CN103111639B - 一种数控车床主轴的过盈预紧方法 - Google Patents

一种数控车床主轴的过盈预紧方法 Download PDF

Info

Publication number
CN103111639B
CN103111639B CN201310054335.7A CN201310054335A CN103111639B CN 103111639 B CN103111639 B CN 103111639B CN 201310054335 A CN201310054335 A CN 201310054335A CN 103111639 B CN103111639 B CN 103111639B
Authority
CN
China
Prior art keywords
ladder
bearing
axle sleeve
main shaft
spacer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310054335.7A
Other languages
English (en)
Other versions
CN103111639A (zh
Inventor
陈戌连
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Jintang Machine Tool Co ltd
Original Assignee
Zhejiang Jintang Machine Tool Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Jintang Machine Tool Co ltd filed Critical Zhejiang Jintang Machine Tool Co ltd
Priority to CN201310054335.7A priority Critical patent/CN103111639B/zh
Publication of CN103111639A publication Critical patent/CN103111639A/zh
Application granted granted Critical
Publication of CN103111639B publication Critical patent/CN103111639B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Turning (AREA)

Abstract

本发明公开了一种数控车床主轴的过盈预紧装置及其方法。它包括阶梯主轴、右端盖、第一轴承、第一隔套、第二轴承、第二隔套、第一阶梯轴套、弹性垫、第三轴承、左端盖、第二阶梯轴套、皮带轮和同步轮;在阶梯主轴右端顺次安装有右端盖、第一轴承、第一隔套、第二轴承、第二隔套、第一阶梯轴套,在阶梯主轴左端顺次安装有弹性垫、第三轴承、左端盖、第二阶梯轴套、皮带轮、同步轮。本发明采用过盈预紧结构,阶梯轴的阶梯状配合面的设计使安装调整方便,也便于用注油法拆卸。阶梯轴套不产生任何有可能降低轴运转精度的压力,并且有更高的安装精度,提高了轴的刚度。调整垫使安装精度提高,弥补了制造误差,并且提高了系统的平稳性。

Description

一种数控车床主轴的过盈预紧方法
技术领域
本发明涉及一种数控车床主轴的过盈预紧结构及其方法。
背景技术
主轴轴承的预紧对于轴运转时的稳定性和精确性有着密切的联系。预紧可以增加轴承的刚度,使旋转轴在轴向和径向正确定位,提高轴的旋转精度,降低轴的振动和噪声,减少由于惯性力矩所引起的滚动体相对于内、外圈滚道的滑动,延长轴承寿命。
主轴轴承的预紧方式分为定位预紧和定压预紧。定位预紧方式将两轴承定位于轴承套中,结构简单,拆卸方便,适用于低俗主轴系统。
现有的定位预紧方式是采用螺纹螺母预紧,该方式精度低,可能造成预紧过度或者预紧不够的现象,使轴承的滚动体在使用过程中不能最大限度的与滚道接触,导致各滚动体的受力不均匀,影响轴承的旋转精度、刚度和使用寿命。在安装过程中,为了防止预紧力不适当造成的危害,必须需要依赖有经验的工人来确保预紧力的准确性,产生较大的装配人工成本。另外,在主轴运行过程中,螺纹可能会产生松动,使轴承之间出现游隙,使主轴出现振动,不仅产生噪音,而且极大的影响了主轴的刚度、旋转精度以及使用寿命。
发明内容
本发明的目的是克服现有技术的不足,提供一种数控车床主轴的过盈预紧装置及其方法。
数控车床主轴的过盈预紧装置包括阶梯主轴、右端盖、第一轴承、第一隔套、第二轴承、第二隔套、第一阶梯轴套、弹性垫、第三轴承、左端盖、第二阶梯轴套、皮带轮和同步轮;在阶梯主轴右端顺次安装有右端盖、第一轴承、第一隔套、第二轴承、第二隔套、第一阶梯轴套,在阶梯主轴左端顺次安装有弹性垫、第三轴承、左端盖、第二阶梯轴套、皮带轮、同步轮。
所述的第一阶梯轴套右侧或第二阶梯轴套右侧与阶梯主轴之间设有狭长缝隙。所述的第一轴承为面对面或背靠背安装的角接触球轴承,第三轴承为单列圆柱滚子轴承或双列圆柱滚子轴承。
数控车床主轴的过盈预紧方法包括以下步骤:
1)在阶梯主轴右端顺次安装有右端盖、第一轴承、第一隔套、第二轴承、第二隔套;
2)将第一阶梯轴套加热到高于阶梯主轴的温度,然后将第一阶梯轴套推到轴颈上,冷却后在第一阶梯轴套与阶梯主轴配合面之间压入液压油;
3)在阶梯主轴左端顺次安装有弹性垫、第三轴承、左端盖;
4)将第二阶梯轴套加热到高于阶梯主轴的温度,然后将第二阶梯轴套推到轴颈上,冷却后在第二阶梯轴套与阶梯主轴配合面之间压入液压油;
5)通过调整弹性垫的位置,使第二阶梯轴套推到设定位置,排除配合面之间的液压油。
本发明采用过盈预紧结构,阶梯轴的阶梯状配合面的设计使安装调整方便,也便于用注油法拆卸。阶梯轴套不产生任何有可能降低轴运转精度的压力,并且有更高的安装精度,提高了轴的刚度。调整垫使安装精度提高,弥补了制造误差,并且提高了系统的平稳性。
附图说明
附图1为数控车床主轴的过盈预紧装置的结构示意图;
图中,阶梯主轴1、右端盖2、第一轴承3、第一隔套4、第二轴承5、第二隔套6、第一阶梯轴套7、弹性垫8、第三轴承9、左端盖10、第二阶梯轴套11、皮带轮12、同步轮13。
具体实施方式
如附图1所示,数控车床主轴的过盈预紧装置包括阶梯主轴1、右端盖2、第一轴承3、第一隔套4、第二轴承5、第二隔套6、第一阶梯轴套7、弹性垫8、第三轴承9、左端盖10、第二阶梯轴套11、皮带轮12和同步轮13;在阶梯主轴1右端顺次安装有右端盖2、第一轴承3、第一隔套4、第二轴承5、第二隔套6、第一阶梯轴套7,在阶梯主轴1左端顺次安装有弹性垫8、第三轴承9、左端盖10、第二阶梯轴套11、皮带轮12、同步轮13。第一阶梯轴套7或第二阶梯轴套9有略微不同的内径与阶梯主轴1匹配。
所述的第一阶梯轴套7右侧或第二阶梯轴套11右侧与阶梯主轴1之间设有狭长缝隙,在装配时可以避免过大的接触压力使配合轴出现相对较大的径向变形。所述的第一轴承3为面对面或背靠背安装的角接触球轴承,第三轴承9为单列圆柱滚子轴承或双列圆柱滚子轴承。弹性垫8为橡胶或树脂等塑性材料制成的弹性元件,装配时可根据需要略微变形以弥补制造精度误差,确保预紧位置的精确性。
数控车床主轴的过盈预紧方法包括以下步骤:
1)在阶梯主轴1右端顺次安装有右端盖2、第一轴承3、第一隔套4、第二轴承5、第二隔套6;
2)将第一阶梯轴套7加热到高于阶梯主轴1的温度,然后将第一阶梯轴套7推到轴颈上,冷却后在第一阶梯轴套7与阶梯主轴1配合面之间压入液压油;
3)在阶梯主轴1左端顺次安装有弹性垫8、第三轴承9、左端盖10;
4)将第二阶梯轴套11加热到高于阶梯主轴1的温度,然后将第二阶梯轴套11推到轴颈上,冷却后在第二阶梯轴套11与阶梯主轴1配合面之间压入液压油;
5)通过调整弹性垫8的位置,使第二阶梯轴套11推到设定位置,排除配合面之间的液压油。
拆卸第一阶梯轴套和第二阶梯轴套时,只需要在轴套与轴间注入油,当油膜建立并分隔配合面后,变径处会产生轴向力,轴套会在无需外部力的条件下滑离安装位置。

Claims (3)

1.一种数控车床主轴的过盈预紧方法,采用数控车床主轴的过盈预紧装置,该装置包括阶梯主轴(1)、右端盖(2)、第一轴承(3)、第一隔套(4)、第二轴承(5)、第二隔套(6)、第一阶梯轴套(7)、弹性垫(8)、第三轴承(9)、左端盖(10)、第二阶梯轴套(11)、皮带轮(12)和同步轮(13);在阶梯主轴(1)右端顺次安装有右端盖(2)、第一轴承(3)、第一隔套(4)、第二轴承(5)、第二隔套(6)、第一阶梯轴套(7),在阶梯主轴(1)左端顺次安装有弹性垫(8)、第三轴承(9)、左端盖(10)、第二阶梯轴套(11)、皮带轮(12)、同步轮(13),其特征在于包括以下步骤:
1)在阶梯主轴(1)右端顺次安装有右端盖(2)、第一轴承(3)、第一隔套(4)、第二轴承(5)、第二隔套(6);
2)将第一阶梯轴套(7)加热到高于阶梯主轴(1)的温度,然后将第一阶梯轴套(7)推到轴颈上,冷却后在第一阶梯轴套(7)与阶梯主轴(1)配合面之间压入液压油;
3)在阶梯主轴(1)左端顺次安装有弹性垫(8)、第三轴承(9)、左端盖(10);
4)将第二阶梯轴套(11)加热到高于阶梯主轴(1)的温度,然后将第二阶梯轴套(11)推到轴颈上,冷却后在第二阶梯轴套(11)与阶梯主轴(1)配合面之间压入液压油;
5)通过调整弹性垫(8)的位置,使第二阶梯轴套(11)推到设定位置,排除配合面之间的液压油。
2.根据权利要求1所述的数控车床主轴的过盈预紧方法,其特征在于所述的第一阶梯轴套(7)右侧或第二阶梯轴套(11)右侧与阶梯主轴(1)之间设有狭长缝隙。
3.根据权利要求1所述的数控车床主轴的过盈预紧方法,其特征在于所述的第一轴承(3)为面对面或背靠背安装的角接触球轴承,第三轴承(9)为单列圆柱滚子轴承或双列圆柱滚子轴承。
CN201310054335.7A 2013-02-20 2013-02-20 一种数控车床主轴的过盈预紧方法 Active CN103111639B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310054335.7A CN103111639B (zh) 2013-02-20 2013-02-20 一种数控车床主轴的过盈预紧方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310054335.7A CN103111639B (zh) 2013-02-20 2013-02-20 一种数控车床主轴的过盈预紧方法

Publications (2)

Publication Number Publication Date
CN103111639A CN103111639A (zh) 2013-05-22
CN103111639B true CN103111639B (zh) 2016-02-03

Family

ID=48410052

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310054335.7A Active CN103111639B (zh) 2013-02-20 2013-02-20 一种数控车床主轴的过盈预紧方法

Country Status (1)

Country Link
CN (1) CN103111639B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103691972B (zh) * 2013-12-25 2017-01-25 北京海普瑞森科技发展有限公司 主轴回转装置
CN113231657B (zh) * 2021-04-19 2022-09-06 广州市昊志机电股份有限公司 一种主轴轴承锁紧结构、电主轴和机床
CN114083397B (zh) * 2021-10-21 2022-05-13 北京博鲁斯潘精密机床有限公司 一种航空发动机叶片磨削修整轴的抗干扰精密传动装置

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1160470A1 (de) * 2000-05-31 2001-12-05 Index-Werke Gmbh & Co. Kg Hahn & Tessky Arbeitsspindelanordnung
CN2778437Y (zh) * 2004-12-29 2006-05-10 大连机床集团有限责任公司 弹簧预紧式铣削头主轴装置
CN2846005Y (zh) * 2005-12-21 2006-12-13 沈阳第一机床厂 数控机床主轴恒定预紧力结构
CN101700632A (zh) * 2009-11-09 2010-05-05 北京联合大学 数控机床消除主轴间隙装置
CN102059357A (zh) * 2010-11-30 2011-05-18 无锡机床股份有限公司 机床的高精度套筒主轴结构

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004034222A (ja) * 2002-07-03 2004-02-05 Mitsubishi Heavy Ind Ltd 主軸装置及び予圧制御方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1160470A1 (de) * 2000-05-31 2001-12-05 Index-Werke Gmbh & Co. Kg Hahn & Tessky Arbeitsspindelanordnung
CN2778437Y (zh) * 2004-12-29 2006-05-10 大连机床集团有限责任公司 弹簧预紧式铣削头主轴装置
CN2846005Y (zh) * 2005-12-21 2006-12-13 沈阳第一机床厂 数控机床主轴恒定预紧力结构
CN101700632A (zh) * 2009-11-09 2010-05-05 北京联合大学 数控机床消除主轴间隙装置
CN102059357A (zh) * 2010-11-30 2011-05-18 无锡机床股份有限公司 机床的高精度套筒主轴结构

Also Published As

Publication number Publication date
CN103111639A (zh) 2013-05-22

Similar Documents

Publication Publication Date Title
CN101688552B (zh) 用于对机械元件进行轴向预加载的装置
CN103111639B (zh) 一种数控车床主轴的过盈预紧方法
JP6009149B2 (ja) 車輪用軸受装置の製造方法
CN201193659Y (zh) 径向推力轴承轴向预紧力定值装配结构
CN202082365U (zh) 皮带张紧轮装置
CN106949814B (zh) 一种精密组配轴承快速装调装置及使用方法
CN204271776U (zh) 一种永磁同步电机转子的动平衡装置
CN204113912U (zh) 一种法兰联轴器轴承
CN203115055U (zh) 变速箱及其轴承预紧力调节装置
CN204489887U (zh) 皮带输送机导向滚筒
CN204321989U (zh) 自动变速器轴承装配工装
CN105545946A (zh) 一种转向器用弹性角接触球轴承
KR101056810B1 (ko) 차량의 액슬캐리어
CN201663508U (zh) 一种高速精密电主轴
CN206000890U (zh) 一种十字轴万向节
CN103671583A (zh) 制造滚动轴承装置的方法和滚动轴承装置
CN201434016Y (zh) 船用柴油机调心滚子轴承
CN108465744A (zh) 一种开卷落料模具的输送系统
CN202629020U (zh) 一种可调整齿轮轴向位置的轴承座
CN201382084Y (zh) 车用轮毂轴承单元
CN203453282U (zh) 一种滚珠丝杠轴承
CN202251851U (zh) 齿轮箱箱体结构
CN203335644U (zh) 分梳辊轴承
CN202165427U (zh) 角接触圆柱滚子轴承
CN208185244U (zh) 一种汽车组件用的调心球轴承

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Numerical control machine tool spindle interference pre-tightening method

Effective date of registration: 20200119

Granted publication date: 20160203

Pledgee: Bank of China Limited by Share Ltd. Development Zone Jinhua subbranch

Pledgor: ZHEJIANG JINTANG MACHINE TOOL Co.,Ltd.

Registration number: Y2020330000050

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20160203

Pledgee: Bank of China Limited by Share Ltd. Development Zone Jinhua subbranch

Pledgor: ZHEJIANG JINTANG MACHINE TOOL Co.,Ltd.

Registration number: Y2020330000050

PC01 Cancellation of the registration of the contract for pledge of patent right