CN103161258A - Prefabricated concrete structure architecture electric pre-buried laying method - Google Patents
Prefabricated concrete structure architecture electric pre-buried laying method Download PDFInfo
- Publication number
- CN103161258A CN103161258A CN2012104195705A CN201210419570A CN103161258A CN 103161258 A CN103161258 A CN 103161258A CN 2012104195705 A CN2012104195705 A CN 2012104195705A CN 201210419570 A CN201210419570 A CN 201210419570A CN 103161258 A CN103161258 A CN 103161258A
- Authority
- CN
- China
- Prior art keywords
- construction
- spool
- concrete structure
- prefabricated
- prefabricated concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The invention relates to a prefabricated concrete structure architecture electric pre-buried laying method which comprises construction of a prefabricated slab, construction of a prefabricated wall, and construction of a top plate cast-in-place layer, wherein a weak current communication line tube, a socket pipe line return circuit and an air conditioning socket pipe line return circuit are arranged inside the prefabricated plate; and a lighting return circuit line pipe and a main line pipe are arranged in the top plate cast-in-place layer. According to the prefabricated concrete structure architecture electric pre-buried laying method, the number of line pipes laid in the cast-in-place layer is reduced; according to the method, through regulation of procedures, reasonable arrangement is carried out on strong and weak line pipes, the arrangement of pre-buried line pipes is guided into the industrialization field, construction efficiency is improved, manual investment is reduced, and construction quality is improved; and optimization design is also carried out on node connection of a prefabricated part and a cast-in-place part, cost is reduced, and production efficiency is improved.
Description
Technical field
The present invention relates to a kind of construction techniques, specifically, relate to the pre-buried distribution method of a kind of prefabricated concrete structure architectural electricity.
Background technology
In the prefabricated concrete structure work progress, need to carry out the production of other members such as a part of body of wall, top board and stair in factory, then transporting the job site to carries out assembling work, and especially the top board with integral body is divided into two, half makes precast plate, and second half carries out cast-in-place operation.The pre-buried mode of strong and weak electricity spool in the prefabricated concrete structure top board is exactly to be placed in in-situ layer substantially at present, so just make the in-situ layer that only has half top plate thickness can't cover the crossover location of pipeline because pipeline is more, bring very large difficulty to construction, because the strong and weak electricity spool all concentrates in in-situ layer, bring very large hidden danger of quality for the construction quality of in-situ layer in addition; Forceful electric power is also very serious to the interference of signal of communication.And precast wall body internal box and line box, spool pre-buried mostly is more coarse operating type, can not accurately locate line box and casing, brings inconvenience for later installation.
Summary of the invention
For above-mentioned deficiency of the prior art, the invention provides a kind of quantity that in in-situ layer, spool is laid that reduces, improve efficiency of construction, reduce the artificial pre-buried distribution method of prefabricated concrete structure architectural electricity that improves workmanship that drops into.
The technical solution used in the present invention is:
The pre-buried distribution method of a kind of prefabricated concrete structure architectural electricity comprises the construction of precast plate, the construction of dry wall and the construction of top board in-situ layer, is provided with light current communication spool, socket pipe line loop and air conditioner socket pipe-loop in described precast plate; Be provided with lighting loop spool and main line pipe in described top board in-situ layer.
Be shaped with in advance the lamp box of electric light in described precast plate, reserve spool in the lamp box and throw away the precast plate surface layer, be connected with lighting loop in in-situ layer.
Described precast plate piece position is provided with the spool interface.
Described precast wall body is provided with the spool interface.
The beneficial effect of the relative prior art of the present invention:
The pre-buried distribution method of prefabricated concrete structure architectural electricity of the present invention has reduced the quantity that in in-situ layer, spool is laid; The method has been carried out rational layout by adjusting operation to the strong and weak electricity spool, and the layout of pre-embedded pipe is incorporated into the industrialization field, has improved efficiency of construction, has reduced artificial input, has improved workmanship; Pre-erection is connected with the node of cast-in-place part and also is optimized design, has reduced cost, has improved production efficiency.
Description of drawings
Fig. 1 is the spool layering laying structure schematic diagram of the pre-buried distribution method of prefabricated concrete structure architectural electricity of the present invention;
Fig. 2 is the detailed local structure for amplifying schematic diagram of spool connected node of the A of Fig. 1.
Critical piece symbol description in accompanying drawing:
In figure:
1, in-situ layer 2, illumination spool and main line pipe
3, illumination spool projecting tube 4, body of wall reserving rib
5, lamp box 6, precast plate
7, socket and light current spool 8, dry wall
9, built-in pipe joint.
The specific embodiment
The present invention will be described in detail referring to drawings and Examples:
Accompanying drawing 1,2 as can be known, the pre-buried distribution method of a kind of prefabricated concrete structure architectural electricity, comprise the construction of precast plate 6, the construction of dry wall 8 and the construction of top board in-situ layer 1, be provided with light current communication spool, socket pipe line loop and air conditioner socket pipe-loop 7 in described precast plate 6; Be provided with lighting loop spool and main line pipe 2 in described top board in-situ layer 1; The interior lamp box 5 that is shaped with in advance electric light of described precast plate 6, the interior reservation spool of lamp box 5 throws away precast plate 6 surface layers, and the lighting loop interior with in-situ layer 1 is connected; Described precast plate 6 piece positions are provided with the spool interface; Described precast wall body 8 is provided with spool interface 9.
The pre-buried distribution method of prefabricated concrete structure architectural electricity of the present invention has reduced the quantity that in in-situ layer, spool is laid; The method has been carried out rational layout by adjusting operation to the strong and weak electricity spool, and the layout of pre-embedded pipe is incorporated into the industrialization field, has improved efficiency of construction, has reduced artificial input, has improved workmanship; Pre-erection is connected with the node of cast-in-place part and also is optimized design, has reduced cost, has improved production efficiency.
The foundation that the layering of the pre-buried distribution method pipeline of prefabricated concrete structure architectural electricity of the present invention arranges:
1) pre-buried main line pipe is thicker, is embedded in advance precast plate is damaged in the handling process, so in the in-situ layer of need to nuzzling in advance.
2) lighting loop is subjected to the restriction of lamp box height to make its spool can not nuzzle fully in advance in precast plate on the one hand, and illuminating line wants complicated compared to socket line on the other hand, and the more problems that easily occurs is so construction is better in cast-in-place construction.
3) light current communication spool and receptacle loop pipeline move towards similar, the line box is arranged highly basically identical, and the line box all is arranged in dry wall, only need pre-embedded pipe just passable in precast plate, simply many compared to lighting loop, so communicate by letter spool and socket of light current nuzzled in precast plate in advance.
The present invention is split as two parts with the strong and weak electricity pre-embedded pipe, and be arranged in precast plate a part of the be comprised of light current communication spool, socket and air conditioner socket; Another part is comprised of lighting loop and main line pipe and is arranged in in-situ layer.At first carry out the global design of plan view when layout design, carry out the thin section node diagram design that layering is laid after completing.Thin section will lay with reference to the broken away view of precast plate during design of node, reserve the design of spool for the plan-position of every precast plate, the design of electrical pipeline is dissolved in precast plate production drawing the most at last, realizes can completing the production of precast plate and pre-embedded pipe on same figure.Publishing picture of electric plan view needs minute three parts: first is the integral planar arrangement diagram, and is the same with traditional drawing; Second portion is the Production design figure of light current communication spool, socket and the air conditioner socket of needs when plant produced, and this figure on same drawing, facilitates production operation with the precast plate production drawing; Third part is the lighting loop of site operation needs and the plan view of main line pipe, and this figure comprises plan view and node diagram.Plan view is used for the laying of on-the-spot pre-embedded pipe, and node diagram is used for the node connection construction of pre-embedded pipe between job site precast plate, dry wall, cast-in-place part.
First carry out the laying of electric pre-buried part in precast plate, dry wall according to the production operation drawing in factory, pre-buried program need to be interted operation in prefabricated component reinforcing bar binding process.The location of casing and line box positions by magnetic fastening device, and then spool is connected with casing, line box, the spool interface is reserved at the prefabricated units edge, except body of wall bottom line tubular structure need to be kept somewhere other position indwelling spool interface the operating space, connection during for site assembly is prepared, and node diagram is seen accompanying drawing 2.
Need first to carry out the connection of spool between prefabricated units after prefabricated units install, the interface of reserving from the member edge is communicated with spool.
Interting when carrying out the reinforcing bar binding of in-situ layer after assembling is completed and carrying out in in-situ layer electric pre-buriedly, during laying, spool pre-buried in spool in in-situ layer and prefabricated units is being connected.Arrange the preheating embedding line in in-situ layer on precast plate.
Claims (4)
1. pre-buried distribution method of prefabricated concrete structure architectural electricity, comprise the construction of precast plate, the construction of dry wall and the construction of top board in-situ layer, it is characterized in that: be provided with light current communication spool, socket pipe line loop and air conditioner socket pipe-loop in described precast plate; Be provided with lighting loop spool and main line pipe in described top board in-situ layer.
2. the pre-buried distribution method of prefabricated concrete structure architectural electricity according to claim 1 is characterized in that: be shaped with in advance the lamp box of electric light in described precast plate, reserve spool in the lamp box and throw away the precast plate surface layer, be connected with lighting loop in in-situ layer.
3. the pre-buried distribution method of prefabricated concrete structure architectural electricity according to claim 1 is characterized in that: described precast plate piece position is provided with the spool interface.
4. the pre-buried distribution method of prefabricated concrete structure architectural electricity according to claim 1, it is characterized in that: described precast wall body is provided with the spool interface.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210419570.5A CN103161258B (en) | 2012-10-29 | 2012-10-29 | The pre-buried distribution method of prefabricated concrete structure architectural electricity |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210419570.5A CN103161258B (en) | 2012-10-29 | 2012-10-29 | The pre-buried distribution method of prefabricated concrete structure architectural electricity |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103161258A true CN103161258A (en) | 2013-06-19 |
CN103161258B CN103161258B (en) | 2015-12-02 |
Family
ID=48584765
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210419570.5A Active CN103161258B (en) | 2012-10-29 | 2012-10-29 | The pre-buried distribution method of prefabricated concrete structure architectural electricity |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103161258B (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106017568A (en) * | 2016-07-06 | 2016-10-12 | 沈阳建筑大学 | Structural health monitoring system of prefabricated assembly type concrete system, and integration method |
CN106284878A (en) * | 2016-08-05 | 2017-01-04 | 成都市第四建筑工程公司 | Assembled stair waist slab and cast-in-place structural plate built-in pipe box connection construction method |
CN108917830A (en) * | 2018-06-19 | 2018-11-30 | 杭州市质量技术监督检测院 | A kind of intelligent wall with self-induction function |
CN111884152A (en) * | 2020-07-31 | 2020-11-03 | 中国二十二冶集团有限公司 | Electrical pre-buried wiring method for prefabricated concrete structure building |
CN112131627A (en) * | 2020-04-13 | 2020-12-25 | 芜湖职业技术学院 | Intelligent manufacturing method and system for assembly type interior decoration |
CN112177223A (en) * | 2020-09-29 | 2021-01-05 | 福建万山水利水电设计有限公司 | Pre-buried electric pipeline system of prefabricated building |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR101874435B1 (en) * | 2017-05-31 | 2018-08-02 | (주)상건 | Electrical wiring structure arranged a connection point in wall and building construction method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1193370A (en) * | 1995-08-16 | 1998-09-16 | 布克工厂两合公司 | Multi-walled structural component |
CN2863957Y (en) * | 2006-01-28 | 2007-01-31 | 锦州玥宝塑业有限公司 | Core composite thermal insulation wall plate |
CN102116065A (en) * | 2010-03-19 | 2011-07-06 | 柳忠林 | Large-span prestressed concrete beam plate as ventilating channel and ventilating channel system |
CN201962828U (en) * | 2011-01-31 | 2011-09-07 | 赵生亮 | Assembly-type non-bearing finished wall body |
-
2012
- 2012-10-29 CN CN201210419570.5A patent/CN103161258B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1193370A (en) * | 1995-08-16 | 1998-09-16 | 布克工厂两合公司 | Multi-walled structural component |
CN2863957Y (en) * | 2006-01-28 | 2007-01-31 | 锦州玥宝塑业有限公司 | Core composite thermal insulation wall plate |
CN102116065A (en) * | 2010-03-19 | 2011-07-06 | 柳忠林 | Large-span prestressed concrete beam plate as ventilating channel and ventilating channel system |
CN201962828U (en) * | 2011-01-31 | 2011-09-07 | 赵生亮 | Assembly-type non-bearing finished wall body |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106017568A (en) * | 2016-07-06 | 2016-10-12 | 沈阳建筑大学 | Structural health monitoring system of prefabricated assembly type concrete system, and integration method |
CN106017568B (en) * | 2016-07-06 | 2018-12-25 | 沈阳建筑大学 | The structural healthy monitoring system and integrated approach of prefabricated assembled concrete system |
CN106284878A (en) * | 2016-08-05 | 2017-01-04 | 成都市第四建筑工程公司 | Assembled stair waist slab and cast-in-place structural plate built-in pipe box connection construction method |
CN108917830A (en) * | 2018-06-19 | 2018-11-30 | 杭州市质量技术监督检测院 | A kind of intelligent wall with self-induction function |
CN112131627A (en) * | 2020-04-13 | 2020-12-25 | 芜湖职业技术学院 | Intelligent manufacturing method and system for assembly type interior decoration |
CN111884152A (en) * | 2020-07-31 | 2020-11-03 | 中国二十二冶集团有限公司 | Electrical pre-buried wiring method for prefabricated concrete structure building |
CN112177223A (en) * | 2020-09-29 | 2021-01-05 | 福建万山水利水电设计有限公司 | Pre-buried electric pipeline system of prefabricated building |
CN112177223B (en) * | 2020-09-29 | 2021-08-20 | 福建万山水利水电设计有限公司 | Pre-buried electric pipeline system of prefabricated building |
Also Published As
Publication number | Publication date |
---|---|
CN103161258B (en) | 2015-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103161258B (en) | The pre-buried distribution method of prefabricated concrete structure architectural electricity | |
CN109577535A (en) | Assembled architecture PC superimposed sheet and the electromechanical installation built-in process of dry wall combination | |
CN103397790A (en) | Assembled bathroom and installation process | |
CN106786266B (en) | Prefabrication and assembly construction steel house cable and wire laying system and its construction method | |
CN106530391A (en) | GIS-based urban underground cable three-dimensional design method | |
CN103460554B (en) | Building and its construction method | |
CN104563527A (en) | Install system of support unit for stone plate corbel | |
CN203394108U (en) | Fabricated bathroom | |
CN201246848Y (en) | Pre-embedded type pipeline laying structure | |
CN207092381U (en) | Prefabricated elements and the electric preburied component of assembled | |
CN106906843A (en) | Underground pipe gallery and its construction method | |
CN205296347U (en) | Arrangement structure that utility tunnel internal drain pipe said | |
CN204651834U (en) | The pre-buried structure of electric pipeline in a kind of brick wall | |
CN111884121A (en) | Pre-buried wiring method for standardized pipeline of assembled laminated slab | |
CN201908403U (en) | Structural system for indoor electrical design and laying of pipelines | |
CN101247033A (en) | Composite wiring facilities and method of indoor concealed circuit | |
CN109707184A (en) | The hard-cover integral vacuum toilet of fulgurite separate type, wall setting water pipe groove | |
CN204387499U (en) | The water power piping network installation device of indoor integrated finishing | |
CN105465482B (en) | A kind of multi-functional pipeline locating device | |
CN205583065U (en) | Electricity core changes box mechanism | |
CN204163293U (en) | The roof structure of steel concrete integrated building | |
CN208034980U (en) | A kind of precast floor slab wire box fixing device | |
CN210562912U (en) | Arrangement structure of pre-buried electric pipeline in prefabricated concrete structure | |
CN204531282U (en) | Leakproof washroom base plate | |
CN216086080U (en) | Electromechanical line fixing device is used in construction of underground pipe gallery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |