CN103161258B - The pre-buried distribution method of prefabricated concrete structure architectural electricity - Google Patents

The pre-buried distribution method of prefabricated concrete structure architectural electricity Download PDF

Info

Publication number
CN103161258B
CN103161258B CN201210419570.5A CN201210419570A CN103161258B CN 103161258 B CN103161258 B CN 103161258B CN 201210419570 A CN201210419570 A CN 201210419570A CN 103161258 B CN103161258 B CN 103161258B
Authority
CN
China
Prior art keywords
spool
construction
concrete structure
precast plate
distribution method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210419570.5A
Other languages
Chinese (zh)
Other versions
CN103161258A (en
Inventor
霍晓光
刘通
王慎栋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China 22MCC Group Corp Ltd
Original Assignee
China 22MCC Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China 22MCC Group Corp Ltd filed Critical China 22MCC Group Corp Ltd
Priority to CN201210419570.5A priority Critical patent/CN103161258B/en
Publication of CN103161258A publication Critical patent/CN103161258A/en
Application granted granted Critical
Publication of CN103161258B publication Critical patent/CN103161258B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to the pre-buried distribution method of a kind of prefabricated concrete structure architectural electricity, comprise the construction of the construction of precast plate, the construction of dry wall and top board in-situ layer, in described precast plate, be provided with light current communication spool, socket pipe line loop and air conditioner socket pipe-loop; Lighting loop spool and main line pipe is provided with in described top board in-situ layer.The pre-buried distribution method of prefabricated concrete structure architectural electricity of the present invention, decreases the quantity that in in-situ layer, spool is laid; The method, by adjustment operation, has been carried out rational layout to strong and weak electricity spool, the layout of pre-embedded pipe has been incorporated into industrialization field, improves efficiency of construction, decreased artificial input, improve workmanship; Pre-erection is connected with the node of cast-in-place part and is also optimized design, reduces cost, improves production efficiency.

Description

The pre-buried distribution method of prefabricated concrete structure architectural electricity
Technical field
The present invention relates to a kind of construction techniques, specifically, relate to the pre-buried distribution method of a kind of prefabricated concrete structure architectural electricity.
Background technology
In prefabricated concrete structure work progress, need the production carrying out other components such as a part of body of wall, top board and stair in factory, then transporting job site to carries out assembling work, is especially divided into two by the top board of entirety, half makes precast plate, and second half carries out cast-in-place operation.The pre-buried mode of current strong and weak electricity spool in prefabricated concrete structure top board is exactly be placed in in-situ layer substantially, so just make to only have the in-situ layer of half top plate thickness cannot cover the crossover location of pipeline because pipeline is more, very large difficulty is brought to construction, in addition because strong and weak electricity spool all concentrates in in-situ layer, bring very large hidden danger of quality to the construction quality of in-situ layer; Forceful electric power is also very serious to the interference of signal of communication.And precast wall body internal box and line box, the pre-buried of spool mostly are more coarse operating type, line box and casing accurately can not be located, bring inconvenience to later installation.
Summary of the invention
For above-mentioned deficiency of the prior art, the invention provides a kind of quantity reducing spool laying in in-situ layer, improve efficiency of construction, reduce the artificial pre-buried distribution method of prefabricated concrete structure architectural electricity dropping into raising workmanship.
The technical solution used in the present invention is:
The pre-buried distribution method of a kind of prefabricated concrete structure architectural electricity, comprises the construction of the construction of precast plate, the construction of dry wall and top board in-situ layer, is provided with light current communication spool, socket pipe line loop and air conditioner socket pipe-loop in described precast plate; Lighting loop spool and main line pipe is provided with in described top board in-situ layer.
Be prefabricated with the lamp box of electric light in described precast plate, in lamp box, reserved spool throws away precast plate surface layer, is connected with the lighting loop in in-situ layer.
Described precast plate piece position is provided with spool interface.
Described precast wall body is provided with spool interface.
The beneficial effect of hinge structure of the present invention:
The pre-buried distribution method of prefabricated concrete structure architectural electricity of the present invention, decreases the quantity that in in-situ layer, spool is laid; The method, by adjustment operation, has been carried out rational layout to strong and weak electricity spool, the layout of pre-embedded pipe has been incorporated into industrialization field, improves efficiency of construction, decreased artificial input, improve workmanship; Pre-erection is connected with the node of cast-in-place part and is also optimized design, reduces cost, improves production efficiency.
Accompanying drawing explanation
Fig. 1 is the spool layering laying structure schematic diagram of the pre-buried distribution method of prefabricated concrete structure architectural electricity of the present invention;
Fig. 2 is the detailed partial enlargement structural representation of spool connected node of the A of Fig. 1.
Critical piece symbol description in accompanying drawing:
In figure:
1, in-situ layer 2, illumination spool and main line pipe
3, throw light on spool projecting tube 4, body of wall reserving rib
5, lamp box 6, precast plate
7, socket and light current spool 8, dry wall
9, built-in pipe joint.
Detailed description of the invention
Referring to drawings and Examples, the present invention will be described in detail:
Accompanying drawing 1,2 known, the pre-buried distribution method of a kind of prefabricated concrete structure architectural electricity, comprise the construction of precast plate 6, the construction of dry wall 8 and the construction of top board in-situ layer 1, in described precast plate 6, be provided with light current communication spool, socket pipe line loop and air conditioner socket pipe-loop 7; Lighting loop spool and main line pipe 2 is provided with in described top board in-situ layer 1; Be prefabricated with the lamp box 5 of electric light in described precast plate 6, in lamp box 5, reserved spool throws away precast plate 6 surface layer, is connected with the lighting loop in in-situ layer 1; Described precast plate 6 piece position is provided with spool interface; Described precast wall body 8 is provided with spool interface 9.
The pre-buried distribution method of prefabricated concrete structure architectural electricity of the present invention, decreases the quantity that in in-situ layer, spool is laid; The method, by adjustment operation, has been carried out rational layout to strong and weak electricity spool, the layout of pre-embedded pipe has been incorporated into industrialization field, improves efficiency of construction, decreased artificial input, improve workmanship; Pre-erection is connected with the node of cast-in-place part and is also optimized design, reduces cost, improves production efficiency.
The foundation that the layering of prefabricated concrete structure architectural electricity of the present invention pre-buried distribution method pipeline is arranged:
1) pre-buried main line pipe is comparatively thick, is embedded in advance in precast plate and easily makes precast plate damage in handling process, so need to nuzzle in in-situ layer in advance.
2) lighting loop makes its spool to nuzzle in precast plate completely in advance by the restriction of lamp box height on the one hand, and illuminating line wants complicated compared to socket line on the other hand, and easy produced problem is more, so construct better when cast-in-place construction.
3) light current communication spool and receptacle loop pipeline move towards similar, line box is arranged highly basically identical, and line box is all arranged in dry wall, in precast plate, only need pre-embedded pipe just passable, simply many compared to lighting loop, so communicated by light current spool and socket are nuzzled in precast plate in advance.
Strong and weak electricity pre-embedded pipe is split as two parts by the present invention, and a part is formed be arranged in precast plate by communicate spool, socket and air conditioner socket of light current; Another part is made up of lighting loop and main line pipe and is arranged in in-situ layer.First carry out the global design of plan view when layout design, after completing, carry out the detail treatment G-Design of layering laying.To lay with reference to the broken away view of precast plate during detail treatment design, the design of reserved spool is carried out in plan-position for every block precast plate, the design of electrical pipeline is dissolved in precast plate production drawing the most at last, realizes the production that can complete precast plate and pre-embedded pipe on same figure.Publishing picture of electric plan view needs point three parts: Part I is integral planar arrangement diagram, the same with traditional drawing; Part II is the Production design figure of light current communication spool, socket and the air conditioner socket needed when plant produced, and this figure on same drawing, facilitates production operation with precast plate production drawing; Part III is the lighting loop of site operation needs and the plan view of main line pipe, and this figure comprises plan view and node diagram.Plan view is used for the laying of on-the-spot pre-embedded pipe, and node diagram is used for the node connection construction of pre-embedded pipe between job site precast plate, dry wall, cast-in-place part.
In factory, first carry out the laying of electric pre-buried part in precast plate, dry wall according to production operation drawing, pre-buried program needs to carry out interspersed operation in prefabricated component reinforcing bar binding process.The magnetic fastening device that is located through of casing and line box positions, and then spool is connected with casing, line box, spool interface is reserved at prefabricated units edge, other position indwelling spool interface except body of wall bottom line tubular structure needs indwelling operating space, for connection during site assembly is prepared, node diagram is shown in accompanying drawing 2.
After prefabricated units install, need the connection first carrying out spool between prefabricated units, spool is communicated with by the interface reserved from Member Lip.
Be interspersed with when carrying out the reinforcing bar binding of in-situ layer after having assembled and carry out in in-situ layer electrically pre-buried, during laying, spool in in-situ layer is connected with spool pre-buried in prefabricated units.Precast plate is arranged the preheating embedding line in in-situ layer.

Claims (4)

1. the pre-buried distribution method of prefabricated concrete structure architectural electricity, comprise the construction of the construction of precast plate, the construction of dry wall and top board in-situ layer, it is characterized in that: in described precast plate, be provided with light current communication spool, socket pipe line loop and air conditioner socket pipe-loop; Lighting loop spool and main line pipe is provided with in described top board in-situ layer.
2. the pre-buried distribution method of prefabricated concrete structure architectural electricity according to claim 1, is characterized in that: the lamp box being prefabricated with electric light in described precast plate, and in lamp box, reserved spool throws away precast plate surface layer, is connected with the lighting loop in in-situ layer.
3. the pre-buried distribution method of prefabricated concrete structure architectural electricity according to claim 1, is characterized in that: described precast plate piece position is provided with spool interface.
4. the pre-buried distribution method of prefabricated concrete structure architectural electricity according to claim 1, is characterized in that: described precast wall body is provided with spool interface.
CN201210419570.5A 2012-10-29 2012-10-29 The pre-buried distribution method of prefabricated concrete structure architectural electricity Active CN103161258B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210419570.5A CN103161258B (en) 2012-10-29 2012-10-29 The pre-buried distribution method of prefabricated concrete structure architectural electricity

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210419570.5A CN103161258B (en) 2012-10-29 2012-10-29 The pre-buried distribution method of prefabricated concrete structure architectural electricity

Publications (2)

Publication Number Publication Date
CN103161258A CN103161258A (en) 2013-06-19
CN103161258B true CN103161258B (en) 2015-12-02

Family

ID=48584765

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210419570.5A Active CN103161258B (en) 2012-10-29 2012-10-29 The pre-buried distribution method of prefabricated concrete structure architectural electricity

Country Status (1)

Country Link
CN (1) CN103161258B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110710074A (en) * 2017-05-31 2020-01-17 相建株式会社 Electrical wiring structure with wiring points arranged on side wall and building construction method

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106017568B (en) * 2016-07-06 2018-12-25 沈阳建筑大学 The structural healthy monitoring system and integrated approach of prefabricated assembled concrete system
CN106284878A (en) * 2016-08-05 2017-01-04 成都市第四建筑工程公司 Assembled stair waist slab and cast-in-place structural plate built-in pipe box connection construction method
CN108917830A (en) * 2018-06-19 2018-11-30 杭州市质量技术监督检测院 A kind of intelligent wall with self-induction function
CN112131627A (en) * 2020-04-13 2020-12-25 芜湖职业技术学院 Intelligent manufacturing method and system for assembly type interior decoration
CN111884152A (en) * 2020-07-31 2020-11-03 中国二十二冶集团有限公司 Electrical pre-buried wiring method for prefabricated concrete structure building
CN112177223B (en) * 2020-09-29 2021-08-20 福建万山水利水电设计有限公司 Pre-buried electric pipeline system of prefabricated building

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1193370A (en) * 1995-08-16 1998-09-16 布克工厂两合公司 Multi-walled structural component
CN2863957Y (en) * 2006-01-28 2007-01-31 锦州玥宝塑业有限公司 Core composite thermal insulation wall plate
CN102116065A (en) * 2010-03-19 2011-07-06 柳忠林 Large-span prestressed concrete beam plate as ventilating channel and ventilating channel system
CN201962828U (en) * 2011-01-31 2011-09-07 赵生亮 Assembly-type non-bearing finished wall body

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1193370A (en) * 1995-08-16 1998-09-16 布克工厂两合公司 Multi-walled structural component
CN2863957Y (en) * 2006-01-28 2007-01-31 锦州玥宝塑业有限公司 Core composite thermal insulation wall plate
CN102116065A (en) * 2010-03-19 2011-07-06 柳忠林 Large-span prestressed concrete beam plate as ventilating channel and ventilating channel system
CN201962828U (en) * 2011-01-31 2011-09-07 赵生亮 Assembly-type non-bearing finished wall body

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110710074A (en) * 2017-05-31 2020-01-17 相建株式会社 Electrical wiring structure with wiring points arranged on side wall and building construction method

Also Published As

Publication number Publication date
CN103161258A (en) 2013-06-19

Similar Documents

Publication Publication Date Title
CN103161258B (en) The pre-buried distribution method of prefabricated concrete structure architectural electricity
CN106786266A (en) Prefabrication and assembly construction steel house cable and wire laying system and its construction method
CN103397790A (en) Assembled bathroom and installation process
CN109577535A (en) Assembled architecture PC superimposed sheet and the electromechanical installation built-in process of dry wall combination
CN203927684U (en) A kind of LED garden lamp
CN206313397U (en) Prefabrication and assembly construction steel house cable and wire laying system
CN103790181A (en) Daylight illumination device pier base and manufacturing method thereof
CN204651834U (en) The pre-buried structure of electric pipeline in a kind of brick wall
CN204326303U (en) Inner corner trim linkage and comprise building unit inner corner trim and the building unit of this device
CN207688061U (en) A kind of prefabricated streetlamp lamp socket
CN101247033A (en) Composite wiring facilities and method of indoor concealed circuit
CN204387499U (en) The water power piping network installation device of indoor integrated finishing
CN105465482B (en) A kind of multi-functional pipeline locating device
CN204728813U (en) A kind of assembling cantilever enclosure wall with illuminating line
CN203757571U (en) Bridge lighting system capable of comprehensively utilizing solar energy and rain energy
CN208039307U (en) A kind of novel double-channel precast concrete pipe gallery structure
CN203145058U (en) Basement buried collector pipe structure
CN207094679U (en) The buried box stacked switch of combustion gas
CN206542144U (en) A kind of prefabricated integrated line box building element
CN204531282U (en) Leakproof washroom base plate
CN205857617U (en) A kind of suspension assembled floor-board being easy to wiring
CN204552153U (en) Leakproof integral vacuum toilet
CN205090097U (en) Brickwork wall poling line structure
CN104234197A (en) Container portable house
CN204662667U (en) Built-in pipe structure based on fabricated structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant