CN103075043B - 一种沥青回收池的施工方法 - Google Patents
一种沥青回收池的施工方法 Download PDFInfo
- Publication number
- CN103075043B CN103075043B CN201310047936.5A CN201310047936A CN103075043B CN 103075043 B CN103075043 B CN 103075043B CN 201310047936 A CN201310047936 A CN 201310047936A CN 103075043 B CN103075043 B CN 103075043B
- Authority
- CN
- China
- Prior art keywords
- meter
- bitumen recovery
- recovery pond
- grey
- soil layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Underground Or Underwater Handling Of Building Materials (AREA)
Abstract
一种沥青回收池的施工方法,它涉及一种施工方法。它能将沥青管道出油口处的沥青进行回收。本发明的技术方案是:一是对沥青回收池地基开挖和压实,二是对灰土层拌合和压实,三是在灰土层上面浇筑混凝土,并在两侧浇筑长方体挡水墙,在一侧挡水墙底部设进排水口,待养生后,并向池内注入0.15米清水。采用该技术方案既能将沥青管道出口处流出的废弃的沥青回收再利用,也解决了场地造成污染的现实问题。本发明经济实用,适用于各大小沥青厂。
Description
所属技术领域
本发明涉及一种施工方法,具体地说是一种沥青管道出油口处沥青回收池的施工方法。
背景技术
在沥青厂,给沥青罐车打完沥青后,沥青管道出油口会有少量的沥青流个不停,把混凝土地面造成污染,地面上的沥青也很难清理。目前,还没有有效的方法将这些沥青进行回收。
发明内容
本发明的目的就是克服现有技术的不足,提供一种沥青回收池的施工方法以解决此问题。
本发明解决其技术问题的方案是:沥青回收池的施工方法包括以下步骤,(a)首先对沥青回收池地基进行开挖,以沥青管道出油口为中心,开挖长20米,宽5米,深0.7米的地槽,地槽两端做成5%坡道;(b)开挖完后对地基进行压实,用18~21吨三轮压路机碾压3~4遍;(c)碾压后,在地基上做两层厚0.15米、灰剂量12%石灰土层,灰拌合均匀后,用履带车稳压,整平后每层用三轮压路机碾压4~5遍;(d)灰土层碾压完后,在灰土层上面浇筑厚0.15米标号为C30的混凝土,在沥青回收池两侧各浇筑一条18米*0.2米*0.5米混凝土长方体挡水墙,在一侧挡水墙底部设有进水口和排水口;(e)施工完毕后要对混凝土进行养生,待强度达到要求时,往沥青回收池里面注入清水,注入清水的深度控制在0.15米。
本发明的积极效果是:采用上述技术方案,既能将沥青管道出口处流出的废弃的沥青回收再利用,还解决了场地造成污染的现实问题。
具体实施方法
本发明的具体实施方法是:沥青回收池的施工方法包括以下步骤,(a)首先对沥青回收池地基进行开挖,以沥青管道出油口为中心,开挖长20米,宽5米,深0.7米的地槽,地槽两端做成5%坡道;(b)开挖完后对地基进行压实,用18~21吨三轮压路机碾压3~4遍;(c)碾压后,在地基上做两层厚0.15米、灰剂量12%石灰土层,灰拌合均匀后,用履带车稳压,整平后每层用三轮压路机碾压4~5遍;(d)灰土层碾压完后,在灰土层上面浇筑厚0.15米标号为C30的混凝土,在沥青回收池两侧各浇筑一条18米*0.2米*0.5米混凝土长方体挡水墙,在一侧挡水墙底部设有进水口和排水口;(e)施工完毕后要对混凝土进行养生,待强度达到要求时,往沥青回收池里面注入清水,注入清水的深度控制在0.15米。
Claims (1)
1.一种沥青回收池的施工方法,其特征是:它包括以下步骤,(a)首先对沥青回收池地基进行开挖,以沥青管道出油口为中心,开挖长20米,宽5米,深0.7米的地槽,地槽两端做成5%的坡度的坡道;(b)开挖完后对地基进行压实,用18~21吨三轮压路机碾压3~4遍;(c)碾压后,在地基上做两层厚0.15米、灰剂量12%石灰土层,灰拌合均匀后,用履带车稳压,整平后每层用三轮压路机碾压4~5遍;(d)灰土层碾压完后,在灰土层上面浇筑厚0.15米标号为C30的混凝土,在沥青回收池两侧各浇筑一条18米*0.2米*0.5米混凝土长方体挡水墙,在一侧挡水墙底部设有进水口和排水口;(e)施工完毕后要对混凝土进行养生,待强度达到要求时,往沥青回收池里面注入清水,注入清水的深度控制在0.15米。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310047936.5A CN103075043B (zh) | 2013-02-01 | 2013-02-01 | 一种沥青回收池的施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310047936.5A CN103075043B (zh) | 2013-02-01 | 2013-02-01 | 一种沥青回收池的施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN103075043A CN103075043A (zh) | 2013-05-01 |
CN103075043B true CN103075043B (zh) | 2015-08-19 |
Family
ID=48151729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310047936.5A Expired - Fee Related CN103075043B (zh) | 2013-02-01 | 2013-02-01 | 一种沥青回收池的施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN103075043B (zh) |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1098986A1 (ru) * | 1983-02-25 | 1984-06-23 | Специальное Конструкторско-Технологическое Бюро По Механизации Монтажных Работ И Запасным Частям | Устройство дл нагрева и сепарации регенерируемого асфальтобетона |
WO2002053646A1 (en) * | 2001-01-05 | 2002-07-11 | The Plasphalt Project Ltd. Co. | Method of making plastic asphalt paving material and paving material and pavement made thereby |
CN1369333A (zh) * | 2001-01-30 | 2002-09-18 | 大山产业株式会社 | 沥青混凝土回收再用装置 |
CN100415393C (zh) * | 2003-10-10 | 2008-09-03 | 中国科学院过程工程研究所 | 沥青混凝土装车时的烟气净化处理和余热回收方法及装置 |
CN201390491Y (zh) * | 2009-02-20 | 2010-01-27 | 山东渤海沥青高科有限公司 | 专用箱体 |
CN101979781B (zh) * | 2010-09-28 | 2011-11-09 | 中国石油集团川庆钻探工程有限公司 | 石油钻井废弃泥浆固化池构筑方法 |
-
2013
- 2013-02-01 CN CN201310047936.5A patent/CN103075043B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN103075043A (zh) | 2013-05-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103556579B (zh) | 一种综合注浆保压加管幕支护的箱涵顶推工法 | |
CN104047217A (zh) | 路面快速修复方法 | |
CN102226335A (zh) | 一种控制软土工后沉降变形的地基处理方法 | |
CN203846796U (zh) | 一种地下室逆作施工所用的临时出土坡道 | |
CN103912001A (zh) | 路基管沟回填土“分层搭接法”施工方法 | |
CN108677638A (zh) | 基于建筑垃圾的高速公路路基填筑方法 | |
CN104746399A (zh) | 防治桥头跳车施工方法 | |
CN107816056A (zh) | 填充式混凝土重力挡土墙及其施工工艺 | |
CN103603251B (zh) | 利用饱和卤水粘土浆加固盐湖铁路路基的方法 | |
CN103075043B (zh) | 一种沥青回收池的施工方法 | |
CN108867225B (zh) | 喀斯特地貌道路路基范围内落水洞的处理方法 | |
CN204491320U (zh) | 填土地基上既有铁路车站路基轻型支挡结构 | |
CN204124111U (zh) | 一种用于建筑施工场地可实现水循环的洗车池 | |
CN203960701U (zh) | 软土路基新老路基路面衔接处的差异沉降协调结构 | |
CN102031757A (zh) | 一种顶进框架桥的底板导向层的施工方法 | |
CN106223351A (zh) | 自吸泵降低局部地下水水位施工方法 | |
CN102787549B (zh) | 一种沥青混凝土路面纵横向单条裂缝的修补方法 | |
CN104499394A (zh) | 一种零填黑棉土路基处治方法 | |
CN203411895U (zh) | 公路桥梁桥面排水设施 | |
CN203144968U (zh) | 混凝土板伸缩缝 | |
CN203034335U (zh) | 粉砂土路段公路排水系统 | |
CN205062993U (zh) | 一种防止路面塌陷的污水窨井 | |
CN206273898U (zh) | 一种快速安装的u型截污槽 | |
CN206768732U (zh) | 用于加固河道驳岸的施工系统 | |
CN203514148U (zh) | 提高路面排水速度的路面边缘石 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20150819 Termination date: 20160201 |