- CN103715633A CN103715633A CN201410023616.0A CN201410023616A CN103715633A CN 103715633 A CN103715633 A CN 103715633A CN 201410023616 A CN201410023616 A CN 201410023616A CN 103715633 A CN103715633 A CN 103715633A
- Authority
- CN
- China
- Prior art keywords
- aluminum alloy
- insulator string
- yoke plate
- adjustable aluminum
- hole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明涉及一种耐张单孔联板绝缘子串更换卡具及其更换方法,该卡具包括前弯板卡、后弯板卡、两个可调式铝合金挂环和铝合金托瓶架,所述前弯板卡上部用于连接导线侧联板,中部固定有转向滑车,下部与一可调式铝合金挂环相连接,所述转向滑车穿设有连接铝合金托瓶架前端的绳索;所述后弯板卡上部用于连接横担侧联板,中部与铝合金托瓶架后端活动连接,下部与另一可调式铝合金挂环相连接;所述可调式铝合金挂环上开设有多个用于调节相应弯板卡连接位置的孔洞,两个可调式铝合金挂环之间通过双钩连接起来。本发明具有装拆方便、可操作性强、降低劳动强度、符合现场高空工作安全要求且提高作业效率等优点。
The present invention relates to a fixture for replacing a stretch-resistant single-hole connecting plate insulator string and a replacement method thereof. The fixture includes a front bent plate clamp, a rear bent plate clamp, two adjustable aluminum alloy hanging rings and an aluminum alloy bottle holder. The upper part of the front curved board is used to connect the wire side connecting plate, the middle part is fixed with a steering block, and the lower part is connected with an adjustable aluminum alloy hanging ring, and the steering block is provided with a rope connecting the front end of the aluminum alloy bottle holder; The upper part of the back-bent board is used to connect the cross-arm side connecting plate, the middle part is flexibly connected with the rear end of the aluminum alloy bottle holder, and the lower part is connected with another adjustable aluminum alloy hanging ring; the adjustable aluminum alloy hanging ring is There are a plurality of holes for adjusting the connection position of the corresponding bent plate card, and the two adjustable aluminum alloy hanging rings are connected by double hooks. The invention has the advantages of convenient assembly and disassembly, strong operability, reduced labor intensity, meeting the safety requirements of on-site high-altitude work, and improving operating efficiency.
Description
技术领域 technical field
本发明涉及一种绝缘子串更换卡具,特别是一种耐张单孔联板绝缘子串更换卡具及其更换方法。 The invention relates to a jig for replacing insulator strings, in particular to a jig for replacing insulator strings with a tension-resistant single-hole joint plate and a replacement method thereof.
背景技术 Background technique
近年来,由于电网建设步伐加快,架空线路运行维护水平的提高,运行在架空线路上联板型号类别不同。然而,面对各类型号联板更换耐张绝缘子所采用措施也截然不同。目前,架空线路更换耐张双串绝缘子作业主要方法采用导线卡线器加链条葫芦,该方法对更换L-3050G*型耐张单孔联板绝缘子串在时间、技术、安全等方面均存在较多的欠缺点。 In recent years, due to the accelerated pace of power grid construction and the improvement of the operation and maintenance level of overhead lines, the types of boards running on overhead lines are different. However, the measures taken to replace the tension insulators of various types of connecting plates are also quite different. At present, the main method of replacing tension double-string insulators on overhead lines is to use wire clamps and chain hoists. This method is relatively expensive in terms of time, technology, and safety for replacing L-3050G* type tension single-hole insulator strings. There are many shortcomings.
