CN109252522A - 低空间可调节拔桩装置 - Google Patents
低空间可调节拔桩装置 Download PDFInfo
- Publication number
- CN109252522A CN109252522A CN201811288713.7A CN201811288713A CN109252522A CN 109252522 A CN109252522 A CN 109252522A CN 201811288713 A CN201811288713 A CN 201811288713A CN 109252522 A CN109252522 A CN 109252522A
- Authority
- CN
- China
- Prior art keywords
- suspender
- pontoon
- steel
- pile pulling
- adjusted
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D9/00—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof
- E02D9/02—Removing sheet piles bulkheads, piles, mould-pipes or other moulds or parts thereof by withdrawing
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Foundations (AREA)
Abstract
本发明涉及桥梁施工技术领域,具体指一种低空间可调节拔桩装置;包括两组浮船平台,所述浮船平台上设有可升降调节的钢架,两组钢架的上端之间设有顶层平台,顶层平台上设有可沿其纵向活动的可动横梁,可动横梁上设有吊具,吊具上设有振动锤,浮船平台上设有卷扬机,卷扬机上的钢缆与吊具连接;本发明结构合理,由卷扬机带动吊具吊装振动锤,安装好振动锤对待拔桩进行振动,待振动结束后利用可移动横梁将振动锤放置在浮船上,再通过吊具对待拔桩进行起吊;钢衍架通过顶升机构对钢立柱进行顶升,适用于低空间中的不同高度拔桩,具有易操作,安全可靠,成本低的优点。
Description
技术领域
本发明涉及桥梁施工技术领域,具体指一种低空间可调节拔桩装置。
背景技术
钢管桩主要作为施工栈桥中的临时设施进行使用,钢管桩使用量大,使用范围广。如果单纯作为施工栈桥使用,在桥侧建立,待项目完成后可以直接拔出,上部操作空间不受限制。然而实际工程很多水上项目中钢管桩作为一种临时设施应用于桥梁箱梁的生产过程中,在钢管桩是架设贝雷梁,上面搭设脚手架,形成满堂支架,在满堂支架上铺装模板,再进行箱梁浇筑,待桥梁建成后,满堂支架和贝雷梁依次拆除,就只剩钢管桩在水中,这时的钢管桩位于桥梁正下方,在拔除时施工空间受限,大型施工机械无法进入桥下,这就使得有限空间的拔桩显得尤为困难。
从国内外的研究现状来看,目前对于水下钢管基的清除主要是采用水中切割的方法,这种方法成本高,施工作业难度大,同时使得大量钢铁资源废弃到河床底部,不利于环境友好型社会和资源节约型社会的建设。在专利文献中有“吴庆东、赵世超、郭保林等;滩涂区梁下支架钢管桩拔出设备及方法:CN,CN103174141A[P]2013”;所述方法主要通过上部横梁作为整个体系的受力构件,由钢丝绳下垂连接下部横梁,钢绞线连接待拔桩体。但是整个体系中重要的连接构件是钢丝绳,在拔边缘的桩时会出现钢丝绳两端受拉不均匀的情况,造成体系失稳;经测算在钢管桩下沉后由上部箱梁荷载的不断施压并随着土体不断固结,最后拔桩时高达桩身重量的10倍左右,所以采用单纯的静力拔桩会引起断桩等情形出现。
因此,现有技术还有待于改进和发展。
发明内容
本发明的目的在于针对现有技术的缺陷和不足,提供一种结构合理、操作灵活的低空间可调节拔桩装置。
为了实现上述目的,本发明采用以下技术方案:
本发明所述的一种低空间可调节拔桩装置,包括两组浮船平台,所述浮船平台上设有可升降调节的钢架,两组钢架的上端之间设有顶层平台,顶层平台上设有可沿其纵向活动的可动横梁,可动横梁上设有吊具,吊具上设有振动锤,浮船平台上设有卷扬机,卷扬机上的钢缆与吊具连接。
根据以上方案,所述顶层平台包括两根纵梁,两根纵梁相互间隔且平行设置,纵梁由工字钢制成,可动横梁上设有可沿纵梁活动的滚轮,可动横梁与纵梁之间设有止行销轴。
根据以上方案,所述可动横梁的两侧均设有固定横梁,两个固定横梁分别与两根纵梁的两端固定连接;所述固定横梁上设有定滑轮,两组浮船平台上均设有卷扬机,且两个卷扬机的钢缆分别穿过对应的定滑轮后与吊具连接。
根据以上方案,所述钢架包括钢衍架,钢衍架固定在浮船平台上,钢衍架上设有顶升机构;所述钢衍架的上端设有钢立柱,钢立柱上端与纵梁固定连接。
根据以上方案,所述两组浮船平台之间设有若干加固梁。
本发明有益效果为:本发明结构合理,由卷扬机带动吊具吊装振动锤,安装好振动锤对待拔桩进行振动,待振动结束后利用可移动横梁将振动锤放置在浮船上,再通过吊具对待拔桩进行起吊;钢衍架通过顶升机构对钢立柱进行顶升,适用于低空间中的不同高度拔桩,具有易操作,安全可靠,成本低的优点。
附图说明
图1是本发明的整体结构示意图。
图中:
1、浮船平台;2、钢架;3、顶层平台;11、加固梁;12、卷扬机;13、吊具;14、振动锤;21、钢衍架;22、顶升机构;23、钢立柱;31、可动横梁;32、固定横梁;33、定滑轮;34、纵梁。
具体实施方式
下面结合附图与实施例对本发明的技术方案进行说明。
如图1所示,本发明所述的一种低空间可调节拔桩装置,包括两组浮船平台1,所述浮船平台1上设有可升降调节的钢架2,两组钢架2的上端之间设有顶层平台3,顶层平台3上设有可沿其纵向活动的可动横梁31,可动横梁31上设有吊具13,吊具13上设有振动锤14,浮船平台1上设有卷扬机12,卷扬机12上的钢缆与吊具13连接;所述顶层平台3通过钢架2搭载在两组浮船平台1上,卷扬机12驱动可动横梁31上的吊具13,首先将振动锤14吊装到待拔钢管桩上,通过振动锤14消除桩侧摩阻力,通过可动横梁31将吊装的振动锤14转移到浮船平台1上,再用吊具13连接待拔钢管桩通过卷扬机12的牵引,使桩体慢慢升起到合理高度进行切割;重复进行上述步骤可有效地在低空间操作环境中,将钢管桩完全拔出,具有易操作,安全可靠,成本低的优点。
所述顶层平台3包括两根纵梁34,两根纵梁34相互间隔且平行设置,纵梁34由工字钢制成,可动横梁31上设有可沿纵梁34活动的滚轮,可动横梁31与纵梁34之间设有止行销轴;所述两根纵梁34构成带轨道的顶层平台3,使可动横梁31通过滚轮可在顶层平台3上平移,使振动锤14在消摩完成后转移到浮船平台1上,再进行拔桩操作以节约空间高度。
所述可动横梁31的两侧均设有固定横梁32,两个固定横梁32分别与两根纵梁34的两端固定连接;所述固定横梁32上设有定滑轮33,两组浮船平台1上均设有卷扬机12,且两个卷扬机12的钢缆分别穿过对应的定滑轮33后与吊具13连接;所述固定横梁32用于配合纵梁34搭建稳固的顶层平台3,在固定横梁32上设置的定滑轮33用于配合卷扬机12,卷扬机12上的钢索依次穿过定滑轮33后与吊具13连接,从而将待拔桩体慢慢提升到一定高度进行切割处理。
所述钢架2包括钢衍架21,钢衍架21固定在浮船平台1上,钢衍架21上设有顶升机构22;所述钢衍架21的上端设有钢立柱23,钢立柱23上端与纵梁34固定连接;所述钢衍架21为多节钢框架结构连接组成,通过顶升机构22的顶升使钢立柱23上升,在钢衍架21中加入或拆除部分钢框架使整体机构高度进行调整,满足不同环境中的拔桩使用要求。
所述两组浮船平台1之间设有若干加固梁11,若干加固梁11使浮船平台1构成一体结构,且浮船平台1以及其上的整体结构可移动,从而满足不同位置的钢管桩拔出需求。
以上所述仅是本发明的较佳实施方式,故凡依本发明专利申请范围所述的构造、特征及原理所做的等效变化或修饰,均包括于本发明专利申请范围内。
Claims (5)
1.一种低空间可调节拔桩装置,包括两组浮船平台(1),其特征在于:所述浮船平台(1)上设有可升降调节的钢架(2),两组钢架(2)的上端之间设有顶层平台(3),顶层平台(3)上设有可沿其纵向活动的可动横梁(31),可动横梁(31)上设有吊具(13),吊具(13)上设有振动锤(14),浮船平台(1)上设有卷扬机(12),卷扬机(12)上的钢缆与吊具(13)连接。
2.根据权利要求1所述的低空间可调节拔桩装置,其特征在于:所述顶层平台(3)包括两根纵梁(34),两根纵梁(34)相互间隔且平行设置,纵梁(34)由工字钢制成,可动横梁(31)上设有可沿纵梁(34)活动的滚轮,可动横梁(31)与纵梁(34)之间设有止行销轴。
3.根据权利要求2所述的低空间可调节拔桩装置,其特征在于:所述可动横梁(31)的两侧均设有固定横梁(32),两个固定横梁(32)分别与两根纵梁(34)的两端固定连接;所述固定横梁(32)上设有定滑轮(33),两组浮船平台(1)上均设有卷扬机(12),且两个卷扬机(12)的钢缆分别穿过对应的定滑轮(33)后与吊具(13)连接。
4.根据权利要求1所述的低空间可调节拔桩装置,其特征在于:所述钢架(2)包括钢衍架(21),钢衍架(21)固定在浮船平台(1)上,钢衍架(21)上设有顶升机构(22);所述钢衍架(21)的上端设有钢立柱(23),钢立柱(23)上端与纵梁(34)固定连接。
5.根据权利要求1所述的低空间可调节拔桩装置,其特征在于:所述两组浮船平台(1)之间设有若干加固梁(11)。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811288713.7A CN109252522A (zh) | 2018-10-31 | 2018-10-31 | 低空间可调节拔桩装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811288713.7A CN109252522A (zh) | 2018-10-31 | 2018-10-31 | 低空间可调节拔桩装置 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109252522A true CN109252522A (zh) | 2019-01-22 |
Family
ID=65044370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811288713.7A Pending CN109252522A (zh) | 2018-10-31 | 2018-10-31 | 低空间可调节拔桩装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109252522A (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609695A (zh) * | 2020-12-16 | 2021-04-06 | 宁波市政工程建设集团股份有限公司 | 大吨位水中钢管桩清除装置及施工方法 |
CN113123794A (zh) * | 2021-03-29 | 2021-07-16 | 北京中煤矿山工程有限公司 | 一种水平冻结管拔管装置 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101831913A (zh) * | 2010-04-23 | 2010-09-15 | 武汉一冶交通工程有限责任公司 | 用千斤顶顶拔钻孔灌注桩钢护筒方法 |
CN101858083A (zh) * | 2010-06-22 | 2010-10-13 | 天津第三市政公路工程有限公司 | 低空间水中钢管桩拔桩施工方法及装置 |
CN204125945U (zh) * | 2014-09-12 | 2015-01-28 | 重庆宏工工程机械有限责任公司 | 车载式拔桩机 |
CN106759340A (zh) * | 2015-11-19 | 2017-05-31 | 重庆市金楠建筑有限责任公司 | 低空间水中钢管桩拔桩施工方法及装置 |
CN108330973A (zh) * | 2018-02-02 | 2018-07-27 | 无锡地铁集团有限公司 | 低净空高度下的拔桩设备及快速拔桩方法 |
CN207861722U (zh) * | 2018-02-12 | 2018-09-14 | 中国葛洲坝集团第五工程有限公司 | 一种简易水上浮式门吊 |
-
2018
- 2018-10-31 CN CN201811288713.7A patent/CN109252522A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101831913A (zh) * | 2010-04-23 | 2010-09-15 | 武汉一冶交通工程有限责任公司 | 用千斤顶顶拔钻孔灌注桩钢护筒方法 |
CN101858083A (zh) * | 2010-06-22 | 2010-10-13 | 天津第三市政公路工程有限公司 | 低空间水中钢管桩拔桩施工方法及装置 |
CN204125945U (zh) * | 2014-09-12 | 2015-01-28 | 重庆宏工工程机械有限责任公司 | 车载式拔桩机 |
CN106759340A (zh) * | 2015-11-19 | 2017-05-31 | 重庆市金楠建筑有限责任公司 | 低空间水中钢管桩拔桩施工方法及装置 |
CN108330973A (zh) * | 2018-02-02 | 2018-07-27 | 无锡地铁集团有限公司 | 低净空高度下的拔桩设备及快速拔桩方法 |
CN207861722U (zh) * | 2018-02-12 | 2018-09-14 | 中国葛洲坝集团第五工程有限公司 | 一种简易水上浮式门吊 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112609695A (zh) * | 2020-12-16 | 2021-04-06 | 宁波市政工程建设集团股份有限公司 | 大吨位水中钢管桩清除装置及施工方法 |
CN113123794A (zh) * | 2021-03-29 | 2021-07-16 | 北京中煤矿山工程有限公司 | 一种水平冻结管拔管装置 |
CN113123794B (zh) * | 2021-03-29 | 2022-08-05 | 北京中煤矿山工程有限公司 | 一种水平冻结管拔管装置 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104963301B (zh) | 用于墩顶梁段与桥墩拆除的拖拉平移下放装置及方法 | |
CN100543235C (zh) | 斜拉索辅助全悬臂架设钢桁梁的方法及系统 | |
CN202090286U (zh) | 一种适用于自锚式双索面悬索桥的牵引系统 | |
CN102080357B (zh) | 钢管墩贝雷梁现浇支架整体落梁装置及方法 | |
CN105297635B (zh) | 墩柱施工使用的组装升降式施工平台及其施工法 | |
CN106522112A (zh) | 斜拉桥边跨梁段架设系统及其方法 | |
CN109972621B (zh) | 一种用于小净空浅水区钢管桩的拔桩装置及其施工方法 | |
CN105926457A (zh) | 一种斜拉桥主塔区钢箱梁安装方法及辅助用架梁吊机底座 | |
CN109252522A (zh) | 低空间可调节拔桩装置 | |
CN108411922A (zh) | 钢支撑的拆除方法 | |
CN110468743B (zh) | 一种用于旧桥墩帽改造的移动式吊架及施工方法 | |
CN105484165B (zh) | 一体化预应力张拉框架结构及其制作和使用方法 | |
CN207987749U (zh) | 骑索式桥面吊机 | |
CN105019357A (zh) | 一种拱桥敞口格构式钢梁上异形预制桥面板的安装方法 | |
CN111350135B (zh) | 大跨度钢桁梁浮拖架设施工方法 | |
CN108708281A (zh) | 一种多孔简支近似拱形钢桁梁架设方法 | |
CN106149542A (zh) | 组合式索道桥 | |
CN111335172A (zh) | 可移动式墩柱横梁预应力张拉挂架施工平台及施工方法 | |
CN203755173U (zh) | 用于桥梁高墩液压爬升的模板装置 | |
CN107217669B (zh) | 拔桩设备及其快速移动方法 | |
CN106400688A (zh) | 主塔及其施工方法 | |
CN205500636U (zh) | 一种水工构件搬运装置 | |
CN210368963U (zh) | 一种用于小净空浅水区钢管桩的拔桩装置 | |
CN207619857U (zh) | 贝雷梁桥面吊机水平滑移装置 | |
CN2871634Y (zh) | 一种桥梁维护设备 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190122 |