CN103147525A - Earthenware brick stone wall - Google Patents

Earthenware brick stone wall Download PDF

Info

Publication number
CN103147525A
CN103147525A CN2010102753106A CN201010275310A CN103147525A CN 103147525 A CN103147525 A CN 103147525A CN 2010102753106 A CN2010102753106 A CN 2010102753106A CN 201010275310 A CN201010275310 A CN 201010275310A CN 103147525 A CN103147525 A CN 103147525A
Authority
CN
China
Prior art keywords
earthenware brick
brick stone
column
stone wall
lintel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2010102753106A
Other languages
Chinese (zh)
Other versions
CN103147525B (en
Inventor
应家荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201010275310.6A priority Critical patent/CN103147525B/en
Publication of CN103147525A publication Critical patent/CN103147525A/en
Application granted granted Critical
Publication of CN103147525B publication Critical patent/CN103147525B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Finishing Walls (AREA)

Abstract

The invention discloses an earthenware brick stone wall for building engineering. Stone, back anchorage bolts, light steel frames, heat-preservation extruded plates and reinforcement iron nets are assembled and formed by combining a steel die in a factory, ceramsite concrete is additionally injected, the earthenware brick stone wall is transported to a construction site after being de-molded, cured and formed, and cement concrete is added for construction. The earthenware brick stone wall is applied to the building engineering, beam and column parts are naturally formed, procedures of assembling and disassembling beam and column templates can be eliminated, more than a half of construction time can be effectively saved, and the beam and the columns are integrated after the earthenware brick stone wall is finished. The earthenware brick stone wall serves as a main wall body, beautiful stone forms an exterior wall body, and an interior wall body can be quickly reinforced by any decorative building material, so that the earthenware brick stone wall is effectively resistant to earthquakes, wind, rain and low temperature, and has a good heat-preservation effect, and pipe lines of water, electricity, gas, video and the like can be effectively hidden and distributed in the earthenware brick stone wall.

Description

The earthenware brick stone walling
[technical field under invention]
The present invention system is about a kind of building engineering building component that is used in various building patterns; particularly can be effectively in conjunction with stone material and haydite concrete; after factory manufactures various forms of earthenware brick stone walling assemblies; can need according to architectural design; deliver to the building that the building site is combined into any pattern; after completing especially, outer wall stone is exactly good decorative cover; the part beam column is without template; the pipelines such as water, electricity, gas, heat are hidden wherein; seismic force is strong, anti-low temperature, fire-resistant, environmental protection, energy-conservation building materials.
[background technology]
The stone material concrete curtain wall of known technology, stone steel skeleton, aluminium chassis are cladding fixing, and stone material foam cement curtain wall is all to be used in the stone material fixed form that high-rise building is used, and is after major structure of construction is completed, then hangs on the agent structure body.
[summary of the invention]
The combination of known stone material for building and foam cement or aluminium chassis steel frame or cement concrete is used, in construction work, only mostly belong to ornament materials and body of wall for exterior wall, and its body of completing mostly to belong to costliness heavy again, and all want the main structure body to bear and could fix; Earthenware brick stone walling of the present invention is for reaching the building engineering design of various building patterns below three floors, what its main Building technology was different is: block is less, in the vertical shaping of factory's punching block group, after can need to numbering according to architectural design, just can transport to the building site assembling and pile up, cost is few, the time is fast, lightweight, heat insulation effect is good, can build assembling under various varying environment landform and unfavorable weather, this is effective efficiency of the present invention, following segmented description summary of the invention:
Is 1. how the earthenware brick stone walling made in factory and is formed?
Earthenware brick stone walling invention system with granite stone plate 600 * 300mm thickness more than 20mm, M6 * 15 holes are bored with alloy water drill bit in the back side, add M6 * 60 back of the body anchor bolts, utilize epoxide-resin glue to implant pre-buried, after the fixing light steelframe of lock and warming plate and reinforcing iron net, utilize the form that punching block fashions into to be needed, through adding the perfusion ceramicite cement concrete, after solid health form removal, become specific earthenware brick stone walling.
2. several form introductions of earthenware brick stone walling practicality:
The basic beam shape 14,15 that initial line begins is as Fig. 3
The main general shape 10 that connects is as Fig. 2
The side bar shape 11 of window side column beam is as Fig. 4
The side column shape 12 of closing up in the corner is as Fig. 2
The window beam shape 18,19 of window opening lintel is as Fig. 4
The building beam shape 16,17,20 of floor lintel is as Fig. 2
The post beam shape 13 of floor corner is as Fig. 2
Does 3. how the earthenware brick stone walling assemble utilization?
three floors are following according to building design drawing, and with building lot setting-out and alignment, the size length and width is the wide size of fixed length with the multiple of 605mm temporarily, for example: long 605mm * 14 piece=8470mm, wide 605mm * 12 piece=7260mm learns long 14, wide 12, each 5mm of clearance gap, through whole ground, after digging down hole, puddle and side column hole, the basic beam shape figure that first begins with initial line begins to build by laying bricks or stones the earthenware brick stone walling, after circle is handed in the levelling of rounding, with upper water, lower water, power supply, gas, hot water, the pipelines such as video signal source, water power separately, move separately the access cover limit to, need to be with water according to design, electric line is built pipe to each trace openings, heelpiece (22) is tiled, successively pinner (23) and isolating pad (28) are closed up one by one again, except access cover adds the edge maintenance, all the other add bottom layer of the reinforcing steel, and upright reinforcing bar combination is taken root with the side column beam, after being reserved in the position of side column beam, execute the cement concrete of pouring water, and smooth be terrace, wait solid after, can begin to build the earthenware brick stone walling according to design number one by one, window opening, door opening can use lintel (21) to process, the pipelines such as side column beam steel and water power should extend in real time the lintel of completing a floor and close up, check the reinforcing bar combination of edge-corner column lintel, the wiring that checks hydroelectric line is really errorless, can utilize concrete to help to foretell car, coordinate special special-purpose inlet and shock club to execute the cement concrete of pouring water at each column, edge-corner column and lintel.This is that the present invention creates integrally formed beam column reinforced concrete structure, and tearing group open without template die, can to execute the hot-metal carburized steel reinforced concrete integrally formed, can utilize after the cement of waiting is solid cement concrete or easily clay up pile up again the earthenware brick stone walling.
other various building patterns can directly be used the earthenware brick stone walling instead with insulation earthenware brick wall frame construction is former, fixedly bore and plant reinforcing bar in the beam column position of earthenware brick stone walling at each floor terrace during use, the dark 10cm of interplantation, expose the 50cm left and right, can begin to pile up the earthenware brick stone walling, correction level in the error of bed course 15mm, first floor pile up drained after, welded post reinforcing bar again, after completing lacing wire, up pile up continuously again the earthenware brick stone walling, the specific standard size that closes up in the corner can be completed closing in by special type earthenware brick stone walling customized, also can on-the-spot cut with machine for working stone, the size that needs is completed body of wall and is closed up.
[specific embodiment]
After earthenware brick stone walling invention system adds back of the body anchor bolt, warming plate, the fixing light steelframe of lock and reinforcing iron net with the stone material plate, utilize punching block the first day of the lunar month to cause 16 kinds of forms that need, through add cement injection, sand, water, haydite stone puddle solid form removal after, become specific earthenware brick stone walling.To deliver to the construction site according to the architectural design numbering at the earthenware brick stone walling of factory's combination forming, assembling is piled up, complete the wire bond such as reinforcing bar and every water, electricity, gas, heat, execute the cement concrete of pouring water, after waiting cement concrete solid, available water cement concrete or easy clay are up piled up the earthenware brick stone walling again.
[brief description of drawingsfig]
Fig. 1: universal 10. earthenware brick stone wallings decompose and punching block 7 combination detailed perspective
Fig. 2: 14,15,12,10,13,17,16,20 earthenware brick stone walling finished product assembling detailed perspective
Fig. 3: initial line 14,15,22,23,28,29 earthenware brick stone walling finished product assembling detailed perspective
Fig. 4: 15,18,19,20,21. window opening earthenware brick stone walling finished product assembling detailed perspective
Fig. 5: construction site practical operation assembling detailed perspective (representative graph)
[primary clustering symbol description]
1. stone material plate
2. water boring
3. anchor bolt: 3A pad, 3B nut
4. warming plate: 4A warming plate backfill pad
5. reinforce light steelframe
6. reinforce the iron net
7. make up and use punching block
8. pipeline is with empty
9. interior metope holder: 9APU foam fill-in pad
10. universal earthenware brick stone walling
11. side bar type earthenware brick stone walling
12. corner cylindricality earthenware brick stone walling
13. interlayer corner lintel type earthenware brick stone walling
14. initial line corner column type earthenware brick stone walling
15. the basic beam type earthenware brick stone walling that initial line begins
16. the right maqting type earthenware brick of interlayer lintel stone walling
17. the left maqting type earthenware brick of interlayer lintel stone walling
18. the left maqting type earthenware brick of edge-corner column interlayer lintel stone walling
19. the right maqting type earthenware brick of edge-corner column interlayer lintel stone walling
20. the universal earthenware brick stone walling of interlayer lintel
Closing in type earthenware brick stone walling on 20A window opening door opening
21. the special-purpose precasting lintel of window opening door opening
22. heelpiece
23. pinner
24. conduit
25. water pipe
26. hot-water line
27. video signal pipe
28. isolating pad
29. steel concrete terrace
30. reinforcing bar.

Claims (7)

1. a building comprises with earthenware brick stone walling assembly: back face of stone is implanted the bolt group with the boring of alloy water with epoxide-resin glue, is fixed light steelframe, adds warming plate, is fixed the iron net, and after punching block was shaped, the form removal of perfusion haydite concrete was shaped.
2. its pattern comprises: initial line is with two kind (14, basic beam type, 15), can be effectively after adding steel concrete and the flooring base lintel, the reinforcing bars such as edge-corner column, column are chained together, and add heelpiece (22), pinner (23) and isolating pad (28).
3. pile up the logical hole (8) of circular pipeline that after being shaped, creation forms.
4. pile up the post beam that after being shaped, creation forms, the shaping circular hole hole of side column beam (12), be used for strengthening the shaped hole after the steel concrete perfusion of house strength structure.
5. the use activity lintel (21) of window opening door opening designs and 18,19, the 20 closing in modes of arranging in pairs or groups.
6. the closing in mode of floor lintel (13,16,17,20), need not tear the group template open, also can form strong interlayer lintel after adding steel concrete, and energy is reliable and column, and edge column, window side column steel concrete are in conjunction with being solidified into one.
7. in reserving, metope stator (9) can conveniently directly be reinforced to decorate with self-tapping screw and use building materials.
CN201010275310.6A 2010-09-08 2010-09-08 Earthenware brick stone wall assembly and earthenware brick stone wall construction method Expired - Fee Related CN103147525B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010275310.6A CN103147525B (en) 2010-09-08 2010-09-08 Earthenware brick stone wall assembly and earthenware brick stone wall construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010275310.6A CN103147525B (en) 2010-09-08 2010-09-08 Earthenware brick stone wall assembly and earthenware brick stone wall construction method

Publications (2)

Publication Number Publication Date
CN103147525A true CN103147525A (en) 2013-06-12
CN103147525B CN103147525B (en) 2015-11-25

Family

ID=48545816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010275310.6A Expired - Fee Related CN103147525B (en) 2010-09-08 2010-09-08 Earthenware brick stone wall assembly and earthenware brick stone wall construction method

Country Status (1)

Country Link
CN (1) CN103147525B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592865A (en) * 2016-11-17 2017-04-26 重庆建工第三建设有限责任公司 Fabricated type precast concrete lintel
CN109723164A (en) * 2018-12-29 2019-05-07 华北水利水电大学 A kind of excessively beam prefabricated connection structure of door opening and its construction method
CN110439311A (en) * 2019-07-24 2019-11-12 上海市建筑装饰工程集团有限公司 A kind of imitative historical building artistic decoration wall hollow out common brick repairing replacement method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2273335Y (en) * 1996-11-08 1998-01-28 陈家新 New composite natural stone board
CN2628614Y (en) * 2003-01-08 2004-07-28 张学贵 Faced outer wall pearlite composite wall body
CN201133024Y (en) * 2007-12-07 2008-10-15 蔡济仁 Two-face-glazed hollow ceramic tiles for wall
CN201144482Y (en) * 2007-12-28 2008-11-05 董柏南 Prefabricate ceramic tile type energy-savingheat-insulation wall board

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2273335Y (en) * 1996-11-08 1998-01-28 陈家新 New composite natural stone board
CN2628614Y (en) * 2003-01-08 2004-07-28 张学贵 Faced outer wall pearlite composite wall body
CN201133024Y (en) * 2007-12-07 2008-10-15 蔡济仁 Two-face-glazed hollow ceramic tiles for wall
CN201144482Y (en) * 2007-12-28 2008-11-05 董柏南 Prefabricate ceramic tile type energy-savingheat-insulation wall board

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106592865A (en) * 2016-11-17 2017-04-26 重庆建工第三建设有限责任公司 Fabricated type precast concrete lintel
CN109723164A (en) * 2018-12-29 2019-05-07 华北水利水电大学 A kind of excessively beam prefabricated connection structure of door opening and its construction method
CN110439311A (en) * 2019-07-24 2019-11-12 上海市建筑装饰工程集团有限公司 A kind of imitative historical building artistic decoration wall hollow out common brick repairing replacement method

Also Published As

Publication number Publication date
CN103147525B (en) 2015-11-25

Similar Documents

Publication Publication Date Title
CN104005502B (en) A kind of precast light building cover board and industrialized building house floor slab structure
CN101769008B (en) Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN103114663B (en) Assemble type multifunctional outer wall body and production and installation method thereof
CN101368428B (en) Prefabricated component house and its construction method
CN103821276B (en) A kind of assembled, modular architectural system
CN106013811A (en) Mounting method of prefabricated building
CN101289880B (en) Chute type light steel keel assembled house
JP2002004610A (en) Prefabricated bathroom
CN107558626A (en) A kind of prefabricated assembled wall structure and the method using this structure building house
CN204826348U (en) Compound floor board of three -dimensional light steel frame structure
CN101629440A (en) Integrally prefabricated composite external wall panel and manufacturing method thereof
CN103352537B (en) Overall load bearing heat preserving wallboard and production construction process thereof
CN106522359A (en) Total-prefabricated rural residential class composite wall structure system and construction method thereof
CN109707070A (en) A kind of assembled modularized light partition wall house and construction method
CN104695662A (en) Stone facing prefabricated external wall plate as well as production method and external wall system thereof
CN204491984U (en) Stone facing precast wall panel and external wall system
CN203834771U (en) Prefabricated light floor cover plate and industrial building floor plate structure
CN103147525A (en) Earthenware brick stone wall
CN103362235B (en) Integrally-poured building house with wallboards integrating thermal insulating and templates
CN106368445B (en) Existing building reinforces self-supporting heat-insulating integral system and construction method
CN206220240U (en) A kind of assembled steel concrete frame panel structure system
CN101122148A (en) House building structure with main steel structure
Sneha et al. A Comparative Study of Construction Using Schnell Concrewall® pre-cast sandwich composite panel and RC moment frame with brick infill
CN204139316U (en) A kind of steel structure shear wall structure system
CN206189891U (en) Existing building reinforcement is from load -bearing and insulating integration system

Legal Events

Date Code Title Description
DD01 Delivery of document by public notice

Addressee: Ying Zongxiang

Document name: Notice of amendment

Addressee: Ying Zongxiang

Document name: Notification to Make Rectification

DD01 Delivery of document by public notice

Addressee: Ying Zongxiang

Document name: Notification that Application Deemed to be Withdrawn

DD01 Delivery of document by public notice

Addressee: Ying Jiarong

Document name: Notification of Approving Refund

C06 Publication
PB01 Publication
DD01 Delivery of document by public notice

Addressee: Ying Zongxiang

Document name: Notification of Passing Examination on Formalities

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151125

Termination date: 20180908

CF01 Termination of patent right due to non-payment of annual fee