CN103174141A - 滩涂区梁下支架钢管桩拔出设备及方法 - Google Patents

滩涂区梁下支架钢管桩拔出设备及方法 Download PDF

Info

Publication number
CN103174141A
CN103174141A CN2013100986938A CN201310098693A CN103174141A CN 103174141 A CN103174141 A CN 103174141A CN 2013100986938 A CN2013100986938 A CN 2013100986938A CN 201310098693 A CN201310098693 A CN 201310098693A CN 103174141 A CN103174141 A CN 103174141A
Authority
CN
China
Prior art keywords
steel pipe
pipe pile
truss
crossbeam
beam lower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2013100986938A
Other languages
English (en)
Other versions
CN103174141B (zh
Inventor
吴庆东
赵世超
郭保林
王焱
刘宪波
胡德功
梅佳鸿
刘吉山
相云云
周鲁
翁程亮
郭忠良
刘元强
贾兴利
韩亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING Co Ltd
WEIFANG CITY ROAD ADMINISTRATION SHANDONG PROV
Road and Bridge International Co Ltd
Shandong Luqiao Group Co Ltd
Original Assignee
Qingdao Baojili Engineering Technology Consulting Co Ltd
Road and Bridge International Co Ltd
Shandong Luqiao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Baojili Engineering Technology Consulting Co Ltd, Road and Bridge International Co Ltd, Shandong Luqiao Group Co Ltd filed Critical Qingdao Baojili Engineering Technology Consulting Co Ltd
Priority to CN201410460415.7A priority Critical patent/CN104213559B/zh
Priority to CN201310098693.8A priority patent/CN103174141B/zh
Publication of CN103174141A publication Critical patent/CN103174141A/zh
Application granted granted Critical
Publication of CN103174141B publication Critical patent/CN103174141B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

本发明提供了一种滩涂区梁下支架钢管桩拔出设备及方法。它避免直接沿海底面截断并遗弃埋深部分钢管桩的做法,避免材料浪费、节约项目投入、降低行船风险。本滩涂区梁下支架钢管桩拔出设备包括架设于梁体顶面处的桁架,桁架与梁体之间设置沿梁体长度方向延展的滑动机构,桁架下方采用卷扬吊挂设置横梁,桁架与横梁呈上下平行设置,横梁通过软索与插陷入滩涂泥地内的钢管桩形成链接。其方法为:(1)箱梁顶面安设桁架;(2)装配横梁及链接钢管桩;(3)开机拔桩;(4)部分切割而后继续拔桩。本滩涂区梁下支架钢管桩拔出设备及方法具备结构原理明确、实施可靠实用、作业安全、操作便捷、施工效率高,可实现一跨范围内连续拔桩特点。

Description

滩涂区梁下支架钢管桩拔出设备及方法
技术领域
本发明属于桥梁施工技术领域,适用于滩涂区梁下支架钢管桩的拔出工作,特别是一种滩涂区梁下支架钢管桩拔出设备及方法。
背景技术
移动模架、钢管桩支架、满堂脚手架是现浇箱梁模板的常用支撑方式。移动模架初期投资巨大,对于现浇箱梁数量不大的工程项目极少采用移动模架方案;满堂脚手架大多适用于梁底净空不大的陆上施工;而滩涂区由于地基承载力较弱,则通常采用钢管桩支架方案。
在桥梁下部结构完成之后,在箱梁正下方打入一定数量的钢管桩,然后在钢管桩顶面铺设横梁以及箱梁底板模板和翼缘板模板。箱梁混凝土浇筑初期,箱梁、模板、模板横梁等的自重都由钢管桩承担,钢管桩需要足够的直径、长度和数量。当箱梁浇注完毕后需要拆除梁底支架,由于支架与箱梁底板之间空间很小,钢管桩难以拆除。通常情况下,在海水低潮位时,沿着海泥顶面将钢管桩截断并重复使用,埋设于泥下的部分会被永久废弃。由此大量的钢管桩被遗弃在海泥中,这样既增加了项目投入、浪费了资源,又成为日后海上行船的安全隐患。
发明内容
本发明的目的是针对现有的技术存在上述问题,提出了一种针对桥梁建造处于滩涂区中使用钢管桩支架的拔桩技术,且其为实施可靠实用、作业安全、操作便捷的滩涂区梁下支架钢管桩拔出设备及方法。
本发明的目的可通过下列技术方案来实现:滩涂区梁下支架钢管桩拔出设备,其特征在于,包括架设于梁体顶面处的桁架,所述桁架与梁体之间设置沿梁体长度方向延展的滑动机构,所述桁架下方采用卷扬吊挂设置横梁,所述桁架与横梁呈上下平行设置,所述横梁通过软索与插陷入滩涂泥地内的钢管桩形成链接。
本滩涂区梁下支架钢管桩拔出设备中桁架的长度方向与箱梁的长度方向垂直,通过滑动机构的滑动连接使桁架可沿箱梁长度方向平移行走。横梁呈圆柱形,且其长度方向与桁架平行。桁架通过卷扬方式控制其下方的横梁升降动作,且在升降过程中横梁保持水平状态,进而通过横梁的上升带动,使与其链接的钢管桩由滩涂泥地中拔出。
在上述的滩涂区梁下支架钢管桩拔出设备中,所述桁架底侧呈对称垂设两根立柱,所述滑动机构具体为呈对称固设在梁体顶面的平行滑轨,所述立柱由其底端对应与上述平行滑轨形成滑动卡接。两根立柱呈对称设置在桁架的两端部位置,由此提供对桁架的稳固支撑;平行滑轨具体为两条相平行延伸设置的钢轨,桁架通过立柱底端的滑动卡接,可沿平行滑轨完成同步均衡的平移行进。
在上述的滩涂区梁下支架钢管桩拔出设备中,所述每根立柱的两侧与桁架之间均呈对称固设斜撑杆。桁架本体、立柱与斜撑杆形成具有稳定结构的三角形状,由此利于增强桁架的稳定性与牢固性。
在上述的滩涂区梁下支架钢管桩拔出设备中,所述桁架的两端部呈对称固设卷扬机,所述横梁的两端部呈对称固设吊耳,所述卷扬机与吊耳的位置呈上下一一对峙,并卷扬机通过钢丝绳吊接对应吊耳。
在上述的滩涂区梁下支架钢管桩拔出设备中,所述横梁于吊耳位置增设加强肋。
在上述的滩涂区梁下支架钢管桩拔出设备中,所述软索的两端均具有闭环,所述一端闭环套接于上述横梁上,另一端闭环套接于上述钢管桩上。
滩涂区梁下支架钢管桩拔出方法,在桩基、承台及墩柱依次浇注完成,且箱梁预应力张拉完毕后实施,其特征在于,包括以下步骤:
(1)、桁架架设于箱梁顶面,且桁架的立柱稳固滑动卡接于平行滑轨上,以便桁架能够沿箱梁的长度方向行走;
(2)、将横梁运送至桁架的正下方,且同步位于箱梁的下方,使软索一端的闭环由横梁的端部套入,桁架两端上的卷扬机下垂钢丝绳,钢丝绳对应绑接横梁两端处的吊耳,切割掉一段露出滩涂水面的钢管桩,使软索另一端的闭环由钢管桩顶端穿设下套,并尽可能使其套接位置下移;
(3)、开启桁架两端上的卷扬机收卷钢丝绳,横梁两端以等速上升,进而同步将钢管桩拔出;
(4)、在钢管桩上升拔出过程中,若其顶端触及或即将触及箱梁的底面,则切割掉钢管桩的上部分,以便提供拔升空间,继而对钢管桩的余下部分再实施拔出操作。
在上述的滩涂区梁下支架钢管桩拔出方法中,当该跨范围内的钢管桩全部拔出后,松开绑接吊耳的钢丝绳卸下横梁,滑移桁架并运送横梁至下一跨进行重复拔桩操作。
本滩涂区梁下支架钢管桩拔出方法中,在海水高潮位时,运用船只将横梁运送至要求位置进行装配,并实现拔桩操作;该跨范围内的钢管桩全部拔出,在海水高潮位时,将横梁下放至船上并卸除,进而转移至下一跨重复步骤实现作业。
与现有技术相比,本滩涂区梁下支架钢管桩拔出设备及方法特别针对桥梁建造处于滩涂区中使用钢管桩支架的拔桩技术,且其具备结构原理明确、实施可靠实用、作业安全、操作便捷、施工效率高,可实现一跨范围内连续拔桩等特点。
附图说明
图1是本滩涂区梁下支架钢管桩拔出设备的结构示意图。
图2是本滩涂区梁下支架钢管桩拔出设备的局部放大结构示意图。
图中,1、桩基;2、承台;3、墩柱;4、箱梁;5、钢管桩;6、软索;7、横梁;8、吊耳;9、平行滑轨;10、桁架;11、钢丝绳;12、立柱;13、斜撑杆;14、卷扬机;15、加强肋。
具体实施方式
以下是本发明的具体实施例并结合附图,对本发明的技术方案作进一步的描述,但本发明并不限于这些实施例。
如图1和图2所示,本滩涂区梁下支架钢管桩拔出设备包括架设于梁体顶面处的桁架10,且桁架10与梁体之间设置使桁架10滑移行走的滑动机构,桁架10下方采用卷扬吊挂设置横梁7,横梁7通过软索6与插陷入滩涂泥地内的钢管桩5形成链接。
梁体由下至上依次垒叠有桩基1、承台2、墩柱3及箱梁4。
桁架10的长度方向与箱梁4的长度方向垂直,桁架10底侧呈对称垂设两根立柱12,且两根立柱12具体固设在桁架10的两端部位置。每根立柱12的两侧与桁架10之间均呈对称固设斜撑杆13,由此桁架10本体、立柱12与斜撑杆13形成具有稳定结构的三角形状,利于增强桁架10支撑的稳定性与牢固性。
滑动机构为呈对称固设在箱梁4顶面的平行滑轨9,该平行滑轨9具体为两条相平行延伸设置的钢轨,桁架10的立柱12底端开设滑槽,且通过滑槽与钢轨形成相对应卡设的滑动连接,实现桁架10沿平行滑轨9完成同步均衡的平移行进,即桁架10可沿箱梁4长度方向平移行走。
横梁7呈圆柱形,且吊挂后其长度方向与桁架10长度方向相平行,即两者呈上下平行设置。桁架10的两端部呈对称固设卷扬机14,横梁7的两端部呈对称固设吊耳8,且在吊耳8位置增设加强肋15。两台卷扬机14与两个吊耳8位置一一上下对峙,并通过卷扬机14下垂的钢丝绳11绑接对应吊耳8,以实现横梁7的吊挂。
软索6的两端均具有闭环,其一端闭环紧固套接于横梁7上,另一端闭环紧固套接于所需拔出的钢管桩5上。
根据上述设备的结构其作业方法如下:桩基1、承台2及墩柱3依次浇注完成,在箱梁4的正下方用打桩机将钢管桩5打入滩涂泥地中,其中钢管桩5的直径、长度及数量应根据箱梁4自重以及模板体系的自重来确定,当箱梁4预应力张拉完毕后,便可进行拔桩步骤。
(1)、桁架10架设于箱梁4顶面,且桁架10的立柱12稳固滑动卡接于平行滑轨9上,以便桁架10能够沿箱梁4的长度方向行走;
(2)、在海水高潮位时,运用船只将横梁7运送至桁架10的正下方,且同步位于箱梁4的下方,使软索6一端的闭环由横梁7的端部套入,桁架10两端上的卷扬机14下垂钢丝绳11,钢丝绳11对应绑接横梁7两端处的吊耳8,切割掉一段露出滩涂水面的钢管桩5,使软索6另一端的闭环由钢管桩5顶端穿设下套,并尽可能使其套接位置下移;
(3)、开启桁架10两端上的卷扬机14收卷钢丝绳11,横梁7两端以等速上升,进而同步将钢管桩5拔出;
(4)、在钢管桩5上升拔出过程中,若其顶端触及或即将触及箱梁4的底面,则切割掉钢管桩5的上部分,以便提供拔升空间,继而对钢管桩5的余下部分再实施拔出操作。
即桁架10通过卷扬方式控制其下方的横梁7升降动作,且在升降过程中横梁7保持水平状态,进而通过横梁7的上升带动,使与其链接的钢管桩5由滩涂泥地中拔出。
当该跨范围内的钢管桩5全部拔出后,在海水高潮位时,将横梁7下放至船上,并松开绑接吊耳8的钢丝绳11卸下横梁7,滑移桁架10并运送横梁7至下一跨进行重复拔桩操作。
本文中所描述的具体实施例仅仅是对本发明精神作举例说明。本发明所属技术领域的技术人员可以对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,但并不会偏离本发明的精神或者超越所附权利要求书所定义的范围。
尽管本文较多地使用了桩基1;承台2;墩柱3;箱梁4;钢管桩5;软索6;横梁7;吊耳8;平行滑轨9;桁架10;钢丝绳11;立柱12;斜撑杆13;卷扬机14;加强肋15等术语,但并不排除使用其它术语的可能性。使用这些术语仅仅是为了更方便地描述和解释本发明的本质;把它们解释成任何一种附加的限制都是与本发明精神相违背的。

Claims (8)

1.滩涂区梁下支架钢管桩拔出设备,其特征在于,包括架设于梁体顶面处的桁架,所述桁架与梁体之间设置沿梁体长度方向延展的滑动机构,所述桁架下方采用卷扬吊挂设置横梁,所述桁架与横梁呈上下平行设置,所述横梁通过软索与插陷入滩涂泥地内的钢管桩形成链接。
2.根据权利要求1所述的滩涂区梁下支架钢管桩拔出设备,其特征在于,所述桁架底侧呈对称垂设两根立柱,所述滑动机构具体为呈对称固设在梁体顶面的平行滑轨,所述立柱由其底端对应与上述平行滑轨形成滑动卡接。
3.根据权利要求2所述的滩涂区梁下支架钢管桩拔出设备,其特征在于,所述每根立柱的两侧与桁架之间均呈对称固设斜撑杆。
4.根据权利要求1所述的滩涂区梁下支架钢管桩拔出设备,其特征在于,所述桁架的两端部呈对称固设卷扬机,所述横梁的两端部呈对称固设吊耳,所述卷扬机与吊耳的位置呈上下一一对峙,并卷扬机通过钢丝绳吊接对应吊耳。
5.根据权利要求4所述的滩涂区梁下支架钢管桩拔出设备,其特征在于,所述横梁于吊耳位置增设加强肋。
6.根据权利要求1所述的滩涂区梁下支架钢管桩拔出设备,其特征在于,所述软索的两端均具有闭环,所述一端闭环套接于上述横梁上,另一端闭环套接于上述钢管桩上。
7.滩涂区梁下支架钢管桩拔出方法,在桩基、承台及墩柱依次浇注完成,且箱梁预应力张拉完毕后实施,其特征在于,包括以下步骤:
(1)、桁架架设于箱梁顶面,且桁架的立柱稳固滑动卡接于平行滑轨上,以便桁架能够沿箱梁的长度方向行走;
(2)、将横梁运送至桁架的正下方,且同步位于箱梁的下方,使软索一端的闭环由横梁的端部套入,桁架两端上的卷扬机下垂钢丝绳,钢丝绳对应绑接横梁两端处的吊耳,切割掉一段露出滩涂水面的钢管桩,使软索另一端的闭环由钢管桩顶端穿设下套,并尽可能使其套接位置下移;
(3)、开启桁架两端上的卷扬机收卷钢丝绳,横梁两端以等速上升,进而同步将钢管桩拔出;
(4)、在钢管桩上升拔出过程中,若其顶端触及或即将触及箱梁的底面,则切割掉钢管桩的上部分,以便提供拔升空间,继而对钢管桩的余下部分再实施拔出操作。
8.根据权利要求7所述的滩涂区梁下支架钢管桩拔出方法,其特征在于,当该跨范围内的钢管桩全部拔出后,松开绑接吊耳的钢丝绳卸下横梁,滑移桁架并运送横梁至下一跨进行重复拔桩操作。
CN201310098693.8A 2013-03-26 2013-03-26 滩涂区梁下支架钢管桩拔出设备 Expired - Fee Related CN103174141B (zh)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201410460415.7A CN104213559B (zh) 2013-03-26 2013-03-26 滩涂区梁下支架钢管桩拔出设备的拔出方法
CN201310098693.8A CN103174141B (zh) 2013-03-26 2013-03-26 滩涂区梁下支架钢管桩拔出设备

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310098693.8A CN103174141B (zh) 2013-03-26 2013-03-26 滩涂区梁下支架钢管桩拔出设备

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN201410460415.7A Division CN104213559B (zh) 2013-03-26 2013-03-26 滩涂区梁下支架钢管桩拔出设备的拔出方法

Publications (2)

Publication Number Publication Date
CN103174141A true CN103174141A (zh) 2013-06-26
CN103174141B CN103174141B (zh) 2015-06-03

Family

ID=48634296

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201410460415.7A Expired - Fee Related CN104213559B (zh) 2013-03-26 2013-03-26 滩涂区梁下支架钢管桩拔出设备的拔出方法
CN201310098693.8A Expired - Fee Related CN103174141B (zh) 2013-03-26 2013-03-26 滩涂区梁下支架钢管桩拔出设备

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201410460415.7A Expired - Fee Related CN104213559B (zh) 2013-03-26 2013-03-26 滩涂区梁下支架钢管桩拔出设备的拔出方法

Country Status (1)

Country Link
CN (2) CN104213559B (zh)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360521A (zh) * 2018-03-15 2018-08-03 中国石油大学(华东) 一种扭转上拔拆除海上平台桩基的方法
CN108894226A (zh) * 2018-09-28 2018-11-27 中国冶集团有限公司 一种桥下拔桩装置
CN109972621A (zh) * 2019-04-22 2019-07-05 中建三局基础设施建设投资有限公司 一种用于小净空浅水区钢管桩的拔桩装置及其施工方法
CN115075247A (zh) * 2022-05-24 2022-09-20 保利长大工程有限公司 一种跨河道箱梁支架钢管桩的拔除方法

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110306553B (zh) * 2019-04-28 2021-06-29 中国一冶集团有限公司 水中钢桩拆除装置及方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002256557A (ja) * 2001-02-28 2002-09-11 Nkk Corp 先端ケーシングおよび残置杭の引抜き工法
CN101858083A (zh) * 2010-06-22 2010-10-13 天津第三市政公路工程有限公司 低空间水中钢管桩拔桩施工方法及装置
CN102296610A (zh) * 2011-05-19 2011-12-28 中天建设集团有限公司 一种用于拔除方桩的装置和它的施工方法
CN203129146U (zh) * 2013-03-26 2013-08-14 山东高速青岛公路有限公司 滩涂区梁下支架钢管桩拔出设备

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10168879A (ja) * 1996-12-10 1998-06-23 Taisei Corp 鋼管矢板の引抜き方法
JPH10306443A (ja) * 1997-04-30 1998-11-17 Nishimatsu Constr Co Ltd 杭引き抜き用治具及びその治具を用いた杭引き抜き方法
CN2348010Y (zh) * 1998-05-15 1999-11-10 江苏金猴机械集团公司研究所 拔桩机构

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002256557A (ja) * 2001-02-28 2002-09-11 Nkk Corp 先端ケーシングおよび残置杭の引抜き工法
CN101858083A (zh) * 2010-06-22 2010-10-13 天津第三市政公路工程有限公司 低空间水中钢管桩拔桩施工方法及装置
CN102296610A (zh) * 2011-05-19 2011-12-28 中天建设集团有限公司 一种用于拔除方桩的装置和它的施工方法
CN203129146U (zh) * 2013-03-26 2013-08-14 山东高速青岛公路有限公司 滩涂区梁下支架钢管桩拔出设备

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108360521A (zh) * 2018-03-15 2018-08-03 中国石油大学(华东) 一种扭转上拔拆除海上平台桩基的方法
CN108894226A (zh) * 2018-09-28 2018-11-27 中国冶集团有限公司 一种桥下拔桩装置
CN109972621A (zh) * 2019-04-22 2019-07-05 中建三局基础设施建设投资有限公司 一种用于小净空浅水区钢管桩的拔桩装置及其施工方法
CN109972621B (zh) * 2019-04-22 2024-03-26 中建三局基础设施建设投资有限公司 一种用于小净空浅水区钢管桩的拔桩装置及其施工方法
CN115075247A (zh) * 2022-05-24 2022-09-20 保利长大工程有限公司 一种跨河道箱梁支架钢管桩的拔除方法

Also Published As

Publication number Publication date
CN103174141B (zh) 2015-06-03
CN104213559A (zh) 2014-12-17
CN104213559B (zh) 2015-12-09

Similar Documents

Publication Publication Date Title
CN100543235C (zh) 斜拉索辅助全悬臂架设钢桁梁的方法及系统
CN103174141B (zh) 滩涂区梁下支架钢管桩拔出设备
CN204266134U (zh) 重载大跨度钢桁梁步履式顶推装置
CN103669216A (zh) 一种钢箱梁散拼滑移装置及安装方法
CN105442518B (zh) 一种桁架式液压插销升降装置
CN105603881A (zh) 一种大型跨海拱桥的整体架设系统及其施工方法
CN104762882B (zh) 桥梁节段吊装装置及吊装方法
CN201106155Y (zh) 斜拉索辅助全悬臂架设钢桁梁装置
CN101392501A (zh) 一种大跨度钢箱桥梁的架设方法
CN105804038A (zh) 一种双层动环梁液压插销式圆柱桩腿连续升降装置
CN204000830U (zh) 分节接管式砂井机
CN203684099U (zh) 一种高墩大跨度钢桁梁桥的浮拖锚固定位系统
CN103194977B (zh) 运架一体式架桥机架设首孔箱梁前导梁机就位方法
CN201991011U (zh) 水中墩承台双壁钢围堰施工用起吊下放系统
CN110468743B (zh) 一种用于旧桥墩帽改造的移动式吊架及施工方法
CN102852095A (zh) 一种桥梁预制墩台多功能吊装系统及施工步骤
CN112323657A (zh) 一种一体化预制桥梁拆除机及预制桥梁拆除方法
CN103255775B (zh) 围堰的安装方法
CN203129146U (zh) 滩涂区梁下支架钢管桩拔出设备
CN102041779A (zh) 一种桥面吊机及其施工方法
CN209798721U (zh) 运河航道中跨越河流的桥轨渡船装置
CN205242238U (zh) 一种应用于自锚式悬索桥的主梁结构
CN204059202U (zh) 一种箱梁横移机构
CN209836981U (zh) 运河航道中跨越河流的下挂桥渡装置
CN201943006U (zh) 辅助不变幅架梁吊机架设钢箱梁用主塔区活动支架

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: QINGDAO LINCHUAN ENGINEERING TECHNOLOGY CONSULTING

Free format text: FORMER OWNER: QINGDAO BAOJILI ENGINEERING TECHNOLOGY CONSULTING CO., LTD.

Effective date: 20150504

Owner name: CRBC INTERNATIONAL CO., LTD. SHANDONG RAILWAY ROAD

Free format text: FORMER OWNER: CRBC INTERNATIONAL CO., LTD. SHANDONG RAILWAY ROAD + BRIDGE GROUP CO., LTD.

Effective date: 20150504

C41 Transfer of patent application or patent right or utility model
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Wu Qingdong

Inventor after: Liu Jishan

Inventor after: Xiang Yunyun

Inventor after: Zhou Lu

Inventor after: Weng Chengliang

Inventor after: Guo Zhongliang

Inventor after: Liu Yuanqiang

Inventor after: Jia Xingli

Inventor after: Han Liang

Inventor after: Zhao Shichao

Inventor after: Tian Zhifeng

Inventor after: Guo Baolin

Inventor after: Wang Yan

Inventor after: Liu Xianbo

Inventor after: Mei Jiahong

Inventor after: Yin Zhiqiang

Inventor after: Hu Degong

Inventor before: Wu Qingdong

Inventor before: Zhou Lu

Inventor before: Weng Chengliang

Inventor before: Guo Zhongliang

Inventor before: Liu Yuanqiang

Inventor before: Jia Xingli

Inventor before: Han Liang

Inventor before: Zhao Shichao

Inventor before: Guo Baolin

Inventor before: Wang Yan

Inventor before: Liu Xianbo

Inventor before: Hu Degong

Inventor before: Mei Jiahong

Inventor before: Liu Jishan

Inventor before: Xiang Yunyun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: WU QINGDONG ZHAO SHICHAO GUO BAOLIN WANG YAN LIU XIANBO HU DEGONG MEI JIAHONG LIU JISHAN XIANG YUNYUN ZHOU LU WENG CHENGLIANG GUO ZHONGLIANG LIU YUANQIANG JIA XINGLI HAN LIANG TO: WU QINGDONG ZHAO SHICHAO TIAN ZHIFENG GUO BAOLIN WANG YAN LIU XIANBO MEI JIAHONG YIN ZHIQIANG HU DEGONG LIU JISHAN XIANG YUNYUN ZHOU LU WENG CHENGLIANG GUO ZHONGLIANG LIU YUANQIANG JIA XINGLI HAN LIANG

Free format text: CORRECT: ADDRESS; FROM: 266003 QINGDAO, SHANDONG PROVINCE TO: 266520 QINGDAO, SHANDONG PROVINCE

TA01 Transfer of patent application right

Effective date of registration: 20150504

Address after: 266520 Qingdao economic and Technological Development Zone, Shandong, No. 182 Jinshatan Road

Applicant after: Qingdao Linchuan Engineering Technology Consulting Co., Ltd.

Applicant after: CRBC International Co., Ltd.

Applicant after: Shandong Railway Road & Bridge Group Co., Ltd.

Applicant after: Weifang City Road Administration, Shandong Prov.

Address before: 266003 Shandong city of Qingdao province Jiangxi City Road No. 105

Applicant before: Qingdao Baojili Engineering Technology Consulting Co., Ltd.

Applicant before: CRBC International Co., Ltd.

Applicant before: Shandong Railway Road & Bridge Group Co., Ltd.

C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150603

Termination date: 20160326