CN103048200A - 管材静液压爆破试验机使用方法 - Google Patents

管材静液压爆破试验机使用方法 Download PDF

Info

Publication number
CN103048200A
CN103048200A CN2012103646346A CN201210364634A CN103048200A CN 103048200 A CN103048200 A CN 103048200A CN 2012103646346 A CN2012103646346 A CN 2012103646346A CN 201210364634 A CN201210364634 A CN 201210364634A CN 103048200 A CN103048200 A CN 103048200A
Authority
CN
China
Prior art keywords
temperature
test machine
tubing
valve
hydrostatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103646346A
Other languages
English (en)
Inventor
陈建军
徐成云
周兆强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
QINGDAO YUTONG PIPELINE CO Ltd
Original Assignee
QINGDAO YUTONG PIPELINE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by QINGDAO YUTONG PIPELINE CO Ltd filed Critical QINGDAO YUTONG PIPELINE CO Ltd
Priority to CN2012103646346A priority Critical patent/CN103048200A/zh
Publication of CN103048200A publication Critical patent/CN103048200A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

本发明公开了一种管材静液压爆破试验机使用方法,它包括以下步骤:A.给设备通电,预热十五分钟,打开主调流阀,同时,关闭主泄流阀、支路泄压阀;B.根据试验标准,设定温控系统的试验温度,进行状态调节;C.试样管材状态调节,状态调节的温度根据试样试验要求设定,保证试样内外温度均匀;D.调节主机上的电接点压力表的上限压力数值、下限压力数值;E.试样管材状态调节达到要求后,打开爆破截止阀、主调流阀,关闭主泄流阀及支路泄压阀;F.设定参数,控制压力、时间,达到指定时间后,泄压,打开管材静液压爆破试验机的外循环式精密恒温介质箱,取下试样管材。该方法简单易懂,将管材静液压爆破试验机进行客观的介绍、科学的解释,了解管材静液压爆破试验机的特性,掌握科学的操作程序。

Description

管材静液压爆破试验机使用方法
技术领域
本发明属于管材检测设备的使用方法,具体涉及一种管材静液压爆破试验机使用方法。
背景技术
目前全国范围内有大量不同规模的生产PE、PVC、PPR等非金属管材的企业,非金属管材在长时间恒定内压和恒定温度下的耐压时间和瞬时破坏的最大压力值,是管材生产厂商及检测机构必须的检测项目。多数操作人员在使用管材静液压爆破试验机检测管材时,没有正确的操作使用管材静液压爆破试验机,使检测数据不精确,影响检测效果,目前暂无完整的管材静液压爆破试验机使用工艺方法供操作人员参考。
发明内容
为了克服现有技术领域存在的上述问题,本发明的目的在于,提供一种管材静液压爆破试验机使用方法,解决目前操作者操作方法有缺陷,没有完整的管材静液压爆破试验机使用方法供操作人员参考的问题,
本发明提供的管材静液压爆破试验机使用方法,它包括以下步骤:
A.给设备通电,预热十五分钟,打开主调流阀,同时,关闭主泄流阀、支路泄压阀;
B.根据试验标准,设定温控系统的试验温度,进行状态调节;
(1)、将被测管装上夹具后放入管材静液压爆破试验机的外循环式精密恒温介质箱中;
(2)、打开管材静液压爆破试验机的外循环式精密恒温介质箱的箱体盖,注去离子水至所需液位;
(3)、接入电源启动管材静液压爆破试验机,循环水泵通电,水路开始循环;
(4)、在控温仪上设定测试温度,电加热器开始对流经循环加热腔中的水加温;
(5)、观察控温仪指示温度值,当到达设定值自动保温;
C.试样管材状态调节,状态调节的温度根据试样试验要求设定,保证试样内外温度均匀;
D.调节主机上的电接点压力表的上限压力数值、下限压力数值;
E.试样管材状态调节达到要求后,打开爆破截止阀、主调流阀,关闭主泄流阀及支路泄压阀;
F.设定参数,控制压力、时间,达到指定时间后,泄压,打开管材静液压爆破试验机的外循环式精密恒温介质箱,取下试样管材。
本发明提供的管材静液压爆破试验机使用方法,其有益效果在于,该方法简单易懂,将管材静液压爆破试验机进行客观的介绍、科学的解释,了解管材静液压爆破试验机的特性,掌握科学的操作程序。
具体实施方式
下面结合实施例,对本发明提供的管材静液压爆破试验机使用方法,进行详细的说明。
实施例
本实施例的管材静液压爆破试验机使用方法,它包括以下步骤:
A.给设备通电,预热十五分钟,打开主调流阀,同时,关闭主泄流阀、支路泄压阀;
B.根据试验标准,设定温控系统的试验温度,进行状态调节;
(1)、将被测管装上夹具后放入管材静液压爆破试验机的外循环式精密恒温介质箱中;
(2)、打开管材静液压爆破试验机的外循环式精密恒温介质箱的箱体盖,注去离子水至所需液位;
(3)、接入电源启动管材静液压爆破试验机,循环水泵通电,水路开始循环;
(4)、在控温仪上设定测试温度,电加热器开始对流经循环加热腔中的水加温;
(5)、观察控温仪指示温度值,当到达设定值自动保温;
C.试样管材状态调节,状态调节的温度根据试样试验要求设定,保证试样内外温度均匀;
D.调节主机上的电接点压力表的上限压力数值、下限压力数值;
E.试样管材状态调节达到要求后,打开爆破截止阀、主调流阀,关闭主泄流阀及支路泄压阀;
F.设定参数,控制压力、时间,达到指定时间后,泄压,打开管材静液压爆破试验机的外循环式精密恒温介质箱,取下试样管材。
现有PE100燃气管试样,做静液压试验,管材试验参数如下:外径:63mm,壁厚:5.8mm,试验温度:80℃,试验时间165h,环应力:5.5Mpa,根据GB/T6111——2003《流体输送用热塑性塑料管材耐内压试验方法》标准规定,试验操场为:给设备通电,预热十五分钟,打开主调流阀,同时,关闭主泄流阀、支路泄压阀,然后接通总电源、主机电源及介质恒温箱电源;将PE100燃气管装上夹具后放入管材静液压爆破试验机的外循环式精密恒温介质箱中;打开管材静液压爆破试验机的外循环式精密恒温介质箱的箱体盖,注去离子水至所需液位;循环水泵通电,水路开始循环;在控温仪上设定测试温度,电加热器开始对流经循环加热腔中的水加温;观察控温仪指示温度值,当到达设定值自动保温;试样管材状态调节,状态调节的温度根据试样试验要求设定,保证试样内外温度均匀;根据GB/T6111-2003标准进行试验压力计算,压力参数设定,设定值1.115,升压值0.669,上限1.137,下限1.104,调节主机上的电接点压力表的上限压力数值、下限压力数值;试样管材状态调节达到要求后,打开爆破截止阀、主调流阀,关闭主泄流阀及支路泄压阀;设定参数,控制压力、时间,达到指定时间后,当试验压力超过设定压力值的上限+2%时,泄压阀开始工作,由于试样管材在试验过程中,会出现蠕变膨胀或微小渗透,当试验压力值低于设定压力值下限时的-1%时,慢速补压阀又从开始补牙工作,使试验压力值始终保持在设定值的加减1%之内,直到试验完成,该路自动停止;打开管材静液压爆破试验机的外循环式精密恒温介质箱,取下试样管材。
该方法简单易懂,将管材静液压爆破试验机进行客观的介绍、科学的解释,了解管材静液压爆破试验机的特性,掌握科学的操作程序。

Claims (1)

1.一种管材静液压爆破试验机使用方法,其特征在于:它包括以下步骤:
A.给设备通电,预热十五分钟,打开主调流阀,同时,关闭主泄流阀、支路泄压阀;
B.根据试验标准,设定温控系统的试验温度,进行状态调节;
(1)、将被测管装上夹具后放入管材静液压爆破试验机的外循环式精密恒温介质箱中;
(2)、打开管材静液压爆破试验机的外循环式精密恒温介质箱的箱体盖,注去离子水至所需液位;
(3)、接入电源启动管材静液压爆破试验机,循环水泵通电,水路开始循环;
(4)、在控温仪上设定测试温度,电加热器开始对流经循环加热腔中的水加温;
(5)、观察控温仪指示温度值,当到达设定值自动保温;
C.试样管材状态调节,状态调节的温度根据试样试验要求设定,保证试样内外温度均匀;
D.调节主机上的电接点压力表的上限压力数值、下限压力数值;
E.试样管材状态调节达到要求后,打开爆破截止阀、主调流阀,关闭主泄流阀及支路泄压阀;
F.设定参数,控制压力、时间,达到指定时间后,泄压,打开管材静液压爆破试验机的外循环式精密恒温介质箱,取下试样管材。
CN2012103646346A 2012-09-18 2012-09-18 管材静液压爆破试验机使用方法 Pending CN103048200A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103646346A CN103048200A (zh) 2012-09-18 2012-09-18 管材静液压爆破试验机使用方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103646346A CN103048200A (zh) 2012-09-18 2012-09-18 管材静液压爆破试验机使用方法

Publications (1)

Publication Number Publication Date
CN103048200A true CN103048200A (zh) 2013-04-17

Family

ID=48060922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103646346A Pending CN103048200A (zh) 2012-09-18 2012-09-18 管材静液压爆破试验机使用方法

Country Status (1)

Country Link
CN (1) CN103048200A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110568888A (zh) * 2019-09-25 2019-12-13 核动力运行研究所 管材高温爆破压力控制系统及方法
CN113295543A (zh) * 2021-06-25 2021-08-24 临海伟星新型建材有限公司 一种管道高温爆破试验设备及方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2150552Y (zh) * 1993-04-08 1993-12-22 化学工业部北京化工研究院 塑料管材内压蠕变试验装置
JP2000046710A (ja) * 1998-07-29 2000-02-18 Toshiba Plant Kensetsu Co Ltd 水圧試験用水の加温方法
CN2457592Y (zh) * 2000-12-25 2001-10-31 李新柏 全自动塑料管耐压试验机
CN2849700Y (zh) * 2005-12-23 2006-12-20 天津市精研工程机械传动有限公司 新型液压软管总成静压爆破试验台
CN102645376A (zh) * 2012-05-07 2012-08-22 王永旺 一种油管爆破试验装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2150552Y (zh) * 1993-04-08 1993-12-22 化学工业部北京化工研究院 塑料管材内压蠕变试验装置
JP2000046710A (ja) * 1998-07-29 2000-02-18 Toshiba Plant Kensetsu Co Ltd 水圧試験用水の加温方法
CN2457592Y (zh) * 2000-12-25 2001-10-31 李新柏 全自动塑料管耐压试验机
CN2849700Y (zh) * 2005-12-23 2006-12-20 天津市精研工程机械传动有限公司 新型液压软管总成静压爆破试验台
CN102645376A (zh) * 2012-05-07 2012-08-22 王永旺 一种油管爆破试验装置

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
XXX实业有限公司: "管材静液压爆破试验机操作规程", 《豆丁网,HTTP://WWW.DOCIN.COM/P-327855273.HTML》 *
中华人民共和国国家质量监督检验检疫总局: "《GB/T 6111-2003 中华人民共和国国家标准》", 5 March 2003 *
田江晓 等: "自动管材耐压爆破试验机的设计研究", 《机床与液压》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110568888A (zh) * 2019-09-25 2019-12-13 核动力运行研究所 管材高温爆破压力控制系统及方法
CN113295543A (zh) * 2021-06-25 2021-08-24 临海伟星新型建材有限公司 一种管道高温爆破试验设备及方法
CN113295543B (zh) * 2021-06-25 2023-04-11 临海伟星新型建材有限公司 一种管道高温爆破试验设备及方法

Similar Documents

Publication Publication Date Title
CN104048912B (zh) 电力变压器绝缘纸老化试验装置及方法
CN105953989B (zh) 用于功率模块水冷板测试的水冷试验台
KR101015438B1 (ko) 로카테스트 시스템
CN106482349A (zh) 一种燃气热水器二次压智能调节方法及系统
CN203756305U (zh) 一种发动机冷却水恒温装置
CN202595200U (zh) 双壁式具有升降温功能的涂液储存槽
CN103048200A (zh) 管材静液压爆破试验机使用方法
CN207396273U (zh) 一种测定多类型井筒中硫沉积影响因素的实验装置
CN206292236U (zh) 多功能岩心驱替实验装置
CN205280547U (zh) 海底电缆透水试验用试验装置
CN104503509A (zh) 一种感应炉水温恒定自动控制系统及方法
CN102039208A (zh) 一种外循环式精密恒温介质箱及其使用方法
CN213986129U (zh) 一种核岛设备冷却水系统材料腐蚀模拟装置
CN103308212B (zh) 一种即热式热水器用温度测试系统
CN204788957U (zh) 发动机水压力实验台架循环水快速升温的水系统
CN205237029U (zh) 一种铸造模具温度控制装置
RU2019116711A (ru) Установка и способ изготовления песчаного стержня
CN204178253U (zh) 一种胶囊自动生产线控制系统
CN203178167U (zh) 管道补口防腐层耐热水浸泡加速试验装置
CN209304918U (zh) 热流道自动循环测试系统
CN208997703U (zh) 钢制环氧套筒一体化灌注系统
CN103048201A (zh) 管材静液压爆破试验机
CN203653985U (zh) 一种染色机温度控制系统
RU131078U1 (ru) Стенд для исследования условий подъема жидкости с использованием газа
CN207438900U (zh) 一种塑胶制品加工的导油加热装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20130417

RJ01 Rejection of invention patent application after publication