CN204662667U - Built-in pipe structure based on fabricated structure - Google Patents
Built-in pipe structure based on fabricated structure Download PDFInfo
- Publication number
- CN204662667U CN204662667U CN201420848411.1U CN201420848411U CN204662667U CN 204662667 U CN204662667 U CN 204662667U CN 201420848411 U CN201420848411 U CN 201420848411U CN 204662667 U CN204662667 U CN 204662667U
- Authority
- CN
- China
- Prior art keywords
- pipe
- wall
- buried pipe
- perpendicularly buried
- reserved
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Built-in pipe structure based on fabricated structure, it comprises perpendicularly buried pipe, and described perpendicularly buried pipe is arranged between the exterior wall and interior wall of building, and vertical direction is directly buried the reserved location to casing; Described perpendicularly buried pipe is during to below ground, reserved pipe laying groove on base surface below described inner wall decoration skirting, and perpendicularly buried pipe directly inserts described pipe laying groove; The vertical direction of described perpendicularly buried pipe between inner wall of building and exterior wall runs into wall column, crossbeam or steel structure keel, in an each side reserved terminal box of wall column, crossbeam or steel structure keel, correspondence position preformed hole on wall column, crossbeam or steel structure keel, connects the reserved location of left and right terminal box after on-the-spot splicing; It has reasonable structural arrangement, spot effect is attractive in appearance, secondary excavation finishing can be avoided, save the site operation cycle, save the features such as construction cost.
Description
Technical field
The utility model relates to a kind of built-in pipe structure based on fabricated structure, belong to the building technology field of intelligent substation.
Background technology
Capital construction portion of State Grid Corporation of China proposes the requirement of construction criteria dispensing formula intelligent substation, the design and construction standard of unified standard dispensing formula intelligent substation, realize " standardized designs, batch production processing, assembled construction ", follow the principle of " security, applicability, versatility, the economy " coordinating and unifying, in transformer station, carry out using fabricated structure. The application of fabricated structure, can reduce scene " wet trade ", improves mechanized construction range of application, reduces field workforce and drops into, reduce site safety risk, improve engineering construction quality, technological level.
Fabricated structure, by machining in factory, is realized Assembling. Generally, building sheet material, need in substation field subsequent construction for facilities such as electric, the ground connection in building, fire-fightings by machining in factory, to on-the-spot splicing, there will be like this and significantly expose pipe laying, affect attractive in appearance and increase work on the spot amount.
Shown in Fig. 1,2, for built-in pipe structural configuration on inner wall panel in conventional fabricated structure, it comprises an assembled wallboard and forms interior wall 3 and exterior wall 1, after conventional fabricated structure builds up, interior wall 3 is buried the casing 5 of pipe laying 4 to direct screening interior wall underground, this mode needs secondary perforate, fluting, and the improper quality problems that may occur of secondary perforate, slot treatment, outward appearance is coarse ugly, and subsequent construction vestige is obvious.
For the batch production processing, the assembled construction that realize truly, reduce site operation workload and construction period, a large amount of hydroelectric lines, reserved opening are buried underground in factory, avoid traditional structure system hydropower installation secondary perforate, the fluting that may occur of constructing, and the improper quality problems that may occur of secondary perforate, slot treatment.
Summary of the invention
The utility model object is to overcome the deficiency that prior art exists, and a kind of reasonable structural arrangement is provided, spot effect is attractive in appearance, secondary excavation finishing can be avoided, save the site operation cycle, save construction cost, and the fabricated structure built-in pipe in advance built-in pipe structure based on fabricated structure of pre-buried, on-the-spot complement can be met.
The purpose of this utility model has been come by following technical solution, a kind of built-in pipe structure based on fabricated structure, it comprises perpendicularly buried pipe, and described perpendicularly buried pipe is arranged between the exterior wall and interior wall of building, and vertical direction is directly buried the reserved location to casing; Described perpendicularly buried pipe is during to below ground, and reserved pipe laying groove on base surface below inner wall decoration skirting, perpendicularly buried pipe directly inserts described pipe laying groove.
The vertical direction of described perpendicularly buried pipe between inner wall of building and exterior wall runs into wall column, crossbeam or steel structure keel, in an each side reserved terminal box of wall column, crossbeam or steel structure keel, correspondence position preformed hole on wall column, crossbeam or steel structure keel, connects the reserved location of left and right terminal box after on-the-spot splicing.
The exterior wall of described building adopts lightgage steel joist+rock cotton board+FC plate, and interior wall adopts lightgage steel joist+rock cotton board+FC plate, and described perpendicularly buried pipe is drawn from the water power such as lighting case, headstock casing, extremely separately destination.
The one that the utility model belongs to prior art is improved, and it has connection and reasonable arrangement, spot effect is attractive in appearance, secondary excavation finishing can be avoided, save the site operation cycle, save the features such as construction cost.
Accompanying drawing explanation
Fig. 1 is the schematic diagram of built-in pipe on inner wall panel of conventional fabricated structure.
Fig. 2 is the top view of built-in pipe on inner wall panel of conventional fabricated structure.
Fig. 3 be in fabricated structure described in the utility model within the walls pipe laying at the connection detail of wall column annex.
Fig. 4 is pipe laying pipe laying top view in the vertical direction within the walls in fabricated structure described in the utility model.
Fig. 5 is the connection detail of pipe laying and ground pipe laying junction within the walls in fabricated structure described in the utility model.
Detailed description of the invention
Label in figure is: 1. exterior wall, 2. steel structure keel, 3. interior wall, 4. pipe laying, 5. casing, 6. inner wall decoration skirting, 7. pipe laying groove, 8. terminal box, 9. reserving hole in structural beams within the walls.
Below in conjunction with drawings and Examples, the utility model is further described. Shown in Fig. 3-5, a kind of built-in pipe structure based on fabricated structure, it comprises perpendicularly buried pipe 4, and described perpendicularly buried pipe 4 is arranged between the exterior wall 1 and interior wall 3 of building, and vertical direction is directly buried to the reserved location of casing 5; Described perpendicularly buried pipe 4 is during to below ground, reserved pipe laying groove 7 on base surface below described inner wall decoration skirting 6, pipe laying groove 7 place described in perpendicularly buried pipe 4 directly inserts.
The vertical direction of described perpendicularly buried pipe 4 between inner wall of building and exterior wall runs into wall column, crossbeam or steel structure keel 2, in an each side reserved terminal box of wall column, crossbeam or steel structure keel 2, correspondence position preformed hole 9 on wall column, crossbeam or steel structure keel 2, connects the reserved location of left and right terminal box after on-the-spot splicing.
The exterior wall of described building adopts lightgage steel joist+rock cotton board+FC plate, and interior wall adopts lightgage steel joist+rock cotton board+FC plate, and described perpendicularly buried pipe 4 is drawn from the water power such as lighting case, headstock casing, extremely separately destination.
Embodiment:
Shown in Fig. 3,4, the utility model is that perpendicularly buried pipe 4 is arranged between described exterior wall 1 and interior wall 3, and vertical direction is directly buried to the reserved location of casing 5; Described perpendicularly buried pipe 4 is during to below ground, reserved pipe laying groove 7 on base surface below described inner wall decoration skirting 6, pipe laying groove 7 place described in perpendicularly buried pipe 4 directly inserts.
Shown in Fig. 5, originally be it by horizontal coiled pipe 4 when passing through described steel structure keel 2, the reserved described terminal box within the walls 8 in steel structure keel 2 both sides, simultaneously preformed hole 9 in the reserved described structural beams of horizontal correspondence position of terminal box 8 within the walls, after on-the-spot splicing by left and right junction box's reserved location connection.
The utility model is for solving built-in pipe installation question within the walls, adopt new design method, reserved location when described pipe laying 4 is arranged in body of wall Production design, can avoid later-stage secondary perforate, embed pipe with trough, also can avoid simultaneously pipe laying not corresponding threading cannot be installed problem.
Claims (3)
1. the built-in pipe structure based on fabricated structure, it comprises perpendicularly buried pipe, and it is characterized in that described perpendicularly buried pipe (4) is arranged between the exterior wall (1) and interior wall (3) of building, vertical direction is directly buried the reserved location to casing (5); Described perpendicularly buried pipe (4) is during to below ground, and reserved pipe laying groove (7) on the base surface of inner wall decoration skirting (6) below, the pipe laying groove (7) described in perpendicularly buried pipe (4) directly inserts is located.
2. the built-in pipe structure based on fabricated structure according to claim 1, it is characterized in that the vertical direction of described perpendicularly buried pipe (4) between inner wall of building and exterior wall runs into wall column, crossbeam or steel structure keel (2), in an each side reserved terminal box of wall column, crossbeam or steel structure keel (2), the upper correspondence position preformed hole (9) of wall column, crossbeam or steel structure keel (2), connects the reserved location of left and right terminal box after on-the-spot splicing.
3. the built-in pipe structure based on fabricated structure according to claim 1 and 2, it is characterized in that the exterior wall (1) of described building adopts lightgage steel joist+rock cotton board+FC plate, interior wall (3) adopts lightgage steel joist+rock cotton board+FC plate, described perpendicularly buried pipe (4) is drawn from lighting case, headstock, water power casing, extremely separately destination.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420848411.1U CN204662667U (en) | 2014-12-29 | 2014-12-29 | Built-in pipe structure based on fabricated structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201420848411.1U CN204662667U (en) | 2014-12-29 | 2014-12-29 | Built-in pipe structure based on fabricated structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204662667U true CN204662667U (en) | 2015-09-23 |
Family
ID=54133062
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201420848411.1U Expired - Fee Related CN204662667U (en) | 2014-12-29 | 2014-12-29 | Built-in pipe structure based on fabricated structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204662667U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652612A (en) * | 2014-12-29 | 2015-05-27 | 浙江省电力设计院 | Embedded pipe structure based on fabricated structure |
-
2014
- 2014-12-29 CN CN201420848411.1U patent/CN204662667U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104652612A (en) * | 2014-12-29 | 2015-05-27 | 浙江省电力设计院 | Embedded pipe structure based on fabricated structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203420403U (en) | Infilled wall construction structure based on wire box and wire tube mounting precasting building blocks | |
CN204282671U (en) | A kind of maintenance corridor structure for architecture-integral roof electricity generation system | |
CN202190047U (en) | Fabricated steel ground cable channel | |
CN105762728A (en) | Method for pre-burying of strong and weak electricity box and electrical tubing | |
CN206538969U (en) | Assembled wall decoration structure | |
CN204662667U (en) | Built-in pipe structure based on fabricated structure | |
CN104652612A (en) | Embedded pipe structure based on fabricated structure | |
CN203473210U (en) | Wall and top cover connecting structure of cabin unit | |
CN204238193U (en) | Underground Hydro-electric Power Station fitting structure | |
CN203188682U (en) | Light and environment-friendly assembly type combined enclosure | |
CN105369955A (en) | Integrated assembly type floor | |
CN211898960U (en) | Assembled concrete building connection structure | |
CN204387499U (en) | The water power piping network installation device of indoor integrated finishing | |
CN208518183U (en) | Assembled type pipe prefabricated components | |
CN207700446U (en) | A kind of water proof type fabricated shear wall | |
CN206722095U (en) | A kind of socket type safety color steel | |
CN206538901U (en) | A kind of assembling type partition wall | |
CN218549428U (en) | Cylindrical lower wire box with expansion tongue | |
CN205753327U (en) | A kind of Novel high-voltage cable feeder pillar | |
CN205874984U (en) | Prefabricated prefabricated channel -section steel widening processing structure of simple beam of erectting between tunnel | |
CN205329903U (en) | Assembled shear force wall hollow core slab line arrangment structure | |
CN205421595U (en) | Steel construction factory building brick wall and waterproof receipts limit structure of various steel wall handing -over department | |
CN210867100U (en) | Shielding spool slot for electrical system | |
CN204662890U (en) | A kind of external corner skirting wire ornamental strip with distribution trough | |
CN219690879U (en) | Assembled wall of pipeline separation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150923 Termination date: 20151229 |
|
EXPY | Termination of patent right or utility model |