MM.

当将该多功能吊装支架安装在杆塔上时,限位板4正好卡在杆塔的顶端,以保证箍圈3始终处于杆塔顶部。 When the multifunctional hoisting bracket is installed on the tower, the limit plate 4 is just stuck on the top of the tower to ensure that the hoop 3 is always on the top of the tower.

使用该多功能吊装支架时,先由一名作业人员登上杆塔顶端,用传递绳将吊装支架提拎到杆塔上部,然后将多功能吊装支架的箍圈3套装在杆塔顶部,用第一螺栓2插入箍圈3的装配孔3.1中并且拧紧,将该多功能吊装支架安装在杆塔顶端。然后向支架两端的定滑轮5中分别穿入绳索,绳索一端头由地面牵引人员控制,另一端系在被提升物上。 When using the multi-functional hoisting bracket, an operator first climbs to the top of the tower, lifts the hoisting bracket to the upper part of the tower with a transfer rope, then sets the hoop 3 of the multi-functional hoisting bracket on the top of the tower, and uses the first bolt 2. Insert it into the assembly hole 3.1 of the hoop 3 and tighten it, and install the multifunctional lifting bracket on the top of the tower. Then pass through ropes respectively in the fixed pulley 5 at support two ends, and one end of the rope is controlled by ground traction personnel, and the other end is tied on the object to be lifted.

实施例2 Example 2

由于实施例1中的横梁是一块整板,当两个箍圈3之间的空间与杆塔顶部不完全吻合的情况下,在安装该多功能吊装支架拧紧第一螺栓2时,会非常吃力,甚至无法安装。因此提出实施例2。它与实施例1不同之处是将横梁6改成可以伸缩式结构,即横梁6由中间横梁6.2和两块侧横梁6.1组成。中间横梁6.2上有两个长方形孔6.21,侧横梁6.1上有一个通孔,中间横梁6.2与两块侧横梁6.1相互搭接,用第二螺栓8穿过中间横梁6.2的长方形孔6.21和侧横梁6.1上的通孔,将中间横梁6.2和侧横梁6.1连接成一体。中间横梁6.2和两块侧横梁6.1之间可以沿长方形孔6.21相对错动,即横梁6的长度可调,这样便于该多功能吊装支架的安装。两块侧横梁6.1的自由端分别安装定滑轮5,两块侧横梁6.1下面分别焊接斜杆7。 Since the beam in Embodiment 1 is a whole plate, when the space between the two hoops 3 does not completely coincide with the top of the tower, it will be very difficult to install the multifunctional hoisting bracket and tighten the first bolt 2. Can't even install. Therefore, Example 2 is proposed. It differs from Embodiment 1 in that the crossbeam 6 is changed into a telescopic structure, that is, the crossbeam 6 is composed of a middle crossbeam 6.2 and two side crossbeams 6.1. There are two rectangular holes 6.21 on the middle beam 6.2, and a through hole on the side beam 6.1. The middle beam 6.2 overlaps with the two side beams 6.1, and the second bolt 8 passes through the rectangular holes 6.21 and the two side beams 6.2. The through holes on the side beams 6.1 connect the middle beam 6.2 and the side beams 6.1 into one body. Between middle crossbeam 6.2 and two side crossbeams 6.1, can move relatively along rectangular hole 6.21, promptly the length of crossbeam 6 is adjustable, is convenient to the installation of this multi-function hoisting bracket like this. Fixed pulleys 5 are respectively installed on the free ends of the two side beams 6.1, and inclined rods 7 are respectively welded under the two side beams 6.1.

安装之前将第二螺栓8松开,让中间横梁6.2与侧横梁6.1之间处于能够相对移动的状态,这时将箍圈3套装在杆塔的顶部,先拧紧第一螺栓2,使箍圈3固定,然后再拧紧第二螺栓8,锁紧中间横梁6.2和两块侧横梁6.1。 Before installation, loosen the second bolt 8, so that the middle beam 6.2 and the side beam 6.1 can move relatively. Fix it, and then tighten the second bolt 8 to lock the middle beam 6.2 and the two side beams 6.1.

Claims (2)

1. multi-functional lifting support that is arranged on electric power line pole tower, it is characterized in that it is comprised of horizontal gird and two braces the framework that is similar to isosceles triangle, the upper end of every brace is fixed on the horizontal gird upper and lower end is installed pilot hole on its of approximate half-circular cranse, mounting limit plate above cranse, the external surface of cranse is installed hook, at the two ends of crossbeam, fixed pulley is installed respectively.
2. the said multi-functional lifting support that is arranged on electric power line pole tower according to claim 1, it is characterized in that said crossbeam is comprised of intermediate transverse girder and two side crossbeams, two slots are arranged on intermediate transverse girder, on every side crossbeam, through hole is arranged, intermediate transverse girder mutually overlaps afterwards with two side crossbeams and is connected with bolt, free end at every side crossbeam is installed fixed pulley, and the upper end of every brace is separately fixed on the side crossbeam.
CN2013101096539A 2013-04-01 2013-04-01 Multifunctional hoisting support frame Pending CN103174323A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2013101096539A CN103174323A (en) 2013-04-01 2013-04-01 Multifunctional hoisting support frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2013101096539A CN103174323A (en) 2013-04-01 2013-04-01 Multifunctional hoisting support frame

Publications (1)

Publication Number Publication Date
CN103174323A true CN103174323A (en) 2013-06-26

Family

ID=48634468

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2013101096539A Pending CN103174323A (en) 2013-04-01 2013-04-01 Multifunctional hoisting support frame

Country Status (1)

Country Link
CN (1) CN103174323A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133916A (en) * 2015-09-26 2015-12-09 国网青海省电力公司 Auxiliary hanging bracket for mounting of upper frame on telegraph pole
CN107558793A (en) * 2017-09-09 2018-01-09 国网辽宁省电力有限公司锦州供电公司 Multilayer cross-arm lifting installation method and its specific purpose tool on a kind of overhead transmission line electric pole
CN109580212A (en) * 2019-01-25 2019-04-05 广东电网有限责任公司 A kind of cross arm lateral side clamp tension test tool
CN115716628A (en) * 2021-08-27 2023-02-28 中国电信股份有限公司 Lifting device for base station equipment installation

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2755285Y (en) * 2004-12-06 2006-02-01 煤炭科学研究总院太原分院 Movable hydraulic supports for protruded support suspension in coal gallery
CN201172601Y (en) * 2008-02-18 2008-12-31 上海宝钢设备检修有限公司 Multifunction retractable cantilever crane frame
GB2466863A (en) * 2008-11-28 2010-07-14 Matthew James Harold Rawlings An upright structure, particularly for use with wind turbines
CN201536236U (en) * 2009-09-27 2010-07-28 北京市电力公司 Bracket for hoisting heavy objects on object like an electrical pole

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2755285Y (en) * 2004-12-06 2006-02-01 煤炭科学研究总院太原分院 Movable hydraulic supports for protruded support suspension in coal gallery
CN201172601Y (en) * 2008-02-18 2008-12-31 上海宝钢设备检修有限公司 Multifunction retractable cantilever crane frame
GB2466863A (en) * 2008-11-28 2010-07-14 Matthew James Harold Rawlings An upright structure, particularly for use with wind turbines
CN201536236U (en) * 2009-09-27 2010-07-28 北京市电力公司 Bracket for hoisting heavy objects on object like an electrical pole

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105133916A (en) * 2015-09-26 2015-12-09 国网青海省电力公司 Auxiliary hanging bracket for mounting of upper frame on telegraph pole
CN107558793A (en) * 2017-09-09 2018-01-09 国网辽宁省电力有限公司锦州供电公司 Multilayer cross-arm lifting installation method and its specific purpose tool on a kind of overhead transmission line electric pole
CN107558793B (en) * 2017-09-09 2019-08-09 国网辽宁省电力有限公司锦州供电公司 A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof
CN109580212A (en) * 2019-01-25 2019-04-05 广东电网有限责任公司 A kind of cross arm lateral side clamp tension test tool
CN109580212B (en) * 2019-01-25 2024-02-13 广东电网有限责任公司 A cross arm side fixture tensile test tool
CN115716628A (en) * 2021-08-27 2023-02-28 中国电信股份有限公司 Lifting device for base station equipment installation

Similar Documents

Publication Publication Date Title
CN104201613B (en) Far-end operation changes device and the application process thereof of straight line list insulator string
CN103174323A (en) Multifunctional hoisting support frame
CN204848091U (en) Steel sheet cross arm hoisting accessory
CN103269036A (en) Tensioning resistant cross arm lifting machine
CN201517022U (en) Lifting tools for pole-mounted equipment
CN104022459A (en) 10 KV distribution line pole-mounted wire suspension device
CN102946065B (en) Employing electric substation pipe bus bar column insulator more changing device realizes the method for post insulator replacing
CN103601087A (en) Transformer lifting device
CN203289011U (en) Tension cross arm hoisting device
CN103669978B (en) The multi-functional anchor ear device of the vertical pole of group
CN103663235A (en) Hand-jack for rod
CN202917892U (en) Replacing tool for supporting insulator of tubular busbar
CN204349336U (en) Overhead-groundwire lifter
CN203439984U (en) Handjack for pole
CN204179569U (en) A kind of sister block wire grip of electric transmission line erection
CN201336516Y (en) Device for manually installing pole top switch
CN107558793B (en) A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof
CN203461720U (en) Simple cantilever hoisting machine
CN102611038A (en) Porcelain insulator moving device
CN203345999U (en) Special multifunctional lifting frame for busbar bridge
CN203288976U (en) Isolating switch hoisting device
CN203626372U (en) Multifunctional hoop device for assembling mounting mast
CN205132926U (en) Special well word hoist of hydroelectric set tail water ell
CN203014282U (en) An overhead ground wire lifting device in a power transmission line
CN206940317U (en) A kind of hanger structure for rack upper air installing

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20130626