发明内容 Contents of the invention
鉴于现有技术的不足,本发明的目的在于提供一种装拆方便、可操作性强、降低劳动强度且符合现场高空工作安全要求的耐张单孔联板绝缘子串更换卡具及其更换方法。 In view of the deficiencies in the prior art, the purpose of the present invention is to provide a tension-resistant single-hole connected plate insulator string replacement jig and its replacement method that is convenient to assemble and disassemble, has strong operability, reduces labor intensity, and meets the safety requirements of on-site high-altitude work . the
为了实现上述目的,本发明的技术方案一是一种耐张单孔联板绝缘子串更换卡具,包括前弯板卡、后弯板卡、两个可调式铝合金挂环和铝合金托瓶架,所述前弯板卡上部用于连接导线侧联板,中部固定有转向滑车,下部与一可调式铝合金挂环相连接,所述转向滑车穿设有连接铝合金托瓶架前端的绳索;所述后弯板卡上部用于连接横担侧联板,中部与铝合金托瓶架后端活动连接,下部与另一可调式铝合金挂环相连接;所述可调式铝合金挂环上开设有多个用于调节相应弯板卡连接位置的孔洞,两个可调式铝合金挂环之间通过双钩连接起来。 In order to achieve the above purpose, the first technical solution of the present invention is a tension-resistant single-hole connecting plate insulator string replacement jig, including a front bending plate clamp, a rear bending plate clamp, two adjustable aluminum alloy hanging rings and an aluminum alloy bottle support The upper part of the front curved board is used to connect the wire side connecting plate, the middle part is fixed with a steering block, and the lower part is connected with an adjustable aluminum alloy hanging ring. Rope; the upper part of the back-bent plate is used to connect the cross-arm side connecting plate, the middle part is flexibly connected with the rear end of the aluminum alloy bottle rack, and the lower part is connected with another adjustable aluminum alloy hanging ring; the adjustable aluminum alloy hanging ring The ring is provided with a plurality of holes for adjusting the connection position of the corresponding bent plate card, and the two adjustable aluminum alloy hanging rings are connected by double hooks.
进一步的,所述前弯板卡上部开设有用于卡入导线侧联板的上开口槽和用于穿设螺栓以固定于导线侧联板上的螺栓孔,下部开设有安装一可调式铝合金挂环的下开口槽和穿设紧固件以固定于一可调式铝合金挂环上的通孔。 Further, the upper part of the front bending board is provided with an upper opening slot for snapping into the wire side connecting plate and a bolt hole for passing through bolts to be fixed on the wire side connecting plate, and the lower part is provided with an adjustable aluminum alloy The lower opening groove of the hanging ring and the through hole through which the fastener is passed to be fixed on an adjustable aluminum alloy hanging ring.
进一步的,所述后弯板卡上部开设有用于卡入横担侧联板的上开口槽和用于穿设螺栓以固定于横担侧联板的螺栓孔,中部开设有用于连接铝合金托瓶架后端的通孔,下部开设有安装另一可调式铝合金挂环的下开口槽和穿设紧固件以固定于另一可调式铝合金挂环上的通孔。 Further, the upper part of the rear bent board is provided with an upper opening slot for snapping into the cross-arm side connecting plate and a bolt hole for passing through bolts to be fixed to the cross-arm side connecting plate, and the middle part is provided with an aluminum alloy bracket. In the through hole at the rear end of the bottle rack, the lower part is provided with a lower opening groove for installing another adjustable aluminum alloy hanging ring and a through hole for fixing fasteners on another adjustable aluminum alloy hanging ring.
进一步的,所述铝合金托瓶架前端铰接有与绳索相连接的T形挂环,后端铰接有与后弯板卡中部固定连接的三角连接架。 Further, the front end of the aluminum alloy bottle holder is hinged with a T-shaped hanging ring connected to the rope, and the rear end is hinged with a triangle connecting frame fixedly connected with the middle of the back-bent board.
进一步的,所述上开口槽的开口截面宽度24mm,两侧壁厚为15mm。 Further, the opening section width of the upper opening groove is 24 mm, and the wall thickness of both sides is 15 mm.
进一步的,所述前弯板卡和后弯板卡均采用铝合金材料制作而成。 Further, the front curved board and the rear curved board are both made of aluminum alloy.
进一步的,所述可调式铝合金挂环上开设有一排13个孔洞。 Further, a row of 13 holes is provided on the adjustable aluminum alloy hanging ring.
进一步的,所述可调式铝合金挂环的长×宽×高为970mm×55mm×15mm,所述孔洞间距为50mm,孔洞直径为23mm。 Further, the length×width×height of the adjustable aluminum alloy hanging ring is 970mm×55mm×15mm, the hole spacing is 50mm, and the hole diameter is 23mm.
为了实现上述目的,本发明的技术方案二是一种耐张单孔联板绝缘子串更换方法,该方法采用如上所述的耐张单孔联板绝缘子串更换卡具,拆除绝缘子串时,将双钩两端分别挂置于两个可调式铝合金挂环,通过收紧双钩,使需更换的绝缘子串处于松弛状态,拆卸绝缘子、金具螺帽、螺栓及插销;安装绝缘子串时,先将铝合金托瓶架置于垂直面,待地面人员将新绝缘子串起吊至与铝合金托瓶架同一垂直面,通过前弯板卡上的转向滑车与铝合金托瓶架前端配合使用将新绝缘子串起吊至原绝缘子串水平部位,进行组装作业。 In order to achieve the above-mentioned purpose, the second technical solution of the present invention is a method for replacing a tension-resistant single-hole connected plate insulator string. The two ends of the double hooks are respectively hung on two adjustable aluminum alloy hanging rings. By tightening the double hooks, the insulator strings to be replaced are in a loose state, and the insulators, hardware nuts, bolts and pins are removed; when installing the insulator strings, first put the aluminum The alloy bottle holder is placed on the vertical plane, and the ground staff will lift the new insulator to the same vertical plane as the aluminum alloy bottle holder, and use the steering pulley on the front curved card together with the front end of the aluminum alloy bottle holder to string the new insulators together. Hoist to the horizontal position of the original insulator string for assembly work.
与现有技术相比,本发明具有以下有益效果:(1)材质选用铝合金材料,具有强度高、轻便等特点,降低塔上作业人员的劳动强度,提高了工作效率。(2)节省了人力资源,缩短了操作时间,比原先的方式节省了30分钟,塔上作业人员减少2人,作业人员明显感觉更换方法省时、省力。(3)拆除、更换绝缘子串时,绝缘子串与连接的金具组装、拆卸方便,可操作性强,有效解决了作业现场因L-3050G*型耐张单孔联板绝缘子串更换困难或无法更换问题,提高了作业效率。 Compared with the prior art, the present invention has the following beneficial effects: (1) The material is made of aluminum alloy, which has the characteristics of high strength and lightness, reduces the labor intensity of operators on the tower, and improves work efficiency. (2) It saves human resources, shortens the operation time, and saves 30 minutes compared with the original method. The number of operators on the tower is reduced by 2. The operators obviously feel that the replacement method saves time and effort. (3) When dismantling and replacing the insulator string, the insulator string and the connected hardware are easy to assemble and disassemble, and the operability is strong, which effectively solves the difficulty or inability to replace the L-3050G* type tension single-hole plate insulator string on the job site problems and improve work efficiency.
下面结合附图和具体实施方式对本发明做进一步详细的说明。 The present invention will be described in further detail below in conjunction with the accompanying drawings and specific embodiments.
附图说明 Description of drawings
图1为本发明实施例的结构示意图。 Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
图2为后弯板卡的结构示意图。 FIG. 2 is a schematic structural diagram of a back-bent card.
图3为前弯板卡的结构示意图。 FIG. 3 is a schematic structural diagram of a front-bent card.
图4为可调式铝合金挂环的结构示意图。 Fig. 4 is a schematic structural diagram of an adjustable aluminum alloy hanging ring.
图5为铝合金托瓶架的结构示意图。 Fig. 5 is a structural schematic diagram of an aluminum alloy bottle holder.
图中:1-后弯板卡,11-通孔,12-上开口槽,13-下开口槽,2-前弯板卡,21-上开口槽,22-下开口槽,23-转向滑车,3-可调式铝合金挂环,31-孔洞,4-铝合金托瓶架,41-三角连接架,42- T型挂环,5-双钩,6-导线侧联板,7-横担侧联板,8-绝缘子串。 In the figure: 1-back curved board, 11-through hole, 12-upper opening slot, 13-lower opening slot, 2-front bending board, 21-upper opening slot, 22-lower opening slot, 23-steering block , 3-adjustable aluminum alloy hanging ring, 31-hole, 4-aluminum alloy bottle holder, 41-triangular connecting frame, 42-T-shaped hanging ring, 5-double hook, 6-wire side connecting plate, 7-cross arm Side connection plate, 8-insulator string.
具体实施方式 Detailed ways
如图1~5所示,一种耐张单孔联板绝缘子串更换卡具,包括前弯板卡、后弯板卡、两个可调式铝合金挂环和铝合金托瓶架,所述前弯板卡上部用于连接导线侧联板,中部固定有转向滑车,下部与一可调式铝合金挂环相连接,所述转向滑车穿设有连接铝合金托瓶架前端的绳索;所述后弯板卡上部用于连接横担侧联板,中部与铝合金托瓶架后端活动连接,下部与另一可调式铝合金挂环相连接;所述可调式铝合金挂环上开设有多个用于调节相应弯板卡连接位置的孔洞,两个可调式铝合金挂环之间通过双钩连接起来。 As shown in Figures 1 to 5, a fixture for replacing tension-resistant single-hole insulator strings includes a front-bent plate clamp, a rear-bent plate clamp, two adjustable aluminum alloy hanging rings, and an aluminum alloy bottle holder. The upper part of the front curved board is used to connect the wire side connecting plate, the middle part is fixed with a steering block, and the lower part is connected with an adjustable aluminum alloy hanging ring. The steering block is threaded with a rope connected to the front end of the aluminum alloy bottle holder; The upper part of the back-bent board is used to connect the cross-arm side connecting plate, the middle part is movably connected with the rear end of the aluminum alloy bottle holder, and the lower part is connected with another adjustable aluminum alloy hanging ring; the adjustable aluminum alloy hanging ring is equipped with A plurality of holes are used to adjust the connection position of the corresponding bent plate card, and the two adjustable aluminum alloy hanging rings are connected by double hooks.
在本实施例中,所述前弯板卡上部开设有用于卡入导线侧联板的上开口槽和用于穿设螺栓以固定于导线侧联板上的螺栓孔,下部开设有安装一可调式铝合金挂环的下开口槽和穿设紧固件以固定于一可调式铝合金挂环上的通孔。所述后弯板卡上部开设有用于卡入横担侧联板的上开口槽和用于穿设螺栓以固定于横担侧联板的螺栓孔,中部开设有用于连接铝合金托瓶架后端的通孔,下部开设有安装另一可调式铝合金挂环的下开口槽和穿设紧固件以固定于另一可调式铝合金挂环上的通孔。 In this embodiment, the upper part of the front curved board is provided with an upper opening slot for snapping into the side connecting plate of the wire and a bolt hole for passing a bolt to be fixed on the side connecting plate of the wire, and the lower part is provided with a mounting bracket. The lower opening groove of the adjustable aluminum alloy hanging ring and the through hole through which the fastener is passed to be fixed on an adjustable aluminum alloy hanging ring. The upper part of the back bending plate is provided with an upper opening slot for snapping into the cross-arm side connecting plate and a bolt hole for passing bolts to be fixed to the cross-arm side connecting plate, and the middle part is opened for connecting the rear of the aluminum alloy bottle holder. There is a through hole at the end, and the lower part is provided with a lower opening groove for installing another adjustable aluminum alloy hanging ring and a through hole for passing fasteners to be fixed on another adjustable aluminum alloy hanging ring.
在本实施例中,所述前弯板卡和后弯板卡均采用铝合金材料制作而成,其上开口槽的开口截面宽度24mm,两侧壁厚为15mm。使用时,将前、后弯板卡的上开口槽分别安装在绝缘子串金具的前、后L-3050G*型耐张单孔联板斜面上,使得其紧密对接,并用螺栓将前、后弯板卡固定于L-3050G*型耐张单孔联板上,整个工具能保持较好的水平稳定性。 In this embodiment, the front curved board and the rear curved board are both made of aluminum alloy material, the opening section width of the upper opening groove is 24 mm, and the wall thickness of both sides is 15 mm. When in use, install the upper opening slots of the front and rear bending boards on the front and rear L-3050G* type tension-resistant single-hole connecting plate slopes of the insulator string fittings respectively, so that they are closely connected, and use bolts to connect the front and rear bending boards. The board is fixed on the L-3050G* type tensile single-hole connecting plate, and the whole tool can maintain good horizontal stability.
在本实施例中,所述铝合金托瓶架为爬梯形,所述铝合金托瓶架前端铰接有能够绕铰接轴360度旋转的T形挂环,所述绳索穿过前弯板卡上的转向滑车后与T型挂环连接;所述铝合金托瓶架后端铰接有一端能够绕铰接轴360度旋转的三角连接架,所述三角连接架的另一端穿过后弯板卡中部通孔后通过110mm长螺栓与后弯板卡固定连接,使得铝合金托瓶架前端在垂直面成为一个自由旋转构造。操作时,将T型挂环与三角连接架高度保持一致,通过地面人员控制绳索,调整铝合金托瓶架起吊高度,提高塔上作业人员快速拆卸、更换绝缘子串工作效率。 In this embodiment, the aluminum alloy bottle holder is in the shape of a climbing ladder, and the front end of the aluminum alloy bottle holder is hinged with a T-shaped hanging ring capable of rotating 360 degrees around the hinge axis, and the rope passes through the front curved plate and is attached to the The steering pulley is connected with the T-shaped hanging ring; the rear end of the aluminum alloy bottle holder is hinged with a triangle connecting frame that can rotate 360 degrees around the hinge axis, and the other end of the triangle connecting frame passes through the middle of the back bending plate card. After the hole, the 110mm long bolt is fixedly connected with the rear bent plate, so that the front end of the aluminum alloy bottle holder becomes a free-rotating structure in the vertical plane. During operation, the height of the T-shaped hanging ring is kept consistent with that of the triangle connecting frame, and the lifting height of the aluminum alloy bottle holder is adjusted through the control of the rope by the ground personnel, so as to improve the working efficiency of the operators on the tower to quickly disassemble and replace the insulator string.
在本实施例中,所述可调式铝合金挂环的长×宽×高为970mm×55mm×15mm,所述可调式铝合金挂环上开设有一排13个孔洞,所述孔洞间距为50mm,孔洞直径为23mm。使用时,根据需更换的绝缘子串长度调节可调式铝合金挂环的作业部位,选择合适的孔洞后将两个可调式铝合金挂环分别与前、后弯板卡的下开口槽对接,将双钩两端分别挂置两侧的可调式铝合金挂环中,减少塔上作业人员高空使用双钩的工作量。 In this embodiment, the length × width × height of the adjustable aluminum alloy hanging ring is 970 mm × 55 mm × 15 mm, and a row of 13 holes is provided on the adjustable aluminum alloy hanging ring, and the distance between the holes is 50 mm. The hole diameter is 23mm. When in use, adjust the working part of the adjustable aluminum alloy hanging ring according to the length of the insulator string to be replaced, and after selecting a suitable hole, connect the two adjustable aluminum alloy hanging rings with the lower opening slots of the front and rear bent boards respectively, and place the The two ends of the double hooks are respectively hung in the adjustable aluminum alloy hanging rings on both sides, which reduces the workload of the operators on the tower to use the double hooks at high altitude.
本发明的工作原理如下:若要拆除绝缘子串,将双钩两端分别挂置于两侧可调式铝合金挂环,通过收紧双钩,使需更换的绝缘子串处于松弛状态,便于拆卸绝缘子、金具螺帽、螺栓、插销等。若要安装绝缘子串,先将铝合金托瓶架置于垂直面,待地面人员将新绝缘子串起吊至与铝合金托瓶架同一垂直面,利用前弯板卡上的转向滑车与铝合金托瓶架上的T型挂环配套使用将新绝缘子串起吊至原绝缘子串水平部位,进行组装作业。 The working principle of the present invention is as follows: if the insulator string needs to be removed, hang the two ends of the double hooks on the adjustable aluminum alloy hanging rings on both sides, and tighten the double hooks so that the insulator string to be replaced is in a loose state, so that the insulator and fittings can be easily disassembled Nuts, bolts, pins, etc. If you want to install the insulator string, first place the aluminum alloy bottle holder on the vertical plane, wait for the ground personnel to lift the new insulator string to the same vertical plane as the aluminum alloy bottle holder, use the steering pulley on the front curved card and the aluminum alloy holder The T-shaped hanging ring on the bottle rack is used to lift the new insulator string to the horizontal position of the original insulator string for assembly work.
具体使用时,横担侧电工带转向滑车与绳索登塔至作业位置,安装好转向滑车与吊绳,导线侧电工沿绝缘子串进入导线侧,地面电工陆续将前弯板卡、后弯板卡、可调式铝合金挂环、铝合金托瓶架吊升至作业位置,地面电工将双钩松至适当长度后,吊升至塔上作业位置。横担侧电工将后弯板卡固定于横担侧L-3050G*型耐张单孔联板上,导线侧电工将前弯板卡固定于导线侧L-3050G*型耐张单孔联板上,横担侧电工、导线侧电工根据需更换的绝缘子串长度选择两个可调式铝合金挂环上合适的孔洞位置,分别与前弯板卡的下开口槽和后弯板卡的下开口槽连接,将铝合金托瓶架的三角连接架与后弯板卡中部通孔通过110mm长螺栓固定,绳索穿过前弯板卡上的转向滑车后与铝合金托瓶架上的T型挂环连接,通过收紧双钩,使绝缘子串处于松弛状态,横担侧电工、导线侧电工即可轻松拆卸绝缘子串并将其置于铝合金托瓶架上以致达到拆卸目的。安装绝缘子串过程中,铝合金托瓶架放松至垂直面,待地面电工将新绝缘子串吊升至与铝合金托瓶架同一垂直面时,利用前弯板卡上的转向滑车与铝合金托瓶架上的T型挂环配套使用将新绝缘子串起吊至原绝缘子串水平部位,进行组装作业。 During specific use, the electrician on the crossarm side takes the steering block and the rope to climb the tower to the working position, installs the steering block and the lifting rope, the electrician on the wire side enters the wire side along the insulator string, and the electrician on the ground successively installs the front bending board and the rear bending board. , Adjustable aluminum alloy hanging ring, aluminum alloy bottle holder hoisted to the working position, after the ground electrician loosened the double hooks to an appropriate length, hoisted to the working position on the tower. The electrician on the cross-arm side fixes the rear bending plate on the L-3050G* type tension-resistant single-hole connecting plate on the cross-arm side, and the electrician on the conductor side fixes the front bending plate on the L-3050G* type tension-resistant single-hole connecting plate on the conductor side According to the length of the insulator string to be replaced, the electrician on the cross-arm side and the conductor side select the appropriate hole positions on the two adjustable aluminum alloy hanging rings, which are respectively connected to the lower opening slot of the front bending board and the lower opening of the rear bending board. Groove connection, the triangular connection frame of the aluminum alloy bottle holder and the through hole in the middle of the rear curved board are fixed by 110mm long bolts, and the rope passes through the steering pulley on the front curved board and is connected to the T-shaped hanger on the aluminum alloy bottle holder. Ring connection, by tightening the double hooks, the insulator string is in a loose state, and the electrician on the crossarm side and the wire side can easily dismantle the insulator string and place it on the aluminum alloy bottle holder to achieve the purpose of disassembly. During the installation of insulator strings, the aluminum alloy bottle holder is relaxed to the vertical plane, and when the ground electrician lifts the new insulator string to the same vertical plane as the aluminum alloy bottle holder, use the steering pulley on the front bent board and the aluminum alloy holder The T-shaped hanging ring on the bottle rack is used to lift the new insulator string to the horizontal position of the original insulator string for assembly work.
本实施例未述部分与现有技术相同,且以上所述仅为本发明的较佳实施例,凡依本发明申请专利范围所做的均等变化与修饰,皆应属本发明的涵盖范围。 The parts not described in this embodiment are the same as the prior art, and the above description is only a preferred embodiment of the present invention. All equivalent changes and modifications made according to the scope of the patent application of the present invention shall fall within the scope of the present invention.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410023616.0A CN103715633B (en) | 2014-01-20 | 2014-01-20 | Strain insulator single hole yoke plate replacing insulator string method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410023616.0A CN103715633B (en) | 2014-01-20 | 2014-01-20 | Strain insulator single hole yoke plate replacing insulator string method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103715633A true CN103715633A (en) | 2014-04-09 |
CN103715633B CN103715633B (en) | 2016-03-30 |
Family
ID=50408376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410023616.0A Active CN103715633B (en) | 2014-01-20 | 2014-01-20 | Strain insulator single hole yoke plate replacing insulator string method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103715633B (en) |
Cited By (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105429054A (en) * | 2015-12-29 | 2016-03-23 | 广西电网有限责任公司玉林供电局 | Universal fixture for lively replacing entire glass insulator string on strain pole |
CN105762707A (en) * | 2016-04-28 | 2016-07-13 | 中国南方电网有限责任公司超高压输电公司柳州局 | Universal clamp for strain tower lead terminal with turning pulley for 500-KV line |
CN107342553A (en) * | 2017-04-14 | 2017-11-10 | 国家电网公司 | A kind of the replacing fixture and replacing options of straight line duplex V insulator strings |
CN107482534A (en) * | 2017-09-01 | 2017-12-15 | 贵州电网有限责任公司 | A kind of portable power line tension insulator string more changing device and its replacing options |
CN108581578A (en) * | 2018-02-02 | 2018-09-28 | 中国电子科技集团公司第三十八研究所 | A kind of axially position device for turning shaft-like workpiece |
CN109672111A (en) * | 2019-02-11 | 2019-04-23 | 国家电网有限公司 | The combination tool and method of horizontal rotation method replacement direct current grounding pole line tension string |
CN110768165A (en) * | 2019-12-09 | 2020-02-07 | 云南电网有限责任公司昆明供电局 | Device for replacing the entire string of tensile insulators at the cross arm end and wire end of DC transmission lines |
CN111682450A (en) * | 2020-07-08 | 2020-09-18 | 国网福建省电力有限公司 | Universal fixture and operation method for live replacement of tension-resistant duplex insulator strings |
CN112448312A (en) * | 2020-11-11 | 2021-03-05 | 国网甘肃省电力公司检修公司 | Clamp for replacing insulator at quadruple end of extra-high voltage line and using method thereof |
CN113809683A (en) * | 2021-10-25 | 2021-12-17 | 国网四川省电力公司成都供电公司 | Method and system for replacing insulator string |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007221998A (en) * | 2007-04-26 | 2007-08-30 | Nippon Katan Co Ltd | Vernier fittings |
CN201656393U (en) * | 2010-04-16 | 2010-11-24 | 扬州达亨线路金具有限公司 | Linear strain device of gap type thermal resistant uprating conductor |
CN202206065U (en) * | 2010-12-08 | 2012-04-25 | 绥化电业局 | Electrified replacement strain insulator string back-up protection device |
CN202488032U (en) * | 2011-12-06 | 2012-10-10 | 宝鸡供电局 | A Bottle Holder for Replacing Tensile Glass Composite Insulators of 330kV Transmission Lines |
CN202651692U (en) * | 2012-06-11 | 2013-01-02 | 江苏省电力公司镇江供电公司 | Replacement of the big knife jig for double-connected tension string insulators |
CN103227431A (en) * | 2013-03-19 | 2013-07-31 | 国家电网公司 | Method for replacing insulator chains in 220 kV long-span high tower in live working |
CN203205771U (en) * | 2013-04-24 | 2013-09-18 | 国家电网公司 | Tensioning insulating clamp for live replacement of tension insulator |
CN203218785U (en) * | 2013-03-19 | 2013-09-25 | 国家电网公司 | 220kV Large Span High Tower Suspended Insulator String Live Replacement Device |
JP2013219850A (en) * | 2012-04-04 | 2013-10-24 | Chugoku Electric Power Co Inc:The | Vernier fitting, and sag adjustment method for overhead line using the same |
CN203690802U (en) * | 2014-01-20 | 2014-07-02 | 国家电网公司 | Tension single-hole yoke plate insulator string replacement clamping apparatus |
-
2014
- 2014-01-20 CN CN201410023616.0A patent/CN103715633B/en active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2007221998A (en) * | 2007-04-26 | 2007-08-30 | Nippon Katan Co Ltd | Vernier fittings |
CN201656393U (en) * | 2010-04-16 | 2010-11-24 | 扬州达亨线路金具有限公司 | Linear strain device of gap type thermal resistant uprating conductor |
CN202206065U (en) * | 2010-12-08 | 2012-04-25 | 绥化电业局 | Electrified replacement strain insulator string back-up protection device |
CN202488032U (en) * | 2011-12-06 | 2012-10-10 | 宝鸡供电局 | A Bottle Holder for Replacing Tensile Glass Composite Insulators of 330kV Transmission Lines |
JP2013219850A (en) * | 2012-04-04 | 2013-10-24 | Chugoku Electric Power Co Inc:The | Vernier fitting, and sag adjustment method for overhead line using the same |
CN202651692U (en) * | 2012-06-11 | 2013-01-02 | 江苏省电力公司镇江供电公司 | Replacement of the big knife jig for double-connected tension string insulators |
CN103227431A (en) * | 2013-03-19 | 2013-07-31 | 国家电网公司 | Method for replacing insulator chains in 220 kV long-span high tower in live working |
CN203218785U (en) * | 2013-03-19 | 2013-09-25 | 国家电网公司 | 220kV Large Span High Tower Suspended Insulator String Live Replacement Device |
CN203205771U (en) * | 2013-04-24 | 2013-09-18 | 国家电网公司 | Tensioning insulating clamp for live replacement of tension insulator |
CN203690802U (en) * | 2014-01-20 | 2014-07-02 | 国家电网公司 | Tension single-hole yoke plate insulator string replacement clamping apparatus |
Cited By (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105429054A (en) * | 2015-12-29 | 2016-03-23 | 广西电网有限责任公司玉林供电局 | Universal fixture for lively replacing entire glass insulator string on strain pole |
CN105762707A (en) * | 2016-04-28 | 2016-07-13 | 中国南方电网有限责任公司超高压输电公司柳州局 | Universal clamp for strain tower lead terminal with turning pulley for 500-KV line |
CN105762707B (en) * | 2016-04-28 | 2018-03-09 | 中国南方电网有限责任公司超高压输电公司柳州局 | 500kV line tension towers conductor wire end band corner block universal card |
CN107342553B (en) * | 2017-04-14 | 2022-12-02 | 国家电网公司 | Replacing fixture and replacing method for linear duplex V-string insulator |
CN107342553A (en) * | 2017-04-14 | 2017-11-10 | 国家电网公司 | A kind of the replacing fixture and replacing options of straight line duplex V insulator strings |
CN107482534A (en) * | 2017-09-01 | 2017-12-15 | 贵州电网有限责任公司 | A kind of portable power line tension insulator string more changing device and its replacing options |
CN108581578A (en) * | 2018-02-02 | 2018-09-28 | 中国电子科技集团公司第三十八研究所 | A kind of axially position device for turning shaft-like workpiece |
CN108581578B (en) * | 2018-02-02 | 2023-08-11 | 中国电子科技集团公司第三十八研究所 | Axial positioner for turning shaft workpiece |
CN109672111A (en) * | 2019-02-11 | 2019-04-23 | 国家电网有限公司 | The combination tool and method of horizontal rotation method replacement direct current grounding pole line tension string |
CN109672111B (en) * | 2019-02-11 | 2024-01-30 | 国家电网有限公司 | Combined tool and method for replacing direct current grounding electrode line strain insulator string by horizontal rotation method |
CN110768165A (en) * | 2019-12-09 | 2020-02-07 | 云南电网有限责任公司昆明供电局 | Device for replacing the entire string of tensile insulators at the cross arm end and wire end of DC transmission lines |
CN111682450A (en) * | 2020-07-08 | 2020-09-18 | 国网福建省电力有限公司 | Universal fixture and operation method for live replacement of tension-resistant duplex insulator strings |
CN112448312A (en) * | 2020-11-11 | 2021-03-05 | 国网甘肃省电力公司检修公司 | Clamp for replacing insulator at quadruple end of extra-high voltage line and using method thereof |
CN113809683A (en) * | 2021-10-25 | 2021-12-17 | 国网四川省电力公司成都供电公司 | Method and system for replacing insulator string |
Also Published As
Publication number | Publication date |
---|---|
CN103715633B (en) | 2016-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103715633B (en) | Strain insulator single hole yoke plate replacing insulator string method | |
CN104167687B (en) | Tool for live-line replacement of suspension insulator and using working method thereof | |
CN203247012U (en) | Composite insulator lifting fixture | |
CN104201613B (en) | Far-end operation changes device and the application process thereof of straight line list insulator string | |
CN215185508U (en) | UHV insulator string replacement device based on insulating soft sling | |
CN103594968A (en) | Lifting device of multiple divided conductors of transmission tower | |
CN203895908U (en) | Balance cross-arm | |
CN206250670U (en) | It is a kind of to be easy to operation and safe replacing device for insulator | |
CN102661057A (en) | Power angle tower pull leg main material changing method and special main material clamp | |
CN209448333U (en) | A kind of multi-functional unmanned plane seton device for transmission line of electricity | |
CN102664377B (en) | Double-cross arm assembler for single lever and double-cross arm mounting method | |
CN203690802U (en) | Tension single-hole yoke plate insulator string replacement clamping apparatus | |
CN208337014U (en) | A kind of charged for replacement Voltage for Insulators on HV Lines lifting block hanging point heightening device | |
CN106384964A (en) | V-type insulator-chain electrified replacing operation method | |
CN211701241U (en) | Insulator replacing device | |
CN109347038B (en) | High-voltage wire jumper windproof partial suspension weight device | |
CN102923600B (en) | Reverse pulley fixing device | |
CN206302092U (en) | Pulling tools for overhead transmission line cables | |
CN205829038U (en) | A kind of eight division 1250mm2device for suspending line tackles | |
CN214003786U (en) | Main beam hoisting device for wind power blade | |
CN204858403U (en) | A temporary hanging point fixing device for live replacement of V-shaped insulators on transmission lines | |
CN210457155U (en) | Vertical precast concrete slab lifting device of prefabricated building | |
CN212403184U (en) | Hoisting tool for duplex insulator string | |
CN208835588U (en) | A bottle holder | |
CN202616658U (en) | Suspension string insulator replacement device of 220kV circuit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |