CN108894226A - 一种桥下拔桩装置 - Google Patents
一种桥下拔桩装置 Download PDFInfo
- Publication number
- CN108894226A CN108894226A CN201811136141.0A CN201811136141A CN108894226A CN 108894226 A CN108894226 A CN 108894226A CN 201811136141 A CN201811136141 A CN 201811136141A CN 108894226 A CN108894226 A CN 108894226A
- Authority
- CN
- China
- Prior art keywords
- bridge
- lower beam
- pile
- steel
- hoist engine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明涉及水面建筑施工技术领域,具体指一种桥下拔桩装置;包括上部横梁、下部横梁和卷扬机,所述上部横梁横向架设于桥上,下部横梁设于水面与桥之间,上部横梁的两端和下部横梁的两端之间分别连接有竖向钢梁;所述卷扬机固定设置在下部横梁上,卷扬机上的钢索与钢管桩的上端固定连接;本发明结构合理,上部横梁、竖向钢梁与可升降支架构成下部横梁的可升降调节机构,可以根据不同的水面深度进行调节;振动锤在拔桩时进行振动消除桩周土侧摩阻力,悬梁和立柱可沿下部横梁平移,通过钢索牵引钢管桩从而使得桩体拔出;可用于桥下有限空间并且桥下无受力支点时的拔桩,具有易操作,安全可靠,成本低的优点。
Description
技术领域
本发明涉及水面建筑施工技术领域,具体指一种桥下拔桩装置。
背景技术
在水上桥梁施工时需要使用大量钢管桩作为临时支撑,传统施工方法是在桥梁施工结束时仅切割河床上部的钢管桩,埋入河床的下部永久废弃。以湖北某桥为例,初步估计该桥用钢量在3000t左右,价值在1000万左右,所以经济效益巨大。从国内外的研究现状来看,目前对于水下钢管基的清除主要是采用水中切割的方法,这种方法成本高,施工作业难度大,同时使得大量钢铁资源废弃到河床底部,不利于环境友好型社会和资源节约型社会的建设。
通过查阅相关文献,在陆地和海洋平台中的拔桩方法很多,但是对于桥面下水面上这一有限空间的拔桩研究比较少。在文献中有“闫学成,张伟,董景强.水中钢管桩拔除施工技术[J].天津建设科技,2006,16(s1):235-237.”同时该方法也申请了专利。文章中所述方法中需要水中浮箱作为受力的支撑点,同时为了保证拔桩时的受力平衡和浮箱不侧翻还必须对浮箱进行配重。但是浮箱比较大,制造成本比较高,还要考虑浮箱内部结构是否符合受力要求,并且对于水位比较浅的情况下浮箱就会搁浅,无法使用。
因此,现有技术还有待于改进和发展。
发明内容
本发明的目的在于针对现有技术的缺陷和不足,提供一种结构合理、使用灵活,施工方便的桥下拔桩装置。
为了实现上述目的,本发明采用以下技术方案:
本发明所述的一种桥下拔桩装置,包括上部横梁、下部横梁和卷扬机,所述上部横梁横向架设于桥上,下部横梁设于水面与桥之间,上部横梁的两端和下部横梁的两端之间分别连接有竖向钢梁;所述卷扬机固定设置在下部横梁上,卷扬机上的钢索与钢管桩的上端固定连接。
根据以上方案,所述下部横梁上设有悬梁,悬梁两端与下部横梁之间设有立柱,悬梁上设有定滑轮,卷扬机上的钢索绕过定滑轮后与钢管桩连接。
根据以上方案,所述下部横梁上设有横移轨道,立柱的下端与横移轨道配合连接。
根据以上方案,所述钢管桩的上端设有振动锤。
根据以上方案,所述上部横梁与桥面之间设有可升降支架。
根据以上方案,所述竖向钢梁上端通过销轴与上部横梁固定连接,竖向钢梁的上部间隔设有若干铆接孔。
本发明有益效果为:本发明结构合理,上部横梁、竖向钢梁与可升降支架构成下部横梁的可升降调节机构,可以根据不同的水面深度进行调节;振动锤在拔桩时进行振动消除桩周土侧摩阻力,悬梁和立柱可沿下部横梁平移,通过钢索牵引钢管桩从而使得桩体拔出;可用于桥下有限空间并且桥下无受力支点时的拔桩,具有易操作,安全可靠,成本低的优点。
附图说明
图1是本发明的整体结构示意图;
图2是钢管桩拔出时的示意图。
图中:
1、上部横梁;2、铆接孔;3、竖向钢梁;4、可升降支架;5、桥;6、定滑轮;7、悬梁;8、立柱;9、振动锤;10、钢索;11、卷扬机;12、下部横梁;13、水面;14、钢管桩。
具体实施方式
下面结合附图与实施例对本发明的技术方案进行说明。
如图1-2所示,本发明所述的一种桥下拔桩装置,包括上部横梁1、下部横梁12和卷扬机11,所述上部横梁1横向架设于桥5上,下部横梁12设于水面13与桥5之间,上部横梁1的两端和下部横梁12的两端之间分别连接有竖向钢梁3;所述卷扬机11固定设置在下部横梁12上,卷扬机11上的钢索10与钢管桩14的上端固定连接;本发明通过上部横梁1和竖向钢梁3构建下部横梁12的支撑结构,使下部横梁12上的卷扬机11固定在桥5与水面13之间,卷扬机11通过钢索10连接钢管桩14,在卷扬机11的牵引下使钢管桩14拔除,在钢管桩14拔出一定高度后,对钢管桩14在水面上的部分进行切割,以此循环从而拔除整个钢管桩14,具有易操作,安全可靠,成本低的优点。
所述下部横梁12上设有悬梁7,悬梁7两端与下部横梁12之间设有立柱8,悬梁7上设有定滑轮6,卷扬机11上的钢索10绕过定滑轮6后与钢管桩14连接;所述悬梁7和立柱8构建下部横梁12上的龙门架,将卷扬机11的牵引支点定滑轮6固定在靠近桥5的位置,进而将钢管桩14的上端拔出至接近桥5时对其进行切割,使切割操作无需水下进行,方便钢管桩14的拔除操作。
所述下部横梁12上设有横移轨道,立柱8的下端与横移轨道配合连接,立柱8与横移轨道的配合使悬梁7以及定滑轮6可沿下部横梁12横向平移,从而拔除水面不同位置上的钢管桩14。
所述钢管桩14的上端设有振动锤9,振动锤9在拔桩中不断对钢管桩14施加激振力,使得拔桩中能够消除桩周土摩阻力。
所述上部横梁1与桥面5之间设有可升降支架4,可升降支架4用于固定和支撑上部横梁1,同时通过升降上部横梁1改变下部横梁12与水面13之间的间距,满足不同水位时的操作空间。
所述竖向钢梁3上端通过销轴与上部横梁1固定连接,竖向钢梁3的上部间隔设有若干铆接孔2,所述竖向钢梁3上的铆接孔2用于调整下部横梁12与水面13之间的相对位置,从而满足不同桥5环境下的操作需求。
以上所述仅是本发明的较佳实施方式,故凡依本发明专利申请范围所述的构造、特征及原理所做的等效变化或修饰,均包括于本发明专利申请范围内。
Claims (6)
1.一种桥下拔桩装置,包括上部横梁(1)、下部横梁(12)和卷扬机(11),其特征在于:所述上部横梁(1)横向架设于桥(5)上,下部横梁(12)设于水面(13)与桥(5)之间,上部横梁(1)的两端和下部横梁(12)的两端之间分别连接有竖向钢梁(3);所述卷扬机(11)固定设置在下部横梁(12)上,卷扬机(11)上的钢索(10)与钢管桩(14)的上端固定连接。
2.根据权利要求1所述的桥下拔桩装置,其特征在于:所述下部横梁(12)上设有悬梁(7),悬梁(7)两端与下部横梁(12)之间设有立柱(8),悬梁(7)上设有定滑轮(6),卷扬机(11)上的钢索(10)绕过定滑轮(6)后与钢管桩(14)连接。
3.根据权利要求2所述的桥下拔桩装置,其特征在于:所述下部横梁(12)上设有横移轨道,立柱(8)的下端与横移轨道配合连接。
4.根据权利要求1所述的桥下拔桩装置,其特征在于:所述钢管桩(14)的上端设有振动锤(9)。
5.根据权利要求1所述的桥下拔桩装置,其特征在于:所述上部横梁(1)与桥面(5)之间设有可升降支架(4)。
6.根据权利要求1所述的桥下拔桩装置,其特征在于:所述竖向钢梁(3)上端通过销轴与上部横梁(1)固定连接,竖向钢梁(3)的上部间隔设有若干铆接孔(2)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811136141.0A CN108894226A (zh) | 2018-09-28 | 2018-09-28 | 一种桥下拔桩装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811136141.0A CN108894226A (zh) | 2018-09-28 | 2018-09-28 | 一种桥下拔桩装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108894226A true CN108894226A (zh) | 2018-11-27 |
Family
ID=64360425
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811136141.0A Pending CN108894226A (zh) | 2018-09-28 | 2018-09-28 | 一种桥下拔桩装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108894226A (zh) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110438993A (zh) * | 2019-08-16 | 2019-11-12 | 中建筑港集团有限公司 | 一种钢管桩拔桩器及其施工工艺 |
CN113123794A (zh) * | 2021-03-29 | 2021-07-16 | 北京中煤矿山工程有限公司 | 一种水平冻结管拔管装置 |
CN115075247A (zh) * | 2022-05-24 | 2022-09-20 | 保利长大工程有限公司 | 一种跨河道箱梁支架钢管桩的拔除方法 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61221417A (ja) * | 1985-03-25 | 1986-10-01 | P S Concrete Kk | 橋体桁下の杭の引抜方法 |
NO315169B1 (no) * | 1995-11-29 | 2003-07-21 | Deep Oil Technology Inc | Fremgangsmåte for anbringelse av dypvannspeler i havbunnen |
CN101858083A (zh) * | 2010-06-22 | 2010-10-13 | 天津第三市政公路工程有限公司 | 低空间水中钢管桩拔桩施工方法及装置 |
CN202090349U (zh) * | 2011-05-19 | 2011-12-28 | 中天建设集团有限公司 | 一种用于拔除方桩的装置 |
CN103174141A (zh) * | 2013-03-26 | 2013-06-26 | 青岛宝基利工程技术咨询有限公司 | 滩涂区梁下支架钢管桩拔出设备及方法 |
-
2018
- 2018-09-28 CN CN201811136141.0A patent/CN108894226A/zh active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61221417A (ja) * | 1985-03-25 | 1986-10-01 | P S Concrete Kk | 橋体桁下の杭の引抜方法 |
NO315169B1 (no) * | 1995-11-29 | 2003-07-21 | Deep Oil Technology Inc | Fremgangsmåte for anbringelse av dypvannspeler i havbunnen |
CN101858083A (zh) * | 2010-06-22 | 2010-10-13 | 天津第三市政公路工程有限公司 | 低空间水中钢管桩拔桩施工方法及装置 |
CN202090349U (zh) * | 2011-05-19 | 2011-12-28 | 中天建设集团有限公司 | 一种用于拔除方桩的装置 |
CN103174141A (zh) * | 2013-03-26 | 2013-06-26 | 青岛宝基利工程技术咨询有限公司 | 滩涂区梁下支架钢管桩拔出设备及方法 |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110438993A (zh) * | 2019-08-16 | 2019-11-12 | 中建筑港集团有限公司 | 一种钢管桩拔桩器及其施工工艺 |
CN113123794A (zh) * | 2021-03-29 | 2021-07-16 | 北京中煤矿山工程有限公司 | 一种水平冻结管拔管装置 |
CN113123794B (zh) * | 2021-03-29 | 2022-08-05 | 北京中煤矿山工程有限公司 | 一种水平冻结管拔管装置 |
CN115075247A (zh) * | 2022-05-24 | 2022-09-20 | 保利长大工程有限公司 | 一种跨河道箱梁支架钢管桩的拔除方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108894226A (zh) | 一种桥下拔桩装置 | |
CN105067211B (zh) | 可拆卸重复利用剪力墙抗震性能试验加载架及试验方法 | |
CN109972621A (zh) | 一种用于小净空浅水区钢管桩的拔桩装置及其施工方法 | |
CN101624825B (zh) | 静拔机 | |
CN206512718U (zh) | 一种可调向多功能振动植桩装置 | |
CN208995928U (zh) | 一种适用于叠合梁施工的多功能桥面吊机 | |
CN109252521B (zh) | 钢梁下有限空间水中钢管桩拔出设备及其施工方法 | |
CN204139219U (zh) | 可冲击、可加压的液压导杆抓斗 | |
CN212248238U (zh) | 一种桥梁施工用打桩机 | |
CN206429270U (zh) | 一种盾构机过站装置 | |
CN103174141A (zh) | 滩涂区梁下支架钢管桩拔出设备及方法 | |
CN210002403U (zh) | 锤击与静压结合的预制桩沉桩装置 | |
CN107217669B (zh) | 拔桩设备及其快速移动方法 | |
CN207904921U (zh) | 一种简易水上打桩设备 | |
CN216551923U (zh) | 一种土木工程用的打桩机构 | |
CN106149542A (zh) | 组合式索道桥 | |
CN109252522A (zh) | 低空间可调节拔桩装置 | |
CN203007843U (zh) | 一种变幅桥面吊机 | |
CN210288386U (zh) | 一种土木工程用一机多用打桩机 | |
CN213389757U (zh) | 一种钢箱梁侧向滑移安装系统 | |
CN211547739U (zh) | 用于绳锯静力切割钢筋混凝土内撑的支撑结构 | |
CN207159996U (zh) | 一种处理机深层搅拌船可调桩架 | |
CN104452760A (zh) | 无噪音钢板桩压桩设备及其施工方法 | |
CN202369932U (zh) | 一种桥梁遮板安装车 | |
CN201459729U (zh) | H型钢夹持器 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181127 |