CN206498168U - A kind of distribution system of high-effective multilayer structure low level equipment - Google Patents
A kind of distribution system of high-effective multilayer structure low level equipment Download PDFInfo
- Publication number
- CN206498168U CN206498168U CN201720121875.6U CN201720121875U CN206498168U CN 206498168 U CN206498168 U CN 206498168U CN 201720121875 U CN201720121875 U CN 201720121875U CN 206498168 U CN206498168 U CN 206498168U
- Authority
- CN
- China
- Prior art keywords
- floor
- hole
- low level
- cable bridge
- generating layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
The utility model provides a kind of distribution system of high-effective multilayer structure low level equipment, include mechanical floor and electricity generating layer, mechanical floor and electricity generating layer are separated by floor, mechanical floor is provided with electrical equipment and power distribution cabinet, electricity generating layer is laid with cable bridge, and floor is provided with first through hole below power distribution cabinet, and first through hole, which is drawn, to be set branch road crane span structure and be connected with cable bridge, floor is provided with the second through hole, cable bridge to draw below electrical equipment and sets spool and be connected to electrical equipment through the second through hole.The utility model improves power distribution efficiency, uses manpower and material resources sparingly, strengthens protection to construction environment, again improves the disguise of distribution line, improves the aesthetic property of construction.
Description
Technical field
The utility model relates generally to distribution technique field, more particularly to a kind of distribution of high-effective multilayer structure low level equipment
System.
Background technology
In the industrial building of modern economy developed country, undergo technological transformation to save in the old on-site of old enterprise
The mode of construction land is showing a rising trend.As the China of developing country maximum in the world, per capita cultivated land is the world
One of upper minimum country, saves construction land and then seems especially prominent currently.Therefore, the industrial building of development sandwich construction exists
China is imperative, and the house of sandwich construction in city, the development of commercial building are particularly true.Along with the hair of these buildings
Exhibition, the distribution for being itself and its equipment is then an indispensable link, therefore for such case, the present invention is as a kind of
The distribution system of high-effective multilayer structure low level equipment, it will gather around and have wide practical use.
The technical scheme being close with the present invention is then traditional conventional power distribution mode, i.e., the power supply of required controller switching equipment
It is to lay introducing by this layer of bracing wire to access cable.Current device layer sets sub-power distribution cabinet where equipment, and point cabinet is then by place
Total power distribution cabinet of building unit provides electric power.When mechanical floor construction area is larger, and required controller switching equipment quantity it is more when, generally
Crane span structure is laid in equipment Relatively centralized position, i.e.,:This layer of crane span structure->Fairlead->To equipment, pipeline requires bright according to laying
Apply or dark deposited.
If as shown in figure 1, using surface, space above where the longitudinal sections of pipeline bright will be exposed at equipment occupies sky
Between, influence perception;In addition in the plant area for having clear height requirement and house, the commercial building of aesthetic requirements etc., then hardly possess
The condition of implementation., need to be a small amount of still in this way, but just large batch of in wall and ground cutting fluting if taking dark deposited
The such distribution of equipment, then need to spend substantial amounts of manpower and material resources, at the same tradition cutting fluting can also produce substantial amounts of noise with
And the construction pollution such as dust, and then great interference is caused to the resident living environment on periphery, easily trigger the contradiction and disputes of both sides
And complain event.Supervision is strengthened to the construction pollution in urban construction for this China, therefore unit in charge of construction then needs to take phase
Measure is answered to reduce the influence to environment, and this undoubtedly adds extra cost.Further for the technology upgrading of old factory building
And transformation, from cost control and execution conditions, secretly apply non-feasible and good selection.
Utility model content
The utility model provides a kind of data center's distributed power supply module, and power distribution pipe is laid using understructure space
Road, solves the deficiency of existing distribution technique, and in order to achieve the above object, the utility model uses following technical scheme:This reality
Included with new:Mechanical floor 1 and electricity generating layer 2, the mechanical floor 1 and electricity generating layer 2 are separated by floor 3, and the mechanical floor 1 is set
Electrical equipment 4 and power distribution cabinet 5 are equipped with, the electricity generating layer 2 is laid with cable bridge 6, and the floor 3 is set below power distribution cabinet 5
There is a first through hole 31, the first through hole 31, which is drawn, to be set branch road crane span structure 61 and be connected with cable bridge 6, and the floor 3 is in electrical equipment 4
Lower section is provided with the second through hole 32, the cable bridge 6 to draw and sets spool 62 and be connected to electrical equipment 4 through the second through hole 32.
It is preferred that, the lower section of floor 3 is laid with steel reinforcement cage 7 and profiled sheet 8 successively.
It is preferred that, the spool 62 is located in the grid of steel reinforcement cage 7.
It is preferred that, the floor 3 uses concreting.
The beneficial effects of the utility model:The utility model is optimized to be applied from power distribution cabinet to the pipeline in electrical equipment space
If by the use of underlying distribution sheaf space as the routing region of mechanical floor distribution pipeline, solving existing distribution technique
It is not enough.
The utility model has some following benefit:
(1)Help reduce cutting fluting work when circuit caliber is laid, improve power distribution efficiency, reduce difficulty of construction
And workload, artificial, material is saved, so as to be conducive to controlling and reducing cost;
(2)Reduce the pollution because cutting a large amount of noises, dust that produce to natural environment, the interference to humanistic environment;
(3)Reduce caliber circuit bright dew, add construction finished goods disguise, improve aesthetic property, this for regarding
It is particularly suitable for the higher residential housing of feel organoleptic requirements, the distribution work of commercial building.
Brief description of the drawings
Fig. 1 is the structural representation of the present utility model being not optimised;
Fig. 2 is the structural representation in the utility model on embodiment one;
Fig. 3 is the mplifying structure schematic diagram in the utility model on A points;
Fig. 4 is the structural representation in the utility model on embodiment two;
Fig. 5 is the construction link flow chart in the utility model on embodiment one and embodiment two;
In figure,
1st, mechanical floor;
2nd, electricity generating layer;
3rd, floor, 31, first through hole, the 32, second through hole;
4th, electrical equipment;
5th, power distribution cabinet;
6th, cable bridge, 61, branch road crane span structure, 62, spool;
7th, steel reinforcement cage;
8th, profiled sheet.
Embodiment
Embodiment one, understands, the utility model includes as Figure 2-3:Mechanical floor 1 and electricity generating layer 2, the mechanical floor
1 and electricity generating layer 2 separated by floor 3, the mechanical floor 1 is provided with electrical equipment 4 and power distribution cabinet 5, and the electricity generating layer 2 is laid with
Cable bridge 6, the floor 3 is provided with first through hole 31 below power distribution cabinet 5, and the first through hole 31, which is drawn, sets branch road crane span structure 61
It is connected with cable bridge 6, the floor 3 is provided with to draw on the second through hole 32, the cable bridge 6 below electrical equipment 4 and set
Spool 62 is connected to electrical equipment 4 through the second through hole 32;Wherein the second through hole 32 can also be arranged on electrical equipment 4 nearby easily
In the position of wiring.
Preferred in this implementation, the lower section of floor 3 is laid with steel reinforcement cage 7 and profiled sheet 8 successively.
Preferred in this implementation, the spool 62 is located in the grid of steel reinforcement cage 7.
Preferred in this implementation, the floor 3 uses concreting.
Embodiment two, understands, the position relationship of mechanical floor 1 and electricity generating layer 2 as shown in Figure 4, electrical equipment 4 and cable bridge
6 position relationship and annexation is identical with embodiment one, the difference is that the position relationship of power distribution cabinet 5 and cable bridge 6.
Power distribution cabinet 5 is arranged in electricity generating layer 2, and cable bridge 6 is by the branch road crane span structure 61 drawn from downside and is arranged under cable bridge 6
The power distribution cabinet 5 of side is connected, and connects the first through hole 31 of branch road crane span structure 61 without being opened up in floor 3, it is to avoid early stage is applied
The problem of reserved hole position of work.
As shown in figure 5, being construction process figure of the present utility model:
(1)Early construction, first confirms that drawing and arrangement and method for construction;
(2)Confirm whether flooring is finished surface, from without scheme;
(3)Flooring is finished surface, by the way of water drilling milling hole is used at set reserved location, to reduce the production of airborne dust
It is raw and reduce the breakage to flooring, the problem of water overflowed during milling hole must be carried out, and caused by avoiding the falling object that milling hole is produced
Various hidden danger generation;
(4)Flooring is non-finished surface, through-flooring hole first through hole is reserved before floor carries out concreting, by spool
In the grid for being fixed on the steel reinforcement cage being laid on profiled sheet, sleeve upper end is wound with adhesive tape and blocked, to avoid concrete
Pour into blocking;For the first through hole below power distribution cabinet, the mode for also taking first through hole same, in advance according to branch road crane span structure
Specification carry out the prefabricated, reserved of respective sleeve, be fixed in steel reinforcement cage grid, and it is solid to carry out at first through hole opening covering
Fixed protected working;
(5)Cable bridge is laid to next layer of horizontal crane span structure, and is drawn at respective line to electrical equipment;
(6)Cable lays to equipment, hangs loop label;
(7)Waterproof fireproofing closure work is done to first through hole and the second through hole;
(8)Equipment is cleaned, checked, power transmission.
The principle and its effect of above-described embodiment only illustrative present patent application, not for limitation this patent Shen
Please.Any person skilled in the art can all be carried out without prejudice under the spirit and scope of present patent application to above-described embodiment
Modifications and changes.Therefore, such as those of ordinary skill in the art without departing from the essence disclosed in present patent application
God is with all equivalent modifications completed under technological thought or change, and the claim that should be asked by this patent is covered.
Claims (4)
1. a kind of distribution system of high-effective multilayer structure low level equipment, includes:Mechanical floor(1)And electricity generating layer(2), the equipment
Layer(1)And electricity generating layer(2)Pass through floor(3)Separate, the mechanical floor(1)It is provided with electrical equipment(4)And power distribution cabinet(5), institute
State electricity generating layer(2)It is laid with cable bridge(6), the floor(3)In power distribution cabinet(5)Lower section is provided with first through hole(31), institute
State first through hole(31)Draw and set branch road crane span structure(61)With cable bridge(6)Connection, the floor(3)In electrical equipment(4)Lower section
It is provided with the second through hole(32), the cable bridge(6)On draw and set spool(62)Through the second through hole(32)Electricity consumption is connected to set
It is standby(4).
2. a kind of distribution system of high-effective multilayer structure low level equipment according to claim 1, it is characterised in that:The building
Plate(3)Lower section is laid with steel reinforcement cage successively(7)And profiled sheet(8).
3. a kind of distribution system of high-effective multilayer structure low level equipment according to claim 2, it is characterised in that:The line
Pipe(62)It is located in steel reinforcement cage(7)Grid in.
4. a kind of distribution system of high-effective multilayer structure low level equipment according to claim 1, it is characterised in that:The building
Plate(3)Using concreting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720121875.6U CN206498168U (en) | 2017-02-10 | 2017-02-10 | A kind of distribution system of high-effective multilayer structure low level equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720121875.6U CN206498168U (en) | 2017-02-10 | 2017-02-10 | A kind of distribution system of high-effective multilayer structure low level equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206498168U true CN206498168U (en) | 2017-09-15 |
Family
ID=59804376
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720121875.6U Active CN206498168U (en) | 2017-02-10 | 2017-02-10 | A kind of distribution system of high-effective multilayer structure low level equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206498168U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109149387A (en) * | 2018-10-17 | 2019-01-04 | 广汽菲亚特克莱斯勒汽车有限公司广州分公司 | A kind of building low-voltage distribution system |
CN111478221A (en) * | 2020-03-27 | 2020-07-31 | 中亿丰建设集团股份有限公司 | Installation method of wet alarm valve group fire-fighting linkage signal pipeline |
-
2017
- 2017-02-10 CN CN201720121875.6U patent/CN206498168U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109149387A (en) * | 2018-10-17 | 2019-01-04 | 广汽菲亚特克莱斯勒汽车有限公司广州分公司 | A kind of building low-voltage distribution system |
CN111478221A (en) * | 2020-03-27 | 2020-07-31 | 中亿丰建设集团股份有限公司 | Installation method of wet alarm valve group fire-fighting linkage signal pipeline |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109577535A (en) | Assembled architecture PC superimposed sheet and the electromechanical installation built-in process of dry wall combination | |
CN203420403U (en) | Infilled wall construction structure based on wire box and wire tube mounting precasting building blocks | |
CN109707091B (en) | Assembly type invisible beam composite floor slab with separated pipelines installed from top to bottom | |
CN206498168U (en) | A kind of distribution system of high-effective multilayer structure low level equipment | |
CN106786266A (en) | Prefabrication and assembly construction steel house cable and wire laying system and its construction method | |
CN206571198U (en) | Building structure and building | |
CN107171189A (en) | A kind of cable tunnel integrated with substation equipment basis | |
CN107227870A (en) | Transformer substation building spliced by prefabricated parts | |
CN109577521A (en) | A kind of PVC spray walling and its construction method | |
CN206313397U (en) | Prefabrication and assembly construction steel house cable and wire laying system | |
CN209585349U (en) | A kind of PVC spray walling | |
CN207063610U (en) | Transformer substation building spliced by prefabricated parts | |
CN203961041U (en) | Fire prevention booth case | |
CN205646701U (en) | Outlet structure of transformer substation's cable intermediate layer | |
CN210857599U (en) | Pipeline separation waterproof heat preservation integration wall body and building that constitutes thereof | |
CN202513512U (en) | Hidden laying construction structure for muff-coupling fastening-type galvanized steel conduit | |
CN115162672A (en) | Integrated open garden type building pipe well | |
CN206570991U (en) | The U-shaped noise reduction fire rated wall structure of main transformer | |
CN209703936U (en) | A kind of floor ground structure suitable for information system computer floor in building | |
CN205976631U (en) | But sled dressization mobility control room | |
CN215632098U (en) | Temporary site electric power arrangement system for engineering | |
JP5968800B2 (en) | Home energy management system | |
CN2812362Y (en) | Bending pipe | |
CN210111565U (en) | Wire outlet structure of box transformer substation arranged above basement | |
CN210947861U (en) | Integrated energy-saving environment-friendly building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 214000 800-2101, yinxiu Road, Wuxi City, Jiangsu Province Patentee after: Baicheng System Technology Co.,Ltd. Address before: 214000 800-2101, yinxiu Road, Wuxi City, Jiangsu Province Patentee before: BOTH ENGINEERING Co.,Ltd. |