CN209585349U - A PVC sprayed wall - Google Patents
A PVC sprayed wall Download PDFInfo
- Publication number
- CN209585349U CN209585349U CN201822202313.1U CN201822202313U CN209585349U CN 209585349 U CN209585349 U CN 209585349U CN 201822202313 U CN201822202313 U CN 201822202313U CN 209585349 U CN209585349 U CN 209585349U
- Authority
- CN
- China
- Prior art keywords
- pvc
- shaped
- sound insulation
- inner formwork
- galvanized steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009415 formwork Methods 0.000 claims abstract description 25
- 229910001335 Galvanized steel Inorganic materials 0.000 claims abstract description 20
- 239000008397 galvanized steel Substances 0.000 claims abstract description 20
- 239000012774 insulation material Substances 0.000 claims abstract description 19
- 239000004570 mortar (masonry) Substances 0.000 claims abstract description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 8
- 239000010959 steel Substances 0.000 claims description 8
- 238000010079 rubber tapping Methods 0.000 claims description 4
- 238000010276 construction Methods 0.000 abstract description 7
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000005611 electricity Effects 0.000 abstract description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 abstract description 2
- 238000005507 spraying Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 5
- 239000010410 layer Substances 0.000 description 5
- 239000002131 composite material Substances 0.000 description 4
- 238000009413 insulation Methods 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 238000005192 partition Methods 0.000 description 4
- 238000007689 inspection Methods 0.000 description 3
- 239000011505 plaster Substances 0.000 description 3
- 239000007921 spray Substances 0.000 description 3
- 241000219095 Vitis Species 0.000 description 2
- 235000009754 Vitis X bourquina Nutrition 0.000 description 2
- 235000012333 Vitis X labruscana Nutrition 0.000 description 2
- 235000014787 Vitis vinifera Nutrition 0.000 description 2
- 238000004140 cleaning Methods 0.000 description 2
- 239000004567 concrete Substances 0.000 description 2
- 238000005336 cracking Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 239000004744 fabric Substances 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 239000002344 surface layer Substances 0.000 description 2
- 239000004568 cement Substances 0.000 description 1
- 238000005034 decoration Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004880 explosion Methods 0.000 description 1
- 235000013305 food Nutrition 0.000 description 1
- 229910052602 gypsum Inorganic materials 0.000 description 1
- 239000010440 gypsum Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Landscapes
- Building Environments (AREA)
Abstract
本实用新型公开了一种PVC喷筑墙,包括分别与天花板和地面连接的U型龙骨,所述两U型龙骨之间设有隔声材料和PVC内模板,所述PVC内模板位于所述隔声材料的左右两侧,所述两U型龙骨的外侧均设有镀锌钢网,所述两镀锌钢网的外侧均连接有预拌砂浆层。本实用新型的有益效果:运输简便、占用仓位少、重量轻、可塑性强、施工方便、防火性能好,可根据现场要求制作成T形、L形、十形等墙体,可灵活在空腔内布置管线,节省水电管线空间。
The utility model discloses a PVC sprayed wall, which comprises U-shaped keels respectively connected to the ceiling and the ground, and a sound insulation material and a PVC inner formwork are arranged between the two U-shaped keels, and the PVC inner formwork is located on the On the left and right sides of the sound insulation material, the outer sides of the two U-shaped keels are provided with galvanized steel mesh, and the outer sides of the two galvanized steel meshes are connected with ready-mixed mortar layers. The utility model has the beneficial effects: easy transportation, less storage space, light weight, strong plasticity, convenient construction, and good fireproof performance. It can be made into T-shaped, L-shaped, ten-shaped and other walls according to site requirements, and can be flexibly installed in the cavity. Pipelines are arranged inside to save space for water and electricity pipelines.
Description
技术领域technical field
本实用新型涉及建筑技术领域,具体来说,涉及一种PVC喷筑墙。The utility model relates to the technical field of buildings, in particular to a PVC sprayed wall.
背景技术Background technique
随着国家综合国力的迅速提升,居民收入的不断提高,住宅建筑的使用功能和质量得到进一步改善,逐步实现由温饱型向小康型的转变,而支撑体理论的提出,使住宅设计建设进入了一个新的阶段,设计师和房地产开发商只需向用户提供 “屋壳 ”,而由用户根据自己的需要进行合理的空间分割与装修,轻质隔墙的应用逐渐成为装修成功与否的决定因素。With the rapid improvement of the country's comprehensive national strength and the continuous increase of residents' income, the use function and quality of residential buildings have been further improved, and the transformation from food and clothing type to well-off type has been gradually realized. In a new stage, designers and real estate developers only need to provide users with "house shells", and users can divide and decorate the space reasonably according to their own needs. The application of lightweight partition walls has gradually become the decision of whether the decoration is successful or not. factor.
现代建筑已向高层、大开间方向发展,其功能要求也不断提高,传统的墙体材料已不能满足建筑发展的要求。由此,各种轻质板材和将不同功能的材料按照设计性能要求复合成各种结构形式,能充分发挥各种材料功能的轻型复合板应运而生。这种轻质板和轻型复合板具有重量轻、保温隔热性能优良、抗震性能好、防火等级高、施工安装方便、速度快及增加建筑使用面积等特点,在我国经济发达地区及大、中城市不断涌现并逐步推广应用。Modern buildings have developed towards high-rise buildings and large bays, and their functional requirements have been continuously improved. Traditional wall materials can no longer meet the requirements of architectural development. As a result, various lightweight panels and lightweight composite panels that combine materials with different functions into various structural forms according to design performance requirements and can fully exert the functions of various materials have emerged as the times require. This kind of light board and light composite board has the characteristics of light weight, excellent thermal insulation performance, good earthquake resistance, high fire protection level, convenient construction and installation, fast speed and increased building use area. Cities continue to emerge and gradually promote applications.
目前市场上住宅建筑使用的轻质隔墙体大多是纸面石膏板、纤维增强水泥板、陶粒混凝土、加气混凝土板、钢丝网架夹芯复合板及彩色钢板夹心复合板等。这些轻质隔墙体具有隔音效果差的缺点,不能满足人们越来越高的隔音要求;另外,目前的轻质隔墙体还具有重量较重的缺点。At present, most of the lightweight partition walls used in residential buildings on the market are paper-faced gypsum boards, fiber-reinforced cement boards, ceramsite concrete, aerated concrete boards, steel wire grid sandwich composite panels, and colored steel sandwich composite panels. These lightweight partition walls have the disadvantage of poor sound insulation effect and cannot meet people's increasingly higher sound insulation requirements; in addition, the current lightweight partition walls also have the disadvantage of heavy weight.
实用新型内容Utility model content
针对相关技术中的上述技术问题,本实用新型提出一种PVC喷筑墙及其施工方法,能够克服现有技术的上述不足。Aiming at the above-mentioned technical problems in the related art, the utility model proposes a PVC sprayed wall and its construction method, which can overcome the above-mentioned deficiencies in the prior art.
为实现上述技术目的,本实用新型的技术方案是这样实现的:For realizing above-mentioned technical purpose, technical scheme of the present utility model is realized like this:
一种PVC喷筑墙,包括分别与天花板和地面连接的U型龙骨,所述两U型龙骨之间设有隔声材料和PVC内模板,所述PVC内模板位于所述隔声材料的左右两侧,所述两U型龙骨的外侧均设有镀锌钢网,所述两镀锌钢网的外侧均连接有预拌砂浆层。A PVC sprayed wall, including U-shaped keels connected to the ceiling and the ground respectively, sound insulation materials and PVC inner templates are arranged between the two U-shaped keels, and the PVC inner templates are located on the left and right sides of the sound insulation materials On both sides, the outer sides of the two U-shaped keels are provided with galvanized steel mesh, and the outer sides of the two galvanized steel meshes are connected with ready-mixed mortar layers.
进一步的,所述隔声材料和隔声材料两侧的PVC内模板通过钢制螺栓连接。Further, the sound insulation material is connected with the PVC inner formwork on both sides of the sound insulation material through steel bolts.
进一步的,所述镀锌钢网和U型龙骨通过自攻钉连接。Further, the galvanized steel mesh and the U-shaped keel are connected by self-tapping nails.
进一步的,所述的U型龙骨与所述天花板或者地面通过射钉连接。Further, the U-shaped keel is connected to the ceiling or the ground through nailing.
本实用新型还提供一种PVC喷筑墙的施工方法,包括如下步骤:The utility model also provides a construction method for PVC spraying walls, comprising the following steps:
S1:将天花板和地面清理干净后进行放线,放线时先找准墙体中心线,然后在中心线两侧弹墙体线,并将墙体线引至天花板;S1: After cleaning the ceiling and the ground, set out the line. When setting out the line, first find the center line of the wall, then bounce the wall line on both sides of the center line, and lead the wall line to the ceiling;
S2:分别在天花板、地面上安装U型龙骨;S2: Install U-shaped keels on the ceiling and the ground respectively;
S3:U型龙骨安装完成并验收合格后安装隔声材料及PVC内模板;S3: Install the sound insulation material and PVC inner formwork after the U-shaped keel is installed and accepted;
S4:安装管线及配件;S4: Install pipelines and accessories;
S5:PVC内模板及管线安装完成后,经检验合格后满铺镀锌钢网,采用弹簧卡扣件及拉杆固定,并保证铺设平整度;S5: After the installation of the PVC inner formwork and the pipeline is completed, the galvanized steel mesh is fully paved after passing the inspection, and the spring buckle and the tie rod are used to fix it, and the laying flatness is guaranteed;
S6:镀锌钢网铺设完成后,用M10预拌砂浆抹面或喷涂,厚度为20mm。S6: After the galvanized steel mesh is laid, plaster or spray with M10 ready-mixed mortar with a thickness of 20mm.
进一步的,步骤S3中,安装安装隔声材料及PVC内模板时,门窗洞口两侧需通长设置U型金属槽加固,并与天花板、地面固定。Further, in step S3, when installing the sound insulation material and the PVC inner formwork, U-shaped metal grooves need to be installed on both sides of the door and window openings for reinforcement, and be fixed to the ceiling and the ground.
进一步的,步骤S4中,管线安装在PVC内模板的凹槽内,且配件与PVC内模板固定牢固。Further, in step S4, the pipeline is installed in the groove of the PVC inner formwork, and the fittings are firmly fixed with the PVC inner formwork.
进一步的,步骤S5中,在开关盒、电盒位置应预留出洞口位置。Further, in step S5, a hole position should be reserved at the position of the switch box and the electric box.
进一步的,步骤S6中,可采用人工抹面或机械喷涂,且第二层抹面时提浆压入抗裂网格布,并收光面层。Further, in step S6, manual plastering or mechanical spraying can be used, and the slurry is extracted and pressed into the anti-cracking mesh cloth during the second layer of plastering, and the surface layer is polished.
本实用新型的有益效果:运输简便、占用仓位少、重量轻、可塑性强、施工方便、防火性能好,可根据现场要求制作成T形、L形、十形等墙体,可灵活在空腔内布置管线,节省水电管线空间。Beneficial effects of the utility model: easy transportation, less storage space, light weight, strong plasticity, convenient construction, good fireproof performance, can be made into T-shaped, L-shaped, ten-shaped and other walls according to site requirements, and can be flexibly installed in the cavity Pipelines are arranged inside to save space for water and electricity pipelines.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only the present invention. For some embodiments of the present invention, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.
图1是根据本实用新型实施例所述的一种PVC喷筑墙的爆炸图;Fig. 1 is the explosion diagram of a kind of PVC sprayed wall according to the embodiment of the present invention;
图2是根据本实用新型实施例所述的一种PVC喷筑墙的安装示意图;Fig. 2 is a schematic diagram of installation of a PVC sprayed wall according to an embodiment of the present invention;
图中:1、水槽;2、左立柱;3、右立柱;4、左葡萄吊挂拱架;5、右葡萄吊挂拱架;6、拱架吊杆;7、钢丝;8、螺栓副;9、拱架加强横杆。In the figure: 1. Sink; 2. Left column; 3. Right column; 4. Left grape hanging arch; 5. Right grape hanging arch; 6. Arch boom; 7. Steel wire; 8. Bolt pair ; 9. The arch frame strengthens the cross bar.
具体实施方式Detailed ways
下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.
如图1-2所示,根据本实用新型实施例所述的一种PVC喷筑墙,包括分别与天花板和地面连接的U型龙骨5,所述两U型龙骨5之间设有隔声材料4和PVC内模板1,所述PVC内模板1位于所述隔声材料4的左右两侧,所述两U型龙骨5的外侧均设有镀锌钢网2,所述两镀锌钢网2的外侧均连接有预拌砂浆层3。As shown in Figure 1-2, a PVC sprayed wall according to the embodiment of the present invention includes U-shaped keels 5 connected to the ceiling and the ground respectively, and a sound insulation wall is provided between the two U-shaped keels 5. Material 4 and PVC inner formwork 1, the PVC inner formwork 1 is located on the left and right sides of the sound insulation material 4, the outer sides of the two U-shaped keels 5 are provided with galvanized steel mesh 2, and the two galvanized steel The outside of the net 2 is connected with a ready-mixed mortar layer 3 .
在一具体实施例中,所述隔声材料4和隔声材料4两侧的PVC内模板1通过钢制螺栓连接。In a specific embodiment, the sound insulation material 4 and the PVC inner formwork 1 on both sides of the sound insulation material 4 are connected by steel bolts.
在一具体实施例中,所述镀锌钢网2和U型龙骨5通过自攻钉6连接。In a specific embodiment, the galvanized steel mesh 2 and the U-shaped keel 5 are connected by self-tapping screws 6 .
在一具体实施例中,所述的U型龙骨5与所述天花板或者地面通过射钉7连接。In a specific embodiment, the U-shaped keel 5 is connected to the ceiling or the ground through nails 7 .
本实用新型还提供一种PVC喷筑墙的施工方法,包括如下步骤:The utility model also provides a construction method for PVC spraying walls, comprising the following steps:
S1:将天花板和地面清理干净后进行放线,放线时先找准墙体中心线,然后在中心线两侧弹墙体线,并将墙体线引至天花板;S1: After cleaning the ceiling and the ground, set out the line. When setting out the line, first find the center line of the wall, then bounce the wall line on both sides of the center line, and lead the wall line to the ceiling;
S2:分别在天花板、地面上安装U型龙骨5;S2: Install U-shaped keels 5 on the ceiling and the ground respectively;
S3:U型龙骨5安装完成并验收合格后安装隔声材料4及PVC内模板1;S3: Install the sound insulation material 4 and the PVC inner formwork 1 after the U-shaped keel 5 is installed and accepted;
S4:安装管线及配件;S4: Install pipelines and accessories;
S5:PVC内模板1及管线安装完成后,经检验合格后满铺镀锌钢网2,采用弹簧卡扣件及拉杆固定,并保证铺设平整度;S5: After the installation of the PVC inner template 1 and the pipeline is completed, the galvanized steel mesh 2 is fully paved after passing the inspection, and the spring buckle and the tie rod are used to fix it, and the flatness of the laying is guaranteed;
S6:镀锌钢网2铺设完成后,用M10预拌砂浆抹面或喷涂,厚度为20mm。S6: After the galvanized steel mesh 2 is laid, plaster or spray with M10 ready-mixed mortar with a thickness of 20mm.
其中,步骤S3中,安装安装隔声材料4及PVC内模板1时,门窗洞口两侧需通长设置U型金属槽加固,并与天花板、地面固定。Wherein, in step S3, when installing the sound insulation material 4 and the PVC inner template 1, U-shaped metal grooves need to be provided on both sides of the door and window openings for reinforcement, and be fixed to the ceiling and the ground.
其中,步骤S4中,管线安装在PVC内模板1的凹槽内,且配件与PVC内模板1固定牢固。Wherein, in step S4, the pipeline is installed in the groove of the PVC inner formwork 1, and the accessories and the PVC inner formwork 1 are firmly fixed.
其中,步骤S5中,在开关盒、电盒位置应预留出洞口位置。Wherein, in step S5, a hole position should be reserved at the position of the switch box and the electric box.
其中,步骤S6中,可采用人工抹面或机械喷涂,且第二层抹面时提浆压入抗裂网格布,并收光面层。Wherein, in step S6, manual plastering or mechanical spraying can be used, and the slurry is extracted and pressed into the anti-cracking mesh cloth during the second layer of plastering, and the surface layer is polished.
为了方便理解本实用新型的上述技术方案,以下通过具体使用方式上对本实用新型的上述技术方案进行详细说明。In order to facilitate the understanding of the above-mentioned technical solution of the present utility model, the above-mentioned technical solution of the present utility model will be described in detail below through specific usage modes.
根据本实用新型所述的一种PVC喷筑墙,包括分别与天花板和地面连接的U型龙骨,U型龙骨为两个角钢,U型龙骨之间设有隔声材料,隔声材料的左右两侧设有PVC内模板,PVC内模板和U型龙骨之间通过钢制螺栓连接,其中,PVC内模板和隔声材料均在U型龙骨内,U型龙骨外通过自攻钉连接有镀锌钢网,镀锌钢网的外侧喷涂或者抹面有预拌砂浆层。A PVC sprayed wall according to the utility model includes U-shaped keels connected to the ceiling and the ground respectively. The U-shaped keels are two angle steels. There are PVC inner formwork on both sides, and the PVC inner formwork and U-shaped keel are connected by steel bolts. Among them, the PVC inner formwork and sound insulation materials are all inside the U-shaped keel, and the outside of the U-shaped keel is connected by self-tapping nails. Galvanized steel mesh, the outside of the galvanized steel mesh is sprayed or plastered with a ready-mixed mortar layer.
另外,再具体施工时,先将天花板及地板清理干净,然后进行放线,放线时先找准墙体中心线,然后在中心线两侧弹墙体线,并将墙体线引至天花板,然后根据放线位置分别在天花板、地面上安装U型龙骨;U型龙骨安装完成并验收合格后安装隔声材料及PVC内模板;安装管线及配件,管线安装在PVC内模板的凹槽内,然后将配件与PVC内模板固定牢固;PVC内模板及管线安装完成后,经检验合格后满铺镀锌钢网,采用弹簧卡扣件及拉杆固定,并保证铺设平整度;镀锌钢网铺设完成后,用M10预拌砂浆抹面或喷涂,厚度为20mm,采用人工抹面或者机械喷涂。In addition, during specific construction, first clean the ceiling and floor, and then set out the wires. When setting out the wires, first find the center line of the wall, then bounce the wall lines on both sides of the center line, and lead the wall lines to the ceiling , and then install U-shaped keels on the ceiling and the ground respectively according to the position of the line; after the U-shaped keel is installed and passed the acceptance, install the sound insulation material and the PVC inner formwork; install the pipeline and accessories, and install the pipeline in the groove of the PVC inner formwork , and then fix the accessories and the PVC inner formwork firmly; after the installation of the PVC inner formwork and the pipeline, after passing the inspection, the galvanized steel mesh is covered, and the spring buckle and the pull rod are used to fix it, and the laying flatness is guaranteed; the galvanized steel mesh After the laying is completed, plaster or spray with M10 ready-mixed mortar with a thickness of 20mm, and use manual plastering or mechanical spraying.
综上所述,本实用新型的PVC喷筑墙具有重量轻,结构简单的优点;另外采用镀锌钢网,更有利于喷涂或者抹面挂灰;PVC内模板上的凹槽可用于放置管线,避免管线外漏,影响墙体的美观性。In summary, the PVC sprayed wall of the present invention has the advantages of light weight and simple structure; in addition, the use of galvanized steel mesh is more conducive to spraying or plastering; the grooves on the PVC inner formwork can be used to place pipelines, Avoid pipeline leakage and affect the aesthetics of the wall.
