CN107558793B - A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof - Google Patents
A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof Download PDFInfo
- Publication number
- CN107558793B CN107558793B CN201710808627.3A CN201710808627A CN107558793B CN 107558793 B CN107558793 B CN 107558793B CN 201710808627 A CN201710808627 A CN 201710808627A CN 107558793 B CN107558793 B CN 107558793B
- Authority
- CN
- China
- Prior art keywords
- cross
- arm
- pole
- arms
- special
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 16
- 229910052573 porcelain Inorganic materials 0.000 claims abstract description 9
- 238000009434 installation Methods 0.000 claims abstract description 5
- 239000000725 suspension Substances 0.000 claims abstract description 3
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 239000002184 metal Substances 0.000 claims description 7
- 238000010276 construction Methods 0.000 claims description 4
- 241000274582 Pycnanthus angolensis Species 0.000 claims 1
- 239000000203 mixture Substances 0.000 claims 1
- 239000011087 paperboard Substances 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 239000000463 material Substances 0.000 description 4
- 230000009194 climbing Effects 0.000 description 2
- 241001503987 Clematis vitalba Species 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
Landscapes
- Electric Cable Installation (AREA)
Abstract
本发明公开了一种架空线路电杆上多层横担提升安装方法及其专用工具,该方法包含步骤如下:在电杆顶端横担上悬挂安装定滑轮,并在定滑轮上绕过吊绳;在地面上组装横担并只连接一根螺栓;使用专用连接绳分别连接二根横担两端;通过吊绳和专用连接绳将二根横担水平吊运至横担安装位置;将二根横担由电杆一侧推入并固定夹持在电杆上;将瓷件、金具放入专用储物箱内,通过下拉吊绳和专用连接绳将专用储物箱吊运至横担处,将瓷件和金具安装在横担上即可。有益效果是:横担无需由杆上作业人员参与即可完成提升,提升到位的横担在电杆上由一人即可完成二根横担的安装,减少了电杆上作业人员的作业量和劳动强度,节省了作业时间,提高了作业效率。
The invention discloses a method for lifting and installing a multi-layer cross arm on an overhead line electric pole and a special tool thereof. The method includes the following steps: hanging and installing a fixed pulley on the cross arm at the top of the electric pole, and bypassing the suspension rope on the fixed pulley ; Assemble the cross-arm on the ground and connect only one bolt; use a special connecting rope to connect the two ends of the two cross-arms respectively; The first cross-arm is pushed in from one side of the pole and fixedly clamped on the pole; put the porcelain pieces and hardware into the special storage box, and lift the special storage box to the cross-arm by pulling down the sling and the special connecting rope place, just install the porcelain pieces and hardware on the cross arm. The beneficial effect is that the cross-arm can be lifted without the participation of the operators on the pole, and the installation of the two cross-arms can be completed by one person on the pole when the cross-arm has been lifted in place, which reduces the workload and labor of the operators on the pole. Labor intensity, saving working time and improving working efficiency.
Description
技术领域technical field
本发明属于电力施工领域,特别涉及一种架空线路电杆上多层横担提升安装方法及其专用工具。The invention belongs to the field of electric power construction, and in particular relates to a method for lifting and installing multi-layer cross-arms on poles of overhead lines and a special tool thereof.
背景技术Background technique
目前,供电企业在架空线路电杆上安装多层横担时,普遍采用的是电杆上的作业人员利用绳索竖直上拉横担并传递材料、电力金具、工具等,接地线、绝缘手套、验电笔等安全工器具由登杆人员随身携带,这种作业方式存在问题如下:At present, when power supply enterprises install multi-layer crossarms on overhead line poles, it is generally used that operators on the poles use ropes to pull up the crossarms vertically and transfer materials, power fittings, tools, etc., grounding wires, insulating gloves, etc. , electroscope pen and other safety tools are carried by the climber. The problems of this operation method are as follows:
1、上拉横担时不仅作业强度大,横担容易掉落,而且容易出现脚扣称重超负荷的情况,存在损坏脚扣和导致滑杆的安全隐患;1. When pulling up the cross arm, not only the work intensity is high, but the cross arm is easy to fall, and it is easy to overload the foot buckle, which may damage the foot buckle and cause the safety hazard of the slide bar;
2、安装横担时需要二人相互配合才能将二根横担对应夹在电杆两侧进行固定,二人在电杆上操作不便;2. When installing the cross-arm, two people need to cooperate with each other to clamp the two cross-arms on both sides of the pole for fixing. It is inconvenient for two people to operate on the pole;
3、作业人员在登杆塔前,在做挂接地线、验电等措施前,都要把工具携带在身上,这为登杆人员增加了负担。3. Operators must carry tools on their bodies before climbing the pole tower, before doing measures such as hanging ground wires and electric tests, which increases the burden on the pole climbing personnel.
