CN103061782B - 大断面机动车隧道土压平衡矩形顶管管节及其施工方法 - Google Patents

大断面机动车隧道土压平衡矩形顶管管节及其施工方法 Download PDF

Info

Publication number
CN103061782B
CN103061782B CN201310030497.7A CN201310030497A CN103061782B CN 103061782 B CN103061782 B CN 103061782B CN 201310030497 A CN201310030497 A CN 201310030497A CN 103061782 B CN103061782 B CN 103061782B
Authority
CN
China
Prior art keywords
jacking
jacking pipe
pipe joints
earth pressure
pipe joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310030497.7A
Other languages
English (en)
Other versions
CN103061782A (zh
Inventor
张先锋
吕剑英
宋仪
张俊岱
黄伟
倪伟伟
闫文博
张彦岭
朱勇士
程鹏
谭子源
杨传勇
付增
赵修旺
马宁
彭林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Liuyuan Group Co Ltd
Original Assignee
CRTG Survey and Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRTG Survey and Design Institute Co Ltd filed Critical CRTG Survey and Design Institute Co Ltd
Priority to CN201310030497.7A priority Critical patent/CN103061782B/zh
Publication of CN103061782A publication Critical patent/CN103061782A/zh
Application granted granted Critical
Publication of CN103061782B publication Critical patent/CN103061782B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

本发明公开了一种大断面机动车隧道土压平衡矩形顶管管节,以顶管顶进的方向为前向,所述顶管管节于外壁面中部沿周向间隔设有径向贯通管壁的注浆孔,所述顶管管节的四个面的中部皆设有吊装孔,所述顶管管节于外壁面前部沿周向间隔设有贯通管壁的径向触变泥浆压浆孔;所述顶管管节的顶部呈拱形,所述管节的截面四角皆为圆弧倒角结构。本发明还公开了所述顶管管节的施工方法。本发明使土压平衡顶管法能够运用在机动车隧道领域,解决了长期以来存在的土压平衡顶管法不能用于机动车隧道施工的技术难题,保证了隧道在长期承受机动车不均衡动荷载条件下管节不发生错位的稳定要求,并实现了永久防水功能,大大降低了后期运营维护成本。

Description

大断面机动车隧道土压平衡矩形顶管管节及其施工方法
技术领域
本发明涉及地下工程施工领域,尤其涉及矩形隧道土压平衡顶管管节及施工方法,可应用于下穿市政道路、铁路或河道等其他构筑物的隧道工程土压平衡顶管施工中。
背景技术
国内外对土压平衡矩形顶管研究的最新进展在于市政过街通道和地下商业街人行通道的实施方面。目前,现有的土压平衡矩形顶管的截面为尺寸较小的矩形,其具有如下的缺陷:1.现有的土压平衡矩形顶管的顶部为平面设置,四角处为直角拐角,承载能力小。2.沿施工方向,前后顶管结合部的防水结构中的承插钢环等金属件在长年使用后容易因锈蚀而发生损毁,导致前后顶管结合部的防水结构不能作为永久防水结构,利用现有的土压平衡矩形顶管施工而成的隧道在长期使用后(20-30年)容易因此而产生管节节头漏水现象,影响隧道的正常使用,增加后期运营维护成本。隧道的设计寿命一般不少于100年,因此在隧道使用寿命的大部分周期内,利用现有土压平衡矩形顶管施工而成的隧道均遭受防水维护的困扰。当然,由于土压平衡矩形顶管在近年来才得到广泛应用,因此漏水现象还未大规模显现出来。3.现有土压平衡矩形顶管的力学结构决定了其截面较小,根据相关规范(城市道路工程设计规范CJJ37-2012)、各地规划部门对隧道机动车车道宽度和限高的要求,既有的矩形顶管断面尺寸也难以满足要求。4. 因现有矩形顶管管节接头均为柔性的承插式接头,对于不同管节承受竖向或侧向较大差异荷载时易产生管节错位,引起接头防水失效,甚至丧失使用功能。5. 现有土压平衡矩形顶管的应用在于市政过街通道和地下商业街人行通道,此类隧道具有长度短、无机动车通过因而没有不均衡动载的影响。现有大断面机动车隧道土压平衡矩形顶管管节如果长期承受不均衡动载,则长期使用中顶管管节容易发生错位的现象。
总之,机动车隧道与地下人行通道相比具有断面较大、覆土和竖向荷载较大、隧道更长的特点,目前的土压平衡矩形顶管承载能力较小,不能解决长期使用后的漏水问题,也不能确保长期使用后顶管管节之间不发生错位现象,不能运用到机动车隧道中来。
发明内容
本发明的目的在于提供一种大断面机动车隧道土压平衡矩形顶管管节。
为实现上述目的,本发明提供了一种大断面机动车隧道土压平衡矩形顶管管节,以顶管顶进的方向为前向,所述顶管管节于外壁面中部沿周向间隔设有径向贯通管壁的注浆孔,所述顶管管节的四个面的中部皆设有吊装孔,所述顶管管节于外壁面前部沿周向间隔设有贯通管壁的径向触变泥浆压浆孔;所述顶管管节的顶部呈拱形,所述管节的截面四角皆为圆弧倒角结构。
该顶管管节设有两层防水结构;第一层防水结构设置在顶管管节的两端部,顶管管节圆周表面的后端设有预埋钢环槽,预埋钢环槽处连接有承插钢环,承插钢环根部处的管壁上设有与承插钢环紧密配合的止水钢环,预埋钢环槽的端部径向凹陷设有密封胶预留槽;顶管管节圆周表面的前端相邻设有两个台阶槽,两台阶槽由前向后分别是防水设置槽和承插槽,防水设置槽外径小于承插槽外径,防水设置槽内间隔设有防水保护钢圈,防水保护钢圈以外的防水设置槽内设有第一止水条,第一止水条用于与相邻顶管管节的承插钢环紧压配合;承插槽用于与相邻顶管管节上的承插钢环相插接;第二层防水结构包括连接在顶管管节前端的环形软木垫板、顶管管节后端设置的后环形槽以及顶管管节前端设置的前环形槽;环形软木垫板的中部设有垫板环形槽,后环形槽内设有后止水条,前环形槽内设有前止水条,垫板环形槽与所述后止水条和所述前止水条对应设置。
沿隧道的长度方向,所述顶管管节内沿管节的周向设有一圈预应力孔道。
本发明还公开了使用上述大断面机动车隧道土压平衡矩形顶管管节的施工方法。
该方法依次包括如下步骤:第一是运送顶管管节至施工现场;第二是在吊装前将第一止水条粘贴在防水设置槽处,使用密封胶对密封胶预留槽进行密封处理;将软木垫板粘贴在顶进管节的前端侧壁上,将前、后止水条分别粘贴在前环形槽和后环形槽内;第三是吊装管节就位,管节放置方向为承插槽位于顶进后方,承插钢环位于顶进前方;第四是顶进施工;第五是顶进施工完毕后,使用预应力钢绞线穿过预应力孔道张拉固定管节,最后用密封胶对管节径向内侧接缝进行嵌缝处理。
本发明具有如下的优点:
本发明中顶管管节的顶部呈拱形,管节的截面四角皆为圆弧倒角结构,相比以往大大增强了顶管管节的承载性能,从而使顶管管节的尺寸得以加大,进而适应机动车隧道的尺寸要求,尤其适合应用于宽度尺寸大于8米、限高尺寸大于4.5米的各类大断面隧道施工(经过试制和测验的管节断面尺寸实际已达10.1x7.25m)。本发明的两层防水结构中,第一层防水结构设在顶管的外缘处,其具体结构中具有金属部件,将第一层防水结构的使用寿命限制在20-30年。当第一层防水结构损坏后,第二层防水结构将发挥其防水作用。由于第二层防水结构中没有金属部件,依靠止水条实现防水功能,因而其使用寿命在100年以上,能够保证隧道在其设计使用寿命之内都具有良好的防水性能。预应力孔道的设置,便于顶进施工后使用预应力钢绞线穿过预应力孔道张拉固定管节,从而确保隧道在长期承受机动车不均衡动载的情况下保证管节不发生错位现象。另外,本发明的顶管管节结构简单,制造和使用均很方便。本发明提供的施工方法能够高效地利用本发明中的大断面机动车隧道土压平衡矩形顶管管节进行隧道施工,确保利用顶管管节施工而成的机动车隧道具有足够的承载性能、永久防水性能和防管节错位性能。本发明可广泛用于单洞两车道的土压平衡矩形顶管隧道工程施工,对多于两车道工程的施工,可采用增加顶管道数方式实现。
总之,本发明的有益效果是多方面的,本发明为机动车下穿隧道施工采用土压平衡矩形顶管施工新工法提供关键技术支持,开辟了土压平衡顶管法应用的新领域,即能够使土压平衡顶管法运用在机动车隧道建设领域,这在土压平衡顶管施工方法几十年的发展史中具有开拓性的意义,解决了长期以来存在的土压平衡顶管法不能用于机动车隧道施工的技术难题。
本发明提出预应力加强管节连接措施,保证了隧道在长期承受机动车不均衡动荷载条件下管节不发生错位的稳定要求。
附图说明
图1是本发明的结构示意图;
图2是去掉承插钢环后图1的俯视图;
图3是图2中A处的放大图;
图4是图1的A-A截面图;
图5是顶管前后管节接缝处的结构示意图;
图6是图5中B处的放大图。
具体实施方式
本发明中,沿隧道长度方向,以顶管顶进的方向为前向,反之为后向。
如图1至图5所示(图2、图4和图5中箭头所示方向为施工时顶管的前进方向),本发明公开了一种大断面机动车隧道土压平衡矩形顶管管节,所述顶管管节于外壁面中部沿周向间隔设有径向贯通管壁的注浆孔2,所述顶管管节的四个面的中部皆设有两个吊装孔1,所述顶管管节于外壁面前部沿周向间隔设有贯通管壁的径向触变泥浆压浆孔4。触变泥浆压浆孔4用于减少顶进阻力,为现有技术,因此图中未作放大显示。所述顶管管节的顶部呈拱形,所述管节的截面四角21皆为圆弧倒角结构。
本发明的大断面机动车隧道土压平衡矩形顶管管节设有两层防水结构。
如图1至图6所示,第一层防水结构设置在顶管管节的两端部,顶管管节圆周表面的后端设有预埋钢环槽5,预埋钢环槽5处连接有承插钢环8,承插钢环8根部处的管壁上设有与承插钢环8紧密配合的止水钢环9,预埋钢环槽5的端部径向凹陷设有密封胶预留槽10。
如图1至图5所示,顶管管节圆周表面的前端相邻设有两个台阶槽,两台阶槽由前向后分别是防水设置槽7和承插槽6,防水设置槽7的外径小于承插槽6的外径,防水设置槽7内间隔设有防水保护钢圈11,防水保护钢圈11以外的防水设置槽7内设有第一止水条12,第一止水条12用于与相邻顶管管节的承插钢环8紧压配合;承插槽6用于与相邻顶管管节上的承插钢环8相插接。
如图6所示并参考图1至图5,第二层防水结构包括以粘贴的方式连接在顶管管节前端的环形软木垫板15、顶管管节后端设置的后环形槽22以及顶管管节前端设置的前环形槽23。
环形软木垫板15的中部设有垫板环形槽25,后环形槽22内以粘贴的方式设有后止水条13,前环形槽23内以粘贴的方式设有前止水条24,垫板环形槽25与所述后止水条13和所述前止水条24对应设置,使用时前、后止水条24、13相压接并皆位于垫板环形槽25与前、后环形槽23、22所围成的空腔内。
如图1和图2所示,沿隧道的长度方向,所述顶管管节内沿管节的周向设有一圈轴向预应力孔道3。
本发明中顶管管节的具体尺寸可以根据不同隧道的特点予以调整,优选的尺寸是:管节长度1.5m(米),断面外包尺寸为10.10m×7.25m,管节特点为顶部起拱,内外侧角部设置圆倒角,适用覆土深度有水地层介于4.0~8.0m,无水地层介于4.0~10.0m。
本发明的顶管管节配合土压平衡矩形顶管掘进机使用,首先根据管节断面制作模具,绑扎管节钢筋,并将吊装孔1(此处指预先准备好的吊装孔1孔管,以下的注浆孔、预应力孔道3和触变泥浆压浆孔4所指皆为预先准备好的相应管路)、注浆孔、预应力孔道3、触变泥浆压浆孔4、承插钢环8、止水钢环9、防水保护钢圈11在模具上进行固定,其中承插钢环8设置在预埋钢环槽5处;浇注混凝土并养护,达到设计强度后拆除模板。
本发明所公开的大断面机动车隧道土压平衡矩形顶管管节的施工方法依次包括如下步骤:
第一是运送顶管管节至施工现场;
第二是在吊装前将第一止水条12粘贴在防水设置槽7处,使用密封胶对密封胶预留槽10进行密封处理;将软木垫板15粘贴在顶进管节的前端侧壁上,将前、后止水条24、13分别粘贴在前环形槽23和后环形槽22内;
第三是吊装管节就位,管节放置方向为承插槽6位于顶进后方,承插钢环8位于顶进前方;
第四是顶进施工;
第五是顶进施工完毕后使用预应力钢绞线穿过预应力孔道3张拉固定管节,最后用密封胶14对关节径向内侧接缝进行嵌缝处理。

Claims (1)

1.大断面机动车隧道土压平衡矩形顶管管节的施工方法,其特征在于依次包括如下步骤:
第一是运送顶管管节至施工现场;
第二是在吊装前将第一止水条粘贴在防水设置槽处,使用密封胶对密封胶预留槽进行密封处理;将软木垫板粘贴在顶进管节的前端侧壁上,将前、后止水条分别粘贴在前环形槽和后环形槽内;
第三是吊装管节就位,管节放置方向为承插槽位于顶进后方,承插钢环位于顶进前方;
第四是顶进施工;
第五是顶进施工完毕后,使用预应力钢绞线穿过预应力孔道张拉固定管节,最后用密封胶对管节径向内侧接缝进行嵌缝处理;
采用增加顶管道数的方式实现多于两车道工程的施工;
各步骤中所述的顶管管节,以顶管顶进的方向为前向,所述顶管管节于外壁面中部沿周向间隔设有径向贯通管壁的注浆孔,所述顶管管节的四个面的中部皆设有吊装孔,所述顶管管节于外壁面前部沿周向间隔设有贯通管壁的径向触变泥浆压浆孔;所述顶管管节的顶部呈拱形,所述管节的截面四角皆为圆弧倒角结构;
该顶管管节设有两层防水结构;
第一层防水结构设置在顶管管节的两端部,顶管管节圆周表面的后端设有预埋钢环槽,预埋钢环槽处连接有承插钢环,承插钢环根部处的管壁上设有与承插钢环紧密配合的止水钢环,预埋钢环槽的端部径向凹陷设有密封胶预留槽;
顶管管节圆周表面的前端相邻设有两个台阶槽,两台阶槽由前向后分别是防水设置槽和承插槽,防水设置槽外径小于承插槽外径,防水设置槽内间隔设有防水保护钢圈,防水保护钢圈以外的防水设置槽内设有第一止水条,第一止水条用于与相邻顶管管节的承插钢环紧压配合;承插槽用于与相邻顶管管节上的承插钢环相插接;
第二层防水结构包括连接在顶管管节前端的环形软木垫板、顶管管节后端设置的后环形槽以及顶管管节前端设置的前环形槽;
环形软木垫板的中部设有垫板环形槽,后环形槽内设有后止水条,前环形槽内设有前止水条,垫板环形槽与所述后止水条和所述前止水条对应设置;
沿隧道的长度方向,所述顶管管节内沿管节的周向设有一圈预应力孔道。
CN201310030497.7A 2013-01-28 2013-01-28 大断面机动车隧道土压平衡矩形顶管管节及其施工方法 Active CN103061782B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310030497.7A CN103061782B (zh) 2013-01-28 2013-01-28 大断面机动车隧道土压平衡矩形顶管管节及其施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310030497.7A CN103061782B (zh) 2013-01-28 2013-01-28 大断面机动车隧道土压平衡矩形顶管管节及其施工方法

Publications (2)

Publication Number Publication Date
CN103061782A CN103061782A (zh) 2013-04-24
CN103061782B true CN103061782B (zh) 2015-04-15

Family

ID=48104635

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310030497.7A Active CN103061782B (zh) 2013-01-28 2013-01-28 大断面机动车隧道土压平衡矩形顶管管节及其施工方法

Country Status (1)

Country Link
CN (1) CN103061782B (zh)

Families Citing this family (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334384B (zh) * 2013-07-29 2016-03-02 苏交科集团股份有限公司 预制混凝土涵洞组装结构
CN104234721B (zh) * 2014-07-24 2017-02-08 中铁隧道集团有限公司 大断面矩形顶管管节及其对接施工方法
CN104110265A (zh) * 2014-07-24 2014-10-22 中铁隧道集团有限公司 大断面矩形顶管管道的触变泥浆注浆系统
CN104265321B (zh) * 2014-08-06 2016-04-13 上海隧道工程有限公司 超大型全断面矩形顶管掘进施工方法
CN104612720A (zh) * 2014-12-22 2015-05-13 上海市政建设有限公司 矩形顶管的防水结构及顶管顶进施工方法
CN105043884B (zh) * 2015-08-26 2017-11-10 宁波交通工程建设集团有限公司 综合管廊管节承载能力试验装置及使用方法
CN108266205A (zh) * 2018-01-03 2018-07-10 上海市城市建设设计研究总院(集团)有限公司 利用复合管节结构实施非开挖地铁车站的施工方法
CN109372532A (zh) * 2018-12-25 2019-02-22 中建四局第六建筑工程有限公司 复杂地址环境下顶管施工工法
CN109854272B (zh) * 2019-01-31 2023-10-13 中国矿业大学 一种岩体小断面通道的顶管管节
CN109882195A (zh) * 2019-03-27 2019-06-14 浙江大学城市学院 一种装配式大断面矩形顶管管节及施工方法
CN111335919A (zh) * 2020-03-20 2020-06-26 重庆渝高科技产业(集团)股份有限公司 预制管节顶推方法
CN111764438A (zh) * 2020-05-07 2020-10-13 中国一冶集团有限公司 顶管法预制管廊接头缝隙防水结构及方法
CN111910574A (zh) * 2020-07-15 2020-11-10 中亿丰建设集团股份有限公司 河道的矩形顶管施工方法
CN113639097A (zh) * 2021-08-13 2021-11-12 中亿丰建设集团股份有限公司 一种多曲线小半径微扰动管廊顶管施工工法
CN113586090B (zh) * 2021-08-13 2024-03-05 郑州亚欧交通职业学院 一种地铁顶管施工中触变泥浆置换装置
CN114165255A (zh) * 2021-12-03 2022-03-11 中国二十冶集团有限公司 一种矩形管节及其顶管施工方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363320A (zh) * 2007-08-08 2009-02-11 上海市机械施工有限公司 顶盾合一隧道掘进机
CN102042020A (zh) * 2010-12-30 2011-05-04 上海交通大学 防止顶管机与管道下沉的施工装置与施工方法
CN203050736U (zh) * 2013-01-25 2013-07-10 中铁隧道勘测设计院有限公司 大断面机动车隧道防水型土压平衡矩形顶管管节
CN203050729U (zh) * 2013-01-28 2013-07-10 中铁隧道勘测设计院有限公司 大断面机动车隧道土压平衡矩形顶管管节

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4137776B2 (ja) * 2003-12-02 2008-08-20 石川島建材工業株式会社 トンネル覆工用角型鋼管の推進方法およびトンネル覆工用角形鋼管
WO2012098531A1 (en) * 2011-01-21 2012-07-26 Fourie Albert William Francis Tunnelling apparatus and method therefor

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363320A (zh) * 2007-08-08 2009-02-11 上海市机械施工有限公司 顶盾合一隧道掘进机
CN102042020A (zh) * 2010-12-30 2011-05-04 上海交通大学 防止顶管机与管道下沉的施工装置与施工方法
CN203050736U (zh) * 2013-01-25 2013-07-10 中铁隧道勘测设计院有限公司 大断面机动车隧道防水型土压平衡矩形顶管管节
CN203050729U (zh) * 2013-01-28 2013-07-10 中铁隧道勘测设计院有限公司 大断面机动车隧道土压平衡矩形顶管管节

Also Published As

Publication number Publication date
CN103061782A (zh) 2013-04-24

Similar Documents

Publication Publication Date Title
CN103061782B (zh) 大断面机动车隧道土压平衡矩形顶管管节及其施工方法
CN203050729U (zh) 大断面机动车隧道土压平衡矩形顶管管节
CN203583498U (zh) 一种微型桩组合墙支护结构
CN105041337A (zh) 一种地下盾构隧道衬砌管片的接缝拼接结构及防水方法
CN104234721B (zh) 大断面矩形顶管管节及其对接施工方法
CN105240024A (zh) 一种平行盾构法扩建施工地铁车站的方法
CN111395391B (zh) 一种多孔矩形顶管与明暗挖交接管廊接头施工方法
CN102535519A (zh) 地下连续墙工字钢接头结构及其施工方法
CN203050736U (zh) 大断面机动车隧道防水型土压平衡矩形顶管管节
CN105672351A (zh) 扣接式预制带肋钢筋混凝土综合管廊结构施工方法
CN203066987U (zh) 防错位大断面机动车隧道土压平衡矩形顶管管节
CN111576488A (zh) 污水管顶管施工装配式工作井结构及建造工艺
CN105240023A (zh) 一种曲线顶管支护结构扩建盾构施工地铁车站的方法
CN102518129B (zh) 后压浆预应力空心方桩的制作方法
CN110886289A (zh) 一种暗挖工程内转角处地下连续墙结构及施工方法
CN204097891U (zh) 钢筋混凝土预制方形涵洞
CN203530959U (zh) 一种高强度的地下连续墙
CN213776657U (zh) 一种插口端带钢接头的多重密封钢筋混凝土管涵
CN210315657U (zh) 一种整节段预制管廊用钢承插口拼装缝结构
CN105155867A (zh) 一种隧道穿越既有大直径桩建筑物的托换装置
CN205742150U (zh) 高容错性可回收钢桩套接结构
CN204899937U (zh) 一种地下盾构隧道衬砌管片的接缝拼接结构
KR20130030702A (ko) 비개착식 터널형성용 구조물 조립체 및 이의 축조방법
CN204960366U (zh) 一种隧道穿越既有大直径桩建筑物的托换装置
CN209839370U (zh) 一种钢纤维混凝土管

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent for invention or patent application
CB03 Change of inventor or designer information

Inventor after: Zhang Jundai

Inventor after: Zhao Xiuwang

Inventor after: Ma Ning

Inventor after: Peng Lin

Inventor after: Huang Wei

Inventor after: Ni Weiwei

Inventor after: Zhang Zonggang

Inventor after: Zhang Yanling

Inventor after: Zhu Yongshi

Inventor after: Cheng Peng

Inventor after: Yang Chuanyong

Inventor after: Fu Zeng

Inventor before: Zhang Xianfeng

Inventor before: Cheng Peng

Inventor before: Tan Ziyuan

Inventor before: Yang Chuanyong

Inventor before: Fu Zeng

Inventor before: Zhao Xiuwang

Inventor before: Ma Ning

Inventor before: Peng Lin

Inventor before: Lv Jianying

Inventor before: Song Yi

Inventor before: Zhang Jundai

Inventor before: Huang Wei

Inventor before: Ni Weiwei

Inventor before: Yan Wenbo

Inventor before: Zhang Yanling

Inventor before: Zhu Yongshi

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: ZHANG XIANFENG LV JIANYING SONG YI ZHANG JUNDAI HUANG WEI NI WEIWEI YAN WENBO ZHANG YANLING ZHU YONGSHI CHENG PENG TAN ZIYUAN YANG CHUANYONG FU ZENG ZHAO XIUWANG MA NING PENG LIN TO: ZHANG JUNDAI HUANG WEI NI WEIWEI ZHANG ZONGGANG ZHANG YANLING ZHU YONGSHI CHENG PENG YANG CHUANYONG FU ZENG ZHAO XIUWANG MA NING PENG LIN

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180619

Address after: 300000 Tianjin free trade zone (Airport Economic Zone), 2-3116 South Road 88.

Patentee after: CHINA RAILWAY LIUYUAN GROUP CO., LTD.

Address before: 300132 Tianjin Hongqiao District Bridge South East Railway Tunnel hospital

Patentee before: Zhongtie Tunnel Survey and Design Inst., Ltd.