CN106786266A - Prefabrication and assembly construction steel house cable and wire laying system and its construction method - Google Patents

Prefabrication and assembly construction steel house cable and wire laying system and its construction method Download PDF

Info

Publication number
CN106786266A
CN106786266A CN201611145896.8A CN201611145896A CN106786266A CN 106786266 A CN106786266 A CN 106786266A CN 201611145896 A CN201611145896 A CN 201611145896A CN 106786266 A CN106786266 A CN 106786266A
Authority
CN
China
Prior art keywords
cable
branch pipe
wire casing
prefabrication
steel house
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201611145896.8A
Other languages
Chinese (zh)
Other versions
CN106786266B (en
Inventor
汤伟
金永华
王红兵
郎卫国
陈晓明
贾宝荣
龚明
马良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction Group Design Institute Co Ltd
Shanghai Mechanized Construction Group Co Ltd
Original Assignee
Shanghai Construction Group Design Institute Co Ltd
Shanghai Mechanized Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction Group Design Institute Co Ltd, Shanghai Mechanized Construction Group Co Ltd filed Critical Shanghai Construction Group Design Institute Co Ltd
Priority to CN201611145896.8A priority Critical patent/CN106786266B/en
Publication of CN106786266A publication Critical patent/CN106786266A/en
Application granted granted Critical
Publication of CN106786266B publication Critical patent/CN106786266B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/36Installations of cables or lines in walls, floors or ceilings
    • H02G3/38Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts
    • H02G3/386Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts in walls
    • H02G3/388Installations of cables or lines in walls, floors or ceilings the cables or lines being installed in preestablished conduits or ducts in walls in modular walls, e.g. wall panels
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G1/00Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines
    • H02G1/06Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle
    • H02G1/08Methods or apparatus specially adapted for installing, maintaining, repairing or dismantling electric cables or lines for laying cables, e.g. laying apparatus on vehicle through tubing or conduit, e.g. rod or draw wire for pushing or pulling
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02GINSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
    • H02G3/00Installations of electric cables or lines or protective tubing therefor in or on buildings, equivalent structures or vehicles
    • H02G3/02Details
    • H02G3/04Protective tubing or conduits, e.g. cable ladders or cable troughs
    • H02G3/0431Wall trunking

Abstract

It is formed in wall in advance for existing cable poling, the inconvenient problem of later stage modification, the larger problem for being unfavorable for saving installing space of radius is laid caused by cable installation in pipe, the invention provides a kind of prefabrication and assembly construction steel house cable and wire laying system and its construction method, the system includes some water power wallboards and some cables, the vertical branch pipe wire casing for cabling is opened up on water power wallboard, cable is fixed by some clip bunchys, clip is bonded in vertical branch pipe wire casing, easy construction, the upper end of cable runs to indoor distribution box in furred ceiling along top board, the lower end of cable is connected with socket or switch respectively.In the later stage in water power wallboard, can be facilitated to change or repair, cable fixes i.e. not cable installation in pipe by some clip bunchys, can reduce and lay radius, saves installing space for cable laying.Additionally, power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, can directly be powered after the completion of every layer of assembly, temporary electricity application can be reduced.

Description

Prefabrication and assembly construction steel house cable and wire laying system and its construction method
Technical field
Laid the present invention relates to electromechanical construction technology field, more particularly to a kind of prefabrication and assembly construction steel house cable and wire System and its construction method.
Background technology
For a long time, the electric wiring laying installation of traditional prefabrication and assembly construction house is divided into two parts:Supply main portion Divide and electric terminal part.
Supply main part refers to electric power, (supporter refers to build to communication trunk line arrangement in house supporter The part that immobilizes is built, resident family utilizes jointly etc. beam, post, floor and load bearing wall, community installations, equipment in load-carrying members Part).Electric terminal part refers to the laying installations such as secondary distribution piping part, socket, switch (filling in house obturator Body refers to building variable part, including interior decoration, internal partition wall, kitchen and toilet facility and privately owned part etc. life pipeline).
The characteristics of coordinating this traditional prefabrication and assembly construction house, from plant produced is designed into, largely the equipment such as electric will match somebody with somebody Pipe, distribution are embedded in reinforced concrete prefabricated board as the pre-buried part of PC plate, due to the prefabricated component of prefabricated dwelling house All disposably machined in factory, live perforate, fluting are not allowed, for electric specialty, in the design process An accurate positioning must be disposed with to equipment and pipeline, this just proposes requirement higher to electrical design:First Calculating will comprehensively consider the quantity of electrical equipment;Perforate, fluting size and position on the prefabricated boards such as its secondary determination floor, exterior wall Put;The pre-buried electrical power distribution pipe position in prefabricated component is finally marked.And these positioning will be carried out more with structure discipline Closely coordinate, it is higher to the fitness requirement between specialty;Even late design change can be damaged to precast wall body.
The content of the invention
It is an object of the invention to provide a kind of prefabrication and assembly construction steel house cable and wire laying system and its construction party Method, by the way that, in the later stage in water power wallboard, can be facilitated to change or repair, cable is solid by some clip bunchys by cable laying Fixed, the clip is bonded in the vertical branch pipe wire casing of water power wallboard, compared to existing cable cable installation in pipe, can be reduced and be laid half Footpath, saves installing space.
In order to solve the above technical problems, the present invention provides following technical scheme:
A kind of prefabrication and assembly construction steel house cable and wire laying system, including some water power wallboards and some cables, The water power wallboard is distributed in the prefabrication and assembly construction steel house according to indoor need for electricity, is opened on the water power wallboard If for the vertical branch pipe wire casing of cabling, the cable is fixed by some clip bunchys, and the clip is bonded in described In vertical branch pipe wire casing, the upper end of the cable runs to indoor distribution box, the lower end of the cable in furred ceiling along top board It is connected with socket or switch respectively.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the cable is in furred ceiling Fixed by some clip bunchys, the clip is bonded on the bottom surface of top board.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, on the water power wallboard also Open up a horizontal branch pipe wire casing perpendicular with the vertical branch pipe wire casing.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the lower end of the cable exists The vertical branch pipe wire casing is walked after being turned with the intersection of the horizontal branch pipe wire casing along the horizontal branch pipe wire casing.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the cable is in level branch Fixed by clip bunchy in chase, the clip is bonded in horizontal branch pipe wire casing.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, also including cover plate, the lid The detachable outside for being arranged at the vertical branch pipe wire casing and horizontal branch pipe wire casing of plate, the cover plate is provided with the switch And/or socket.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the top board is provided with honeybee Nest beam, sets reserved threading sleeve pipe in the hole that current supply cable is passed through in the Honeycomb Beam.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the water power wallboard it is upper End is provided with upper lateral chase, and the upper lateral chase is connected with the vertical branch pipe wire casing, the upper lateral pipe Wire casing sets plaster decoration line with furred ceiling link position.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, power distribution room is with emanant confession Electrically it is connected with each indoor distribution box respectively, the service entrance cable between power distribution room and each indoor distribution box passes through cable testing bridge It is arranged in floor cup prefabricated components, size is directly formed in floor cup prefabricated components the cable testing bridge in advance on demand.
The invention also discloses a kind of construction of prefabrication and assembly construction steel house cable and wire laying system as described above Method, comprises the following steps:
Step one, there is provided some water power wallboards and some cables;
Step 2, the prefabrication and assembly construction steel house is arranged at according to indoor need for electricity by the water power wallboard It is interior, the vertical branch pipe wire casing for cabling is opened up on the water power wallboard, the cable is fixed by some clip bunchys, The clip is bonded in the vertical branch pipe wire casing, and the upper end of the cable runs to indoor distribution in furred ceiling along top board Case, the lower end of the cable is connected with socket or switch respectively;
Step 3, power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, and power distribution room is indoor with each Service entrance cable between distribution box is arranged in floor cup prefabricated components by cable testing bridge, and the cable testing bridge is big on demand It is small to be directly formed in advance in floor cup prefabricated components.
From techniques disclosed above scheme, compared with prior art, beneficial effects of the present invention are as follows:
First, the present invention is provided prefabrication and assembly construction steel house cable and wire laying system and its construction method, in water power The vertical branch pipe wire casing for cabling is opened up on wallboard, the cable is fixed by some clip bunchys, the clip glues Tie in the vertical branch pipe wire casing, by by cable laying in the later stage in water power wallboard, can be facilitated to change or repair;Electricity Cable is fixed by some clip bunchys, and the clip is bonded in the vertical branch pipe wire casing of water power wallboard, is worn compared to existing cable Pipe lays, and can reduce and lay radius, saves installing space.The clip is bonded in the vertical branch pipe wire casing of water power wallboard, Bonding mode compares other connected modes, and construction more facilitates convenient.
2nd, the present invention is provided prefabrication and assembly construction steel house cable and wire laying system and its construction method, at one layer Total ammeter metering room is set, and power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, power distribution room and each family Cable between interior distribution box is arranged in floor cup prefabricated components by cable testing bridge, cable testing bridge size on demand Directly it is formed in advance in floor cup prefabricated components.Existing normal cable main line crane span structure is installed in electric shaft, and present invention electricity Size is directly formed in floor cup prefabricated components cable crane span structure in advance on demand, can complete each layer distributing box for household in factory in advance Service entrance cable is prefabricated, such that it is able to directly take scene laid by floor, length according to actual needs and pre- allowance carry out it is prefabricated, in Between be not required to joint, can directly be powered after the completion of every layer of assembly, such that it is able to reduce temporary electricity application.
Brief description of the drawings
Fig. 1 is the structural representation of the prefabrication and assembly construction steel house cable and wire laying system of one embodiment of the invention.
Fig. 2 illustrates for the distribution of vertical branch pipe wire casing and horizontal branch pipe wire casing on water power wallboard in one embodiment of the invention Figure.
In figure:1- water power wallboard, 2- cables, 3- clips, 4 vertical branch pipe wire casings, 5- top boards, 6- horizontal branch pipees wire casing, 7- The reserved threading sleeve pipe of cover plate, 8- Honeycomb Beams, 9-, 10- upper laterals chase, 11- lower, transverses chase, 12- gypsum decoratives Lines, 13- walls inner chamber, 14- skirtings.
Specific embodiment
The present invention is described in further detail below in conjunction with the drawings and specific embodiments.According to following explanation and right Claim, advantages and features of the invention will become apparent from.Hereinafter this hair will be described in detail by cited embodiment combination accompanying drawing Bright technology contents and feature.Need to illustrate in addition, accompanying drawing is compared in the form of simplifying very much and accurately using non- Example, is only used to conveniently, lucidly aid in illustrating the purpose of the embodiment of the present invention.For sake of convenience, described below " on ", The upper and lower direction of D score and accompanying drawing is consistent, but this can not turn into the limitation of technical solution of the present invention.
Embodiment one
Fig. 1 and Fig. 2 is referred to, present embodiment discloses a kind of prefabrication and assembly construction steel house cable and wire laying system, Including some water power wallboards 1 and some cables 2 (can turn into inside cable), the water power wallboard 1 is according to indoor electricity consumption Demand is distributed in the prefabrication and assembly construction steel house, and the vertical branch pipe for cabling 2 is opened up on the water power wallboard 1 Wire casing 4, the cable 2 is fixed by the bunchy of some clips 3, and the clip 3 is bonded in the vertical branch pipe wire casing 4, described The upper end of cable 2 runs to indoor distribution box (not shown) in furred ceiling along top board, and the upper end of the cable 2 is stretched into furred ceiling Run to indoor distribution box connection, i.e., the upper end of described cable 2 is stretched into furred ceiling along running to indoor distribution box, institute inside furred ceiling The lower end for stating cable 2 is connected with socket or switch (not shown) respectively.On the one hand, the present embodiment is laid in by by cable 2 In water power wallboard 1, the later stage can be facilitated to change or repair.On the other hand, cable 2 passes through some 3 one-tenth of clips in the present embodiment Beam is fixed, and the clip 3 is bonded in the vertical branch pipe wire casing 4 of water power wallboard 1, it is seen that the cable 2 of the present embodiment is used and do not worn Bright system of laying is managed, it compares the cable installation in pipe mode of existing cable 2, can reduce and lay radius, save installing space.The card Folder 3 is bonded in the vertical branch pipe wire casing 4 of water power wallboard 1, and bonding mode compares other connected modes so that construction more facilitates It is convenient.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the cable 2 is in furred ceiling Fixed by the bunchy of some clips 3, the clip 3 is bonded on the top board 5 i.e. bottom surface of floor of steel structure.Likewise, cable 2 Using the bright system of laying of not poling, it compares the cable installation in pipe mode of existing cable 2, can reduce and lay radius, saves and installs empty Between;The clip 3 is bonded on the bottom surface of top board 5, and bonding mode compares other connected modes so that construction more facilitates just It is prompt
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, on the water power wallboard 1 also Open up a horizontal branch pipe wire casing 6 perpendicular with the vertical branch pipe wire casing 4.The lower end of the cable 2 is in the vertical branch pipe Wire casing 4 is walked after being turned with the intersection of the horizontal branch pipe wire casing 6 along the horizontal branch pipe wire casing 6.By setting level The setting of branch pipe wire casing 6, can cause required horizontal level by cable 2.Preferably, lived in above-mentioned prefabrication and assembly construction steel construction In home telephone cable electrical line setting system, the cable 2 is fixed in horizontal branch pipe wire casing 6 by the bunchy of clip 3, and the clip 3 glues Tie in horizontal branch pipe wire casing 6, bonding mode compares other connected modes so that construction more facilitates convenient.
Preferably, it is described also including cover plate 7 in above-mentioned prefabrication and assembly construction steel house cable and wire laying system The detachable outside for being arranged at the vertical branch pipe wire casing 4 and horizontal branch pipe wire casing 6 of cover plate 7.The cover plate 7 is provided with described Switch and/or socket (not shown).Can not only be protected in vertical branch pipe wire casing 4 and horizontal branch pipe wire casing 6 by setting cover plate 7 Cable 2, be easy to switch or socket installation.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the top board 5 is provided with honeybee Nest beam 8, sets reserved threading sleeve pipe 9 in the hole that current supply cable 2 is passed through in the Honeycomb Beam 8.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, the water power wallboard 1 it is upper End and lower end are respectively equipped with upper lateral chase 10 and lower, transverse chase 11, the upper lateral chase 10 with it is described Vertical branch pipe wire casing 4 is connected, and the upper lateral chase 10 sets plaster decoration line 12 with furred ceiling link position.The water Electric wallboard 1 has wall inner chamber 13, and the side of the water power wallboard 1 is provided with the opening connected with interior wall intracoelomic cavity 13, is available for Pipeline level is passed through.The outside of the lower, transverse chase 11 is provided with skirting 14.
Preferably, in above-mentioned prefabrication and assembly construction steel house cable and wire laying system, in prefabrication and assembly construction steel construction One layer of house sets total ammeter metering room (not shown), and power distribution room is connected with each indoor distribution box respectively with emanant power supply mode Connect, the service entrance cable between power distribution room and each indoor distribution box is arranged in floor cup prefabricated components by cable testing bridge, Size is directly formed in floor cup prefabricated components the cable testing bridge in advance on demand.Compared to existing normal cable crane span structure electric Install in vertical shaft, and cable testing bridge of the present invention size is directly formed in floor cup prefabricated components in advance on demand, in advance can be Each layer distributing box for household service entrance cable is completed in factory prefabricated, laid by floor such that it is able to the scene of directly taking, length is by actual Need and pre- allowance carries out prefabricated, centre is not required to joint, can directly be powered after the completion of every layer of assembly, it is interim such that it is able to reduce Electricity consumption application.
Embodiment two
Please continue to refer to Fig. 1 and Fig. 2, the present embodiment provides the prefabrication and assembly construction steel house cable electricity described in embodiment one The construction method of wire routing system, comprises the following steps:
Step one, there is provided some water power wallboards and some cables.
Step 2, the prefabrication and assembly construction steel house is arranged at according to indoor need for electricity by the water power wallboard It is interior, the vertical branch pipe wire casing 4 for cabling 2 is opened up on the water power wallboard 1, the cable 2 passes through the bunchy of some clips 3 Fixed, the clip 3 is bonded in the vertical branch pipe wire casing 4, and the upper end of the cable 2 is walked in furred ceiling along top board 5 To indoor distribution box, the lower end of the cable 2 is connected with socket or switch respectively.On the one hand, the present embodiment is by by cable 2 It is laid in water power wallboard 1, the later stage can be facilitated to change or repair.On the other hand, cable 2 passes through some cards in the present embodiment Press from both sides 3 bunchys to fix, the clip 3 is bonded in the vertical branch pipe wire casing 4 of water power wallboard 1, it is seen that the cable 2 of the present embodiment is used The not bright system of laying of poling, it is compared the cable installation in pipe mode of existing cable 2, can reduce and lay radius, saves installing space.Institute State clip 3 to be bonded in the vertical branch pipe wire casing 4 of water power wallboard 1, bonding mode compares other connected modes so that construction is more Facilitate convenient.
Step 3, power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, and power distribution room is indoor with each Service entrance cable between distribution box is arranged in floor cup prefabricated components by cable testing bridge, and the cable testing bridge is big on demand It is small to be directly formed in advance in floor cup prefabricated components.Installed in electric shaft compared to existing normal cable crane span structure, and it is of the invention Size is directly formed in floor cup prefabricated components cable testing bridge in advance on demand, can complete Ge Ceng resident families distribution in factory in advance Case service entrance cable is prefabricated, such that it is able to directly take scene laid by floor, length according to actual needs and pre- allowance carry out it is prefabricated, Centre is not required to joint, can directly be powered after the completion of every layer of assembly, such that it is able to reduce temporary electricity application.
In sum, the present invention has the beneficial effect that:
First, the prefabrication and assembly construction steel house cable and wire laying system that the present invention is provided, use is opened up on water power wallboard In the vertical branch pipe wire casing of cabling, the cable is fixed by some clip bunchys, and the clip is bonded in described vertical In branch pipe wire casing, by by cable laying in water power wallboard, can facilitate the later stage change or repair;Cable passes through some cards Folder bunchy is fixed, and the clip is bonded in the vertical branch pipe wire casing of water power wallboard, compared to existing cable cable installation in pipe, can be subtracted It is small to lay radius, save installing space.The clip is bonded in the vertical branch pipe wire casing of water power wallboard, and bonding mode compares it His connected mode, construction more facilitates convenient.
2nd, the prefabrication and assembly construction steel house cable and wire laying system that the present invention is provided, total ammeter meter is set at one layer Between amount, power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, between power distribution room and each indoor distribution box Cable be arranged in floor cup prefabricated components by cable testing bridge, size is directly formed on building to the cable testing bridge in advance on demand In layer cup prefabricated component.Existing normal cable main line crane span structure is installed in electric shaft, and cable testing bridge of the present invention is on demand Size is directly formed in floor cup prefabricated components in advance, can complete each layer distributing box for household service entrance cable in factory in advance pre- System, such that it is able to directly take it is live laid by floor, length is according to actual needs and pre- allowance carries out prefabricated, and centre is not required to connect Head, can directly power after the completion of every layer of assembly, such that it is able to reduce temporary electricity application.
Foregoing description is only the description to present pre-ferred embodiments, not to any restriction of the scope of the invention, this hair Any change, modification that the those of ordinary skill in bright field does according to the disclosure above content, belong to the protection of claims Scope.

Claims (10)

1. a kind of prefabrication and assembly construction steel house cable and wire laying system, it is characterised in that including some water power wallboards and Some cables, the water power wallboard is distributed in the prefabrication and assembly construction steel house according to indoor need for electricity, the water The vertical branch pipe wire casing for cabling is opened up on electric wallboard, the cable is fixed by some clip bunchys, the clip It is bonded in the vertical branch pipe wire casing, the upper end of the cable runs to indoor distribution box in furred ceiling along top board, described The lower end of cable is connected with socket or switch respectively.
2. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 1, it is characterised in that the cable Fixed by some clip bunchys in furred ceiling, the clip is bonded on the bottom surface of top board.
3. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 1, it is characterised in that the water power A horizontal branch pipe wire casing perpendicular with the vertical branch pipe wire casing is also opened up on wallboard.
4. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 3, it is characterised in that the cable Lower end after the intersection of the vertical branch pipe wire casing and the horizontal branch pipe wire casing is turned along the horizontal branch pipe wire casing Walking.
5. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 4, it is characterised in that the cable Fixed by clip bunchy in horizontal branch pipe wire casing, the clip is bonded in horizontal branch pipe wire casing.
6. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 3, it is characterised in that also including lid Plate, the detachable outside for being arranged at the vertical branch pipe wire casing and horizontal branch pipe wire casing of the cover plate, the cover plate is provided with The switch and/or socket.
7. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 2, it is characterised in that the top board Honeycomb Beam is provided with, reserved threading sleeve pipe is set in the hole that current supply cable is passed through in the Honeycomb Beam.
8. prefabrication and assembly construction steel house cable and wire laying system as claimed in claim 1, it is characterised in that the water power The upper end of wallboard is provided with upper lateral chase, and the upper lateral chase is connected with the vertical branch pipe wire casing, it is described on Portion's transverse pipe wire casing sets plaster decoration line with furred ceiling link position.
9. the prefabrication and assembly construction steel house cable and wire laying system as described in any one in claim 1-8, its feature It is that power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, between power distribution room and each indoor distribution box Service entrance cable be arranged in floor cup prefabricated components by cable testing bridge, size is directly prefabricated on demand for the cable testing bridge In in floor cup prefabricated components.
10. prefabrication and assembly construction steel house cable and wire laying system in a kind of 1-9 such as claim as described in any one Construction method, it is characterised in that comprise the following steps:
Step one, there is provided some water power wallboards and some cables;
, be arranged at the water power wallboard in the prefabrication and assembly construction steel house according to indoor need for electricity, institute by step 2 The vertical branch pipe wire casing opened up on water power wallboard for cabling is stated, the cable is fixed by some clip bunchys, described Clip is bonded in the vertical branch pipe wire casing, and the upper end of the cable runs to indoor distribution box in furred ceiling along top board, The lower end of the cable is connected with socket or switch respectively;
Step 3, power distribution room is connected with each indoor distribution box respectively with emanant power supply mode, power distribution room and each indoor distribution Service entrance cable between case is arranged in floor cup prefabricated components by cable testing bridge, and size is straight on demand for the cable testing bridge Connect pre- being formed in floor cup prefabricated components.
CN201611145896.8A 2016-12-13 2016-12-13 Prefabrication and assembly construction steel house cable and wire laying system and its construction method Active CN106786266B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611145896.8A CN106786266B (en) 2016-12-13 2016-12-13 Prefabrication and assembly construction steel house cable and wire laying system and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611145896.8A CN106786266B (en) 2016-12-13 2016-12-13 Prefabrication and assembly construction steel house cable and wire laying system and its construction method

Publications (2)

Publication Number Publication Date
CN106786266A true CN106786266A (en) 2017-05-31
CN106786266B CN106786266B (en) 2018-08-31

Family

ID=58876503

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611145896.8A Active CN106786266B (en) 2016-12-13 2016-12-13 Prefabrication and assembly construction steel house cable and wire laying system and its construction method

Country Status (1)

Country Link
CN (1) CN106786266B (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019218224A1 (en) * 2018-05-16 2019-11-21 深圳市君盈建筑科技有限公司 House having water pipe and high-voltage wire separate from main structure
WO2019218179A1 (en) * 2018-05-16 2019-11-21 深圳市君盈建筑科技有限公司 Construction method for house having water pipe and high-voltage wire separate from main structure
CN110499933A (en) * 2018-05-16 2019-11-26 深圳市君盈建筑科技有限公司 A kind of house that pipeline is separated with main structure
CN110499861A (en) * 2018-05-16 2019-11-26 深圳市君盈建筑科技有限公司 A kind of furred ceiling electricity separation system
CN110730853A (en) * 2018-05-16 2020-01-24 深圳市君盈建筑科技有限公司 Construction method of house with separated pipeline and main body structure
CN110945191A (en) * 2018-05-16 2020-03-31 广东博智林机器人有限公司 Construction method of house with separated strong-current electric wire and main body structure
CN110945198A (en) * 2018-05-16 2020-03-31 广东博智林机器人有限公司 House with separated strong current wire and main body structure
CN110945197A (en) * 2018-05-16 2020-03-31 广东博智林机器人有限公司 Residence with separated electric wire and main structure
CN111201358A (en) * 2018-05-16 2020-05-26 深圳市君盈建筑科技有限公司 Residence with water pipe and weak current electric wire separated from main structure

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004064816A (en) * 2002-07-25 2004-02-26 Aoki Engineering:Kk Routing method of conduit in building
CN103061515A (en) * 2012-12-29 2013-04-24 陕西省第三建筑工程公司 Method for perforating and pre-burying polyvinyl chloride (PVC) wiring tubes in concrete hollow block filled walls
CN204216515U (en) * 2014-10-18 2015-03-18 福州万山电力咨询有限公司 The mounting structure of distribution engineering cable testing bridge
CN104453085A (en) * 2014-10-28 2015-03-25 成都市第四建筑工程公司 Mounting method of wire box of lightweight aggregate concrete hollow partition board
CN204651834U (en) * 2015-06-09 2015-09-16 上海绿地建设(集团)有限公司 The pre-buried structure of electric pipeline in a kind of brick wall
CN204741240U (en) * 2015-04-07 2015-11-04 自贡市博雅装饰工程有限公司 Strong and weak electric winding displacement system
CN106149880A (en) * 2015-03-20 2016-11-23 万平华 Use the assembling room of new architecture
CN206313397U (en) * 2016-12-13 2017-07-07 上海市建工设计研究总院有限公司 Prefabrication and assembly construction steel house cable and wire laying system

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004064816A (en) * 2002-07-25 2004-02-26 Aoki Engineering:Kk Routing method of conduit in building
CN103061515A (en) * 2012-12-29 2013-04-24 陕西省第三建筑工程公司 Method for perforating and pre-burying polyvinyl chloride (PVC) wiring tubes in concrete hollow block filled walls
CN204216515U (en) * 2014-10-18 2015-03-18 福州万山电力咨询有限公司 The mounting structure of distribution engineering cable testing bridge
CN104453085A (en) * 2014-10-28 2015-03-25 成都市第四建筑工程公司 Mounting method of wire box of lightweight aggregate concrete hollow partition board
CN106149880A (en) * 2015-03-20 2016-11-23 万平华 Use the assembling room of new architecture
CN204741240U (en) * 2015-04-07 2015-11-04 自贡市博雅装饰工程有限公司 Strong and weak electric winding displacement system
CN204651834U (en) * 2015-06-09 2015-09-16 上海绿地建设(集团)有限公司 The pre-buried structure of electric pipeline in a kind of brick wall
CN206313397U (en) * 2016-12-13 2017-07-07 上海市建工设计研究总院有限公司 Prefabrication and assembly construction steel house cable and wire laying system

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019218224A1 (en) * 2018-05-16 2019-11-21 深圳市君盈建筑科技有限公司 House having water pipe and high-voltage wire separate from main structure
WO2019218179A1 (en) * 2018-05-16 2019-11-21 深圳市君盈建筑科技有限公司 Construction method for house having water pipe and high-voltage wire separate from main structure
CN110499933A (en) * 2018-05-16 2019-11-26 深圳市君盈建筑科技有限公司 A kind of house that pipeline is separated with main structure
CN110499861A (en) * 2018-05-16 2019-11-26 深圳市君盈建筑科技有限公司 A kind of furred ceiling electricity separation system
CN110730853A (en) * 2018-05-16 2020-01-24 深圳市君盈建筑科技有限公司 Construction method of house with separated pipeline and main body structure
CN110731038A (en) * 2018-05-16 2020-01-24 深圳市君盈建筑科技有限公司 Construction method of house with water pipe, strong electric wire and main body structure separated
CN110945191A (en) * 2018-05-16 2020-03-31 广东博智林机器人有限公司 Construction method of house with separated strong-current electric wire and main body structure
CN110945198A (en) * 2018-05-16 2020-03-31 广东博智林机器人有限公司 House with separated strong current wire and main body structure
CN110945197A (en) * 2018-05-16 2020-03-31 广东博智林机器人有限公司 Residence with separated electric wire and main structure
CN111201358A (en) * 2018-05-16 2020-05-26 深圳市君盈建筑科技有限公司 Residence with water pipe and weak current electric wire separated from main structure
CN112106265A (en) * 2018-05-16 2020-12-18 东莞市碧桂园房地产开发有限公司 House with separated water pipe, strong current electric wire and main body structure

Also Published As

Publication number Publication date
CN106786266B (en) 2018-08-31

Similar Documents

Publication Publication Date Title
CN106786266B (en) Prefabrication and assembly construction steel house cable and wire laying system and its construction method
CN206313397U (en) Prefabrication and assembly construction steel house cable and wire laying system
CN109577535A (en) Assembled architecture PC superimposed sheet and the electromechanical installation built-in process of dry wall combination
CN111980233A (en) Vertical splicing light and thin template structure of assembled inner wall
CN203296259U (en) Light type prefabricated wall body assembly with conductor inlaying and power distribution connection functions
CN106906843A (en) Underground pipe gallery and its construction method
CN103326279A (en) Cable duct bank construction device and method
CN216344379U (en) Pipeline node two-way connecting piece
CN206498168U (en) A kind of distribution system of high-effective multilayer structure low level equipment
CN206558992U (en) Outlet distribution structure under a kind of assembled architecture house indoor distribution box
CN210857599U (en) Pipeline separation waterproof heat preservation integration wall body and building that constitutes thereof
CN210621997U (en) Assembled wall body of pre-buried electric wire
CN203339577U (en) Cable duct construction device
CN208094124U (en) A kind of electrical structure wiring system for assembled architecture
CN212935272U (en) Mounting structure of indoor distribution box and household distribution box of residence
JP5537972B2 (en) Apartment house provided with solar power generation device and method of renovating this apartment house
JP2013044187A (en) Building
II Technical Specifications
CN215926561U (en) Building pipeline separation system
CN216195868U (en) Line box embedded structure and coincide floor
CN205976631U (en) But sled dressization mobility control room
CN214900035U (en) Assembled light wallboard electrical pipeline integrated device
CN112027827B (en) Method for shifting along household power conductor by matching with existing house and additionally installing elevator
CN207651821U (en) First and second unit equipment prefabricated cabins of 35kV with additional maintenance cabin
CN210111565U (en) Wire outlet structure of box transformer substation arranged above basement

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 200050 Changning District, Wuyi Road, No. 150,

Applicant after: Shanghai construction design and Research Institute Co Ltd

Applicant after: Shanghai Mechanized Construction Group Co., Ltd.

Address before: 200050 Changning District, Wuyi Road, No. 150,

Applicant before: Shanghai Construction Group Design Institute Co., Ltd.

Applicant before: Shanghai Mechanized Construction Group Co., Ltd.

GR01 Patent grant
GR01 Patent grant