4、作业人员在往杆塔传递工具和材料时,每次只能传递一种工具或者少量材料,长此往复定会增加作业时间,分散杆塔上作业人员的注意力,作业时嫌麻烦有时就会随手扔下,随便摆放,存在高空材料工具掉落伤人的安全隐患。4. When workers transfer tools and materials to the tower, they can only transfer one tool or a small amount of material at a time. If things go on like this, it will increase the working time and disperse the attention of the workers on the tower. Throw it down and place it casually, there is a potential safety hazard that the high-altitude material tool will fall and hurt people.
发明内容Contents of the invention
本发明所要解决的技术问题是提供一种架空线路电杆上多层横担提升安装方法及其专用工具,该方法不仅能够降低作业强度,提高作业安全性,而且由一人登杆便可进行横担安装作业,提高了作业效率。The technical problem to be solved by the present invention is to provide a method for lifting and installing multi-layer cross-arms on overhead line poles and its special tools. Undertake the installation work, improve the work efficiency.
本发明的技术方案如下:Technical scheme of the present invention is as follows:
一种架空线路电杆上多层横担提升安装方法,包含步骤如下:A method for lifting and installing multi-layer cross-arms on overhead line poles, comprising the following steps:
1、在电杆顶端的横担上悬挂安装定滑轮,并在定滑轮上绕过吊绳;1. Hang and install the fixed pulley on the cross arm at the top of the pole, and bypass the suspension rope on the fixed pulley;
2、在所要安装横担的电杆下方的地面上组装横担;组装横担时二根横担之间只连接一根螺栓;2. Assemble the cross arm on the ground below the pole where the cross arm is to be installed; when assembling the cross arm, only connect one bolt between the two cross arms;
3、使用专用连接绳下端的横担连接螺栓分别穿过二根横担两端的立瓶安装孔并紧固;3. Use the cross-arm connecting bolts at the lower end of the special connecting rope to pass through the vertical bottle mounting holes at both ends of the two cross-arms and fasten them;
4、将专用连接绳上端的金属挂扣挂在吊绳一端的吊钩上,由地面施工人员下拉吊绳另一端,通过吊绳将二根横担水平吊运至电杆上的横担安装位置;4. Hang the metal buckle on the upper end of the special connecting rope on the hook at one end of the sling, and the ground construction personnel pull down the other end of the sling, and lift the two cross-arms horizontally to the cross-arm on the pole for installation through the sling. Location;
5、由电杆上的作业人员将二根横担由电杆一侧推入,使电杆夹在二根横担之间,再穿设另一根螺栓,将二根横担固定夹持在电杆上;5. The operator on the pole pushes the two cross-arms from one side of the pole so that the pole is clamped between the two cross-arms, and then another bolt is inserted to fix and clamp the two cross-arms on the pole;
6、将横担上所需安装的瓷件、金具放入专用储物箱内,再放下专用连接绳,将专用连接绳下端的四个挂钩分别挂在专用储物箱顶面四角处的挂环上,通过下拉吊绳将专用储物箱吊运至电杆上的横担处,由电杆上的作业人员将专用储物箱内的瓷件和金具安装在横担上即可。6. Put the porcelain pieces and goldware to be installed on the cross arm into the special storage box, then put down the special connecting rope, and hang the four hooks at the lower end of the special connecting rope on the hanging hooks at the four corners of the top surface of the special storage box respectively. On the ring, the special storage box is hoisted to the cross arm on the pole by pulling down the sling, and the operator on the pole installs the porcelain and hardware in the special storage box on the cross arm.
7、重复上述步骤2~6,直至多层横担全部提升安装完毕。7. Repeat steps 2 to 6 above until all the multi-layer cross-arms are lifted and installed.
一种架空线路电杆上多层横担提升安装方法所使用的专用工具,包括专用连接绳和专用储物箱,A special tool used in the method of lifting and installing multi-layer cross-arms on overhead line poles, including special connecting ropes and special storage boxes,
所述专用储物箱包括一个上端敞口的箱体,在箱体上端沿其外缘设有一圈工具挂架,用于悬挂作业工具;在箱体顶面四角处分别设有挂环,用于连接专用连接绳;在箱体下端四角处分别设有工具挂钩,用于悬挂作业工具;The special storage box includes a box body with an open upper end, and a circle of tool hangers is arranged on the upper end of the box body along its outer edge for hanging working tools; Special connecting ropes for connection; tool hooks are provided at the four corners of the lower end of the box for hanging working tools;
所述专用连接绳包括四根连接绳,四根连接绳一端缠绕合并成一股并连接有金属挂扣,四根连接绳的另一端分别连接有挂钩和横担连接螺栓,用于分别连接专用储物箱和横担。The special connecting ropes include four connecting ropes, one end of the four connecting ropes is wound and merged into one strand and connected with a metal buckle, and the other ends of the four connecting ropes are respectively connected with hooks and cross-arm connecting bolts for connecting the special storage Boxes and crossarms.
作为进一步优选,所述箱体外形为长方体,且由一个长方体框架及分别固定在长方体框架底面和四周的箱板构成。As a further preference, the box body is a cuboid in shape and is composed of a cuboid frame and box plates respectively fixed on the bottom surface and surroundings of the cuboid frame.
作为进一步优选,所述工具挂架包括一个由钢筋焊接而成的矩形框架,该矩形框架固定在箱体上端外围,矩形框架上的每根钢筋与箱体外缘之间设有30-50mm间隙。As a further preference, the tool hanger includes a rectangular frame welded by steel bars, the rectangular frame is fixed on the outer periphery of the upper end of the box, and a gap of 30-50 mm is provided between each steel bar on the rectangular frame and the outer edge of the box .
作为进一步优选,在矩形框架上位于每个长边的钢筋与箱体之间沿其纵向均布有多个横杆,以便分隔开悬挂的作业工具。As a further preference, a plurality of horizontal bars are evenly distributed along the longitudinal direction of the rectangular frame between the steel bars on each long side and the box, so as to separate the suspended working tools.
本发明的有益效果是:The beneficial effects of the present invention are:
1、所需安装的横担无需由杆上作业人员参与即可完成提升,提升到位的横担在电杆上由一人即可完成二根横担的安装,减少了电杆上作业人员的作业量和劳动强度,横担不会掉落,节省了作业时间,提高了作业效率。避免了传统作业方式中由电杆上作业人员人工上提横担容易掉落的风险。1. The cross-arms that need to be installed can be lifted without the participation of operators on the poles. The cross-arms that have been lifted in place can be installed on the pole by one person, which reduces the work of operators on the poles The weight and labor intensity are reduced, the cross arm will not fall, which saves working time and improves working efficiency. It avoids the risk of the crossarm being easily dropped by the operator on the pole in the traditional operation method.
2、将横担上所需的瓷件、金具通过专用储物箱一次便可全部送到电杆上,提高了作业安全性和作业效率。2. All the porcelain pieces and hardware required on the cross arm can be sent to the electric pole at one time through the special storage box, which improves the operation safety and efficiency.
附图说明Description of drawings
图1是本发明中专用储物箱的结构示意图。Fig. 1 is a schematic structural view of a special storage box in the present invention.
图2是图1的俯视图。FIG. 2 is a top view of FIG. 1 .
图3是本发明中专用连接绳的结构示意图。Fig. 3 is a structural schematic diagram of the special connecting rope in the present invention.
图中:箱体1,工具挂钩2,工具挂架3,挂环4,横杆5,连接绳6,金属挂扣7,横担连接螺栓8,挂钩9。In the figure: box body 1, tool hook 2, tool hanger 3, hanging ring 4, cross bar 5, connecting rope 6, metal buckle 7, cross arm connecting bolt 8, hook 9.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without creative efforts fall within the protection scope of the present invention.
本发明涉及的一种架空线路电杆上多层横担提升安装方法,包含步骤如下:The present invention relates to a method for lifting and installing multi-layer cross-arms on overhead line poles, which includes the following steps:
1、在电杆顶端的横担上悬挂安装一个定滑轮,并在定滑轮上绕过吊绳;1. Hang and install a fixed pulley on the cross arm at the top of the pole, and bypass the sling on the fixed pulley;
2、在所要安装横担的电杆下方的地面上组装横担;组装横担时二根横担之间只连接一根螺栓;2. Assemble the cross arm on the ground below the pole where the cross arm is to be installed; when assembling the cross arm, only connect one bolt between the two cross arms;
3、使用专用连接绳下端的横担连接螺栓8分别穿过二根横担两端的立瓶安装孔并通过螺母紧固;3. Use the cross-arm connecting bolts 8 at the lower end of the special connecting rope to respectively pass through the vertical bottle mounting holes at both ends of the two cross-arms and tighten them with nuts;
4、将专用连接绳上端的金属挂扣7挂在吊绳一端的吊钩上,由地面施工人员下拉吊绳另一端,通过吊绳将二根横担水平吊运至电杆上的横担安装位置;4. Hang the metal buckle 7 on the upper end of the special connecting rope on the hook at one end of the sling, and the ground construction personnel pull down the other end of the sling, and lift the two cross arms horizontally to the cross arm on the pole through the sling. installation location;
5、由电杆上的作业人员将二根横担由电杆一侧推入,使电杆夹在二根横担之间,再穿设另一根螺栓,使二根横担固定夹持在电杆上;5. The operator on the pole pushes the two cross-arms from one side of the pole, so that the pole is clamped between the two cross-arms, and then another bolt is inserted to fix the two cross-arms. on the pole;
6、将横担上所需安装的瓷件、金具放入专用储物箱内,再放下专用连接绳,将专用连接绳下端的四个挂钩9分别挂在专用储物箱顶面四角处的挂环4上,通过下拉吊绳将专用储物箱吊运至电杆上的横担处,由电杆上的作业人员将专用储物箱内的瓷件和金具安装在横担上即可。6. Put the porcelain pieces and goldware to be installed on the cross arm into the special storage box, then put down the special connecting rope, and hang the four hooks 9 at the lower end of the special connecting rope on the four corners of the top surface of the special storage box respectively. On the hanging ring 4, the special storage box is hoisted to the cross arm on the electric pole by pulling down the sling, and the operator on the electric pole installs the porcelain and hardware in the special storage box on the cross arm. .
7、重复上述步骤,直至多层横担全部提升安装完毕。7. Repeat the above steps until all the multi-layer cross arms are lifted and installed.
本发明涉及的一种架空线路电杆上多层横担提升安装方法所使用的专用工具,包括专用连接绳和专用储物箱;The present invention relates to a special tool used in a method for lifting and installing multi-layer cross-arms on overhead line poles, including special connecting ropes and special storage boxes;
所述专用储物箱包括一个上端敞口的箱体1,所述箱体1外形为长方体,且由一个长方体框架及分别固定在长方体框架底面和四周的箱板构成。在箱体1上端沿其外缘设有一圈工具挂架3,用于悬挂作业工具;在箱体1顶面四角处分别设有挂环4,用于连接专用连接绳;在箱体1下端四角处分别设有工具挂钩2,用于悬挂作业工具。The special storage box includes a box body 1 with an open upper end. The box body 1 has a rectangular parallelepiped shape and is composed of a rectangular parallelepiped frame and box plates respectively fixed on the bottom surface and surrounding sides of the rectangular parallelepiped frame. On the upper end of the box body 1, there is a circle of tool hanger 3 along its outer edge, which is used to hang working tools; at the four corners of the top surface of the box body 1, there are respectively provided with hanging rings 4, which are used to connect special connecting ropes; at the lower end of the box body 1 The four corners are respectively provided with tool hooks 2 for hanging operation tools.
所述工具挂架3包括一个由钢筋焊接而成的矩形框架,该矩形框架固定在箱体1上端外围,矩形框架上的每根钢筋与箱体1外缘之间设有30-50mm间隙。在矩形框架上位于每个长边的钢筋与箱体1之间沿其纵向均布焊接有多个横杆5,以便分隔开悬挂的作业工具。The tool hanger 3 includes a rectangular frame welded by steel bars, which is fixed on the outer periphery of the upper end of the box body 1, and a gap of 30-50 mm is provided between each steel bar on the rectangular frame and the outer edge of the box body 1 . A plurality of cross bars 5 are evenly distributed and welded along the longitudinal direction between the steel bars on each long side and the box body 1 on the rectangular frame, so as to separate the suspended working tools.
所述专用连接绳包括四根连接绳6,四根连接绳6一端缠绕合并成一股并连接有金属挂扣7,四根连接绳6的另一端分别连接有挂钩9和横担连接螺栓8,用于分别连接专用储物箱和横担。The special connecting ropes include four connecting ropes 6, one end of the four connecting ropes 6 is wound and merged into one strand and is connected with a metal buckle 7, and the other ends of the four connecting ropes 6 are respectively connected with a hook 9 and a cross arm connecting bolt 8, For connecting the dedicated storage box and the cross arm separately.
尽管本发明的实施方案已公开如上,但其并不仅仅限于说明书和实施方式中所列运用,它完全可以被适用于各种适合本发明的领域,对于熟悉本领域的人员而言,可容易地实现另外的修改,因此在不背离权利要求及等同范围所限定的一般概念下,本发明并不限于特定的细节和这里示出与描述的图例。Although the embodiment of the present invention has been disclosed as above, it is not limited to the use listed in the specification and implementation, it can be applied to various fields suitable for the present invention, and it can be easily understood by those skilled in the art Therefore, the invention is not limited to the specific details and examples shown and described herein without departing from the general concept defined by the claims and their equivalents.
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710808627.3A CN107558793B (en) | 2017-09-09 | 2017-09-09 | A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710808627.3A CN107558793B (en) | 2017-09-09 | 2017-09-09 | A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107558793A CN107558793A (en) | 2018-01-09 |
CN107558793B true CN107558793B (en) | 2019-08-09 |
Family
ID=60980376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710808627.3A Active CN107558793B (en) | 2017-09-09 | 2017-09-09 | A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107558793B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108206466A (en) * | 2018-02-06 | 2018-06-26 | 浙江辉弘光能股份有限公司 | A kind of device of photovoltaic plant lifting |
CN108756435A (en) * | 2018-07-21 | 2018-11-06 | 国家电网有限公司 | Cross-arm locator |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4048779A (en) * | 1975-08-20 | 1977-09-20 | Interpace Corporation | Turnbuckle connector useable in a method for replacing an existing utility pole without disturbing hardware mounted thereon |
CN201518397U (en) * | 2009-06-16 | 2010-06-30 | 福建省福州电业局 | Tool for replacing line suspension insulation string in 220 KV circuit with charged line |
CN103174323A (en) * | 2013-04-01 | 2013-06-26 | 国家电网公司 | Multifunctional hoisting support frame |
CN203289011U (en) * | 2013-05-17 | 2013-11-13 | 国家电网公司 | Tension cross arm hoisting device |
CN203707659U (en) * | 2013-11-30 | 2014-07-09 | 国家电网公司 | Rapid installation suspender for distribution grid cross arms |
-
2017
- 2017-09-09 CN CN201710808627.3A patent/CN107558793B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4048779A (en) * | 1975-08-20 | 1977-09-20 | Interpace Corporation | Turnbuckle connector useable in a method for replacing an existing utility pole without disturbing hardware mounted thereon |
CN201518397U (en) * | 2009-06-16 | 2010-06-30 | 福建省福州电业局 | Tool for replacing line suspension insulation string in 220 KV circuit with charged line |
CN103174323A (en) * | 2013-04-01 | 2013-06-26 | 国家电网公司 | Multifunctional hoisting support frame |
CN203289011U (en) * | 2013-05-17 | 2013-11-13 | 国家电网公司 | Tension cross arm hoisting device |
CN203707659U (en) * | 2013-11-30 | 2014-07-09 | 国家电网公司 | Rapid installation suspender for distribution grid cross arms |
Also Published As
Publication number | Publication date |
---|---|
CN107558793A (en) | 2018-01-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102882153B (en) | Phase replacing insulator string method in charged for replacement circuit many times towers | |
CN102040166A (en) | Hoisting tool for equipment on pillar | |
CN107558793B (en) | A method for lifting and installing multi-layer cross-arms on overhead line poles and special tools thereof | |
CN204767097U (en) | High altitude construction safety belt linkage | |
CN201517022U (en) | Hoisting tool for apparatus on column | |
CN109256721A (en) | A kind of helicopter live-line maintenance operation hanging basket | |
CN104514485A (en) | Overhead-line rod working ladder | |
CN202405695U (en) | Lifting tool for overhead ground wire of steel pipe pole | |
CN204349336U (en) | Overhead-groundwire lifter | |
CN102237654B (en) | Method for replacing jumper string using tool at double angle hanging point | |
CN103318745A (en) | Lightweight special-purposed spreader and mounting method thereof | |
CN214899827U (en) | High-altitude outdoor cable terminal operation platform | |
CN105366559A (en) | Small hoisting machine fixed on channel steel framework | |
CN104134948A (en) | 500kV overhead line tangent tower lightning conductor lifting working device | |
CN103615189B (en) | Rope ladder connecting structure for aerial cable | |
CN203345999U (en) | Special multifunctional lifting frame for busbar bridge | |
CN204369398U (en) | Insulation hoisting bracket | |
CN211056587U (en) | Angle iron pothook pulley device | |
CN202670992U (en) | Rod hoisting device | |
CN203119386U (en) | Concrete rod lightning conductor lifting device | |
CN203976285U (en) | With the matching used allocated radio lifting of two electric poles guide chain | |
CN207572853U (en) | A Live Replacement Tool for Tower Insulator Strings | |
CN105060154A (en) | Suspension installation machine of suspended load type transformer | |
CN202444205U (en) | Grounding wire which people can hang without mounting a pole | |
CN204958263U (en) | Suspended load formula transformer suspends installation apparatus in midair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |