CN103170813B - 装船机塔架门框安装余量切割工艺 - Google Patents
装船机塔架门框安装余量切割工艺 Download PDFInfo
- Publication number
- CN103170813B CN103170813B CN201310065561.5A CN201310065561A CN103170813B CN 103170813 B CN103170813 B CN 103170813B CN 201310065561 A CN201310065561 A CN 201310065561A CN 103170813 B CN103170813 B CN 103170813B
- Authority
- CN
- China
- Prior art keywords
- door frame
- doorframe
- surplus
- column
- ship loader
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
本发明公开了一种装船机塔架门框安装余量切割工艺,其创新点在于:在吊装调试门框主梁之前,直接测量好两根立柱的高度和主梁门框的高度,把测量数据与理论值对比,对立柱余量切割,需要时同时修割门框主梁,最后吊装门框主梁精确配合立柱一次焊接成型。这样的工艺,避免了重复的吊装门框主梁与立柱匹配的过程,节约了成本,同时提高了工作效率也提高了安全系数。
Description
技术领域
本发明涉及一种余量切割工艺,尤其涉及一种装船机塔架门框安装的余量切割工艺。
背景技术
装船机门框的安装,由于装船机本身体积庞大,重量也大,在安装的过程中需要借助吊机等工具进行配合。由于安装时,对于部件的余量需要进行控制,然后在安装的时候才精确切割,最后成型。传统的门框余量的切割工艺,是先将立柱焊接在下梁上,然后再将主梁吊起至立柱上,然后进行对比测量,确定切割余量,切割好后再对比,再切割余量,重复作业直至符合要求,最后焊接成型。这样的工艺操作麻烦,而且吊机一直工作,运作成本高,重复的抬吊主梁也使得安全存在隐患。
发明内容
本发明所要解决的技术问题是提供一种操作简单、一次成型的装船机塔架门框安装余量切割工艺。为解决上述技术问题,本发明所采用的技术方案是:一种装船机塔架门框安装余量切割工艺,其特征在于包括以下步骤:
1)两根立柱一端分别焊接在门框下梁的两端上侧,形成U型,焊接一步到位;
2)测量两根立柱的高度;
3)将测量的高度与理论值对比,同时对比主梁门框与立柱的对接情况,根据对比结果来修割立柱上端余量,若单独修割立柱余量不能达到要求,则继续修割主梁门框两端直到达到预定值;
4)用吊机吊起主梁门框至立柱上方根据要求精确放置,然后一次焊接成型。
采用这样的工艺步骤,可以通过精确的测量和对比计算,直接将余量预先切割好,然后直接将主梁门框吊起后精确放置在立柱上,最后一步焊接到位。这样一步到位,避免了重复操作,加快了效率,同时也加大了安全系数。
附图说明
图1是本发明装船机塔架门框安装余量切割工艺的门框示意图。
具体实施方式
如图1所示,首先将两根立柱2的下端焊接在门框下梁1的两端的上侧,形成U型。然后测量立柱2的高度,将测量的高度与理论高度进行对比,再对比立柱2与门框主梁3的连接配合的数据,通过对比计算,对立柱2的余量进行切割,如果光切割立柱2不能达到要求,则再对门框主梁3进行余量切割,直到达到计算的预定值。最后将门框主梁3用吊机吊起至立柱2的上方,精确放置在立柱2上进行匹配,再进行焊接一次成型。
这样通过精确的测量和计算对比,省去了传统工艺的重复的匹配对比过程,加快了余量切割的进程,提高了工作效率,同时减去了重复掉转门框主梁的过程,提高了安全系数。
Claims (1)
1.一种装船机塔架门框安装余量切割工艺,其特征在于包括以下步骤: 1)两根立柱(2)上端分别预留50mm的修割余量,两根立柱(2)的一端分别焊接在门框下梁(1)的两端上侧,形成U型,焊接一步到位;
2) 测量两根立柱(2)的高度及主梁门框(3)的高度;
3) 将测量的立柱(2)和主梁门框(3)的高度和与理论值对比,根据对比结果来修割立柱(2)上端余量,若单独修割立柱(2)余量不能达到要求,则继续修割主梁门框两端直到达到预定值;
4) 用吊机吊起主梁门框(3)至立柱(2)上方根据要求精确放置,然后一次焊接成型。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310065561.5A CN103170813B (zh) | 2013-03-01 | 2013-03-01 | 装船机塔架门框安装余量切割工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310065561.5A CN103170813B (zh) | 2013-03-01 | 2013-03-01 | 装船机塔架门框安装余量切割工艺 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103170813A CN103170813A (zh) | 2013-06-26 |
CN103170813B true CN103170813B (zh) | 2015-07-15 |
Family
ID=48631236
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310065561.5A Active CN103170813B (zh) | 2013-03-01 | 2013-03-01 | 装船机塔架门框安装余量切割工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103170813B (zh) |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19954839A1 (de) * | 1999-11-09 | 2001-05-17 | Mannesmann Ag | Lastführung an einem Hafenmobilkran |
DE10231911A1 (de) * | 2002-07-09 | 2004-02-05 | Gottwald Port Technology Gmbh | Hafenmobilkran als mobiles Umschlaggerät für Stückgüter |
CN101088906A (zh) * | 2007-07-12 | 2007-12-19 | 同济大学 | 龙门起重机多塔组合安装方法 |
CN102616340B (zh) * | 2011-01-30 | 2015-08-19 | 华锐风电科技(江苏)有限公司 | 一种运输安装船、一种用船运输安装风电机组的方法 |
CN202369263U (zh) * | 2011-12-20 | 2012-08-08 | 上海振华重工(集团)股份有限公司 | 龙门吊刚性塔架 |
-
2013
- 2013-03-01 CN CN201310065561.5A patent/CN103170813B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN103170813A (zh) | 2013-06-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105177625B (zh) | 一种电解槽更换阳极的方法 | |
CN104060839B (zh) | 专用于大型场馆金属幕墙钢结构竖向龙骨施工控制方法 | |
CN103645009A (zh) | 一种扭矩扳手检定仪 | |
CN108163745A (zh) | 一种plc调节高精度同步顶升系统 | |
CN202165088U (zh) | 一种顶管掘进机自动导向控制机构 | |
CN105174085A (zh) | 一种塔机垂直度校准与纠偏装置及其施工方法 | |
CN103835511A (zh) | 一种超长轻薄巨型钢管桁架整体提升方法 | |
CN104742079A (zh) | 一种蝶形阀门组装机阀杆液压自动组合装置及其组合方法 | |
CN103170813B (zh) | 装船机塔架门框安装余量切割工艺 | |
CN102951260B (zh) | 舵桨在船体分段的安装方法 | |
CN203479555U (zh) | 千斤顶试压装置 | |
CN104563525B (zh) | 一种箱式钢拱梁整体卧式组对方法 | |
CN103612994B (zh) | 汽包单吊点倾斜吊装方法 | |
CN202963332U (zh) | 利用简易龙门架制作桩基钢筋笼的装置 | |
CN205421988U (zh) | 混凝土独立柱加固用plc智能同步顶升卸荷施工装置 | |
CN204188127U (zh) | 一种用于连杆分型面上下对称度测量工具 | |
CN104016252B (zh) | 一种利用塔身顶端轨迹特征判定塔机塔身单肢螺栓预紧力的方法及其应用 | |
CN105366598A (zh) | 煤气柜柜顶液压提升方法 | |
CN203669471U (zh) | 管塔结构高空顶升法纠偏装置 | |
CN104018657A (zh) | 一种采用水平滑移平台施工高大挑檐的方法 | |
CN205798849U (zh) | 一种组对装置 | |
CN105945464B (zh) | 钢筋笼滚焊机液压自动支撑装置及方法 | |
CN204565483U (zh) | 一种用于卧式千斤顶的三角支架的焊接固定装置 | |
CN105225712B (zh) | 核电站装卸料机轻重组件载荷模拟一体化的水下切换装置 | |
CN202166416U (zh) | 制动盘外倾角检测装置和制动盘生产线装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20170420 Address after: The 226000 farm of Jiangsu province Nantong Development Zone Riverview Road No. 1 Patentee after: Nantong Zhenhua Heavy Equipment Manufacturing Co., Ltd. Address before: 226010 Zhenhua Road, Nantong Development Zone, Jiangsu, Nantong, China, 1 Patentee before: Shanghai Zhenhua Heavy Industry Group (Nantong) Co., Ltd. |