CN205742150U - 高容错性可回收钢桩套接结构 - Google Patents
高容错性可回收钢桩套接结构 Download PDFInfo
- Publication number
- CN205742150U CN205742150U CN201620638588.8U CN201620638588U CN205742150U CN 205742150 U CN205742150 U CN 205742150U CN 201620638588 U CN201620638588 U CN 201620638588U CN 205742150 U CN205742150 U CN 205742150U
- Authority
- CN
- China
- Prior art keywords
- piling bar
- adapter plate
- piling
- recyclable
- fault tolerance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000012943 hotmelt Substances 0.000 claims abstract description 7
- 239000000463 material Substances 0.000 claims description 9
- 239000003351 stiffener Substances 0.000 claims description 9
- 229910000831 Steel Inorganic materials 0.000 claims description 6
- 239000010959 steel Substances 0.000 claims description 6
- 230000013011 mating Effects 0.000 claims description 4
- 241000276425 Xiphophorus maculatus Species 0.000 claims description 3
- 230000000630 rising effect Effects 0.000 claims 1
- 238000004064 recycling Methods 0.000 abstract description 4
- 238000010276 construction Methods 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 239000004570 mortar (masonry) Substances 0.000 description 4
- 238000003466 welding Methods 0.000 description 4
- 239000004567 concrete Substances 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 239000004593 Epoxy Substances 0.000 description 1
- UCKMPCXJQFINFW-UHFFFAOYSA-N Sulphide Chemical compound [S-2] UCKMPCXJQFINFW-UHFFFAOYSA-N 0.000 description 1
- 210000000683 abdominal cavity Anatomy 0.000 description 1
- 239000011083 cement mortar Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000008233 hard water Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000013521 mastic Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620638588.8U CN205742150U (zh) | 2016-06-24 | 2016-06-24 | 高容错性可回收钢桩套接结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620638588.8U CN205742150U (zh) | 2016-06-24 | 2016-06-24 | 高容错性可回收钢桩套接结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN205742150U true CN205742150U (zh) | 2016-11-30 |
Family
ID=57384756
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620638588.8U Active CN205742150U (zh) | 2016-06-24 | 2016-06-24 | 高容错性可回收钢桩套接结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN205742150U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112553992A (zh) * | 2020-12-01 | 2021-03-26 | 谭晓雷 | 高速公路工程的路基土石方加固方法 |
-
2016
- 2016-06-24 CN CN201620638588.8U patent/CN205742150U/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112553992A (zh) * | 2020-12-01 | 2021-03-26 | 谭晓雷 | 高速公路工程的路基土石方加固方法 |
CN112553992B (zh) * | 2020-12-01 | 2022-04-05 | 谭晓雷 | 高速公路工程的路基土石方加固方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103061782B (zh) | 大断面机动车隧道土压平衡矩形顶管管节及其施工方法 | |
US20060185279A1 (en) | Foundations for constructions | |
CN104988915B (zh) | 一种可拆卸钢护筒及水下联系梁的预制安装方法 | |
KR100698878B1 (ko) | 강관 버팀보의 와이형 연결구조 | |
CN104947684B (zh) | 一种基于装配式可回收工艺土钉墙支护的施工方法 | |
KR20140001554A (ko) | 로타리 파일의 강관 연결구조를 이용한 말뚝 시공 방법 | |
CN104234721A (zh) | 大断面矩形顶管管节及其对接施工方法 | |
CN202559375U (zh) | 一种h型钢地下连续墙基坑支护结构 | |
CN103696443A (zh) | 预制拼装式检查井 | |
CN205742150U (zh) | 高容错性可回收钢桩套接结构 | |
CN102518129B (zh) | 后压浆预应力空心方桩的制作方法 | |
CN105605335A (zh) | 一种用于顶进施工的大口径预应力钢筒混凝土管 | |
KR20110016846A (ko) | 견고한 연장수단을 갖는 철골빔 | |
CN102061702A (zh) | 一种带有抗震槽的混凝土预制桩接头 | |
CN106013089A (zh) | 一种高容错性可回收钢桩套接方法 | |
CN110700274A (zh) | 一种机械连接的装配式立柱和立柱桩 | |
JP4798203B2 (ja) | 既設基礎の補強構造および補強方法 | |
CN211735364U (zh) | 预制装配式护壁人工挖孔桩 | |
CN204530666U (zh) | 一种高分子聚合物板桩 | |
CN211547428U (zh) | 一种加肋结构的波纹管 | |
CN111206590A (zh) | 一种可回收、循环使用的装配式型钢冠梁 | |
CN220749304U (zh) | 一种钢筒混凝土顶管 | |
CN204252127U (zh) | 一种装配式桩 | |
CN217840028U (zh) | 桩端后注浆预制斜撑 | |
CN214401813U (zh) | 一种土质基坑钢管桩复合支挡结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20181106 Address after: 200086 502, room 4, Lane 306, Helen Road, Hongkou District, Shanghai. Patentee after: Shanghai Solid Earth Rock Engineering Co., Ltd. Address before: 200086 502, room 4, Lane 306, Helen Road, Hongkou District, Shanghai. Patentee before: Zhang Jihong |
|
EE01 | Entry into force of recordation of patent licensing contract | ||
EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shanghai Tongdi Complete Engineering Co.,Ltd. Assignor: SHANGHAI GEO-ANCHOR CO.,LTD. Contract record no.: X2022310000010 Denomination of utility model: High fault tolerance recyclable steel pile socket structure Granted publication date: 20161130 License type: Common License Record date: 20220307 |