CN206313397U - Prefabrication and assembly construction steel house cable and wire laying system - Google Patents

Prefabrication and assembly construction steel house cable and wire laying system Download PDF

Info

Publication number
CN206313397U
CN206313397U CN201621366607.2U CN201621366607U CN206313397U CN 206313397 U CN206313397 U CN 206313397U CN 201621366607 U CN201621366607 U CN 201621366607U CN 206313397 U CN206313397 U CN 206313397U
Authority
CN
China
Prior art keywords
cable
branch pipe
prefabrication
wire casing
construction steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621366607.2U
Other languages
Chinese (zh)
Inventor
汤伟
金永华
王红兵
郎卫国
陈晓明
贾宝荣
龚明
马良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Design And Research Institute Co Ltd
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Construction Design And Research Institute Co Ltd
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Design And Research Institute Co Ltd, Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Construction Design And Research Institute Co Ltd
Priority to CN201621366607.2U priority Critical patent/CN206313397U/en
Application granted granted Critical
Publication of CN206313397U publication Critical patent/CN206313397U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It is formed in wall in advance for existing cable poling, the inconvenient problem of later stage modification, the larger problem for being unfavorable for saving installing space of radius is laid caused by cable installation in pipe, the utility model provides a kind of prefabrication and assembly construction steel house cable and wire laying system, including some water power wallboards and some cables, the vertical branch pipe wire casing for cabling is opened up on water power wallboard, cable is fixed by some clip bunchys, clip is bonded in vertical branch pipe wire casing, easy construction, the upper end of cable runs to indoor distribution box in furred ceiling along top board, the lower end of cable is connected with socket or switch respectively.In the later stage in water power wallboard, can be facilitated to change or repair, cable fixes i.e. not cable installation in pipe by some clip bunchys, can reduce and lay radius, saves installing space for cable laying.Additionally, power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, can directly be powered after the completion of every layer of assembly, temporary electricity application can be reduced.

Description

Prefabrication and assembly construction steel house cable and wire laying system
Technical field
The utility model is related to electromechanical construction technology field, more particularly to a kind of prefabrication and assembly construction steel house cable and wire Laying system.
Background technology
For a long time, the electric wiring laying installation of traditional prefabrication and assembly construction house is divided into two parts:Supply main portion Divide and electric terminal part.
Supply main part refers to electric power, (supporter refers to build to communication trunk line arrangement in house supporter The part that immobilizes is built, resident family utilizes jointly etc. beam, post, floor and load bearing wall, community installations, equipment in load-carrying members Part).Electric terminal part refers to the laying installations such as secondary distribution piping part, socket, switch (filling in house obturator Body refers to building variable part, including interior decoration, internal partition wall, kitchen and toilet facility and privately owned part etc. life pipeline).
The characteristics of coordinating this traditional prefabrication and assembly construction house, from plant produced is designed into, largely the equipment such as electric will match somebody with somebody Pipe, distribution are embedded in reinforced concrete prefabricated board as the pre-buried part of PC plate, due to the prefabricated component of prefabricated dwelling house All disposably machined in factory, live perforate, fluting are not allowed, for electric specialty, in the design process An accurate positioning must be disposed with to equipment and pipeline, this just proposes requirement higher to electrical design:First Calculating will comprehensively consider the quantity of electrical equipment;Perforate, fluting size and position on the prefabricated boards such as its secondary determination floor, exterior wall Put;The pre-buried electrical power distribution pipe position in prefabricated component is finally marked.And these positioning will be carried out more with structure discipline Closely coordinate, it is higher to the fitness requirement between specialty;Even late design change can be damaged to precast wall body.
Utility model content
The purpose of this utility model is to provide a kind of prefabrication and assembly construction steel house cable and wire laying system, by inciting somebody to action In the later stage in water power wallboard, can be facilitated to change or repair, cable is fixed by some clip bunchys, the card for cable laying Folder is bonded in the vertical branch pipe wire casing of water power wallboard, compared to existing cable cable installation in pipe, can be reduced and be laid radius, saves peace Dress space.
In order to solve the above technical problems, the utility model provides following technical scheme:
A kind of prefabrication and assembly construction steel house cable and wire laying system, including some water power wallboards and some cables, The water power wallboard is distributed in the prefabrication and assembly construction steel house according to indoor need for electricity, is opened on the water power wallboard If for the vertical branch pipe wire casing of cabling, the cable is fixed by some clip bunchys, and the clip is bonded in described In vertical branch pipe wire casing, the upper end of the cable runs to indoor distribution box, the lower end of the cable in furred ceiling along top board It is connected with socket or switch respectively.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the cable is in furred ceiling Fixed by some clip bunchys, the clip is bonded on the bottom surface of top board.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, on the water power wallboard also Open up a horizontal branch pipe wire casing perpendicular with the vertical branch pipe wire casing.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the lower end of the cable exists The vertical branch pipe wire casing is walked after being turned with the intersection of the horizontal branch pipe wire casing along the horizontal branch pipe wire casing.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the cable is in level branch Fixed by clip bunchy in chase, the clip is bonded in horizontal branch pipe wire casing.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, also including cover plate, the lid The detachable outside for being arranged at the vertical branch pipe wire casing and horizontal branch pipe wire casing of plate.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the cover plate is provided with institute State switch and/or socket.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the top board is provided with honeybee Nest beam, sets reserved threading sleeve pipe in the hole that current supply cable is passed through in the Honeycomb Beam.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the water power wallboard it is upper End is provided with upper lateral chase, and the upper lateral chase is connected with the vertical branch pipe wire casing, the upper lateral pipe Wire casing sets plaster decoration line with furred ceiling link position.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, power distribution room is with emanant confession Electrically it is connected with each indoor distribution box respectively, the service entrance cable between power distribution room and each indoor distribution box passes through cable testing bridge It is arranged in floor cup prefabricated components, size is directly formed in floor cup prefabricated components the cable testing bridge in advance on demand.
From techniques disclosed above scheme, compared with prior art, the beneficial effects of the utility model are as follows:
First, the prefabrication and assembly construction steel house cable and wire laying system that the utility model is provided, opens on water power wallboard If for the vertical branch pipe wire casing of cabling, the cable is fixed by some clip bunchys, and the clip is bonded in described In vertical branch pipe wire casing, by by cable laying in the later stage in water power wallboard, can be facilitated to change or repair;If cable passes through Dry clip bunchy is fixed, and the clip is bonded in the vertical branch pipe wire casing of water power wallboard, compared to existing cable cable installation in pipe, can Radius is laid to reduce, installing space is saved.The clip is bonded in the vertical branch pipe wire casing of water power wallboard, bonding mode phase Than other connected modes, construction more facilitates convenient.
2nd, the prefabrication and assembly construction steel house cable and wire laying system that the utility model is provided, total electricity is set at one layer Table metering room, power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, power distribution room and each indoor distribution box Between cable be arranged in floor cup prefabricated components by cable testing bridge, size is directly prefabricated on demand for the cable testing bridge In in floor cup prefabricated components.Existing normal cable main line crane span structure is installed in electric shaft, and the utility model cable bridge Size is directly formed in floor cup prefabricated components frame in advance on demand, can complete each layer distributing box for household house lead in factory in advance Cable is prefabricated, is laid by floor such that it is able to the scene of directly taking, length according to actual needs and pre- allowance carry out it is prefabricated, it is middle not Joint is needed, can directly be powered after the completion of every layer of assembly, such that it is able to reduce temporary electricity application.
Brief description of the drawings
Fig. 1 is the structural representation of the prefabrication and assembly construction steel house cable and wire laying system of the embodiment of the utility model one Figure.
Fig. 2 is for vertically branch pipe wire casing shows with the distribution of horizontal branch pipe wire casing on water power wallboard in the embodiment of the utility model one It is intended to.
In figure:1- water power wallboard, 2- cables, 3- clips, 4 vertical branch pipe wire casings, 5- top boards, 6- horizontal branch pipees wire casing, 7- The reserved threading sleeve pipe of cover plate, 8- Honeycomb Beams, 9-, 10- upper laterals chase, 11- lower, transverses chase, 12- gypsum decoratives Lines, 13- walls inner chamber, 14- skirtings.
Specific embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation and Claims, advantages and features of the present utility model will become apparent from.Below will be by cited embodiment combination accompanying drawing, in detail Illustrate technology contents of the present utility model and feature.Need to illustrate in addition, accompanying drawing makes in the form of simplifying very much and With non-accurately ratio, only it is used to conveniently, lucidly aid in illustrating the purpose of the utility model embodiment.For sake of convenience, under Described in text " on ", the upper and lower direction of D score and accompanying drawing it is consistent, but this can not turn into the limit of technical solutions of the utility model System.
Fig. 1 and Fig. 2 is referred to, present embodiment discloses a kind of prefabrication and assembly construction steel house cable and wire laying system, Including some water power wallboards 1 and some cables 2 (can turn into inside cable), the water power wallboard 1 is according to indoor electricity consumption Demand is distributed in the prefabrication and assembly construction steel house, and the vertical branch pipe for cabling 2 is opened up on the water power wallboard 1 Wire casing 4, the cable 2 is fixed by the bunchy of some clips 3, and the clip 3 is bonded in the vertical branch pipe wire casing 4, described The upper end of cable 2 runs to indoor distribution box (not shown) in furred ceiling along top board, and the upper end of the cable 2 is stretched into furred ceiling Run to indoor distribution box connection, i.e., the upper end of described cable 2 is stretched into furred ceiling along running to indoor distribution box, institute inside furred ceiling The lower end for stating cable 2 is connected with socket or switch (not shown) respectively.On the one hand, the present embodiment is laid in by by cable 2 In water power wallboard 1, the later stage can be facilitated to change or repair.On the other hand, cable 2 passes through some 3 one-tenth of clips in the present embodiment Beam is fixed, and the clip 3 is bonded in the vertical branch pipe wire casing 4 of water power wallboard 1, it is seen that the cable 2 of the present embodiment is used and do not worn Bright system of laying is managed, it compares the cable installation in pipe mode of existing cable 2, can reduce and lay radius, save installing space.The card Folder 3 is bonded in the vertical branch pipe wire casing 4 of water power wallboard 1, and bonding mode compares other connected modes so that construction more facilitates It is convenient.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the cable 2 is in furred ceiling Fixed by the bunchy of some clips 3, the clip 3 is bonded on the top board 5 i.e. bottom surface of floor of steel structure.Likewise, cable 2 Using the bright system of laying of not poling, it compares the cable installation in pipe mode of existing cable 2, can reduce and lay radius, saves and installs empty Between;The clip 3 is bonded on the bottom surface of top board 5, and bonding mode compares other connected modes so that construction more facilitates just It is prompt
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, on the water power wallboard 1 also Open up a horizontal branch pipe wire casing 6 perpendicular with the vertical branch pipe wire casing 4.The lower end of the cable 2 is in the vertical branch pipe Wire casing 4 is walked after being turned with the intersection of the horizontal branch pipe wire casing 6 along the horizontal branch pipe wire casing 6.By setting level The setting of branch pipe wire casing 6, can cause required horizontal level by cable 2.Preferably, lived in above-mentioned prefabrication and assembly construction steel construction In home telephone cable electrical line setting system, the cable 2 is fixed in horizontal branch pipe wire casing 6 by the bunchy of clip 3, and the clip 3 glues Tie in horizontal branch pipe wire casing 6, bonding mode compares other connected modes so that construction more facilitates convenient.
Preferably, it is described also including cover plate 7 in above-mentioned prefabrication and assembly construction steel house cable and wire laying system The detachable outside for being arranged at the vertical branch pipe wire casing 4 and horizontal branch pipe wire casing 6 of cover plate 7.The cover plate 7 is provided with described Switch and/or socket (not shown).Can not only be protected in vertical branch pipe wire casing 4 and horizontal branch pipe wire casing 6 by setting cover plate 7 Cable 2, be easy to switch or socket installation.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the top board 5 is provided with honeybee Nest beam 8, sets reserved threading sleeve pipe 9 in the hole that current supply cable 2 is passed through in the Honeycomb Beam 8.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the water power wallboard 1 it is upper End and lower end are respectively equipped with upper lateral chase 10 and lower, transverse chase 11, the upper lateral chase 10 with it is described Vertical branch pipe wire casing 4 is connected, and the upper lateral chase 10 sets plaster decoration line 12 with furred ceiling link position.The water Electric wallboard 1 has wall inner chamber 13, and the side of the water power wallboard 1 is provided with the opening connected with interior wall intracoelomic cavity 13, is available for Pipeline level is passed through.The outside of the lower, transverse chase 11 is provided with skirting 14.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, in prefabrication and assembly construction steel construction One layer of house sets total ammeter metering room (not shown), and power distribution room is connected with each indoor distribution box respectively with emanant power supply mode Connect, the service entrance cable between power distribution room and each indoor distribution box is arranged in floor cup prefabricated components by cable testing bridge, Size is directly formed in floor cup prefabricated components the cable testing bridge in advance on demand.Compared to existing normal cable crane span structure electric Install in vertical shaft, and the utility model cable testing bridge size is directly formed in floor cup prefabricated components in advance on demand, in advance may be used It is prefabricated to complete in factory each layer distributing box for household service entrance cable, to be laid by floor such that it is able to the scene of directly taking, length is pressed It is actually needed and pre- allowance carries out prefabricated, centre is not required to joint, can directly be powered after the completion of every layer of assembly, such that it is able to reduce Temporary electricity application.
In sum, the utility model has the beneficial effect that:
First, the prefabrication and assembly construction steel house cable and wire laying system that the utility model is provided, opens on water power wallboard If for the vertical branch pipe wire casing of cabling, the cable is fixed by some clip bunchys, and the clip is bonded in described In vertical branch pipe wire casing, by by cable laying in the later stage in water power wallboard, can be facilitated to change or repair;If cable passes through Dry clip bunchy is fixed, and the clip is bonded in the vertical branch pipe wire casing of water power wallboard, compared to existing cable cable installation in pipe, can Radius is laid to reduce, installing space is saved.The clip is bonded in the vertical branch pipe wire casing of water power wallboard, bonding mode phase Than other connected modes, construction more facilitates convenient.
2nd, the prefabrication and assembly construction steel house cable and wire laying system that the utility model is provided, total electricity is set at one layer Table metering room, power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, power distribution room and each indoor distribution box Between cable be arranged in floor cup prefabricated components by cable testing bridge, size is directly prefabricated on demand for the cable testing bridge In in floor cup prefabricated components.Existing normal cable main line crane span structure is installed in electric shaft, and the utility model cable bridge Size is directly formed in floor cup prefabricated components frame in advance on demand, can complete each layer distributing box for household house lead in factory in advance Cable is prefabricated, is laid by floor such that it is able to the scene of directly taking, length according to actual needs and pre- allowance carry out it is prefabricated, it is middle not Joint is needed, can directly be powered after the completion of every layer of assembly, such that it is able to reduce temporary electricity application.
Foregoing description is only the description to the utility model preferred embodiment, not to any limit of the utility model scope Calmly, the those of ordinary skill in the utility model field does according to the disclosure above content any change, modification, belonging to right will Seek the protection domain of book.

Claims (10)

1. a kind of prefabrication and assembly construction steel house cable and wire laying system, it is characterised in that including some water power wallboards and Some cables, the water power wallboard is distributed in the prefabrication and assembly construction steel house according to indoor need for electricity, the water The vertical branch pipe wire casing for cabling is opened up on electric wallboard, the cable is fixed by some clip bunchys, the clip It is bonded in the vertical branch pipe wire casing, the upper end of the cable runs to indoor distribution box in furred ceiling along top board, described The lower end of cable is connected with socket or switch respectively.
2. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 1, it is characterised in that the cable Fixed by some clip bunchys in furred ceiling, the clip is bonded on the bottom surface of top board.
3. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 1, it is characterised in that the water power A horizontal branch pipe wire casing perpendicular with the vertical branch pipe wire casing is also opened up on wallboard.
4. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 3, it is characterised in that the cable Lower end after the intersection of the vertical branch pipe wire casing and the horizontal branch pipe wire casing is turned along the horizontal branch pipe wire casing Walking.
5. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 4, it is characterised in that the cable Fixed by clip bunchy in horizontal branch pipe wire casing, the clip is bonded in horizontal branch pipe wire casing.
6. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 3, it is characterised in that also including lid Plate, the detachable outside for being arranged at the vertical branch pipe wire casing and horizontal branch pipe wire casing of the cover plate.
7. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 6, it is characterised in that the cover plate It is provided with the switch and/or socket.
8. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 2, it is characterised in that the top board Honeycomb Beam is provided with, reserved threading sleeve pipe is set in the hole that current supply cable is passed through in the Honeycomb Beam.
9. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 1, it is characterised in that the water power The upper end of wallboard is provided with upper lateral chase, and the upper lateral chase is connected with the vertical branch pipe wire casing, it is described on Portion's transverse pipe wire casing sets plaster decoration line with furred ceiling link position.
10. the prefabrication and assembly construction steel house cable and wire laying system as described in any one in claim 1-9, its feature It is that power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, between power distribution room and each indoor distribution box Service entrance cable be arranged in floor cup prefabricated components by cable testing bridge, size is directly prefabricated on demand for the cable testing bridge In in floor cup prefabricated components.
CN201621366607.2U 2016-12-13 2016-12-13 Prefabrication and assembly construction steel house cable and wire laying system Active CN206313397U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621366607.2U CN206313397U (en) 2016-12-13 2016-12-13 Prefabrication and assembly construction steel house cable and wire laying system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621366607.2U CN206313397U (en) 2016-12-13 2016-12-13 Prefabrication and assembly construction steel house cable and wire laying system

Publications (1)

Publication Number Publication Date
CN206313397U true CN206313397U (en) 2017-07-07

Family

ID=59252822

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621366607.2U Active CN206313397U (en) 2016-12-13 2016-12-13 Prefabrication and assembly construction steel house cable and wire laying system

Country Status (1)

Country Link
CN (1) CN206313397U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786266A (en) * 2016-12-13 2017-05-31 上海市建工设计研究院有限公司 Prefabrication and assembly construction steel house cable and wire laying system and its construction method
WO2019218223A1 (en) * 2018-05-16 2019-11-21 深圳市君盈建筑科技有限公司 House having electrical wire separate from main structure
CN112883801A (en) * 2021-01-20 2021-06-01 上海品览智造科技有限公司 Accurate identification method for household distribution box system diagram subgraph in CAD distribution system diagram

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106786266A (en) * 2016-12-13 2017-05-31 上海市建工设计研究院有限公司 Prefabrication and assembly construction steel house cable and wire laying system and its construction method
WO2019218223A1 (en) * 2018-05-16 2019-11-21 深圳市君盈建筑科技有限公司 House having electrical wire separate from main structure
CN112883801A (en) * 2021-01-20 2021-06-01 上海品览智造科技有限公司 Accurate identification method for household distribution box system diagram subgraph in CAD distribution system diagram

Similar Documents

Publication Publication Date Title
CN106786266B (en) Prefabrication and assembly construction steel house cable and wire laying system and its construction method
CN206313397U (en) Prefabrication and assembly construction steel house cable and wire laying system
CN109577535A (en) Assembled architecture PC superimposed sheet and the electromechanical installation built-in process of dry wall combination
CN203296259U (en) Light type prefabricated wall body assembly with conductor inlaying and power distribution connection functions
CN207353655U (en) Assembled substation pipeline connecton layout
CN208733977U (en) A kind of decorative wall electricity separation system
CN216344379U (en) Pipeline node two-way connecting piece
CN206498168U (en) A kind of distribution system of high-effective multilayer structure low level equipment
CN210857599U (en) Pipeline separation waterproof heat preservation integration wall body and building that constitutes thereof
CN208094124U (en) A kind of electrical structure wiring system for assembled architecture
CN210621997U (en) Assembled wall body of pre-buried electric wire
JP2013044187A (en) Building
CN212935272U (en) Mounting structure of indoor distribution box and household distribution box of residence
CN207597923U (en) A kind of detachable tent
CN205976631U (en) But sled dressization mobility control room
CN201327952Y (en) Bus mounting structure
CN215926561U (en) Building pipeline separation system
II Technical Specifications
CN204552153U (en) Leakproof integral vacuum toilet
CN201918677U (en) Power line installing slot
CN219569341U (en) Positioning device and mounting structure for placing electric box in double-sided laminated wallboard
CN207651821U (en) First and second unit equipment prefabricated cabins of 35kV with additional maintenance cabin
CN210111565U (en) Wire outlet structure of box transformer substation arranged above basement
CN112443174B (en) Improvement method of prefabricated module of assembly type building
CN201297478Y (en) Plastic-steel rectangular sheath pipe for insulation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant