CN103109699A - Efficient heat preservation greenhouse and manufacturing method - Google Patents
Efficient heat preservation greenhouse and manufacturing method Download PDFInfo
- Publication number
- CN103109699A CN103109699A CN2013100510781A CN201310051078A CN103109699A CN 103109699 A CN103109699 A CN 103109699A CN 2013100510781 A CN2013100510781 A CN 2013100510781A CN 201310051078 A CN201310051078 A CN 201310051078A CN 103109699 A CN103109699 A CN 103109699A
- Authority
- CN
- China
- Prior art keywords
- arc
- frame
- panelgirder
- gable
- curved side
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A40/00—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production
- Y02A40/10—Adaptation technologies in agriculture, forestry, livestock or agroalimentary production in agriculture
- Y02A40/25—Greenhouse technology, e.g. cooling systems therefor
Landscapes
- Tents Or Canopies (AREA)
Abstract
This invention relates to a greenhouse and a manufacturing method thereof, in particular to an efficient heat preservation greenhouse and the manufacturing method thereof. the efficient heat preservation greenhouse comprises reinforced concrete foundation piles, a back gable wall, two arc side gable walls, a parapet wall and arc flower beam frames, wherein the rear gable wall is formed by two layers of heat preservation plates in a split joint mode, and the reinforced concrete foundation piles are arranged at the bottoms of the rear gable wall, the two arc side gable walls and the parapet wall. Two parallel deep grooves are arranged in the reinforced concrete foundation piles of the rear gable wall and the two arc side gable walls. Inner heat preservation plates and outer heat preservation plates are fixed in the deep grooves, and the arc flower beam frames are arranged between the top of the parapet wall and the rear gable wall. A pedestrian channel is arranged on the top of the rear gable wall, and covering objects are arranged on the tops of the arc flower beam frames. The manufacturing method of the efficient heat preservation greenhouse has the advantages that on the condition of maintaining an original plane, lime soil, pre-arranged blocks and ring beams can be adopted for the foundation. The efficient heat preservation greenhouse which is of a steel frame and has no upright column and cool in summer and warm in winter is long in service life, quick in temperature raising, efficient, energy-efficient, high in yield, and good in benefit.
Description
One, technical field
The present invention relates to a kind of green house and preparation method thereof, particularly a kind of high-efficiency insulated booth and preparation method thereof.
Two, background technology
At present the Hou Qiang of greenhouse system and two mountains are all to become with brick with being the employing clay, need a large amount of clays and heavy-duty machinery in the process of construction on Hou Qiang and two mountains, southern soil property is not suitable for the construction of this booth, therefore belongs to the operating type that the highly energy-consuming high pollution should be eliminated.Increasing due to thickness of wall body has simultaneously reduced cultivated area, has wasted land resources.Because whole booth needs the situ wet operation, stationary structure is not quick detachable yet in addition, wastes the auxiliary material such as a large amount of concrete columns, steel wire, and therefore not only construction period is longer, assembles also very bothersome.
Existing patented technology has: China Patent No. is that 201110075721.5 " a kind of Industrialized prefabricated assembled-type greenhouse and preparation method thereof " comprises the side gable that the parapet that is spliced by thermal insulating composite panel, rear gable and two tops are curved; The splicing place top of each adjacent thermal insulating composite panel of described rear gable and two described side gables is provided with a U-shaped cutting ferrule; Between described parapet top and described rear gable top across being provided with several arc steel skeletons, each described arc steel skeleton bottom welding one gripper shoe, described gripper shoe by a U-shaped fixedly cutting ferrule be fixedly connected on described parapet; Each described arc steel skeleton upper end is welded with a plate, corresponding with it, described rear gable outer wall is provided with a triangular support bracket, described connecting plate and described triangular support bracket link into an integrated entity by the bolt that is located on described rear gable, and an elongated workbench is set on each described triangular support bracket; Be provided with many elongated cross reinforcings on each described arc steel skeleton, each described arc steel skeleton top is provided with holistic covering.The problem of its existence is: the top cover plastic film is fixing simple, and heat insulation effect is poor, and the thermal insulating composite panel of rear gable and two curved side gables is fixing simple, is not suitable for northern strong wind weather.
Three, summary of the invention
Purpose of the present invention is exactly in view of the foregoing defects the prior art has, and a kind of high-efficiency insulated booth and preparation method thereof is provided.
its technical scheme is: a kind of high-efficiency insulated booth, comprise the armored concrete foundation pile, the rear gable that Dual-layer insulation board is spliced into and two curved side gables, parapet, arc panelgirder frame, rear gable, the bottom of two curved side gables and parapet is provided with the armored concrete foundation pile, the armored concrete foundation pile of rear gable and two curved side gables is provided with two parallel dark grooves, warming plate and heat-insulation plate for external in fixing in dark groove, vertical fixedly rear supporting tube and side stay pipe on rear gable and two curved side gables, rear gable is consistent with the height of warming plate with the side stay pipe with the rear supporting tube on two curved side gables, the top of parapet is provided with the front support pipe, rear supporting tube, side stay pipe and front support pipe and the armored concrete foundation pile structure that is fixed as one, be provided with arc panelgirder frame between the top of described parapet and rear gable, the front end of arc panelgirder frame is fixedly connected with front support pipe on parapet, the rear end of arc panelgirder frame is fixedly connected with rear supporting tube on rear gable, the both sides of arc panelgirder frame are fixedly connected with side stay pipe on two curved side gables, arc panelgirder frame is provided with cross reinforcing, described arc panelgirder frame is connected to form by many groups slope frame and arc frame, arc frame is comprised of upper beam and underbeam, fixedly garland between described upper beam and underbeam, the top of rear gable is provided with the walkway, arc panelgirder top of the trellis is provided with covering.
Be provided with coating steel pipe between described slope frame and arc frame.
The mid portion level of described slope frame is provided with two gripper shoes.
Wall heat-insulating board after the top of described slope frame is fixed by jump ring.
The top of described rear wall heat-insulating board is provided with folding nonwoven.
The surrounding of described heat-insulation plate for external is provided with film-pressing tank, by fishtail bolt, insulation film is fixed in film-pressing tank.
The outside of described two curved side gables is provided with several groups of stay cords that connect arc panelgirder frame.
Described two curved side gables are provided with cascade curtain and blower fan.
Described garland triangularity structure.
The covering of described arc panelgirder top of the trellis connects shutter.
The preparation method of high-efficiency insulated booth, it comprises the following steps: (1) presets the front support pipe of armored concrete foundation pile together with the top of the rear supporting tube on rear gable and two curved side gables and side stay pipe parapet; (2) interior warming plate and heat-insulation plate for external are fixed on the armored concrete foundation pile; (3) front end of arc panelgirder frame is fixedly connected with front support pipe on parapet, the rear end of arc panelgirder frame is fixedly connected with rear supporting tube on rear gable, and the both sides of arc panelgirder frame are fixedly connected with side stay pipe on two curved side gables; (4) at interior warming plate and heat-insulation plate for external fill insulant material; (5) insulation film is fixed in the film-pressing tank of heat-insulation plate for external; (6) fixing coating steel pipe between the slope frame on arc panelgirder frame and arc frame; (7) wall heat-insulating board and folding nonwoven after the top of slope frame is fixing; (8) lay covering at arc panelgirder top of the trellis; (9) connect the stay cord of arc panelgirder frame in the external stability of two curved side gables.
The invention has the beneficial effects as follows: high-efficiency insulated booth and preparation method thereof is suitable for different regions, different physical features, high water level, should not fetch earth and area design that the formula of partly digging is built green house of vegetables, it can be broken ground on a small quantity or not break ground, when keeping original ground level, can adopt dirt, prediction block, three kinds of modes of collar tie beam as ground; This booth is made simply, feeding is convenient, construction period is short, and is of many uses, and cascade curtain and the blower fan of this booth design have been accomplished good result cool in summer and warm in winter, for the growth of vegetable melon and fruit, flowers and other crops provides good condition, greatly reduce use cost; Just can welded and installed in the situation that accomplish fluently ground; This steelframe reaches 30 years without the column roof insulating service life, and temperature raising is fast, has reduced peasant's input, and energy-efficient, output is high, profitable.
Four, description of drawings
Accompanying drawing 1 is structural representation of the present invention.
Accompanying drawing 2 is side sectional views of the present invention.
Accompanying drawing 3 is structural representations of slope of the present invention frame.
Accompanying drawing 4 is wall structure schematic diagrames of the present invention.
Accompanying drawing 5 is structural representations of eastern body of wall of the present invention.
Accompanying drawing 6 is structural representations of western body of wall of the present invention.
Accompanying drawing 7 is two curved side gable upside supporting tube structure schematic diagrames of the present invention.
Five, embodiment
1-7 by reference to the accompanying drawings, the invention will be further described:
the present invention includes armored concrete foundation pile 1, the rear gable 2 that Dual-layer insulation board is spliced into and two curved side gables 3, parapet 4, arc panelgirder frame 5, rear gable 2, the bottom of two curved side gables 3 and parapet 4 is provided with armored concrete foundation pile 1, the armored concrete foundation pile 1 of rear gable 2 and two curved side gables 3 is provided with two parallel dark grooves 6, the interior fixing interior warming plate 7 of dark groove 6 and heat-insulation plate for external 8, vertical fixedly rear supporting tube 9 and side stay pipe on rear gable 2 and two curved side gables 3, rear gable 2 is consistent with the height of warming plate with side stay pipe 27 with the rear supporting tube 9 on two curved side gables 3, the top of parapet is provided with front support pipe 28, rear supporting tube 9, side stay pipe 27 and front support pipe 28 and armored concrete foundation pile 1 structure that is fixed as one, be provided with arc panelgirder frame 5 between the top of described parapet 4 and rear gable 2, the front end of arc panelgirder frame 5 is fixedly connected with front support pipe 28 on parapet, the rear end of arc panelgirder frame 5 is fixedly connected with rear supporting tube 9 on rear gable 2, the both sides of arc panelgirder frame 5 are fixedly connected with side stay pipe 27 on two curved side gables, arc panelgirder frame 5 is provided with cross reinforcing 5.2.3, described arc panelgirder frame 5 is connected to form by many groups slope frame 5.1 and arc frame 5.2, arc frame 5.2 is comprised of upper beam 5.2.1 and underbeam 5.2.2, fixing garland 5.2.4 between described upper beam 5.2.1 and underbeam 5.2.2, the top of rear gable 2 is provided with walkway 18, arc panelgirder frame 5 tops are provided with covering 10.
in order to make whole booth more firm, insulation more, increase the service life, be provided with coating steel pipe 11 between slope frame 5.1 and arc frame 5.2, the mid portion level of slope frame 5.1 is provided with two gripper shoes 12, support as rear wall heat-insulating board 13, wall heat-insulating board 13 after the top of slope frame 5.1 is fixing by jump ring 14, rear wall heat-insulating board 13 is provided with angle steel 15 with the junction of slope frame 5.1, in order to prevent that rear wall heat-insulating board 13 from scratching coverlay, be provided with folding nonwoven 17 at the top of rear wall heat-insulating board 13, for fixing covering better, insulation film, on body of wall every two meters fixed expansion bolts 16.
For insulation more, be provided at the suitable environment of winter growth to crop, the present invention has paid attention to the insulation of rear gable 2 and two curved side gables 3, the surrounding of the outside heat-insulation plate for external 8 of rear gable 2 and two curved side gables 3 is provided with film-pressing tank 19, by fishtail bolt 21, insulation film 20 is fixed in film-pressing tank 19, can fills the filler 22 of insulation use in the middle of body of wall, filler 22 can be perlite, cotton-wool, straw etc., make body of wall airtight, wrap up by insulation film at the top of body of wall.
Because northern strong wind weather is more, crops are overweight may cause the booth distortion, can be provided with in the outside of two curved side gables more than 3 groups of stay cords 25 that connect arc panelgirder frame 5, guarantees that booth is indeformable.
This booth will be accomplished as general throughout the year booth, Winter protection, cooling in summer, for guaranteeing well to lower the temperature summer, be provided with cascade curtain 23 and blower fan 24 on two curved side gables 3, temperature of shed is during higher than the plant growth temperature, start blower fan and drive Air Flow in canopy, the cascade curtain is comprised of water system, and the Water curtain filter hot-air reaches the purpose of cooling, and temperature of shed is reduced rapidly.
In order to make booth bear larger pressure, the present invention has used coating steel pipe as arc panelgirder frame 5, fixing garland 5.2.4 between the upper beam 5.2.1 of arc panelgirder frame 5 and underbeam 5.2.2, the 10# round steel is adopted in garland, garland 5.2.4 is welded into triangular structure, make it more firm, not only bearing capacity is good, and wind resistance snow ability is strong.
Facilitate rolling, putting down of covering, the covering 10 at arc panelgirder frame 5 tops connects shutters 26.
Booth adopts all steel frame, twin-spar construction, and rear gable 2 and two curved side gables 3 adopt insulation film to cover, and sturdy and durable, bearing capacity is good, and wind resistance snow ability is strong, adopts without pillar construction in canopy, and the open daylighting of cultivated area is effective, is fit to the big machinery operation.
The preparation method of high-efficiency insulated booth, it comprises the following steps:
(1) the front support pipe 28 of armored concrete foundation pile 1 together with the top of the rear supporting tube 9 on rear gable 2 and two curved side gables 3 and side stay pipe 27 parapets preset;
(2) interior warming plate 7 and heat-insulation plate for external 8 are fixed on armored concrete foundation pile 1;
(3) front end of arc panelgirder frame 5 is fixedly connected with front support pipe 28 on parapet, the rear end of arc panelgirder frame 5 is fixedly connected with rear supporting tube 9 on rear gable 2, and the both sides of arc panelgirder frame 5 are fixedly connected with side stay pipe 27 on two curved side gables 3;
(4) at interior warming plate 7 and heat-insulation plate for external 8 fill insulant materials 22;
(5) insulation film 20 is fixed in the film-pressing tank 19 of heat-insulation plate for external 8;
(6) fixing coating steel pipe 11 between the slope frame 5.1 on arc panelgirder frame 5 and arc frame 5.2;
(7) wall heat-insulating board 13 and folding nonwoven 17 after the top of slope frame 5.1 is fixing;
(8) at arc panelgirder frame 5 tops laying coverings 10;
(9) connect the stay cord 25 of arc panelgirder frame in the external stability of two curved side gables 3.
Claims (10)
1. high-efficiency insulated booth, it is characterized in that: comprise the armored concrete foundation pile, the rear gable that Dual-layer insulation board is spliced into and two curved side gables, parapet, arc panelgirder frame, rear gable, the bottom of two curved side gables and parapet is provided with the armored concrete foundation pile, the armored concrete foundation pile of rear gable and two curved side gables is provided with two parallel dark grooves, warming plate and heat-insulation plate for external in fixing in dark groove, vertical fixedly rear supporting tube and side stay pipe on rear gable and two curved side gables, rear gable is consistent with the height of warming plate with the side stay pipe with the rear supporting tube on two curved side gables, the top of parapet is provided with the front support pipe, rear supporting tube, side stay pipe and front support pipe and the armored concrete foundation pile structure that is fixed as one, be provided with arc panelgirder frame between the top of described parapet and rear gable, the front end of arc panelgirder frame is fixedly connected with front support pipe on parapet, the rear end of arc panelgirder frame is fixedly connected with rear supporting tube on rear gable, the both sides of arc panelgirder frame are fixedly connected with side stay pipe on two curved side gables, arc panelgirder frame is provided with cross reinforcing, described arc panelgirder frame is connected to form by many groups slope frame and arc frame, arc frame is comprised of upper beam and underbeam, fixedly garland between described upper beam and underbeam, the top of rear gable is provided with the walkway, arc panelgirder top of the trellis is provided with covering.
2. a kind of high-efficiency insulated booth according to claim 1, is characterized in that: be provided with coating steel pipe between described slope frame and arc frame.
3. a kind of high-efficiency insulated booth according to claim 2, it is characterized in that: the mid portion level of described slope frame is provided with two gripper shoes.
4. a kind of high-efficiency insulated booth according to claim 1, is characterized in that: wall heat-insulating board after the top of described slope frame is fixed by jump ring.
5. a kind of high-efficiency insulated booth according to claim 4, it is characterized in that: the top of described rear wall heat-insulating board is provided with folding nonwoven.
6. a kind of high-efficiency insulated booth according to claim 1, it is characterized in that: the surrounding of described heat-insulation plate for external is provided with film-pressing tank, by fishtail bolt, insulation film is fixed in film-pressing tank.
7. a kind of high-efficiency insulated booth according to claim 1 is characterized in that: the outside of described two curved side gables is provided with several groups of stay cords that connect arc panelgirder framves.
8. a kind of high-efficiency insulated booth according to claim 1, it is characterized in that: described two curved side gables are provided with cascade curtain and blower fan.
9. a kind of high-efficiency insulated booth according to claim 1, is characterized in that: described garland triangularity structure.
10. the preparation method of according to claim 1-9 described high-efficiency insulated booths of any one, it comprises the following steps:
(1) the front support pipe of armored concrete foundation pile together with the top of the rear supporting tube on rear gable and two curved side gables and side stay pipe parapet preset;
(2) interior warming plate and heat-insulation plate for external are fixed on the armored concrete foundation pile;
(3) front end of arc panelgirder frame is fixedly connected with the rear end of arc panelgirder frame and rear gable with front support pipe on parapet
On rear supporting tube be fixedly connected with, the both sides of arc panelgirder frame are fixedly connected with side stay pipe on two curved side gables;
(4) at interior warming plate and heat-insulation plate for external fill insulant material;
(5) insulation film is fixed in the film-pressing tank of heat-insulation plate for external;
(6) fixing coating steel pipe between the slope frame on arc panelgirder frame and arc frame;
(7) wall heat-insulating board and folding nonwoven after the top of slope frame is fixing;
(8) lay covering at arc panelgirder top of the trellis;
(9) connect the stay cord of arc panelgirder frame in the external stability of two curved side gables.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100510781A CN103109699A (en) | 2013-01-21 | 2013-01-21 | Efficient heat preservation greenhouse and manufacturing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2013100510781A CN103109699A (en) | 2013-01-21 | 2013-01-21 | Efficient heat preservation greenhouse and manufacturing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN103109699A true CN103109699A (en) | 2013-05-22 |
Family
ID=48408087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2013100510781A Pending CN103109699A (en) | 2013-01-21 | 2013-01-21 | Efficient heat preservation greenhouse and manufacturing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103109699A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103749207A (en) * | 2013-12-31 | 2014-04-30 | 朝阳馨百种苗科技开发有限公司 | Method for improving wind load and snow load capability of greenhouse |
CN104082071A (en) * | 2014-07-17 | 2014-10-08 | 施文有 | Energy-saving greenhouse used in high and cold area |
CN105028034A (en) * | 2015-07-13 | 2015-11-11 | 河南科技大学 | Water curtain cooling device for greenhouse |
CN105409649A (en) * | 2015-11-07 | 2016-03-23 | 濮阳市林业科学院 | Steel structure sunlight greenhouse |
CN107593178A (en) * | 2017-09-15 | 2018-01-19 | 江西省农业科学院蔬菜花卉研究所 | A kind of assembled type steel frame greenhouse design method and its structure |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2680001Y (en) * | 2003-12-16 | 2005-02-23 | 潘利军 | Plastic booth |
CN101235679A (en) * | 2007-12-24 | 2008-08-06 | 白建国 | Door type solar energy warm booth production method |
CN201535081U (en) * | 2009-04-09 | 2010-07-28 | 赵国祥 | Assembly type multi-layered splicing plastic film greenhouse capable of rolling curtain with manipulator |
CN202565851U (en) * | 2012-04-19 | 2012-12-05 | 北京天工创道建筑科技有限公司 | Ecological solar greenhouse |
-
2013
- 2013-01-21 CN CN2013100510781A patent/CN103109699A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2680001Y (en) * | 2003-12-16 | 2005-02-23 | 潘利军 | Plastic booth |
CN101235679A (en) * | 2007-12-24 | 2008-08-06 | 白建国 | Door type solar energy warm booth production method |
CN201535081U (en) * | 2009-04-09 | 2010-07-28 | 赵国祥 | Assembly type multi-layered splicing plastic film greenhouse capable of rolling curtain with manipulator |
CN202565851U (en) * | 2012-04-19 | 2012-12-05 | 北京天工创道建筑科技有限公司 | Ecological solar greenhouse |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103749207A (en) * | 2013-12-31 | 2014-04-30 | 朝阳馨百种苗科技开发有限公司 | Method for improving wind load and snow load capability of greenhouse |
CN104082071A (en) * | 2014-07-17 | 2014-10-08 | 施文有 | Energy-saving greenhouse used in high and cold area |
CN104082071B (en) * | 2014-07-17 | 2016-03-16 | 施文有 | A kind of high and cold energy saving greenhouse |
CN105028034A (en) * | 2015-07-13 | 2015-11-11 | 河南科技大学 | Water curtain cooling device for greenhouse |
CN105028034B (en) * | 2015-07-13 | 2017-10-13 | 河南科技大学 | A kind of greenhouse water curtain heat sink |
CN105409649A (en) * | 2015-11-07 | 2016-03-23 | 濮阳市林业科学院 | Steel structure sunlight greenhouse |
CN105409649B (en) * | 2015-11-07 | 2018-04-10 | 濮阳市林业科学院 | Steel construction heliogreenhouse |
CN107593178A (en) * | 2017-09-15 | 2018-01-19 | 江西省农业科学院蔬菜花卉研究所 | A kind of assembled type steel frame greenhouse design method and its structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103109699A (en) | Efficient heat preservation greenhouse and manufacturing method | |
CN201107941Y (en) | Double symphysis ridgepole day-light greenhouse | |
CN102113457A (en) | Pest-resistant rainproof shed | |
CN213662746U (en) | Integral multilayer heat preservation big-arch shelter | |
CN103210804B (en) | Manufacturing method for sunlight greenhouse with straw wall bodies | |
CN102884961A (en) | Intelligent heat-preservation type sunlight greenhouse and manufacturing method | |
CN204733681U (en) | Eccentric formula large -span hunch canopy is planted to four seasons | |
CN201595042U (en) | Insect-prevention rain shelter | |
CN104396629A (en) | Movable steel frame greenhouse and construction method thereof | |
CN202998948U (en) | High-efficiency heat preservation greenhouse | |
CN204426171U (en) | A kind of novel solar greenhouse of variable roofing angle | |
CN108391539B (en) | Super-span stacked high-energy greenhouse and construction method thereof | |
CN202035334U (en) | Internal heat preservation solar greenhouse | |
JP6719792B1 (en) | Agricultural house and construction method thereof | |
CN206024654U (en) | Glasshouse big -arch shelter | |
CN202857414U (en) | Disassembling type sunlight greenhouse usable in summer and winter | |
CN102763577B (en) | Dual-purpose demountable sunlight greenhouse used in winter and summer | |
CN102124904B (en) | Method for building greenhouse for cultivating mushrooms | |
CN215012005U (en) | Soft package high-temperature assembled sunlight greenhouse | |
CN202232343U (en) | Steel constructs air wall warmhouse booth | |
CN204090647U (en) | Connect a plastic tunnel | |
CN211909854U (en) | Energy-conserving sunlight greenhouse of easy dismouting removal | |
CN203942874U (en) | Three season temperature canopy | |
CN210808465U (en) | Intelligence sunlight greenhouse major structure | |
CN106105884A (en) | A kind of deep lower sleeping low heating and energy saving heliogreenhouse design being applicable to extremely frigid zones |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20130522 |