以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included in the Within the protection scope of the present utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822202313.1U CN209585349U (en) | 2018-12-26 | 2018-12-26 | A PVC sprayed wall |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201822202313.1U CN209585349U (en) | 2018-12-26 | 2018-12-26 | A PVC sprayed wall |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN209585349U true CN209585349U (en) | 2019-11-05 |
Family
ID=68379059
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201822202313.1U Active CN209585349U (en) | 2018-12-26 | 2018-12-26 | A PVC sprayed wall |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN209585349U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109577521A (en) * | 2018-12-26 | 2019-04-05 | 北京绿城易筑科技有限公司 | A kind of PVC spray walling and its construction method |
| CN112609871A (en) * | 2020-11-24 | 2021-04-06 | 北京绿城易筑科技有限公司 | Dense rib wall body replacing traditional stiffening beams and constructional columns and construction method |
-
2018
- 2018-12-26 CN CN201822202313.1U patent/CN209585349U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109577521A (en) * | 2018-12-26 | 2019-04-05 | 北京绿城易筑科技有限公司 | A kind of PVC spray walling and its construction method |
| CN112609871A (en) * | 2020-11-24 | 2021-04-06 | 北京绿城易筑科技有限公司 | Dense rib wall body replacing traditional stiffening beams and constructional columns and construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN101265723B (en) | Architecture structure system assembled by composite building board and building method | |
| CN113878708A (en) | Assembly type construction equipment and use method | |
| CN103104094A (en) | Construction method of lattice light-gauge steel house | |
| CN215253698U (en) | Ceramsite foam concrete exterior wall hanging plate in assembly type building | |
| WO2011075947A1 (en) | Heat insulating structure for door/window opening | |
| WO2013135108A1 (en) | Assembled steel structure hollow building | |
| CN104120824A (en) | Profiled steel sheet composite board as well as roofing board, floor board or wall panel with composite boards | |
| CN204152075U (en) | Profiled steel plate composite board and there is the roof panel of composite plate, floor plate and shingle nail | |
| RU92037U1 (en) | QUICK BUILDING BUILDING | |
| CN209585349U (en) | A PVC sprayed wall | |
| CN205116541U (en) | Foaming light aggregate concrete partition plate | |
| CN109577521A (en) | A kind of PVC spray walling and its construction method | |
| CN207686011U (en) | An anti-crack structure at the junction of steel columns and walls | |
| CN108842943A (en) | A kind of PVC hollow light wall body | |
| CN209509259U (en) | For spraying the template of walling body | |
| CN203034595U (en) | Integrated house | |
| CN208009804U (en) | A kind of bathroom panel structure of novel sound insulating waterproof | |
| CN215054296U (en) | High strength fire prevention heat preservation partition wall structure | |
| CN201952918U (en) | Door and window hole heat insulation break bridge structure for composite heat insulation wall | |
| CN111101594A (en) | A cold-formed thin-walled light steel structure building | |
| CN206752762U (en) | A kind of environment friendly wall efficiently irrigated | |
| CN206233455U (en) | A kind of integral light precast concrete wall panel with exterior window trim | |
| CN109577523A (en) | For spraying the template and construction method of walling body | |
| CN205171752U (en) | Prefabricated light steel partition wall and mounting structure thereof | |
| CN118241796A (en) | Construction of steel building shell |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20241224 Address after: Room 802, Unit 3, Building 2, Gaode Land Center, Shangcheng District, Hangzhou City, Zhejiang Province 310016 Patentee after: Zhejiang Lvcheng Yizhu Technology Co.,Ltd. Country or region after: China Address before: 102446 a-1158, 58 Liangguan street, Liangxiang Township, Fangshan District, Beijing Patentee before: BEIJING LYUCHENG YIZHU TECHNOLOGY Co.,Ltd. Country or region before: China |
|
| TR01 | Transfer of patent right |